Week 1 1) Data that increases by a constant amount at each successive time period shows: 1 point
Linear trend
Week 3
Exponential trend
Week 4
Polynomial trend
Regression
Based
No, the answer is incorrect.
Forecasting Score: 0
Methods- Part I Accepted Answers:
Regression Linear trend
Based
Forecasting 2) In following regression equation: Yt = α+β*t+ε 1 point
Methods- Part Where t = time index, Yt = number of bicycle riders at time t, and t= 1, 2, 3,…..
II Which of the following component from the above regression equation leads to trend?
Regression
Based
Forecasting t
Methods-Part
III ε
Time Series α
Forecasting-
β
Smoothing
Methods Part I No, the answer is incorrect.
Time Series Score: 0
Forecasting - Accepted Answers:
Smoothing
β
Methods Part II
Quiz : 3) Which of the following is not a type of variation in time-series forecasting? 1 point
Assignment 4
Predictable
Solution for © 2014 NPTEL - Privacy & Terms - Honor Code - FAQs -
Week 4 Trend
A project of In association with
WEEKLY Cylical
FEEDBACK
Irregular
Funded by
Download No, the answer is incorrect.
Qualitative
Time-series
Barometric
Econometric
Yt=αe^(βt+ε)
Yt=α+β
ln(Yt)=αe^βt
T-shape
U-shape
Linear
V-shape
Low value of w
High value of w
Mean value of w
w=0
10)Calculate four-period moving average forecast from the following last six periods dataset: 1 point
Period Demand
1 38
2 40
3 42
4 40
5 44
6 38
40
41
42
43