Professional Documents
Culture Documents
Manual Detail Calculation of Conveyor KC
Manual Detail Calculation of Conveyor KC
EDRC-BMH-MMH IC
DOCUMENT NO DATE REV
PROJECT: MHS FOR DEVELOPMENT OF DRY BULK
AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 09.07.13 A
TERMINAL AT TUNA NEAR KANDLA
L&T : O13074-M-BM-CS-DC-0007 09.07.13 2
TITLE: TYPICAL MANUAL DETAIL CACULATION OF Designed Checked SHEET
CONVEYOR KC-4AA (As per IS:11592) MNS SAI 1 OF
INDEX
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS:11592) MNS SAI
A) POWER AND TENSION CALCULATION FOR CONVEYOR KC-4AA
Sl. No. Description Nomenclature / Formula / Equation Unit Numerical value Remarks
3 Material - - COAL
ρ1 3
4 Max Bulk Density Kg/m 1200
ρ2 3
5 Min Bulk Density Kg/m 800
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS:11592) MNS SAI
SPEED CALCULATION WITH MIN DENSITY
30 Motor RPM Available at GB input shaft Nm = Motor RPM*0.97 RPM 1445 (Considering fluid coupling slip as max.3%)
33 Belt speed with gear box nominal ratio V2= (π x D1 x Motor RPM)/(60 x reduction ratio) m/sec 4.50
HENCE BELT SPEED V2 IS ADEQUATE TO CATER FOR RATED CAPACITY.THEREFORE CHOSEN REDUCTION RATIO IS CORRECT.
LARSEN & TOUBRO LIMITED
EDRC-BMH-MMH IC
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS:11592) MNS SAI
SPEED CALCULATION WITH MAX DENSITY
33A Belt Speed required(V) V= C/(3600xA x ρ x K x Kf) m/sec 2.77 C=DESIGN CAPACITY
For 1600 BW. 3 Roll, 45° troughed with 20°
33B Maximum cross sectional area of load on belt(A) A m2 0.324 Surcharge angle (Refer Page no. 11 of IS-
11592:2000)
For 8° conveyor inclination (max.)
33C Slope factor(K) K - 0.97
(Refer page no.13 of IS 11592:2000)
As Design Capacity is used to calculate required
33D Filling factor(Kf) Kf - 1.0
belt speed
Considering Maximum bulk density of conveyed
33E Bulk density(ρ) ρ T/m3 1.2
material
33F Belt speed as per Spec(V1) V1 m/sec 4.6
33G Motor RPM - RPM 1490
33H Motor RPM Available at GB input shaft Nm = Motor RPM*0.97 RPM 1445 (Considering fluid coupling slip as max.3%)
33K Belt speed with gear box nominal ratio V2= (π x D1 x Motor RPM)/(60 x reduction ratio) m/sec 4.50
HENCE BELT SPEED V2 IS ADEQUATE TO CATER FOR RATED CAPACITY.THEREFORE CHOSEN REDUCTION RATIO IS CORRECT.
LARSEN & TOUBRO LIMITED
EDRC-BMH-MMH IC
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS:11592) MNS SAI
DRIVING FORCE CALCULATION
INPUTS
Mass of rotating parts on return side(Mr) [ For 2 ROLL φ139.7, 4.85mm Shell Thickness
35 Mr Kg/m 10
Idler for 1.6 m belt width and at 3.3m spacing].
42 Volumetric conveying capacity(Q) Q= C/(3600 xρ ) cu.m/sec 1.250 Min. bulk density of material is considered
43 Coefficient of Friction between material & Belt µ1 - 0.6 Refer page 17 of IS-11592:2000
Co-efficient of friction between material and skirt
44 µ2 0.6 Refer page 17 of IS:11592 – 2000
plates
45 Acceleration length at loading area La = V22/(2 x g x µ1) M 1.7202
LARSEN & TOUBRO LIMITED
EDRC-BMH-MMH IC
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS:11592) MNS SAI
Wrap Resistance for Type A Pulley (Drive, Assumed. To be checked after pulley
47 Rwa N 350
HT Bend) calculations
Wrap Resistance for Type B Pulley (Tail,Take Assumed. To be checked after pulley
48 Rwb N 250
up) calculations
Wrap Resistance for Type C Pulley (Snub,LT Assumed. To be checked after pulley
49 Rwc N 200
Bend) calculations
Pulley brg. Resistance(Rb) for Type A Pulley Assumed. To be checked after pulley
50 Rba 500
(Drive, HT Bend) calculations
Pulley brg. Resistance(Rb) for Type B Pulley Assumed. To be checked after pulley
51 Rbb N 350
(Tail,Take up) calculations
Pulley brg. Resistance(Rb) for Type C Pulley Assumed. To be checked after pulley
52 Rbc N 300
(Snub,LT Bend) calculations
53 Length of skirt plate(Lsk) Lsk M 6.5 Total skirt length (13m) is divided as 6.5m & 2
loading points. Including The Length of
54 No of loading points - - 2 Acceleration at Loading Area
62 Pressure between belt and belt cleaner(P) No. of External belt cleaners
P x Length of each belt 2
65000 [Refer page 17 of IS:11592 – 2000]
N/M
Co-efficient of friction between belt and belt
63 µ3 0.65 [Refer page 17 of IS:11592 – 2000]
cleaner(µ3)
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS:11592) MNS SAI
RESISTANCES - (FULLY LOADED)
CARRY SIDE RESISTANCES FROM TAIL TO
65 Te1 = Rm + Rsl+Rs+Rsp N 67511.72
DRIVE VIDE DISCHARGE
66 Total Inclined Length Carry Lc m 117.14
Inertial and frictional resistance at the loadng in the acceleration area between the handled
73 Ra = Q x 1000 x ρ x V2 N 4500.00
point and material and the belt
between handled material and the skirt plate in
74 Frictional resistance at the loadng point and Rska = (µ2 x Q2x1000x ρ x g x La)/((V22/4) x b12) N 2066.14
acceleration area
75 Wrap resistance between belt and pulley Rw = (Rwa xA')+(RwbxB)+(RwcxC) N 950.00 1 no Tail & 2 no. HT Bend pulleys
76 Pulley bearing resistance Rb = Rb x (A'+B+C) N 1350.00 1 no Tail & 2 no. HT Bend pulleys
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS:11592) MNS SAI
87 Wrap resistance between belt and pulley Rw = (Rwa xA')+(RwbxB)+(RwcxC) N 600.00 2No LT Bend + 1 No Snub
95 Wrap resistance between belt and pulley Rw = (Rwa xA')+(RwbxB)+(RwcxC) N 650.00 1 No Take up + 1 No LT Bend
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS:11592) MNS SAI
POWER CALCULATION AT FULLY LOADED CONDITION
105 Overall drive efficiency(η0) η0= Gear box efficiency x coupling efficiency X 0.99 0.927 Considering Gear Coupling Efficiency of 99%
RESISTANCES - (EMPTY)
CARRY SIDE RESISTANCES FROM TAIL TO
109 Te1 = Rm + Rsl+Rs+Rsp N 8770.48
HEAD
110 Total Inclined Length Carry Lc + Lrd m 117.14
Inertial and frictional resistance at the loadng in the acceleration area between the handled
117 Ra = Q x 1000 x ρ x V2 N 0.00
point and material and the belt
between handled material and the skirt plate in
118 Frictional resistance at the loadng point and Rska = (µ2 x Q2x1000x ρ x g x La)/((V22/4) x b12) N 0.00
acceleration area
LARSEN & TOUBRO LIMITED
EDRC-BMH-MMH IC
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS:11592) MNS SAI
119 Wrap resistance between belt and pulley Rw = (Rwa xA')+(RwbxB)+(RwcxC) N 950.00
131 Wrap resistance between belt and pulley Rw = (Rwa xA')+(RwbxB)+(RwcxC) N 600.00 2No LT Bend + 1 No Snub
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS:11592) MNS SAI
139 Wrap resistance between belt and pulley Rw = (Rwa xA')+(RwbxB)+(RwcxC) N 650.00 1 No Take up + 1 No LT Bend
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS:11592) MNS SAI
POWER CALCULATION AT EMPTY CONDITION
149 Overall drive efficiency(η0) η0= Gear box efficiency x coupling efficiency X 0.99 0.927 Considering Gear Coupling Efficiency of 99%
-
150 Required power at motor shaft(Pm) Pm= Pa/η0 - 76.68 At Empty Condition
TENSION CALCULATION
Minimum belt tension required from belt sag
151 T'sag = (Sc x (Mb + Mg) x 9.81)/(8 x S) N 16952.39 At carrying side (with material)
consideration(T'min)
152 Carrying idler spacing(Si) Sc m 1.1
153 Belt sag(S) S 0.02 [Refer page 20 of IS-11592:2000]
Minimum belt tension required from belt sag
154 T''sag = (SR x (Mb) x 9.81)/(8 x S) N 5895.12 At Return side (without material)
consideration(T''min)
155 Return idler spacing(SR) SR m 3.3
coefficient of friction between Head pulley and
156 µ - 0.30
belt,(µ)
Ratio of T1/T2 at any Loading/dynamic condition
157 Maximum Wrap Ratio Allowable (T1/T2) T1/T2 = e µθ - 3.0
shall not exceed this value
159 Starting Force Fs = ξ x Te /(Gear box eff x L/S coup eff) N 111770.7 To be controlled by Scoop Type fluid coupling
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS:11592) MNS SAI
167 Total Mass at Carry Side Mc kg 38897.9 Refer Coasting Time Calculation
169 Total Mass at Return Side (Drive to take up) Mr2 kg 1687.6 Refer Coasting Time Calculation
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS:11592) MNS SAI
EMPTYCONDITION
185 Total Mass at Carry Side Mc kg 12866.4 Refer Coasting Time Calculation
187 Total Mass at Return Side (Drive to take up) Mr2 kg 1687.6 Refer Coasting Time Calculation
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS:11592) MNS SAI
STARTING CONDITION EMPTY
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS:11592) MNS SAI
B) BELT AND PULLEY DIA SELECTION
Breaking strength of our selected belt
1 Tb 1250
1250/4 HEAVY DUTY KN/m
2 Factor of safety considered FOS - 9 As per spec.
3 Allowable Belt tension Ta=Tb/FOS KN/m 138.89
5 % Loading of the belt at running condition T1 /Tb 59.60 < 80%. So, selected belt is O.K.
< 150%. Therefore, selected belt is safe during
6 % Loading of belt during starting T1max/Tb 76.69
starting also.
HENCE SELECTED BELT IS NN-1250/4 Heavy duty. Maximum width for satisfactory load support is 2000mm > BW.
As per belt manufacturer with pulley lifted by half
6A Minimum Transition distance required - mm 2040
trough distance
Drive pulley(Type – A)
= 500 mm
As per PHOENIX YULE catalogue, for the
Tail/Take-up pulley(Type – B)
7 Min Required pulley dia selected belt minimum required diameters of
= 400 mm
various types of pulleys
Snub / LT Bend pulley(Type– C)
= 315 mm
Drive pulley
(Type – A) = 800 mm
Tail/Take-up pulley
8 Selected diameter for different pulleys - For heavy duty belt.
(Type – B) = 630 mm
Snub / LT Bend pulley
(Type – C) = 500 mm
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS:11592) MNS SAI
C. CONVEX/CONCAVE RADIUS CALCULATION
Belt tension at the IP point of concave curve for Tcs fully = T1s - Main Resistance for Lp1 - Slope
21 N 125283.99
fully loaded conditions at starting (Tcsfully) Resistance for Hp1 - Acceleration for Lp1
Belt tension at the IP point of concave curve for Tc fully = T1 - Main Resistance for Lp1- Slope
22 N 89260.13
fully loaded conditions at running (Tcfully) Resistance for Hp1
Belt tension at the IP point of concave curve for Tcs empty = T1s - Main Resistance for Lp1 - Slope
23 N 163237.86
Empty conditions at starting (Tcsempty) Resistance for Hp1 - Acceleration for Lp1
Belt tension at the IP point of concave curve for Tc empty = T1 - Main Resistance for Lp1- Slope
24 N 68101.70
Empty conditions at running (Tcempty) Resistance for Hp1
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS:11592) MNS SAI
D.GEAR BOX & COUPLING SELECTION
Actual power required at drive pulley shaft
1 (considering drive pulley loss) Pa= Belt power + Power loss due to drive pulley kW 335.22
3 Required Mechanical rating of Gearbox Max. value of power (1.6 times of Motor Power) kW 640
7 Thermal capacity available with natural cooling PG1 kW 420 for KBN 450 As per ELECON catalogue
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS:11592) MNS SAI
COUPLING SELECTION
HIGH SPEED COUPLING:
Required motor power at motor shaft (excluding
1 P kW 361.74
drive margin)
2 Motor rating P kW 400
As per Design basis, Scoop type fluid coupling shall be provided since motor power requirement is greater than 160 kW
Selected High Speed Coupling model SC 11A (Fluidomat or Equivalent) with a rating of 500kW > Motor Power
6 Design power for low speed coupling Motor Powerx S.F kW 800.00
Refer catalogue enclosed. (As per design basis)
7 Service Factor(S.F.) S.F. 2.00
8 Power to be transmitted per RPM Design Power / Coupling RPM kW/1/Min 7.75
Sl. No. Description Nomenclature / Formula / Equation Unit Numerical value Remarks
5 Output Coupling (Gear coupling) 'GD2' value at pulley rpm CG1 = Kg-m2 5.39
Sl. No. Description Nomenclature / Formula / Equation Unit Numerical value Remarks
27 Total 'GD2' value of drive system at motor rpm TG2 =MG + FG2 + FG1 + GG + CG2 kg-m2 107.256
Sl. No. Description Nomenclature / Formula / Equation Unit Numerical value Remarks
31 Total weight of non-drive pulley (NW) NW =NPB x WNPB + NPC x WNPC Kgf 12800
Belt Mass at Return side for L3 distance TB2 =WB x L3 = Kgf 1472.65
Belt Mass at Return side for L4 distance TB3 =WB x L4 = Kgf 164.50
Belt Mass at Return side for L5 distance TB4 =WB x L5 = Kgf 1782.77
34 Total weight of material (TM) TM =WM x L2 Kgf 26031.47 At Carry Side Only
Idler Mass at Return side for L3 distance IW3 =L3 x W2 = Kgf 505.440
Idler Mass at Return side for L4 distance IW4 =L4 x W2 = Kgf 56.460
Idler Mass at Return side for L5 distance IW5 =L5 x W2 = Kgf 611.880
Total equivalent weight of moving parts including material
36 TMW =ENW + TB + TM + IW = Kgf 47491.576
(TMW)=
b) Without considering GD2 of motor & primary side of HS WE2 =TMW + TED2 = Kgf 52913.885
coupling
Sl. No. Description Nomenclature / Formula / Equation Unit Numerical value Remarks
Case-I : When conveyor will be stopped by operator, entire system including conveyor system, drive unit and motor will start decelerating. However,
after 5 seconds secondary section of Scoop coupling shall be disengaged. Henceforth conveyor assembly, gear coupling, gearbox &
secondary section of fluid coupling will continue to decelerate till they come to standstill.
Therefore, Natural Coasting time of conveyor under this condition =
disengagement time of scoop coupling (i.e. 5 sec) + time required for conveyor assembly,
Gear coupling, gearbox and secondary section of scoop coupling to come to rest from a speed what the conveyor assembly and drive unit
including motor would have attained before secondary section of scoop coupling would be disengaged.
39 Scoop coupling disengagement time td S 5
Reduced belt speed when secondary section of scoop BSr = BS-(60 x1000 x MOPR x td)/
40 m/min 12.19
coupling is going to be disengaged (WE1x(BS/60))
Case-II : When conveyor will be stopped due to power cut, secondary section of scoop coupling can not be disengaged as because no power
is there to take out scoop actuator. In that case entire system including conveyor system, drive unit and motor will decelerate till it comes to rest
from belt speed at running condition.
5 Required Stopping time for the present conveyor At1 = t2- t3 S 27.70 Instead of CT2
Therefore, total Mass inertia require to increase the
6 WET = AT1x(MOPR x 1000)/ (BS/60)2 Kg 429780.889
conveyor stopping time.
LARSEN & TOUBRO LIMITED
ECC Division - EDRC
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK TERMINAL NEAR
AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TEKRA, KANDLA
L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
DESIGNED CHECKED SHEET :
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per IS:11592)
MNS SAI OF
Sl. No. Description Nomenclature / Formula / Equation Unit Numerical value Remarks
10 No of Flywheel Q - 8
11 Total Weight of flywheel at motor RPM Wef = 3.14*D2/4 X T/1000 X 7850 X Q KG 2466.150
11B Equivalent Mass at the belt line Wef = (I) x (2 x π x MR / BS)2 = kg 368141.399
11C Equivalent mass of the entire drive system at the belt line We1 = Wef + EW + ED2 kg 401896.63
11F Difference between required weight & Selected Weight Diff = W 2 - WET kg 19607.32 >0 Hence O.K
Revised Stopping time of the conveyor with the selected Opening to Stock pile, Hence
12 CT=(We2) x (BS/60)2 / (MOPR x 1000) S 28.964
flywheel weight No brake is required.
LARSEN & TOUBRO LIMITED
EDRC-BMH-MMH IC
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS: 11592) MNS SAI
ANNEXURE - 1 POWER CALCULATION CONSIDERING MAXIMUM BULK DENSITY OF MATERIAL
Sl. No. Description Nomenclature / Formula / Equation Unit Numerical value Remarks
3 Material - - COAL
ρ1 3
4 Max Bulk Density Kg/m 1200
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS: 11592) MNS SAI
SPEED CALCULATION WITH MIN DENSITY
29 Motor RPM Available at GB input shaft Nm = Motor RPM*0.97 RPM 1445 (Considering fluid coupling slip as max.3%)
32 Belt speed with gear box nominal ratio V2= (π x D1 x Motor RPM)/(60 x reduction ratio) m/sec 4.50
HENCE BELT SPEED V2 IS ADEQUATE TO CATER FOR RATED CAPACITY.THEREFORE CHOSEN REDUCTION RATIO IS CORRECT.
LARSEN & TOUBRO LIMITED
EDRC-BMH-MMH IC
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS: 11592) MNS SAI
DRIVING FORCE CALCULATION
INPUTS
Mass of rotating parts on return side(Mr) [ For 2 ROLL φ139.7, 4.85mm Shell Thickness
34 Mr Kg/m 10
Idler for 1.6 m belt width and at 3.3m spacing].
41 Volumetric conveying capacity(Q) Q= C/(3600 xρ ) cu.m/sec 0.833 Min. bulk density of material is considered
42 Coefficient of Friction between material & Belt µ1 - 0.6 Refer page 17 of IS-11592:2000
Co-efficient of friction between material and
43 µ2 0.6 Refer page 17 of IS:11592 – 2000
skirt plates
44 Acceleration length at loading area La = V22/(2 x g x µ1) M 1.7202
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS: 11592) MNS SAI
Wrap Resistance for Type A Pulley (Drive, Assumed. To be checked after pulley
46 Rwa N 350
HT Bend) calculations
Wrap Resistance for Type B Pulley (Tail,Take Assumed. To be checked after pulley
47 Rwb N 250
up) calculations
Wrap Resistance for Type C Pulley (Snub,LT Assumed. To be checked after pulley
48 Rwc N 200
Bend) calculations
Pulley brg. Resistance(Rb) for Type A Pulley Assumed. To be checked after pulley
49 Rba 500
(Drive, HT Bend) calculations
Pulley brg. Resistance(Rb) for Type B Pulley Assumed. To be checked after pulley
50 Rbb N 350
(Tail,Take up) calculations
Pulley brg. Resistance(Rb) for Type C Pulley Assumed. To be checked after pulley
51 Rbc N 300
(Snub,LT Bend) calculations
52 Length of skirt plate(Lsk) Lsk M 6.5 Total skirt length (13m) is divided as 6.5m & 2
loading points. Including The Length of
53 No of loading points - - 2 Acceleration at Loading Area
61 Pressure between belt and belt cleaner(P) thickness + No. of External P belt cleaners x Length of N/M
2
65000 [Refer page 17 of IS:11592 – 2000]
Co-efficient of friction between belt and belt
62 µ3 0.65 [Refer page 17 of IS:11592 – 2000]
cleaner(µ3)
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS: 11592) MNS SAI
RESISTANCES - (FULLY LOADED)
CARRY SIDE RESISTANCES FROM TAIL
64 Te1 = Rm + Rsl+Rs+Rsp N 65865.73
TO DRIVE VIDE DISCHARGE
65 Total Inclined Length Carry Lc m 117.14
Inertial and frictional resistance at the loadng in the acceleration area between the handled
72 Ra = Q x 1000 x ρ x V2 N 4499.82
point and material and the belt
between handled material and the skirt plate in
73 Frictional resistance at the loadng point and Rska = (µ2 x Q2x1000x ρ x g x La)/((V22/4) x b12) N 1377.31
acceleration area
74 Wrap resistance between belt and pulley Rw = (Rwa xA')+(RwbxB)+(RwcxC) N 950.00 1 no Tail & 2 no. HT Bend pulleys
75 Pulley bearing resistance Rb = Rb x (A'+B+C) N 1350.00 1 no Tail & 2 no. HT Bend pulleys
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS: 11592) MNS SAI
86 Wrap resistance between belt and pulley Rw = (Rwa xA')+(RwbxB)+(RwcxC) N 600.00 2No LT Bend + 1 No Snub
94 Wrap resistance between belt and pulley Rw = (Rwa xA')+(RwbxB)+(RwcxC) N 650.00 1 No Take up + 1 No LT Bend
DOCUMENT NO :
PROJECT: MATERIAL HANDLING SYSTEM FOR DEVELOPEMENT OF BULK AKBTPL : KDL-12 / E101.007 / M013 / DN - C 06 01 Rev. No: A DT: 09.07.13
TERMINAL NEAR TEKRA, KANDLA L&T : O13074-M-BM-CS-DC-0007 Rev. No: 2 DT: 09.07.13
TITLE: TYPICAL MANUAL DETAIL CACULATION OF CONVEYOR KC-4AA (As per DESIGNED CHECKED SHEET : OF
IS: 11592) MNS SAI
POWER CALCULATION AT FULLY LOADED CONDITION
104 Overall drive efficiency(η0) η0= Gear box efficiency x coupling efficiency X 0.99 0.927 Considering Gear Coupling Efficiency of 99%