Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 1 of 75
CONTENTS 2
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 2 of 75
1 PURPOSE......................................................................................................................................... 4
2 APPLICATION.................................................................................................................................. 4
3 DEFINITION........................................................................................................................................ 4
4 RESPONSIBILITY............................................................................................................................... 8
5 PROGRAMS........................................................................................................................................ 8
5.1. LEADERSHIP AND COMMITMENT................................................................................................... 8
6 POLICY AND STRATEGIC OBJECTIVE........................................................................................... 9
6.1. HSE POLICY STATEMENT................................................................................................................ 9
6.2. STRATEGIC OBJECTIVES................................................................................................................10
7 ORGANIZATION, RESPONSIBILITIES, RESOURCES, STANDARDS AND DOCUMENTATION 11
7.1. ORGANIZATION............................................................................................................................... 11
7.2. SUBCONTRACTOR 14
7.3. HSE COMMUNICATION AND MEETING PROGRAM 16
7.4. HSE PROMOTION AND AWARENESS PROGRAM 20
7.5. HSE TRAINING, COMPETENCY AND MINIMUM REQUIREMENT FOR ENTRY TO COPI FACILITIES
23
7.6. HSE LEGISLATIONS AND STANDARDS 26
8 EVALUATION AND RISK MANAGEMENT 30
8.1. METHODE AND PROCEDURE FOR HAZARDS AND EFFECTS MANAGEMENT 30
8.1.1. HAZARD IDENTIFICATION 31
8.1.2. RISK ASSESSMENT 31
8.1.3. DETERMINING RISK CONTROL 32
8.2. PPE REQUIREMENT 35
8.2.1. MINIMUM PPE STANDARD 41
8.2.2. SPECIFICATION PPE STANDARD 42
8.2.3. DURATION USE OF PPE 42
9 PLANNING AND PROCEDURE 44
9.1. HSE PROCEDURES 44
9.1.1. XXXX HSEMS MASTER LIST 44
9.1.2. COMPANY HSE STANDARD AND PROCEDURE 45
9.2. EMERGENCY RESPONSE PROCEDURE 46
9.2.1. ORGANIZATION RESPONSIBILITIES 46
9.2.2. INSTRUCTION FOR EVACUATION 49
9.2.3. RESPOND CHART OF EMERGENCY CASE 50
9.2.4. EMERGENCY TELEPHONE NUMBER 51
9.3. EQUIPMENT CONTROL, MAINTENANCE AND INSPECTION 51
9.4. OCCUPATIONAL HEALTH AND MEDICAL FACILITIES 52
9.5. ENVIRONMENTAL PROGRAM 57
9.5.1. SPILL CONTINGENCY PLAN 57
9.5.2. MITIGATION PLAN 57
9.5.3. MONITORING PROGRAM 58
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 3 of 75
1 PURPOSE
These XXXX Health, Safety and Environment (HSE) Management System framework
summary prepare to describe how XXXX HSE activities and consistently deliver HSE
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 4 of 75
performance improvement in the office area and client premises area to be implemented by all
business lines.
Indeed these health, safety environment management system framework is a summary of the
rules and regulations that requires to follow in their program of incident prevention. They are
not intended to be an all-inclusive set of rules, but are indicative of the level of care and
attention to HSE that all personnel shall follow when working for the COMPANY.
The work shall not proceed until the proper precautions have been taken to protect the safety
and health of all workers involved. Incidents and injuries are not a necessary part of any job
and can be prevented by following the appropriate safe work practices.
2 APPLICATION
This HSE plan applies to XXXX employees and subcontractors that working under / within
XXXX premises at Project of Engineering Services For Instrumentation and Automation
System.
XXXX specified in Engineering Service for Instrumentation and Automation System is
managed by the Director who supported by Engineers, Accountant and QA & HSE Manager
who has functional responsibility for departmental employees. As shown, the line
responsibility and accountability for HSE lies with the Director for showing the commitment of
Company.
3 DEFINITION
For the purpose of the implementation of this HSEMS, the terms and definitions apply based
on XXXX standard and specification as follows:
Acceptable risk:
Risk that has been reduced to a level that can be tolerated by the organization having regard
to its legal obligations and HSE policy of XXXX.
Audit:
Systematic, independent and documented process for obtaining "audit evidence" and
evaluating it objectively to determine the extent to which "audit criteria" are fulfilled
[ISO9000:2005] NOTE 1 Independent does not necessarily mean external to the organization.
In many cases, particularly in smaller organizations, independence can be demonstrated by
the freedom from responsibility for the activity being audited.
Continual improvement:
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 5 of 75
CONTRACTOR:
CONTRACTOR will be interpreted as XXXX
COMPANY:
COMPANY will be interpreted as XXX
Corrective action:
Action to eliminate the cause of a detected nonconformity or other undesirable situation.
NOTE 1 There can be more than one cause for a nonconformity.
NOTE 2 Corrective action is taken to prevent recurrence whereas preventive action is taken to
prevent occurrence.
Document:
Information and its supporting medium NOTE. The medium note can be paper, magnetic,
electronic or optical computer disc, photograph or master sample, or a combination thereof.
Hazard:
Source, situation, or act with a potential for harm in terms of human injury or ill health, or a
combination of these
Hazard identification:
Process of recognizing that a hazard exists and defining its characteristics
Incident:
Work-related event(s) in which an injury or ill health (regardless of severity) or fatality
occurred, or could have occurred
NOTE 1 : An accident is an incident which has given rise to injury, ill health or fatality.
NOTE 2 : An incident where no injury, ill health, or fatality occurs may also be referred to as a
“near-miss”, "near-hit", "close call" or "dangerous occurrence".
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 6 of 75
Interested party:
Person or group, inside or outside the workplace, concerned with or affected by the XXXX’s
HSE Performance
Nonconformity:
Non-fulfillment of a requirement [ISO 9000:2005 ; ISO 14001]
NOTE : A nonconformity can be any deviation from:
relevant work standards, practices, procedures, legal requirements,
etc.
HSE Management System requirements.
HSE Objective:
HSE goal, in terms of HSE Performance, that an organization sets itself to achieve
NOTE 1 Objectives should be quantified wherever practicable.
NOTE 2 requires that HSE objectives are consistent with the HSE Policy
HSE Performance:
Measurable results of an organization's management of its HSE risks
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 7 of 75
HSE Policy:
Overall intentions and direction of an organization related to its HSE Performance as formally
expressed by top management NOTE 1 The HSE Policy provides a framework for action and
for the setting of HSE Objectives NOTE 2 Adapted from ISO 14001:2004.
Organization:
Company, corporation, firm, enterprise, authority or institution, or part or combination thereof,
whether incorporated or not, public or private, that has its own functions and administration
NOTE For organizations with more than one operating unit, a single operating unit may be
defined as an organization.
[ISO14001:2004]
Preventive Action:
Action to eliminate the cause of a potential nonconformity or other undesirable potential
situation.
NOTE 1 There can be more than one cause for a potential nonconformity.
NOTE 2 Preventive action is taken to prevent occurrence whereas corrective action is taken
to prevent recurrence.
[ISO 9000:2005]
Procedure:
Specified way to carry out an activity or a process
NOTE Procedures can be documented or not.
[ISO 9000:2005]
Record:
Document stating results achieved or providing evidence of activities performed
[ISO 14001:2004]
Risk:
Combination of the likelihood of an occurrence of a hazardous event or exposure(s) and the
severity of injury or ill health that can be caused by the event or exposure(s).
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 8 of 75
Risk assessment:
Process of evaluating the risk(s) arising from a hazard(s), taking into account the adequacy of
any existing controls, and deciding whether or not the risk(s) is acceptable
Workplace:
Any physical location in which work related activities are performed under the control of the
organization NOTE When giving consideration to what constitutes a workplace, the
organization should take into account the HSE effects on personnel who are, for example,
traveling or in transit (e.g. driving, flying, on boats or trains), working at the premises of a
client or customer, or working at home
4 RESPONSIBILITY
The Director is ultimately responsible for the HSE of the company and to ensure it is properly
implemented and performs to requirements within the offices and facilities.
The Lead of departments are responsible for the operation of HSE within their departments.
Job Description shall be provided to all personnel outlining their responsibilities and duties.
5 PROGRAMS
5.1. LEADERSHIP AND COMMITMENT
PT. XXXX’s senior management demonstrates Management’s commitment to an HSE
culture, but not limited to :
- Personally sign the HSE Policy, HSE Manual, HSE Procedure and
annual HSE objective, target and program
- HSE Work Instruction and perform HSE management tours to work site.
- Project Managers are responsible to ensure all of HSE Plan implemented well, HSE
projects
- documents and reports and monitor the HSE performance for SR and FR at the
project level
- HSE figures are reported monthly at head office via the corporate accounting system
- Company implements HSE improvements programs and socialization to company
employees
- Top management will involve in supervision of Engineering Services For
Instrumentation and Automation System project by conducting site HSE tour/visit to
the project
- Top management involve in every Safety Campaign at site
PT. XXXX will provide adequate resources to comply with COMPANY HSE minimum
requirement which applicable to our activities
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 9 of 75
PT. XXXX is recognizing that the effective management of health, safety and environmental
(HSE) matters is fundamental to the welfare of our employees and the long-term prosperity of
the company. PT. XXXX must therefore so far as it is reasonably practicable, put the
protection of HSE of its own employees, visitors, subcontractors and the public.
All employees and contractors for their part will be required to:
Comply with relevant standards specified by statute, industry or the PT. XXXX;
Passed the medical check up fitness certification
Contribute the planning process, actively participate in assisting the company in achieving
its stated goals and targets;
Report and actively subsequent investigation of all accidents, incidents, hazards and near
misses that have the potential to impact on PT. XXXX operations;
Accept responsibility for protecting themselves, visitors and members of the public who
may be affected by their activities.
Recognition by all employees and contractors that safety and environmental protection is
a condition of the employment and they are responsible for their safety and the safety of
those around them;
Stop undesired events from taking place and leading to harm such as injury, property
damage or environment pollution.
Employee right to stop work if all HSE conditions are not proper.
Director is responsible for enacting this policy and giving the HSE equal priority with all
other business issues. Implementation will involve employees in the achievement of the
objectives
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 10 of 75
XXXX HSE policy communicated to all employees and visitors through the display on
strategic area and via HSE Induction to new employees and subcontractors
Director will:
Formulate HSE Policy and ensure it is given the full backing of the
Company
Ensure adequate resources are available to ensure effective
implementation of the HSEMS
Implement and support the HSE Policy and ensure that all employees
fully understand and comply with its requirements
Ensure that specific responsibilities for HSE within their scope are
adequately defined and delegated
Take personal interest in, and support where applicable, meetings
convened by XXXX to discuss or resolve matters relating to HSE
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 12 of 75
Engineer will:
Participate in every HSE activities
Ensure all team in good health before start the activities
Ensure that all team understood and care to HSE plan and objective,
target, program
Ensure all equipments received in good condition, comply with
requirement and has certified
Respect with XXXX HSE procedure and work instruction, if there is not
applicable team shall report to their engineer for follow up
Beside of corporate organization chart XXXX formed also the P2K3/HSE Committee to
comply with Permenaker No.05/1996, please see below the P2K3/HSE Committee
organization chart :
Every change of member on XXXX P2K3 Organization chart will be communicated to all
member of P2K3 on HSE Management Review Meeting
SUBCONTRACTOR
Generally, XXXX not employ subcontractor for project of Engineering Services for
Instrumentation and Automation System. But if there is subcontractor for scope of work
of XXXX, HSE requirement also included in requirement that must be comply by
candidate of vendor or subcontractor in pre-qualification phase.
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 15 of 75
Vendor contract, work order or purchase order must be available and include HSE
requirement clausal to be complied.
JI/FORM/HSE/09/01
Rev. 0
No Conditions / Persyaratan
1 Follow all project HSE rules & regulations, as well as safety signs
Wajib mengikuti Tata Tertib K3LL proyek, serta mematuhi rambu-rambu di proyek
2 Driver, assistant and loading-unloading worker must wear a project helmet and shoes ever since entering the project site
Supir, pendamping, maupun pekerja bongkar-muat wajib mengenakan helm proyek dan sepatu kerja sejak masuk gerbang proyek
3 Location for unloading material shall follow direction from Logistic of PT. JI
Lokasi penurunan material harus mengikuti arahan dari Logistik PT. JI
4 Driver, assistant and loading-unloading worker may only enter as far as unloading location; It is prohibited to enter other project area
without permit from HSE Representative of PT. JI
Sopir, pendamping, maupun pekerja bongkar-muat hanya boleh sampai lokasi penurunan material; Dilarang memasuki area proyek lain
tanpa ijin dari perkailan HSE PT. JI
5 Provide all hazardous materials with MSDS (Material Safety Data Sheet)
Wajib melengkapi semua material B3 dengan MSDS / LDKB (Lembar Data Keselamatan Bahan)
6 All hazardous materials brought into the project shall be reported to HSE Department
Wajib melaporkan semua material B3 yang akan dibawa masuk ke dalam proyek kepada Departemen HSE
7 Any special requirement/condition of hazardous material storage must be informed to the Logistic/Storekeeper
Wajib menginformasikan persyaratan khusus penempatan material B3 (jika ada) ke bagian Logistik/Gudang
8 Every vehicle leaving project site will be checked by Security
Setiap kendaraan yang keluar dari lokasi proyek akan diperiksa oleh Security
9 If any violation of HSE rules & regulations which cause material return or transportation prohibited to enter, Supplier shall be fully
responsible for any cost impact both directly and indirectly, including third party liabilities
Jika terjadi pelanggaran peraturan dan Tata Tertib HSE yang mengakibatkan material dikembalikan atau kendaraan pengantar dilarang
masuk, maka Supplier menanggung sepenuhnya segala kerugian yang ditimbulkan baik secara langsung maupun tidak langsung,
termasuk apabila sampai menimbulkan kerugian pada pihak lain
XXXX will participate also in the HSE communication and meeting event that conducted
by COMPANY.
PT JI have HSE Meeting procedure which explain role and responsibility of each Top
Management and Employee both internal HSE Meeting and External HSE Meeting
Senior Management
Attend and active in HSE Committee Meeting at Corporate of PT. XXXX
Consider, support and implement the recommendation and corrective action of
HSE Management System which was decided in the HSE Committee Meeting at
corporate level
Project Manager
Attend and be active in the HSE Meeting, project HSE Committee Meeting and
Corporate HSE Meeting at PT. XXXX’s Head Office
Consider, support and implement the recommendation and corrective action to
improve HSE implementation in the project which was decided in the HSE
Committee Meeting project level and corporate level
HSE Department
Project HSE Engineer provide agenda which will be used in weekly HSE
Meeting and HSE Committee Meeting
Creating and maintain departmental records and minutes of meeting at all HSE
Meeting and Committee Meeting
The attendance list and minute of meeting to monitor the action plan resulted from the
meeting and communication will be recorded.
XXXX commit to make minute of meeting on every HSE Meeting both in internal meeting
and external meeting with COMPANY
PT JI have HSE Meeting calendar and agenda for period time, This calendar and agenda
explain the execution and agenda of each HSE Meeting as explained below :
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 19 of 75
HSE promotion and awareness program will cover the whole operation area of PT. XXXX
to educate, communicate and motivate all personnel and others who related to PT.
XXXX’s operation.
Director and Project Manager are responsible for the provision of adequate facilities,
equipments, materials and human resources provided in effective implementation of HSE
promotional program at the workplace, such as :
Displaying HSE Policy of PT. XXXX in the workplace which signed by Director
of PT. XXXX :
HSE Policy as a commitment from Director of PT. XXXX shall be displayed
clearly prominent at notice board and also site office. As far as practicable,
the policies statement could be translated in various languages to
understood by all employees / workers at site project
This promotion could be extended through the briefing during HSE Induction
training for new employees and subcontractor or vendor who work on site
under PT. XXXX.
HSE Poster / Banner / Sign Board / Flag
(a) HSE Poster / Banner / Sign Board and Flag are meant to motivate personnel
toward good HSE practice. It also serves as tool to warn work personnel of
hazard and precautionary measures related to particular trade of work
carried out at site project
(b) HSE Poster / Banner and Sign Board shall be displayed at prominent
location where worker could gather for certain activities such as the
workshop, rest area, canteen, training room, along the road within the work
site
(c) PT. XXXX’s Flag, red-white flag, and HSE flag could be erected and displayed in
front of site office.
(d) HSE Sign Board and Banner, sign board and banner either custom or ready-made
are easily available and if less / need again can be made immediately
(e) Weekly HSE Talk
HSE talk is one of medium promotion activity held every once a week for
approximately 30 minutes. Every employees must follow these activity whitout
exception. HSE talk is different with toolbox meeting, all material discussed about
HSE, and also there are some additional activities conducted in addition to
directing, such as cleaning activities, structuring the work environment, checking
PPE, fitness examination of worker, as well as physical fitness exercises.
HSE talk agenda :
All employees gathered in a row according to their group, leaded by HSE
engineer
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 21 of 75
(f) HSE award is given in the form of gift-giving of the best worker to all the
people involved in the project, regardless of status, or organizational level
(PT. XXXX’s lemployee and subcontractor or vendor) to give credit to the
implementation of regulation, awareness and discipline good HSE. This
award was held in every month which its ceremonial carried out together
with HSE Campaign
(g) Selection of the best employee could be done through meeting of certain
criteria set by the management shall be in accordance with candidate
proposed from groups of worker ( daily, foreman, sub contractor) refer to
HSE award assessment forms.
(h) Winners in the safety awards could be given with gifts or award from
management also certificate / charter. Winner photo set in strategic place to
motivate other worker.
HSE Award for Best Employee
(i) Anomaly form is a form prepared by HSE Management as one means of
participation, consultation and communication between employee and HSE
management. All employees and guests are asked to fill out the form and
inserted into the anomaly Box that had been prepared. The contents of
anomalies can be suggested, enter, finding discrepancies in the
implementation of HSE
(j) HSE award given to participant with best filling on the anomaly
(k) Criteria in selection of the best anomaly form participant could be selected 3
best form shall be in accordance with anomaly form which filled in anomaly
box
(l) Selection of the best anomalies conducted by HSE Committee (Project HSE
Committee). 3 Winner of best anomaly given a gift or other award from
management. The 3 best anomaly Form strategically placed locations to
motivate other workers to fill the anomalies form
HSE Award for Workplace with Best Housekeeping
(m) HSE award was also given to the workshop, warehouse, fabrication and
overall work area of PT. XXXX and subcontractor and vendor for the best
housekeeping conducted once every month
(n) Criteria in selection of the workplace with best housekeeping could be
assessed every workplace in accordance with HSE inspection form
(o) Winners of HSE Awards are given prizes or other awards and certificates
from the management. Photo location with the house keeping work best
placed in strategic locations with another award.
HSE Campaign
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 23 of 75
HSE Engineer
Fire fighting, basic Public/in-house SPOC/PM
Senior system engineer
System engineer
Instrument engineer
Database/Software engineer
Network engineer
Process control engineer
Support Services
HSE Engineer
HSE orientation In-house (CBT) SPOC/PM
Senior system engineer
System engineer
Instrument engineer
Database/Software engineer
Network engineer
Process control engineer
Support Services
HSE Engineer
TBOSIET/TFOET Public SPOC/PM
Senior system engineer
System engineer
Instrument engineer
Database/Software engineer
Network engineer
Process control engineer
Support Services
HSE Engineer
PPE Public / external by SPOC/PM
COMPANY Senior system engineer
System engineer
Instrument engineer
Database/Software engineer
Network engineer
Process control engineer
Support Services
HSE Engineer
STOP CARD Public / external by SPOC/PM
COMPANY Senior system engineer
System engineer
Instrument engineer
Database/Software engineer
Network engineer
Process control engineer
Support Services
HSE Engineer
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 25 of 75
XXXX will comply with applicable HSE standard (international or national) which
applicable with scope of work of XXXX, such as :
SNI
OSHA
ANSI
NFPA
IMCA
Etc
XXXX also identify HSE Standard and legislation which applicable with scope of work of
Corporate XXXX
01/1982
14 Permenaker No. Kualifikasi Juru Las
02/1982
15 Permenaker No. Pelayanan Kesehatan Tenaga Kerja
03/1982
16 Permenaker No. Instalasi Alarm Kebakaran Otomatik
02/1983
17 Permenaker K3 dalam Penggunaan Bahan Asbes
No..03/1985
18 Permenaker No. Pengawasan Ketenagakerjaan Terpadu
03/1984
Permenaker No. K3 Pemakaian Asbes di Tempat Kerja
03/1985
19 Permenaker No. K3 Pesawat Tenaga dan Produksi
04/1985
20 Permenaker No. K3 Pesawat Angkat dan Angkut.
05/1985
21 Permenaker No. Biaya Pemeriksaan dan Pengawasan K3 di Perusahaan
02/1986
22 Permenaker No. K3 pada Penyimpanan dan Pemakaian Pestisida
03/1986
23 Permenaker No. Tata cara Pembentukan P2K3 dan Penunjukan Ahli K3
04/1987
24 Permenaker No. Kwalifikasi dan Syarat-syatrat Operator Pesawat Uap
01/1988
25 Permenaker No. Biaya Pemeriksaan dan Pengawasan K3 di Perusahaan
02/1988
26 Permenaker No. Berlakunya SNI-225-1987 mengenai PUIL 1987 di Tempat Kerja
04/1988
27 Permenaker No. Kwalifikasi dan Syarat-syarat Operator Keran Angkat.
01/1989
28 Permenaker No. Pengawasan Instalasi Penyalur Petir
02/1989
29 Permenaker No. Syarat-syarat K3 Pesawat Karbid
01/1992
30 Permenaker No. Tata Cara Penunjukan, Kewajiban dan Wewenang Ahli K3
02/1992
31 Permenaker No. Perusahaan Jasa K3
04/1995
32 Permenaker No. Sistem Manajemen K3 (SMK3)
05/1996
33 Permenkes No. 453/ Bahan Berbahaya
Menkes/ Per/XI/1983
34 Permen PU No. Panitia Tata Pengaturan Air Propinsi Daerah Tingkat I
67/1993
35 Permenaker No. Penyelenggaraan Pemeliharaan Kesehatan bagi Tenaga Kerja
01/1998 dengan Manfaat Lebih Baik dari Paket Jaminan Pemeliharaan
Kesehatan Dasar Jamsostek
36 Permenaker No. Tata Cara Pelaporan dan Pemeriksaan Kecelakaan
03/1998
37 Permenaker No. Pengangkatan, Pemberhentian dan Tata Kerja Dokter Penasehat
04/1998
38 Permenaker No. Syarat-syarat K3 Lift untuk Pengangkutan Orang dan Barang
03/1999
VII. Keputusan/Instruksi Menteri & Keputusan Bersama Menteri
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 29 of 75
Then, based on activity, potential hazard and determining the control need to consider
legal and other requirement of HSE, so legal and other requirement of HSE written on
legal field within the form that made HIRADC.
XXXX has the generic HIRADC form, please see below HIRADC form for Engineering
Services For Instrumentation and Automation System Project :
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 34 of 75
Falling objects Head Hard Hats ANSI Z89.1- Hard hats shall be
1987, Type 1, completed with chin
Class E & G straps for working at
height
Falling / Sharp Foot and Safety shoes, ANSI Z41.1 or
objects leg or Safety boots DIN 4843
(for potential
ankle injury)
Impact from flying Eyes Safety glasses ANSI Z87.1- * For personnel
particles (c/w side 1989 or DIN wearing glasses, an
shield EN 166-167 approved
prescription safety
glasses is required.
The use of overfit
safetyglasses/gogge
s over the safety
glasses is
acceptable
* Dark lenses safety
glasses shall not be
worn at night or
indoor areas
2 Working in noisy Excessive noise > Ear Ear muff or Ear NRR value minimum
environment 82 dBA plug (may be 24 Db
(also refer to combined with
COPI-HS-ST- communication
00001-Hearing head set)
Protection
3 Light duty Lightweight, Hands Tight-fitting
general work (e.g Slippery objects cotton cloth
laboring, brick with nitrile/ pvc
laying, paving, dots
manual handling)
4 Handling Mid to Hands Combination of Used in conjunction
rough/abrasive heavyweight, heavy-duty with no 13, 14, 15
materials, mid to rough/abrasive thick cotton
heavyweight objects with nitrile
materials (e.g coated or with
scaffolding, leather
powered tools,
manual handling)
5 Welding-electric Hot sparks and Hands Specialized Used in conjunction
arc, gas cutting, molten metal leather with no 16
torch brazing, gauntlet (long
torch soldering gloves)
6 Assembly Hand injury Hands Tight-fitting, Only to be used
operations where fingerless where potential
a high level of gloves injury to fingers is
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 36 of 75
In time of an emergency occurred at the Office and this project, positives measure must be
taken to ensure the safest and best ways to evacuate the personnel from the building to the
designated assembly area. Thus, it is extremely important for all personnel to understand
this procedure.
This procedure is prepared to provide information and guidelines to all Office personnel the
emergency response plan available and actions to be taken by the Emergency Team.
This procedure applies to all activities of PT. XXXX’s Corporate Office at Graha Surya
Internusa Building, 7th Floor Suite 701, Jl. H.R. Rasuna Said Kav X-0, Jakarta 12950. This
procedure should be used in conjunction with GSI specific procedures for the management
of emergency.
XXXX Emergency Response procedure has been developed to cater for various
emergencies. The implementation of the procedure involves the deployment of dedicated
personnel and coordinated with security or officer GSI Building to evacuate occupants to
the designated muster point. All employees are made aware of emergency response
procedure during the induction training or safety briefing for long term visitors.
HSE Manager
The HSE Manager shall have overall accountability and responsibility during
Emergencies to direct his staff and for taking all necessary precaution to prevent
inducing an emergency
His major duties and responsibilities are to:
Establish and make public Emergency and Evacuation Plan. When establishing
this plan, he shall obtain information on the GSI Building Management
requirements and system for emergencies evacuation.
Issue the Emergency Alert according to the alert system
Issue the evacuation order to all personnel on the office
Issue the call off of the emergency after confirming it
Liaise closely with the GSI Building Management during an emergency
Ensure fire fighting and evacuation training
The Discipline Manager and Engineer shall assist the HSE Manager.
His major duties and responsibilities are to:
Inform the GSI Emergency Control Centre of the status of the emergency and
its location and to receive further instructions for evacuation, etc.
Assist HSE Manager in directing the Prevention Team to establish measures to
prevent and minimize emergencies
Lead the Prevention Team in establishing measures against the recurrence
and containment of the emergency
HSE Coordinator
The HSE Coordinator shall assist and advise the HSE Manager
His major duties and responsibilities are to:
Prepare the Emergency and Evacuation Plans for the HSE Manager
Plan and conduct Training and Drills for fire fighting, rescue and evacuation at
least once a year
Prepare equipment for emergency use
Instruct new staff and workers during the new comer orientation regarding the
Emergency Communication System and how to act during emergencies and how
to carry’s out evacuation
Coordinate with Security to control office access for unauthorized personnel
and ensure accountability of personnel entering and leaving the site
Report to the HSE Manager on the status of the evacuation, etc.
Administration Manager
The Administration Manager shall assist the Project Manager
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 43 of 75
Employees at Office
Employees at Office shall cooperate with Project Manager, Discipline Manager and
Discipline Engineer during emergencies
His major duties and responsibilities are to:
Join Training and Drills for fire fighting, rescue and evacuation
Carry’s out evacuation during and emergency under the direction of Project
Manager, Discipline Manager and Discipline Engineer
During equipment operation, HSE Department will place proper signage, install
barricade and make protection toward operational of heavy equipment also
light equipment and conduct periodic inspection of readiness of the equipment
Equipment Maintenance
Maintenance of light machine conducted periodically by the mechanics every
150 hours of use or is determined by replacing lubricants and filter
At PT. XXXX’s project which including equipment such as : chain block,
scaffolding, forklift, mobile crane, etc.
Daily Maintenance on heavy equipment carried by operator of the equipment.
Non Discrimination: MCU will purely asses the fitness to work in any designated job.
The same treatment will be applied for all personnel regardless position, nationality,
etc. If there are some different medical assessments, it is purely because of the
specific requirement to determine the fitness to work, such as age, job type, working
conditions, etc.
Acceptance: Contractor will only accept a MCU and fitness to work certificated form
certified physician from an approved medical facility. Contractor will consult with
COMPANY to get approval of their medical facilities.
Validity: All MCU and fitness to work certificates from the contractor’s employee will
be verified by COMPANY.
Laboratory Examination
Hematology
6. Hb Yes Yes Yes
7. Rbc Yes Yes Yes
8. WBC Yes Yes Yes
9. Hematocrite Yes Yes Yes
10. Platelet Yes Yes Yes
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 49 of 75
Blood Sugar
1. Glucosa Fasting Yes Yes Yes
2. Glucosa Post Prandial Yes Yes Yes
Liver Function
1. Total Bilirubin Yes Yes Yes
2. Ohospatase Alkali Yes Yes Yes
3. Gamma GT Yes Yes Yes
4. AG / Ratio Yes Yes Yes
5. Total Protein Yes Yes Yes
6. Albumin Yes Yes Yes
7. Globulin Yes Yes Yes
8. SGPT Yes Yes Yes
9. SGOT Yes Yes Yes
Renal Function
1. Ureum Yes Yes Yes
2. Creatinin Yes Yes Yes
3. Urin Acid Yes Yes Yes
Lipid Profile
1. Total cholesterol Yes Yes Yes
2. HDL Yes Yes Yes
3. LDL Yes Yes Yes
4. Trigliceride Yes Yes Yes
Serology
1. VDRL Yes Yes Yes
Immunology
1. HBs Ag No Yes No
2. Anti HBs Ag No Yes No
10 Frequency of Examination
Based on the Indonesian regulation, every person will be examined prior to
employment and the thereafter at least once every year. The interval between
assessments will vary, depending on:
Type of proposed employment and duty,
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 50 of 75
11 Medical History
Medical history questionnaire should include:
Administrative information (name, address, date of birth, sex, etc)
Proposed/ Current position
Occupational History
Past medical and dental history
Current medical complaints
Known allergies
Current medications
Lifestyle (smoking, use of alcohol and other drugs, exercise)
Family medical history
Immunizations received
All positive answers in the questionnaire must be discussed with the employee,
and the results recorded.
The employee must sign the completed questionnaire as being complete and
true record and should recognize the significance of doing so.
12 Medical Examination
A full physical examination should be conducted, including evidence of dental
health and neurological examination for all type of MCU.
Other medical diagnostic tests such as urinalysis, chest x-ray, blood test, etc.
will be conducted based on the type of MCU performed.
Although the potential for oil spill is practically zero since there will be no oil involvement
during the execution of all PT. XXXX Project other than insignificant amount of diesel
fuel for marine transportation & construction purposes. However in case of spill or any
other applicable cases the emergency response as outlined in the Emergency
Response Plan will apply.
IMPACT
SOURCE
POTENTIA (IS)
L / IMPACT RESIDUAL
ACTIVITY MITIGATION
IMPACT ENV. SIGNIFICANCE IMPACT
ON SENSITIV
ITY
(ENV)
System IS:
documentati Excessive 1 – Low
Conduct 3R
on and use of paper
Medium Program (Reduce, Low
document and ink
Reuse, Recycle)
verification / cartridge ENV:
update 2-Medium
IS: 1 –
Excessive
Creating or Medium
use of paper Conduct 3R
updating
and ink Medium Program (Reduce, Low
manuals / ENV:
cartridge Reuse, Recycle)
procedures 3 - High
/validation
and
optimization 2 -Medium
system
development
IS:
Data tags
Excessive 1 – Low
tracing, Conduct 3R
use of paper
mapping and Medium Program (Reduce, Low
and ink ENV:
documentati Reuse, Recycle)
cartridge 2 -Medium
on
IS:
Replacement
Excessive 1 – Low
/revamp/new Conduct 3R
use of paper
control Medium Program (Reduce, Low
and ink ENV:
system Reuse, Recycle)
cartridge 2 -Medium
design
Location
No Waste
Office Site
1 Paper (organic) To be handled local recycle Handled by COMPANY
company
2 Plastic, Bottle, Cans (non To be handled local recycle Handled by COMPANY
organic) company
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 54 of 75
Requirement for vehicle and driver of CONTRACTOR in this project refer to document
ID-G-BU-00000-00000-00399 Rev. 1 Page 10,11 of 18 and Page 8,9 of 18 – Journey
Management
XXXX has adopted the following golden rules that must be observed by all personnel and
subcontractors:
Always:
Comply with the traffic legislation, be conscious of road safety and demonstrate safe
driving and other good road safety habits
Avoid driving when fatigued or when unfamiliar with the location/country
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 55 of 75
Always review whether the journey can be avoided or conducted more safely.
Never:
Drive when under the influence of alcohol
Below is XXXX HSE Performance for last three years (2008 – 2010).
For Project of Engineering Services for Instrumentation and Automation System 2011 -
2014 XXXX will use CONTRACTOR HSE Performance Record Form, refer to COMPANY
HSE Form standard.
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 59 of 75
The place where a lot of work done in the static work, especially the lack of
ventilation and sunlight, and using floor mats should be checking the number
of germs and bacteria colonies in the study. Measurement results are then
compared with a threshold value that allowed for the colonies of bacteria and
germs in the air space. If the results of measurements obtained results that
exceed the threshold value, then the necessary corrective and preventive
action to prevent employees suffering from diseases, especially respiratory
infection (infection of the respiratory tract)
condition and victim is good, Safety Officer must immediately report written report
in 1 x 24 hours. After investigation conducted, investigation report must be finished
in 2 x 24 hours HSE Engineer along with Administration will take victim of incident
to referral hospital if can not be helped with first aid treatment at project. For
further, Administration section will coordinate with HSE Engineer and hospital staff
for incident report or ill health establishment which can be used for claim of
incident treatment cost to insurance
15. Implementation
Implementation of investigation pursued an approach based on P 4 techniques,
namely People, Parts, and Position Paper.
(f) Conduct Investigation
HSE Department to prepare the equipment and ensure investigation scene
awake and seek the documentation photographs of the scene, initial
reports the incident, witnesses data and photographs of the victim can be
recorded prior to the preliminary data presented to the investigation team
Observation area at the scene by identifying, protecting and collecting
sources of evidence through 4P : People, parts, paper and Position
People : involved person, victim, etc.
Parts : goods evident condition, material, incident location,
equipment, etc
Paper : documents, procedures, work instruction, induction,
TBM attendance, certificate, licenses, inspection, physical description
place of work / lay out, sirens, hazard, etc.
Position : location of physical evidence, the sign on the road or
trace (e.g. trace of brake), PPE location, operating condition, etc.
(g) Interview the Witness
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 64 of 75
The investigators team will conduct interviews of the witness directly and
indirectly by preparing a list of questions.
At the beginning of interview, investigator will explain about :
Purpose of investigation
Request honesty for explaining information
Convince health condition of victim at the time of interview
Ask the witnesses directly and indirectly to tell pre-incident, during the
incident and post incident
17. Analysis
In this process stage, the information collected is organized and analyzed in order
to identify the direct cause (this incident would not have happened if ....) and
indirect causes (this incident might not happen if ... ..) This analysis can also
eliminate possible causes. This is particularly important if the incident resulted in
damage and insurance claims later. The important thing to be noted at the time of
the incident investigation is :
Sequences of chronologies must be made
an analysis of the causes of the causes must be made. In many cases, the
cause of the cause providing a more effective way because avoiding the cost of
repetition. Analysis of the causes of the causes can also identify problems that
contribute to the incident range wider
Give serious attention to the possible problems of people, equipment,
environment or system that may have a role in the incident, either directly or
indirectly.
has been completed, and signed an approval on the report. Specifically for the
project, the entire incident report, investigation and correction and prevention
measures should be reported to the HSE Manager at each end of the month.
19. Recommendation
Based on the findings and have determined the cause of the Investigation Team
makes a recommendation for follow up recommendations given should be short
and clear solid so it is easy to implement in the field and should consider HSE
elements that does not affect processes already underway. All recommendations
will be made in form and Corrective Action Report (CAR) to be followed up by the
relevant department
Inspection with check list on work implementation, conducted with HSE Engineer. If
found any unsafe condition and unsafe action while inspection HSE Engineer can
request to stop work for a while until corrected, controlled hazard and safe condition.
c. Approval Evidence Lifting Equipment
Approval evidence of lifting equipment, contain equipment, installation and power
machine by Authorized agency. Conducted based on requirement in government
regulation by competent officer or agency. Before conduct procurement or rent an
equipment, Logistic must check administration completeness of the equipment.
Administration equipment as follow : SILO and SIO, if needed, can request
equipment history and manual book. Lifting equipment, contain equipment and
power machine which will enter project should show approval certificate from
competent agency (official of ministry of manpower and transmigration or Service
company of HSE. If new equipment or equipment which don’t have approval
certificate must be finished immediately. Every year or if project location move to
other area, lifting equipment, contain equipment, generator set and other equipment
based on government regulation must be re-checked to authorized agency Operator
license certificate is valid for 5 years, after that must be re-certificate to official of
Ministry of manpower and transmigration. Beside having Operator license
certificate, Lifting equipment and contain equipment must be conducted with an
interview and see their work experiences to ensure the operator have skill which
required with work risk level
d. Pre-Use Equipment Checklist
Pre-use equipment check list conducted by each equipment operator while operate
lifting equipment, transport equipment and machine. While weekly equipment
inspection, HSE Engineer must inspect by using pre-use check list and make
corrective note to be done.
e. HSE Assessment
The team of HSE Committee conduct assessment on HSE implementation level.
Grade of HSE implementation level must be made on statistic. Assessment result
will be reported to Director and sent to all project, and discussed in weekly HSE
meeting in corporate of PT. XXXX
f. Housekeeping Inspection
Weekly inspection with check list on housekeeping in project or site office which
conducted by Safety Inspector. In HSE Campaign, location with best housekeeping
given proper award.
g. Emergency Equipment Inspection
Emergency equipment inspection : All emergency equipment must be inspected
every month to ensure the readiness of that equipment if there are emergency
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 67 of 75
XXXX also have HSE audit procedure which have the purpose to :
Ensure that the audit process in order to implement the HSE Management System can
walk in accordance with OHSAS 18001:2007 standard procedure
Ensure the implementation of audit of HSE management system effectively in
evaluating the level of compliance with the HSE policies, objectives, targets, work plans
and programs and procedures
Below are XXXX HSE audit procedure :
a. Arrange Annual Internal Audit Program
HSE Manager preparing annual HSE Internal Audit Programs and submit to the
Director for approval.
In the implementation of the audit, the annual audit program detail to be Audit
Detail Plan.
Duration of Yearly Audit
HSE internal audit of PT. XXXX conducted minimal 2 times in 1 year
HSE audit of PT. XXXX conducted at least 2 times a year. For internal audit on
the projects underway, auditing the implementation schedule is as follows :
Projects with schedule 3 – 6 months : 1 time of audit as progress 50%
Projects with schedule 6 – 12 months : 2 times of audit when progress audits
20% and 60%
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 68 of 75
Projects with schedule of more than 1 year: the audit conducted when
progress at 20% and 60% with the provision of not less than 6 months
Project on schedule less than 3 months do not need to be conducted HSE
internal audit
The program explained above should cover all section and projects of PT. XXXX
which involved in implementation of OHSAS 18001:2007 management system
If necessary, Director could order to conduct audit beside determined audit
program, both comprehensive for whole section or any part of section or project.
Please see the our internal audit program during project execution :
c. Checklist Audit
. All the plan of HSE internal audit implementation will use a check list refers to standard
OHSAS 18001:2007. Check list that will be used must be appropriate to the program and
HSE Management Systems in Company.
Please see the our check list audit at the next page :
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 70 of 75
RECORD COMPLY
NO DESCRIPTION RESPONSIBILITY
FORM OTHER EVIDENCE/ REMARK YES NO N/A
Clause 4.2. HSE Policy
HSE Policy
Put HSE Policy with the frame and hang at the strategic
1 Put Policy at strategic place (Meeting room, Visitor room etc) HSE Coordinator
place (receptionist room, meeting room)
4.4.4. Documentation
4.4.5. Control of Documentation
JI/HSE/P/07 : HSE Document Control Procedure
Distribution list of Document (Policy, Manual, Prosedur,
36 JI/FORM/HSE/07//01 Transmittal Record Project Doc. Controller
Form)
e. Audit Report
After audit activity in one period finished, HSE Manager establish Audit Report.
Policy/Plan/Program: ID-G-BU-00000-00362 Rev.5
Contractor Health, Safety & Environmental Management System (C-HSE MS)
XXX Page 75 of 75
Results of audit report from the findings reports or audit verification report will be
one of the studies in management review meetings
d. Report
The outputs from management review shall be consistent with the corporate of PT.
XXXX commitment to continual improvement and shall include any decisions and
actions related to possible changes to :
HSE Performance
HSE Policy
Resources
Other Elements of HSE Management System
Result of decision on management review meeting, include minutes of meeting and report
of meeting will be record and controlled refer to document control procedure and
distributed to communication and consultation of interest party.