You are on page 1of 2

PJ Tech

Northlands Business Park Tel.: +27 (011) 704-7088 / 9


New Market Rd., North Riding Fax: +27 (011) 704-7019
Johannesburg, South Africa e-mail: sales@pjtech.co.za
www: www.pjtech.co.za

APPLICATION CHECK LIST: METAL DETECTOR


Quote Reference:       Tag:      
Customer:       End-User:      
Fax No/e-
      Date:      
mail:

In order to evaluate the application and to ensure that any system subsequently purchased will be compatible with the application, certain
data is required. Please enter the data required on the sketch and questionnaire below.

PROBLEM METALS
Smallest size metal to be detected (mm)       X       X       mm
Metal Type (s)      

PROCESS MATERIAL
PROCESSED MATERIAL:      
Is material Damp Wet Dry Contain iron Yes No (Mark Choice)
What type       % Iron      
Conductive Yes No

GENERAL FACILITY INFORMATION


Equipment to be protected      
Crusher Setting      
Power supply available 220V AC 110V AC 50 Hz 60 Hz (Mark Choice)
Is power regulated? Yes No (Mark Choice)

Belt Width (A)       mm Belt Speed       m/sec


Trough Idler Angle (B)       deg
Belt Rise (Z)       mm Idler Spacing (C)       mm
Idler Diameter (D)       mm
Outer Frame Width (E)       mm Inside Frame Width (F)       mm
Average Nominal Burden Depth
      mm
(G)
Lump Size       mm Total Height with Lumps       mm
Distance between bottom of carry and return belt (H)       mm
Distance between top of frame and bottom of carry belt
      mm
(I)
Belt Sag under full load (J)       mm
Steel Core Belt Yes No (Mark Choice)
Are metal splices or clips used? Yes No (Mark Choice)

Page 1 of 2
PJ Tech
Northlands Business Park Tel.: +27 (011) 704-7088 / 9
New Market Rd., North Riding Fax: +27 (011) 704-7019
Johannesburg, South Africa e-mail: sales@pjtech.co.za
www: www.pjtech.co.za

GENERAL FACILITY INFORMATION (continued)


Do flanges point like “X” or “Y”? X Y
Desired control unit location (left/right) when viewed in belt movement direction Right Left
Portable Plant? Yes No (Mark Choice)
Moved Frequently? Yes No (Mark Choice)
Search Coils location? Outdoors Indoors (Mark Choice)
Explosive area? Yes No (Mark Choice)
Control Enclosure location? Outdoors Indoors (Mark Choice)
Cable length required between search coils and control enclosure       meters

SPECIAL REQUIREMENTS (e.g. marking device, remote reset)


     
     
     
     
     
     

OPTIONAL - SKETCH OF CONVEYOR (Side View)


or attach drawing (ACAD .dwg or .pdf )

     

CONFIRMATION OF TECHNICAL DETAILS AS SET OUT ABOVE (requirement of ISO 9000/9001)


Print Name:       Designation:      
Signature:       Date:      

FOR OFFICE USE


Model purchased:      
Spray marking purchased:      
Clip detector purchased:      
Additional requirements:      
     
     

Page 2 of 2

You might also like