Professional Documents
Culture Documents
1 2 3 4 5 6
6
ELEVATION
FE FE
B FHC
C
5 FIRE HOSE CABINET DETAIL FOURTH FLOOR LINE
4 5 6
1 2 3 4 5 6
THIRD FLOOR LINE
FE
FHC
A
A
FHC
FDC
FE FE B
B
RISER PIPE (TYP.)
REVIEWED AS TO
DESIGNED: SUBMITTED: RECOMMENDING APPROVAL APPROVED:(FOR ISSUANCE) PROJECT & LOCATION / BARANGAY: SHEET CONTENTS: SET NO. SHEET NO.
DESIGN CONCEPT:
VARIOUS DPWH
PROPOSED PROJECTS GROUND FLOOR, SECOND FLOOR & THIRD FLOOR
MANUEL D. TORRES PABLO G. RACINES (SEE COVER SHEET) (SEE COVER SHEET) FIRE PROTECTION PLAN, PARTIAL ROOF PLAN, FIRE BOD
STANDARD FOUR-STOREY 46
MECHANICAL DESIGN MANAGING PARTNER JOSEPHINE P. ISTURIS DANTE B. POTANTE RAUL C. ASIS SCHOOL BUILDING
HOSE CABINET DRY STAND PIPE RISER DIAGRAM FP-1
POSITION: MECHANICAL ENGINEER CONN., FIRE HOSE CABINET DETAIL, FIRE 46
PRC No.: 2195 TIN No.: 145-553-983 CHIEF, DIRECTOR IV, BOD UNDERSECRETARY (8 CLASSROOMS ) EXTINGUISHER DETAIL, GENERAL NOTES, LEGEND
PTR No.: 3399286 BUILDINGS DIVISION, BOD (REVISED 3-24-17)