SCHEDULE OF REINFORCEMENT

BAR MARK SHAPE DIA SPACING/NOS. REMARK


p1 20 16 NOS. THROUGHOUT BAR

ABUTMENT PILE

6000
p2a 25 8 NOS. ADDITIONAL BARS AT TOP
TO BE BUNDLED WITH p1a

12000
p2b 25 8 NOS.
p3 10 150 C/C.
p4 12 150 C/C. HELICAL STIRRUPS

1250 FOR p2a/p2b


1000 FOR p1a
500

500
p5 16 110 C/C.

800

500
c1a 8400 16 8 NOS. BOTTOM REINFORCEMENT OF
c1b 16 8 NOS. ABUTMENT CAP

500

800
1800
B B 7650
1800

1800

200 200
8400
c2a 12 3 NOS.
p5 SURFACE REINFORCEMENT

200 200
p5 p5
c2b 12 3 NOS.

ABUTMENT CAP
7650
p5 p5

800

500
c3a 8400 16 9 NOS. TOP REINFORCEMENT OF
c3b 16 9 NOS. ABUTMENT CAP

500

800
1800
7650
1800

1800
s1 12 2L-200 C/C.

750
p4 300 THROUGHOUT
p4 p4 s2 16 2L-200 C/C.

2395
p4 p4
750
s3 16 2L-200 C/C. AT GIRDER LOCATION

2395
950
s3a 16 2L-200 C/C. IN BETWEEN GIRDERS

2395
p1 + p2a + p2b
p1 + p2a + p2b p1 + p2a + p2b
p1 + p2a + p2b p1 + p2a + p2b
f1 12 3 NOS. FACE BAR

f2 10 150 C/C. EARTH FACE VERTICAL BAR

FLYWING
p2a p2a
p2a p2a p2a p2a
p2a p2a p2a p2a f2a 10 150 C/C. WATER FACE VERTICAL BAR
f3 300
12 100 C/C. EARTH FACE HORIZONTAL BAR
p3
p3 p3 p1 + p2b
p3
p1 + p2b p1 + p2b p3 f3a 10 150 C/C. WATER FACE HORIZONTAL BAR
p1 + p2b p1 + p2b

C C
p1 + p2b p1 + p2b

p1 + p2b
p1 + p2b p1 + p2b
p2b p2b
p2b p2b p2b p2b
p2b p2b p2b p2b

D D

p3
p1 p3 p1 p3 p1
p1 p3 p3
p1

A Notes :
ELEVATION SECTION A-A 1. All dimensions are in millimeters and levels are in meter
unless otherwise specified.
2. Dimensions are not to be scaled, only written dimensions
shall be followed.
3. Minimum clear cover for
p5 p3 p3 Abutment cap - 75mm
p1 Pile - 75mm
p1 + p2a p1 Flywing - 75mm
p1 + p2b 4. Grade of concrete in.
p1 + p2b Abutment cap - M35
p1
Pile - M35
Flywing - M35
5. Reinforcing steel shall be HYSD bars (Grade designation
Fe:500D) conforming to IS:1786-2008.
6. Bars shall be lapped in such way that not more than 50%
of the bars are lapped at any section. Lap length shall be
50xd where 'd' is the diameter of bar.
SECTION B-B SECTION C-C SECTION D-D 7. Earth face bar
8. Outer face bar
1ST STAGE CONSTRUCTION 2ND STAGE CONSTRUCTION

CONSTRUCTION JOINT
E

s3a s3 s3a s3 s3a s3


s3a s3 s3a s3
s3a s3 F s3a

s2 s2
c3a c1b c1a c3b
s3 s3a

c1a c1b c3a c3b

c3a c3b
s1
c3b c3a
c2a c2b c2a c2b s1
c1a E c1b
s1 s1
c1a c1b

ELEVATION OF ABUTMENT CAP F SECTION E-E SECTION F-F

C
L OF PIER C
L OF PIER C
L OF PIER C
L OF PIER
CONSTRUCTION JOINT 700 (MIN.)

c3a c3b
PIER CAP TOP REINFORCEMENT f2 f2a
f1

f1 f3
500
C
L OF PIER C
L OF PIER C
L OF PIER C
L OF PIER
CONSTRUCTION JOINT 700 (MIN.)

f3a

f1

c1a c1b
PIER CAP BOTTOM REINFORCEMENT
REINFORCEMENT DETAIL OF
FLYWING