sr Question ans1 ans2 ans3 ans4 Type


Answer

Approach is established to
Approach is established to
identify, assess and monitor
HSE Competency and Training procedure defines a system and identify, plan, implement and Employees and sub contractors
1 the competencies All of the options 4 MCQ
responsibilities to ensure? monitor a risk based are competent
HSE Training programme required to perform a task in a
safe manner

The purpose of the procedure is make personnel at relevant


2 levels and functions aware of working safely and without risk t f 1 TFQ
impact to health, safety and environment

The ability to perform a particular job in compliance with


3 performance standards is termed as? Standard Capability Competency Skills 3 MCQ

Who is responsible for establishing the HSE MS training


4 programme and its periodical revisions annually. HSE Officer Human Resource QHSE Manager QEM 4 MCQ

The Training requirements matrix applicable to the project is


5 identified in the EHS Construction Plan by which personnel HSE Officer HSE Manager HR & Admin Manager Project Manager 2 MCQ

When employees are promoted to higher level or their


6 roles are changed, they satisfy the competency required for the Project Manager HSE Manager HR & AM Superintendents 3 MCQ
new positions is ensured by which department?

HSE inductions to all new personnel mobilised


7 to site in coordination with client are conducted by HSE t f 2 TFQ
Manager
Who is responsible for conducting the Tool Box Talks in
8 HSE Officer HSE Manager Superintendents HR & AM 3 MCQ
coordination with HSE officer?
Providing all resources required and to ensure that
9 Training requirements are met and all personnel under are HSE Manager Superintendents HR & AM Project Manager 4 MCQ
competent for the job they perform is ensured by?

10 Competency for performing any job includes Knowledge Task specific competencies Skills Experience 2 MCQ

Competency requirements are assessed and identified in “Job


11 HSE Manager QE Manager HR Site Manager 3 MCQ
Description” and are controlled by?

Roles and HSE Performance and


12 Which document identifies the generic HSE responsibilities ? Competency and Training HSE Manual 2 MCQ
Responsibilities Monitoring
Several jobs that requires task specific competency which shall
13 be certified by a competent authority. Identify from the Welders Riggers Fire Wardens All of the options 4 MCQ
following

The gap between the actual and demanding competencies is


14 vital in the decision making of training needs t f 1 TFQ

What is considered as a mandatory requirement for all new


15 employees to any new work location or work environment. Security checks Induction Introduction Competency 2 MCQ

This document is prepared every year, showing the generic


EHS Construction Management HSE Training Project HSE Training
16 training needs including job specific HSE trainings and HSE MS Plan Program HSE MS trainings Plan 2 MCQ
trainings. Identify the document from the following

Trainings are held if "Employees performance evaluation"


17 comments received demands so t f 1 TFQ

The “HSE Training Program” and “Project HSE Training Plan”


18 should clearly make visible which of the following aspects Targeted attendees Frequency Internal/External All of the options 4 MCQ

This QHSE induction program is focussed on familiarising the


new recruit with :
19 Option 1 : Organization’s HSE policy Option 1 and 2 Option 2 and 3 Option 1 and 3 All of the options 1 MCQ
Option 2 : HSE-MS requirements
Option 3 : Amana Overview and Policies

HSE-Management System Induction covers Introduction, R&R


20 t f 1 TFQ
and Emergency response as a minimum

Records of HSE Training and tool box talks provided at project


21 HR & Admin department QHSE department Project Site Offices Individuals 3 MCQ
sites are maintained by

A feedback survey by the participant at the end of training is


22 t f 1 TFQ
another method of measuring the training results.

Project HSE Training plan for every project depending on need


23 HSE Manager HSE Officer HR Project HSE Officer 2 MCQ
and complexity is prepared by?

Identify from below the tool box topics:


Option 1 : Manual handling of materials
24 Option 1 and 2 Option 2 and 3 Option 1 and 3 None 3 MCQ
Option 2 : Amana Introduction
Option 3 : Heat Stress/Illness/ Prevention