PRODUCTIVITY ASSIGNMENT

Compute the multifactor productivity measure for each of the weeks shown. Assume 40-hour
weeks and hourly wages of Php 50. Overhead is 1.2 times weekly labor cost. Material cost is Php
300 per pound.

Week Output (units) Workers Material (lbs)

1 40000 5 420

2 45000 6 490

3 50000 6 480

4 55000 6 500

Answer here--------

Week Output Labor Cost Material Overhead Total Cost Productivity


Cost Cst

1. How much is the increase or decrease in productivity from week 3 to 4?


____________________________________