Abstract of cost of Pump House of STW No.

11 Kg, Village – Paili, Block – Semariyawa


Under Plan Head – 1101 R&R TWP – 2021-2022

S.No. Description of Work Unit Qty Rate(Rs.) Amount(Rs.)

1 E/W in digging foundation m3 11.00 111.00 ** Expression


is faulty **.0
0
2 C.C. in 1:4:8 cm with brick ballast m3 2.40 6312.00 ** Expression
is faulty **0
3 C.C. in 1:2:4 cm with stone grit m3 0.16 9426.00 ** Expression
is faulty **
4 C.C. in 1:3:6 cm m3 0.70 11475.00 ** Expression
is faulty **0
5 1st class brick work 1:4 cm in 23 cm section m3 11.00 6358.00 ** Expression
is faulty **.0
0
6 1st class brick work 1:4 cm in 11 cm section m3 1.20 6173.00 ** Expression
is faulty **0
7 R.B. work 1:3 cm m3 1.45 7904.00 ** Expression
is faulty **0
8 Centering & shuttering for R.C.C. Work m3 2.00 630.00 ** Expression
is faulty **.0
0
9 Centering & shuttering for R.B. Work m3 8.00 260.00 ** Expression
is faulty **.0
0
10 Cement plaster 1:4 cm in 12 mm thick m3 50.00 220.00 ** Expression
is faulty **.0
0
11 Cement pointing 1:2 cm (struck deep) m3 35.00 146.00 ** Expression
is faulty **.0
0
12 M.S. bar Kg 75.00 70.00 ** Expression
is faulty **.0
0
13 White washing two coat of TW P/H including Job 1 1500.00 ** Expression
cost of material is faulty **.0
0
14 Drip course Mtr 15.00 11.00 ** Expression
is faulty **.0
0
15 Steel door 1980*1070 mm Nos 1 10472.00 ** Expression
is faulty **.0
0
16 Steel ventilator 450*300 mm Nos 2 719.00 ** Expression
is faulty **.0