NO OF CAPACITY SELF OF PILE OF PILE CARRING SELFWEI OF PILE PILE DIA OF PILES OF PILE WEIGHT GROUP IN NO AS PER CAPASITY GHT OF GROUP(EXCLUDIN GROUP PILE IN THE GROUP(90% OF EACH SESMIC SBC OF EACH PILE CAP G SW OF PILE&PILE GROUP CONSIDERE PILE CASE(*1.2 REPORT PILE CAP) D) 5)
2 PG2 380 5 310 2 558 23.86 21 489 611
4 PG4 380 5 310 3 837 23.86 48 718 897
6 PG16 380 5 310 4 1116 23.86 83 937 1172
8 PG8 380 5 310 5 1395 23.86 109 1167 1458
9 PG9 380 5 310 6 1674 23.86 139 1392 1739
10 PG10 380 5 310 8 2232 23.86 286 1755 2194
Design of Two Pile cap
Grade of Concrete, fck = 30 N/mm^2
Grade of Steel,fy = 500 N/mm^2 Dia of pile, D = 380 mm Dia of Bulb, Du (2.5D) = 950 mm Spacing of Pile (1.5*Du) = 1425 mm Pedastal Size = 600 mm Length of Pile Cap = 2105 mm Width of Pile Cap 680 Depth of Pile Cap = 600 mm Dia of Bars in Cap = 16 mm Capacity of each Pile, Pu = 310 kN No. of Piles = 2 Load capacity of Pile Group, (2*Pu*0.9) = 558 kN Self Weight of Pile Cap = 21 kN Safe Load on each Pile = 268 kN Effective Depth = 517 mm Factored Bending Moment = 240 kN-m Mu/bd^2 = 0.43 % steel = 0.10 Min. %of Steel = 0.20 Area of Steel = 1034 mm^2 Dia of Bars in Cap = 16 mm Spacing of bars = 194 mm c/c Location of SF from outer face of Pile = 344 mm Factored Shear Force at the above location = 1052 kN Tv = 0.97 N/mm^2 Tc = 0.33 N/mm^2 PUNCHING SHEAR Total Load = 2325 kN Shear Stress = 1.01 N/mm^2 Allowable stress = 1.36931 N/mm^2 Design of Three Pile cap 300 380 Grade of Concrete, fck = 30 30 N/mm^2 Grade of Steel,fy = 500 500 N/mm^2 Dia of pile, D = 300 380 mm Dia of Bulb, Du (2.5D) = 750 950 mm Spacing of Pile (1.5*Du) = 1125 1425 mm Base dimension of Pile = 1725 2105 mm Height of the traiangle = 974 1234 mm CG from top pile = 650 823 mm CG from base = 325 411 mm Pile Cap Height (Dimension) = 1574 1914 mm Pedastal Size = 750 750 mm Depth of Pile Cap = 600 600 mm Beam Width = 600 600 mm Dia of Bars in Beam = 16 16 mm Pile Capacity = 240 310 kN No. of Piles = 3 3 Load capacity of Pile Group = 648 837 kN Self Weight of Pile Cap = 32 48 kN Safe Load on each Pile = 205 263 kN Effective Depth = 517 517 mm Design of Beam B1 Factored Bending Moment = 124 260 kN-m Mu/bd^2 = 0.77 1.62 % steel = 0.18 0.40 Min. % of Steel = 0.20 0.40 Area of Steel = 620 1240 mm^2 Dia of Bars in Beam = 16 16 mm No of Bars = 4 7 Nos Factored Shear Force = 450 581 kN Tc = 0.33 0.45 N/mm^2 Shear Carried by Concrete = 104 140 kN Shear to be taken by steel = 346 441 kN Dia stirrups = 8 10 mm No of Legs = 4 4 Nos Spacing Required = 131 160 c/c Design of Beam B2 Factored Bending Moment = 253 414 kN-m Mu/bd^2 = 1.58 2.58 % steel = 0.39 0.67 Min. % of Steel = 0.39 0.67 Area of Steel = 1204 2073 mm^2 Dia of Bars in Beam = 16 16 mm No of Bars = 6 11 Nos Factored Shear Force = 450 581 kN Tc = 0.446 0.560 N/mm^2 Shear Carried by Concrete = 138 174 kN Shear to be taken by steel = 312 408 Dia stirrups = 8 10 mm No of Legs = 4 4 Nos Spacing Required = 145 173 c/c PUNCHING SHEAR Total Load = 720 930 kN Shear Stress = 0.52 0.67 N/mm^2 Allowable stress = 1.369306393763 1.369306 N/mm^2 Design of Four Pile cap
Grade of Concrete, fck = 30 30 N/mm^2
Grade of Steel,fy = 500 500 N/mm^2 Dia of pile, D = 300 380 mm Dia of Bulb, Du (2.5D) = 750 950 mm Spacing of Pile (1.5*Du) = 1125 1425 mm Pedastal Size = 750 750 mm Side of Cap = 1725 2105 mm Depth of Pile Cap = 600 750 mm Dia of Bars in Cap = 16 16 mm Capacity of each Pile, Pu = 240 310 kN No. of Piles = 4 4 Load capacity of Pile Group, (4*Pu*0.9) = 864 1116 kN Self Weight of Pile Cap = 45 83 kN Safe Load on each Pile = 205 258 kN Effective Depth = 517 667 mm Factored Bending Moment = 169 392 kN-m Mu/bd^2 = 0.37 0.42 % steel = 0.09 0.10 Min. %of Steel = 0.20 0.20 Area of Steel = 1034 1334 mm^2 Dia of Bars in Cap = 16 16 mm Spacing of bars = 194 151 mm c/c Location of SF from outer face of Pile = 79 194 mm Factored Shear Force at the above location = 237 593 kN Tv = 0.27 0.42 N/mm^2 Tc = 0.33 0.33 N/mm^2 PUNCHING SHEAR Total Load = 1800 2325 kN Shear Stress = 0.69 0.61 N/mm^2 Allowable stress = 1.369306394 1.36931 N/mm^2 Design of Five Pile cap
Grade of Concrete, fck = 30 N/mm^2
Grade of Steel,fy = 500 N/mm^2 Dia of pile, D = 380 mm Dia of Bulb, Du (2.5D) = 950 mm Min Spacing of Pile (1.5*Du) = 1425 mm Spacing of outer Piles (sqrt(2)*1.5*Du) = 2015.25 mm Pedastal Size = 600 mm Side of Cap = 2695.25 mm Depth of Pile Cap = 600 mm Dia of Bars in Cap = 16 mm Capacity of each Pile, Pu = 310 kN No. of Piles = 5 Load capacity of Pile Group, (5*Pu*0.9) = 1395 kN Self Weight of Pile Cap = 109 kN Safe Load on each Pile = 257 kN Effective Depth = 517 mm Factored Bending Moment = 823 kN-m Mu/bd^2 = 1.14 % steel = 0.28 Min. %of Steel = 0.28 Area of Steel = 1423 mm^2 Dia of Bars in Cap = 16 mm Spacing of bars = 141 mm c/c Location of SF from outer face of Pile = 639.127 mm Factored Shear Force at the above location = 1955 kN Tv = 1.40 N/mm^2 Tc = 0.38 N/mm^2 PUNCHING SHEAR Total Load = 2325 kN Shear Stress = 1.01 N/mm^2 Allowable stress = 1.36931 N/mm^2 Design of Six Pile cap
Grade of Concrete, fck = 30 N/mm^2
Grade of Steel,fy = 500 N/mm^2 Dia of pile, D = 380 mm Dia of Bulb, Du (2.5D) = 950 mm Spacing of Pile (1.5*Du) = 1425 mm Pedastal Size = 900 mm Length of pile Cap = 3530 mm Width of pile Cap = 2105 mm Depth of Pile Cap = 750 mm Dia of Bars in Cap = 16 mm Capacity of each Pile, Pu = 310 kN No. of Piles = 6 Load capacity of Pile Group, (6*Pu*0.9) = 1674 kN Self Weight of Pile Cap = 139 kN Safe Load on each Pile = 256 kN Effective Depth = 667 mm X-Axis (Three Piles Side) Factored Bending Moment = 458 kN-m Mu/bd^2 = 0.29 % steel = 0.07 Min. %of Steel = 0.20 Area of Steel = 1334 mm^2 Dia of Bars in Cap = 16 mm Spacing of bars = 151 mm c/c Location of SF from outer face of Pile = 119 mm Factored Shear Force at the above location = 364 kN Tv = 0.15 N/mm^2 Tc = 0.33 N/mm^2 PUNCHING SHEAR Total Load = 3487.5 kN Shear Stress = 0.83 N/mm^2 Allowable stress = 1.36931 N/mm^2
Y-Axis (Three Piles Side)
Factored Bending Moment = 1133 kN-m Mu/bd^2 = 1.21 % steel = 0.29 Min. %of Steel = 0.29 Area of Steel = 1952 mm^2 Dia of Bars in Cap = 16 mm Spacing of bars = 103 mm c/c Location of SF from outer face of Pile = 119 mm Factored Shear Force at the above location = 364 kN Tv = 0.26 N/mm^2 Tc = 0.40 N/mm^2 PUNCHING SHEAR Total Load = 3487.5 kN Shear Stress = 0.83 N/mm^2 Allowable stress = 1.36931 N/mm^2 Design of Eight Pile cap
Grade of Concrete, fck = 30 N/mm^2
Grade of Steel,fy = 500 N/mm^2 Dia of pile, D = 380 mm Dia of Bulb, Du (2.5D) = 950 mm Spacing of Pile (1.5*Du) = 1425 Spacing of outer Piles (sqrt(2)*1.5*Du) = 2015.25 mm Pedastal Size = 310 mm Length of pile Cap = 4710.51 mm Width of pile Cap = 2695.25 mm Depth of Pile Cap = 900 mm Dia of Bars in Cap = 16 mm Capacity of each Pile, Pu = 310 kN No. of Piles = 8 Load capacity of Pile Group, (8*Pu*0.9) = 2232 kN Self Weight of Pile Cap = 286 kN Safe Load on each Pile = 243 kN Effective Depth = 817 mm X-Axis (Three Piles Side) Factored Bending Moment = 1487 kN-m Mu/bd^2 = 0.47 % steel = 0.11 Min. %of Steel = 0.20 Area of Steel = 1634 mm^2 Dia of Bars in Cap = 16 mm Spacing of bars = 123 mm c/c Location of SF from outer face of Pile = 634.127 mm Factored Shear Force at the above location = 1940 kN Tv = 0.50 N/mm^2 Tc = 0.33 N/mm^2 PUNCHING SHEAR Total Load = 4650 kN Shear Stress = 1.26 N/mm^2 Allowable stress = 1.36931 N/mm^2 Design of Five Pile cap