You are on page 1of 4

EMPLOYER

PROJECT NAME

Design and Build of Intake, Raw Water Pipeline, and 500 MLD Water Treatment Plant at
Gandharbpur under Dhaka Environmentally Sustainable Water Supply Project (DESWSP)

OWNER ENGINEER

CONTRACTOR

SUB-CONTRACTOR

DOCUMENT TITLE

LIGHTING SYSTEM: CALCULATION NOTE

B 15/08/2021 Ist Revision M.A. ARIFIN

A 28/01/2021 FIRST ISSUE J.MUNSHI S.ISLAM E. KHAN

Rev Date Revision Description Prepared By Checked By Approved By

DOCUMENT NUMBER REVISION * Document Status

B-001464-EKA-CL-I00-CN-0701 B IFA

Format: * Key words for document status: ALL RIGHTS RESERVED FOR ALL COUNTRIES

IFI : Issued for Information IFA : Issued for Approval INT : Internal CAN : Cancelled RFQ : Ready for Quotation
A4
IFR : Issued for Review IFC : Issued for Construction ASB : As Built SUP : Superseded RFP : Ready for Purchase
B-001464-EKA-CL-I00-CN-0701

B IFA
LIGHTING SYSTEM : CALCULATION NOTE 15/08/2021
28/01/2021

Introduction to content & Purpose of this document

This document contains the calculation note of the Lighting system at the intake

Revision Change Record

Revision Revision Date List of updated sections Reason for update


A 28/01/201 FIRST ISSUE

B 15/08/2021 Street Light Specific Light based calculation


B-001464-EKA-CL-I00-CN-0701

IF
A IFA
LIGHTNNG SYSTEM : A
CALCULATION NOTE
28/01/2021

FLOOD LIGHTING ILLUMINATION CALCULATION

Area Name I96 W I96 S I84 I80 W I80 N/S I91 N/S I91 E/W I92 E I92 S

Area (A) 110 300 130 130 140 350 180 300 120

Lux 50 50 120 100 100 30 30 80 80

Total lumen required on 5500 15000 15600 13000 14000 10500 5400 24000 9600
surface (TS)

Waste Light Factor (WF) 1.20 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25

Utilization Factor (UF) 0.40 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48

Depreciation Factor (DF) 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30

Total Lumen required by 12692.3077 30048.0769 31250 26041.6667 28044.8718 21033.6538 10817.3077 48076.9231 19230.7692
lamps (TL)

Lamp Watt (W) 200 200 200 200 200 200 200 200 200

Lumen Output of Lamp 20000 20000 20000 20000 20000 20000 20000 20000 20000

Number of lamps 1 2 2 1 1 1 1 2 1
required

Radius of illuminated 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50
circle, Meter

Distance from light 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00
source, Meter

Beam angle, degree 60 60 60 60 60 60 60 60 60


B-001464-EKA-CL-I00-CN-0701

IF
B IFA
LIGHTNNG SYSTEM : A
CALCULATION NOTE
28/01/2021
15/08/2021

STREET LIGHTING ILLUMINATION CALCULATION

Area Name Ch 000 - Ch 250 - Ch 375 Ch 425 Ch 150 Ch 175 Ch 200 Ch 225
Ch 125 Ch 350
Road width, meter (w) 6.50 6.00 5.00 12.00 6.60 9.00 9.00 5.00

Pole Hieght in Meters 7.00 7.00 6.00 7.00 7.00 8.00 8.00 7.00

Pole distance, meter (d) 14 14 14 14 14 20 20 14

LIGHT to Road C-C 3.75 3.5 3.5 6.5 3.5 5 5 3.5


distance in Meers

Pole to Road C-C distance 5 5 5 8 5 6.5 6.5 5

Maintenance factor (Mf) 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9

Utilization Factor (Uf) 0.29 0.25 0.24 0.36 0.29 0.29 0.29 0.29

Overall Luminous 0.20 0.20 0.20 0.20 0,20 0.20 0.20 0.20
uniformity (Uo)

Recommended 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00


illumination, Lux (E)

Average lumen of Light 12000.00 12000.00 12000.00 12000.00 12000.00 20000.00 20000.00 12000.00
Fixture with bulb

Lumen Output of Lamp 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
(lu/w)

Radius of 20 Lux light 7.00 7.00 7.00 7.00 x2 7.00 10.00 10.00 7.00

Angle of Light Shed in 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Degree

Lamp Watt (W) `120 120 120 120 (x2) 120 200 200 120