PREPARATION:
BRIDGE: Plug-in the remote control console and test monitors and point on safe desired
position. Inform Engineer's which unit to operate first.
ENGINE ROOM:
STARTING: Fi-Fi operation should be done in engine room for safety purposes.
NOTE: When first unit reach the rated speed, transfer the power to other shaft geny or
auxiliary geny. Repeat the STARTING sequence to the next unit.
STOPPING:
ENGINE ROOM:
• Drain the water to the pipe line, monitors and close all valves.
PACIFIC PARAKEET
Note: Keep F.W valve open when pump is running for lubrication and cooling of the
pump.
STOPPING OPERATION
• Before stopping, open sea water supply valve and close the valve on bilge suction.
• Run the pump at least 10- 15 minutes to flush the system.
• Stop the pump
• Close all valves at the pump and valve chest.
PACIFIC PARAKEET
Note: The suction pipe starboard is branch to Bilge Pump, need to open
both suction valve of the bilge pump.
LOCATION: Located at cement room portside aft underneath stair going up to upper
cement room.