BUILTUP AREA STATEMENT

Project: - BLUEWOOD DATE


YASHADA REALTY GROUP
Bldg: - A Building 20/5/2016
Top
2nd 3rd 4th 5th 6th 7th OHWT &
Sr. No DESCRIPTION UNIT PARKING 1ST SLAB Terrace
SLAB SLAB SLAB SLAB SLAB SLAB LMR
Slab
2nd 3rd 4th 5th 6th 7th
1ST FLOOR
FLOOR FLOOR FLOOR FLOOR FLOOR FLOOR
Clear Slab Area
A sq.m. 212.81 509.38 494.2 512.89 477.28 512.89 477.28 512.89 135 0.00
(Including Walls)

DUCT Deductions 59.04 40.81 78.02 40.81 78.02 40.81 78.02 0.00 0.00
Duct 01 sq.m 8.00 3.42 8.00 3.42 8.00 3.42 8.00
Duct 02 sq.m 2.19 8.00 2.19 8.00 2.19 8.00 2.19
Duct 03 sq.m 2.19 2.19 8.00 2.19 8.00 2.19 8.00
Duct 04 sq.m 4.00 2.19 2.19 2.19 2.19 2.19 2.19
Duct 05 sq.m 4.00 0.30 2.19 0.30 2.19 0.30 2.19
Duct 06 sq.m 3.78 8.70 4.50 0.60 4.50 0.60 4.50
Duct 07 sq.m 0.30 1.88 4.50 2.19 4.50 2.19 4.50
Duct 08 sq.m 0.60 0.30 4.24 8.70 4.24 8.70 4.24
Duct 09 sq.m 8.70 0.60 0.30 1.88 0.30 1.88 0.30
Duct 10 sq.m 1.87 2.19 0.60 0.30 0.60 0.30 0.60
Duct 11 sq.m 0.30 2.19 2.19 2.19 2.19 2.19 2.19
Duct 12 sq.m 4.00 2.19 8.70 2.19 8.70 2.19 8.70
Duct 13 sq.m 4.00 1.87 1.87 1.87
Duct 14 sq.m 2.19 0.30 0.30 0.30
2.19 4.50 4.50 4.50
2.1 4.50 4.50 4.50
1.97 2.19 2.19 2.19
2.19 2.19 2.19
8.21 8.21 8.21
Lift1 3.33 3.33 3.33 3.33 3.33 3.33 3.33
Lift2 3.33 3.33 3.33 3.33 3.33 3.33 3.33

terrace area
6.62 3.85 6.80 3.85 6.80 3.85 6.80
6.62 3.85 6.80 3.85 6.80 3.85 6.80
2.04 2.04 2.04 2.04 2.04 2.04 2.04
2.04 2.04 2.04 2.04 2.04 2.04 2.04
4.00 3.86 4.00 3.86 4.00 3.86 4.00
4.00 3.86 4.00 3.86 4.00 3.86 4.00
3.62 3.62 3.62 3.62 3.62 3.62 3.62
2.04 2.04 2.04 2.04 2.04 2.04 2.04
6.67 2.29 6.67 3.86 6.67 3.86 6.67
3.86 4.00 3.86 3.86 3.86 3.86 3.86
3.86 4.25 3.86 2.04 3.86 2.04 3.86
2.04 2.32 2.04 2.04 2.04 2.04 2.04
2.04 3.86 2.04 2.04 2.04
3.86
2.04
2.04
area deduction after
49 50 50 37 50 37 50 0 0
d. ht terrace

50% Terrace Area 24.725 24.91 24.91 18.48 24.90 18.48 24.90

Net Area for work


Sq.mt. 213 426 428 410 418 410 418 410 135 0
order
SQFT 2290 4580 4610 4411 4498 4411 4498 4411 1456 0
Grand Total SQFT 35164

Notes : - 1) Slab Area Excluding Terraces 100%


2) Terrace Area Considered 50%
3) Parking 50%
4) Top terrace 33%
5)All duct deduction
Gagan Platinum Space LLP
15/B, 2nd floor, Above BMW showroom, Beside Lal Deval, Camp, Modi Colony, Pune, Maharashtra 411001

WORK ORDER
Work Order
GPS/GCC/06 Date 19-Nov-2018
No. :

Contractor Details : Project Address :


Name Of Firm : Kapil Sons Gagan Commerce Centre
Contact Person : Mr. Kapil Baheti Mr. Prasad Dhumal
47/11 United Apartment Taware Colony, 262 Bund Garden Road
Address : near Surbhi Mangal Karyalay, Pune-
411009 Pune 411001
Contact No. : 9765311111 7391070206
GST No. : 27AAXPB6707C2ZO GST No : 27AAQFG3861R1ZG
PAN Card No. : AAXPB6707C PAN Card No : AAQFG3861R
TYPE OF
Earth Moving
CONTRACT :
WORK DETAILS Excavation Work
:
I ) Strictly Follow General Instruction As Per Attached Sheet.
NOTE :
II) Pay Schedule Will Be As Per Below Mentioned.
Sr No. Work Description & Specification Quantity Rate Unit Total
Top to Bottom rock with breaking or
1 blasting upto 15m depth and transporting 32,214.00 475.00 Cum 15301650
it outside the site

Top to Bottom soft with breaking and


2 transporting it outside the site 5,000.00 165.00 Cum 825000

TOTAL 16126650

GRAND TOTAL IN
WORDS One Crore Sixty One Lakhs Twenty Six Thousand Six Hundred Fifty Only.

TYPE OF
CONTRACT Earth Moving

Mode Of
Measurement As per Annexture

Payment Schedule As per Attached sheet

2) TDS will be deducted as per norms


3) GST Extra .
4) No Advance Demands & No Advance Billing.

Contractor Estimation Head Project Manager


Annexure A
Terms & Conditions
i) GST paid Extra as per Govt Rule TDS Duduction as Govt Rule.
ii) 10 % retention will be kept & release after 6 month of work completion
iii) Penalty of 5% of the work order amount per week for delay in completion.

iv)
Safety & labours accommodation is vendor responsibility.Safety Equipments & instalation
in scope of contractor
v) In case of accident,injury of any nature Gagan Platinum Space LLP will not be
responsible for any such incidents, the sole liability of any accident shall be responsibility
of Contractor.
vi) Arbitration subject to pune jurisdiction.
vii) TDS & allied taxes shall be deducted wherever applicable as per government norms.
viii)
The contractor shall follow all the safety norms laid by government ( i.e safety
belts,helments,etc) ,
as necessary on site and indemnify Gagan Platinum Space LLP for any issues arising from
the same.

ix)
The work shall be carried out as per drawings,specifications as per relevant IS codes &
instruction of
the Engineer-in-charge along with all required Plywood , Steeel materials,manpower with
tools & tackles,
machinary etc.complete.
x) All labour's ESI ,PF, etc as per statutory requirement.

xi)
All rights of termination of work order at any stage without giving any reason whatsoever
reserved with
Gagan Platinum Space LLP
xii) No price escalation is applicable for the said work order.

xiii)
If any changes required in any terms of work order to be intimated within 24 hrs from
received of work order, after which it shall be understood that you have
accepted the terms & conditions of the work order .Work order terms & conditions shall
be binding upon you. 0

xiv) All local political and obstacles from local civilians should be handled by contractor.
xv) Any RTO or legal issue will be taken care by contractor
xvi) Royalty Charges & Dewatering in Builder Scope
xvii) After work completion contracor should be clean ramp and loose Material.
xviii) Excavation qty for ramp other than excavated block will not be considered in qty.
xix) The above mentioned work to be completed in 60days from the date of starting of
work, if vendor is not able to complete the work in specified time limit he is debited
Rs 2Lakhs per day from his bill & if completed early then Rs 2Lakhs per day bonus
will be given
1) 10 % retention will be kept & release after 6 month of work completion
2) TDS will be deducted as per norms
Terms & 3) GST Extra if applicable .
Conditions
4) No Advance Demands & No Advance Billing.
5) Every 30 days Payment should be realesed as per actual work &
mutually agreed terms & Conditions
Contractor Estimation Head Project Manager
BUILTUP AREA STATEMENT
Project: - BLUEWOOD DATE
YASHADA REALTY GROUP
Bldg: - A Building 20/5/2016
Top
2nd 3rd 4th 5th 6th 7th OHWT &
Sr. No DESCRIPTION UNIT PARKING 1ST SLAB Terrace
SLAB SLAB SLAB SLAB SLAB SLAB LMR
Slab
2nd 3rd 4th 5th 6th 7th
1ST FLOOR
FLOOR FLOOR FLOOR FLOOR FLOOR FLOOR
Clear Slab Area
A sq.m. 509.38 494.2 512.89 477.28 512.89 477.28 512.89 0.00
(Including Walls)

DUCT Deductions 59.04 40.81 78.02 40.81 78.02 40.81 78.02 0.00 0.00
Duct 01 sq.m 8.00 3.42 8.00 3.42 8.00 3.42 8.00
Duct 02 sq.m 2.19 8.00 2.19 8.00 2.19 8.00 2.19
Duct 03 sq.m 2.19 2.19 8.00 2.19 8.00 2.19 8.00
Duct 04 sq.m 4.00 2.19 2.19 2.19 2.19 2.19 2.19
Duct 05 sq.m 4.00 0.30 2.19 0.30 2.19 0.30 2.19
Duct 06 sq.m 3.78 8.70 4.50 0.60 4.50 0.60 4.50
Duct 07 sq.m 0.30 1.88 4.50 2.19 4.50 2.19 4.50
Duct 08 sq.m 0.60 0.30 4.24 8.70 4.24 8.70 4.24
Duct 09 sq.m 8.70 0.60 0.30 1.88 0.30 1.88 0.30
Duct 10 sq.m 1.87 2.19 0.60 0.30 0.60 0.30 0.60
Duct 11 sq.m 0.30 2.19 2.19 2.19 2.19 2.19 2.19
Duct 12 sq.m 4.00 2.19 8.70 2.19 8.70 2.19 8.70
Duct 13 sq.m 4.00 1.87 1.87 1.87
Duct 14 sq.m 2.19 0.30 0.30 0.30
2.19 4.50 4.50 4.50
2.1 4.50 4.50 4.50
1.97 2.19 2.19 2.19
2.19 2.19 2.19
8.21 8.21 8.21
Lift1 3.33 3.33 3.33 3.33 3.33 3.33 3.33
Lift2 3.33 3.33 3.33 3.33 3.33 3.33 3.33

terrace area
6.62 3.85 6.80 3.85 6.80 3.85 6.80
6.62 3.85 6.80 3.85 6.80 3.85 6.80
2.04 2.04 2.04 2.04 2.04 2.04 2.04
2.04 2.04 2.04 2.04 2.04 2.04 2.04
4.00 3.86 4.00 3.86 4.00 3.86 4.00
4.00 3.86 4.00 3.86 4.00 3.86 4.00
3.62 3.62 3.62 3.62 3.62 3.62 3.62
2.04 2.04 2.04 2.04 2.04 2.04 2.04
6.67 2.29 6.67 3.86 6.67 3.86 6.67
3.86 4.00 3.86 3.86 3.86 3.86 3.86
3.86 4.25 3.86 2.04 3.86 2.04 3.86
2.04 2.32 2.04 2.04 2.04 2.04 2.04
2.04 3.86 2.04 2.04 2.04
3.86
2.04
2.04
area deduction after
49 50 50 37 50 37 50 0 0
d. ht terrace

50% Terrace Area 24.725 24.91 24.91 18.48 24.90 18.48 24.90

Net Area for work


Sq.mt. 0 426 428 410 418 410 418 410 0 0
order
SQFT 0 4580 4610 4411 4498 4411 4498 4411 0 0
Grand Total SQFT 31419

Notes : - 1) Slab Area Excluding Terraces 100%


2) Terrace Area Considered 50%
3) Parking 50%
4) Top terrace 33%
5)All duct deduction