Custom Daily Work (DPR) Report

TINGS &
TOLL
HIGHWA
01/04/202
2 To
Date :
TEMAGA
V
Group /
Task :
ALL

SrNo. Date Task Task Unit

1 2/4/2022 Geogrid below levelling Pad SQM


2 6/4/2022 Levelling Pad CuM
3 7/4/2022 Levelling Pad CuM
4 8/4/2022 Levelling Pad CuM
5 8/4/2022 Levelling Pad CuM
6 9/4/2022 Levelling Pad CuM
7 10/4/2022 Geotextile below Levelling Pad SQM
8 11/4/2022 Levelling Pad CuM
9 11/4/2022 Geogrid below levelling Pad SQM
10 13/04/2022 Levelling Pad CuM
11 13/04/2022 Levelling Pad CuM
12 14/04/2022 Geogrid below levelling Pad SQM
13 15/04/2022 Geogrid below levelling Pad SQM
14 16/04/2022 Levelling Pad CuM
15 16/04/2022 Levelling Pad CuM
16 17/04/2022 Levelling Pad CuM
17 19/04/2022 RE Wall Panel Erection SQM
18 19/04/2022 RE Wall Panel Erection SQM
19 19/04/2022 RE Wall Panel Erection SQM
20 19/04/2022 Geogrid below levelling Pad SQM
21 19/04/2022 Geotextile below Levelling Pad SQM
22 20/04/2022 Levelling Pad CuM
23 20/04/2022 RE Wall Panel Erection SQM
24 20/04/2022 RE Wall Panel Erection SQM
25 20/04/2022 RE Wall Panel Erection SQM
26 21/04/2022 Geogrid below levelling Pad SQM
27 21/04/2022 Geogrid below levelling Pad SQM
28 22/04/2022 RE Wall Panel Erection SQM
29 25/04/2022 RE Wall Panel Erection SQM
30 25/04/2022 RE Wall Panel Erection SQM
31 25/04/2022 Geogrid below levelling Pad SQM
32 25/04/2022 Geogrid below levelling Pad SQM
33 26/04/2022 RE Wall Panel Erection SQM

34 28/04/2022 Levelling Pad CuM

35 29/04/2022 Geotextile below Levelling Pad SQM


36 29/04/2022 Geogrid below levelling Pad SQM
37 30/04/2022 RE Wall Panel Erection SQM
38 30/04/2022 RE Wall Panel Erection SQM
Total
) Report

Chainage Chainage
Daily Work DPR Qty. Road Side Nos.
From To
Geogrid below lavel pad 1100 RHS 27035 27160 1
Pcc work m15 for lavel pad 7.8 LHS 27085 27150 1
Pcc for lavel pad 4.8 LHS 27045 27085 1
Pcc work for lavel pad 1.8 LHS 27030 27045 1
Pcc work for lavel pad 2.76 RHS 27128 27151 1
Pcc for lavel pad 4.56 RHS 27090 27128 1
Geotextile laying below lavel ped 264 LHS 27190 27212 1
Pcc work for lavel pad 4.56 RHS 27052 27090 1
Geogrid laying below lavel pad 280 LHS 27190 27212 1
Pcc work for leval pad 2.64 RHS 27030 27052 1
Pcc for leval pad 0.72 RHS 27150 27156 1
Geogrid below leval pad 80 RHS 27180 27190 1
Geogrid laying below leval pad 160 RHS 27210 27230 1
Pcc for leval pad 2.76 LHS 27182 27205 1
Pcc for level pad Tepard portion 1.08 LHS 27205 27212 1
Pcc work for lavel pad 3.06 LHS 27150 27175 1
2NOS SGP & 2NOS SGP4 10.618 LHS 17057 17065 4
1NOS BGH & 3NOS BGH2 5.376 LHS 17057 17065 4
1NOS Corner Panel 1.264 LHS 17059 17060 1
Geogrid SGB 100 225 RHS 17930 17955 1
Geotextile laying below lavel pad 856 RHS 27438 27545 1
Pcc work for lavel pad 2.88 RHS 27156 27180 1
Corner penal 1.264 LHS 27205 27205 1
2 nos BGH 2 2.688 LHS 27205 27212 2
3 nos SGP 4 7.963 LHS 27205 27212 3
1 trip embankment material stock at 17 030 270 RHS 16995 16925 1
Geogrid laying below BOL 297.5 RHS 16960 16995 1
SGP Panel 4th Lift 31.853 RHS 18235 18276 12
SGP4 7.963 RHS 18276 18283 3
SGP 45.125 RHS 18180 18235 17
Geogrid laying below lavel pad 120 RHS 27195 27210 1
Geogrid laying below lavel pad 440 RHS 27495 27550 1
SGP Panel 34.507 RHS 18140 18180 13

PCC work for Panel Erection by M15 Concrete 4.5 Cum 4.44 RHS 17943 17980 1

Geotextile laying into LR 120 RHS 27423 27438 1


Geogrid laying below laveling pad 320 RHS 27455 27495 1
11 nos SGP 29.198 LHS 27165 27205 11
12 nos BGH 16.128 LHS 27165 27205 12
4770.307
Length Breadth Depth

125 8.8 0
65 0.6 0.2
40 0.6 0.2
15 0.6 0.2
23 0.6 0.2
38 0.6 0.2
33 8 0
38 0.6 0.2
35 8 0
22 0.6 0.2
6 0.6 0.2
10 8 0
20 8 0
23 0.6 0.2
9 0.6 0.2
25.5 0.6 0.2
1.58 1.68 0
0.8 1.68 0
1.58 0.8 0
25 9 0
107 8 0
24 0.6 0.2
0.8 0 1.58
1.68 0 0.8
1.68 0 1.58
30 9 0
35 8.5 0
1.68 1.58 0
1.58 1.68 0
1.58 1.68 0
15 8 0
55 8 0
1.58 1.68 0

37 0.6 0.2

15 8 0
40 8 0
1.68 0 1.58
1.68 0 0.8
Four Laning of
Vill- Gulariatar,Post-Nawagarh
Dist-Lateher, Jharkhand
Pin - 829207
Harda to Mob.-6204627029

Teamagaon
GSTIN 09FSUPS1844B1Z9 PAN - FSUPS1844B
section (HardaCONTRACTOR -
REINFORCED SOIL WALL
NAME
Betul Pkg-1)
MEASURMENT SHEET RA NH- B
Bill Peroid 01-03-2022 To 31-03-2022
47(Old
Bill To Prakash NH-59A)
Asphltings & Toll Highway India LTD.

from Design Ch.


Add. Harda Teamagaon Project Gram-Behragaon,Sodalpur Distt
HARDA
GSTIN - 23AABCP0398N1Z6

0.000 To Design
STATE - MADHYA PRADESH
Bill Date 31/3/2022

Ch. 30.000
CONTRACTOR NAME
Bill Peroid
SUJIT KUMAR SINGH
01-03-2022 To 31-03-2022
(Length - 30.00RATE AS
Sl.No. ITEM PER WORK UNIT QTY. Amount
Km) under ORDER

Bharatmala
1
Geotextile below Levelling
Pad
10 SQM 1240 12400

Pariyojana
2 Drainage Bay Filter Phase
media 2 - RMT 0 0

1 3(Economic
Geogrid below levelling
10 SQM 3292.5 32925
Pad
Corridor) in the
state
4
of Madhya350 CUM 43.86
Levelling Pad(M-15) 15351

Pradesh
5 RE Wall Panelon HAM130 SQM 193.947
Erection 25213.11

Mode Total Amount 85889.1


CGST -
SGST -
IGST 18% 15460.0
Round off (-)0.8

NET Amount Payble 101348.3


tar,Post-Nawagarh