2. Check readiness of materials with supplier before planning the visit 3. Co-ordinate with GE/Supplier/Customer of GE for deputation confirmation 4. Review the provided documents clearly before the inspection & get clarified with GE 5. Confirm participants inspector’s name & mobile Number at least 1 day before the inspection, without the need of follow up from GE.
During Inspections:
1. Inform GE during the visit and align the requirement
2. Report immediately during the day if necessary 3. Witness the tests , review the reports with respect to approved documents, standards and get clarified from supplier / GE as necessary. Any deviations shall be brought out immediately to the notice of GE. 4. Closing call / report for the day, address the gaps 5. Report release, NC / observations etc with closure of NC date, if possible
After Inspections:
1. Release Report, observations, NC etc within a day of inspection.
2. Release Flash report if insp is more than a day. 3. suggest actions for closing the observations. (i.e. Closing requirements to be specified to GE/Supplier before releasing the reports) 4. Co-ordinate with GE for Release Note and signed documents 5. Communicate the reports with stake holders 6. To release the revised IRN for hold cases within 1 day of receiving the compliance. 7. Give a moment to take learnings out of the episode and share vital learnings with GE QA team.