KOZHIKODE CITY ROAD IMPROVEMENT PROJECT

Client: :KERALA ROAD FUND BOARD


Concessionaire: :UCCIDP
Independent Engineer: :SCPL-ICES JV

MARSHALL TEST FOR BC


As per ASTM D1559
Effective Sp. Gr. of total Agg.(Gse) 2.808 Grade of bitumen VG 30 Date of sampling 4/29/2017
Bulk Sp. Gr. of total Agg.(Gsb) 2.562 Proving ring factor 0.03942 Date of testing 5/15/2017
Specific Gravity of bitumen 1.033 No.of blows, each side 75 Location C1 0+050 - 0+580 BHS

Sample % Bitumen % Aggregate Wt. of specimen (gm) Bulk Sp. Gr. of % Air voids % VMA %VFB Stability(kgf) Flow
Volume of
No. by total wt. by total wt. Gmm Thickness In air In water SSD Specimen (C - compacted mix (Va) 100-{(7x3)/Gsb} {(9-8)/9}100 Volumetric (mm)
B) Dial Gauge Correction Corrected
Load (KN)
of mix of mix mm (A) (B) (C) (A)/(6) {(4-7)/4}100 Reading Factor(As per table Load
5.1 of MS-2)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)

1 59.00 1203.6 718.1 1204.4 486 2.475 3.66 8.61 57.5 350 13.80 1.131 15.60 2.30

2 60.67 1206.2 720.4 1207.3 487 2.477 3.57 8.53 58.1 315 12.42 1.078 13.39 4.30

60.67 1202.0 714.9 1202.4 488 2.466 4.02 8.96 55.1 300 11.83 1.078 12.75 2.40
5.40 94.60 2.569
60.33 1199.3 712.4 1199.5 487 2.462 4.16 9.09 54.2 310 12.22 1.089 13.31 3.30

60.67 1202.0 711.8 1202.9 491 2.448 4.73 9.63 50.9 305 12.02 1.078 12.96 4.50

3 60.33 1203.1 717.6 1204.3 487 2.472 3.78 8.72 56.7 325 12.81 1.089 13.95 3.40

Avg 60.28 2.467 3.99 8.92 55.43 Average 13.66 3.37

For UCCIDP For Independent Engineer

Name :_____________________ Name :__________________

Sign.:______________________ Sign.:___________________
Date:_______________________ Date:___________________