This document provides a cost estimate for construction of a pump house for STW No. 11 Kg village in Paili block. It lists 14 line items with descriptions of work, units, quantities, rates, and amounts. However, all the calculated amounts appear faulty as they show the expression "** Expression is faulty **". So while the intent is to provide a cost estimate, the actual amounts calculated cannot be determined from this document due to the faulty expressions.
This document provides a cost estimate for construction of a pump house for STW No. 11 Kg village in Paili block. It lists 14 line items with descriptions of work, units, quantities, rates, and amounts. However, all the calculated amounts appear faulty as they show the expression "** Expression is faulty **". So while the intent is to provide a cost estimate, the actual amounts calculated cannot be determined from this document due to the faulty expressions.
This document provides a cost estimate for construction of a pump house for STW No. 11 Kg village in Paili block. It lists 14 line items with descriptions of work, units, quantities, rates, and amounts. However, all the calculated amounts appear faulty as they show the expression "** Expression is faulty **". So while the intent is to provide a cost estimate, the actual amounts calculated cannot be determined from this document due to the faulty expressions.
S.No. Description of Work Unit Qty Rate(Rs.) Amount(Rs.)
1 E/W in digging foundation m3 11.00 111.00 ** Expression
is faulty **.0 0 2 C.C. in 1:4:8 cm with brick ballast m3 2.40 6312.00 ** Expression is faulty **0 3 C.C. in 1:2:4 cm with stone grit m3 0.16 9426.00 ** Expression is faulty ** 4 C.C. in 1:3:6 cm m3 0.70 11475.00 ** Expression is faulty **0 5 1st class brick work 1:4 cm in 23 cm section m3 11.00 6358.00 ** Expression is faulty **.0 0 6 1st class brick work 1:4 cm in 11 cm section m3 1.20 6173.00 ** Expression is faulty **0 7 R.B. work 1:3 cm m3 1.45 7904.00 ** Expression is faulty **0 8 Centering & shuttering for R.C.C. Work m3 2.00 630.00 ** Expression is faulty **.0 0 9 Centering & shuttering for R.B. Work m3 8.00 260.00 ** Expression is faulty **.0 0 10 Cement plaster 1:4 cm in 12 mm thick m3 50.00 220.00 ** Expression is faulty **.0 0 11 Cement pointing 1:2 cm (struck deep) m3 35.00 146.00 ** Expression is faulty **.0 0 12 M.S. bar Kg 75.00 70.00 ** Expression is faulty **.0 0 13 White washing two coat of TW P/H including Job 1 1500.00 ** Expression cost of material is faulty **.0 0 14 Drip course Mtr 15.00 11.00 ** Expression is faulty **.0 0 15 Steel door 1980*1070 mm Nos 1 10472.00 ** Expression is faulty **.0 0 16 Steel ventilator 450*300 mm Nos 2 719.00 ** Expression is faulty **.0