CALIBRATION PROCEDURE

OPERATION SETUP

METHODS

NEW

CHANGE THE NEW METHOD NAME (EXP. RAWMEAL)

SELECT CATEGARY TO USER


PERIODIC TABLE
IN PERIODIC TABLE SELECT MORE THEN 10% HAS MAJOR ELEMENT, 0.5 TO
10% MINOR AND LESS THEN 0.5 HAS TRACES.

CLICK ADD ELEMENT


Select the monochromator element which is available in your instrument has _m (exp.
Ca_m) . then select other element in goniometer.
Change the Kv/mA has 30Kv 70mA. Change the counting time 20. Then click ok.

METHOD HEADER

Select OXIDE

COMPONENTS
Change the display name for all the elements.

PSEUDOS(FORMULA) enter the name and formula


SETTING UP SAMPLES
In this save and keep the windows open and again go to

OPERATION SETUP

1
SETTING UP SAMPLES

2
CREATE FROM METHOD

CREATE FROM METHODE


In method select your method (exp. RAWMEAL)

Change the template name to samples name (exp.RM1)

Category to user
Position no to 1 and validity period to 48
Chick UPD ALWAYS chick DO FULL UPDATE
Again click DUPLICATE
Enter the second sample name and position No. do the same upto your samples to be
completed.

SAVE THEN CANCEL.


In open method windows at setting up samples box, select your TOP AND BOTTOM in
all element. SAVE AND CLOSED THE BOX.

2nd STEP

OPERATION SETUP

CALIBRATION MVR

In right side box directly come to down and select calibration STANDARD
Click right batten in mouse
NEW MATRIX

CLICK NEW MATRIX


Enter the method name (exp. RAWMENAL)

2
RIGHT CLICK METHOD

3
NEW SET OF CALIBRATION STANDARDS
Enter same method name
Right click EDITFROM METHOD select your methodOK
Enter all the samples name and chemical values-SAVEOK

Again go to top of the same windows and select your method


Double click the your method measure standards right click
Measure calibration standards select your mrthodOK
BATCHCREATE BATCH
Its shows batch has been successfully created and note the batch name.

IIIrd STEP

ANALYSIS AND DATA


MANAGE SCT SAMPLES(F12)


In select itemselect your method(exp RAWMEAL)

BATCH ALL SAMPLESCREATE BATCH


Shows batch has been successfully createdclick OK

Then keep the samples in position and click GREEN ANALYSIS BOTTEN
After completing the SUS batch select calibration batch and run all calibration samples.

IVth STEP

OPERATION SETUP

CALIBRATION –MVR

METHODselect your methodselect ANALYTES—CLICK select the element and


see the curve, if any point out from the curve uncheck the same and compute. Then save.
Same to be repute all the element.

Vth step.

ANALYSIS AND DATA

3

MANAGE SCT SAMPLES
4

SELECT ITEM(YOUR METHOD)


BATCH-ALL SAMPLESCREATE BATCH


Run the samples and after completed the analysis do your regular analysis.