Compute the multifactor productivity measure for each of the weeks shown. Assume 40-hour
weeks and hourly wages of Php 50. Overhead is 1.2 times weekly labor cost. Material cost is Php
300 per pound.
1 40000 5 420
2 45000 6 490
3 50000 6 480
4 55000 6 500
Answer here--------