You are on page 1of 4

ANNEXURE-2: INTERFACE BETWEEN EPCC-3

AND EPCC-4 RELATED TO CABLING

Culvert in
EPCC-3 Scope

ETP-TIEIN-1

LEGEND: NOTE:

ABOVEGROUND CABLE 1) THE ABOVEGROUND / UNDERGROUND CABLE ROUTE INDICATED FROM CT


ROUTE SUBSTATION TO ETP SUBSTATION AND FROM ETP SUBSTATION TO ETP UNIT IS
PRELIMINARY. CONTRACTOR SHALL FURTHER UDATE THE CABLE ROUTE
DURING DETAIL ENGINEERING PHASE.
UNDERGROUND CABLE TRENCH
ROUTE
2) THE ABOVEGROUND/UNDERGRODUND CABLE ROUTE FROM SUBSTATION
SS-319N TO INTERFACE POINT ETP-TIEIN-1 INCLUDING CABLE TRAY,
UNDERGROUND CABLE CULVERT SUPPORTS, RCC TRENCH, CULVERT AT ROAD CROSSING, ETC. SHALL BE IN
ROUTE OTHER CONTRACTOR'S (EPCC-4) SCOPE.

3) THE ABOVEGROUND/UNDERGRODUND CABLE ROUTE FROM INTERFACE


POINT ETP-TIEIN-1 TO SUBSTATION SS-319AN INCLUDING CABLE TRAY,
SUPPORTS, RCC TRENCH, CULVERT AT ROAD CROSSING, ETC. SHALL BE IN
CONTRACTOR'S SCOPE.

4) CONTRACTOR SHALL LIAISE WITH OTHER CONTRACTOR (EPCC-4) FOR


FINALIZATION OF INTERFACE TIEIN POINT (ETP-TIEIN-1) DURING DETAIL
ENGINEERING PHASE.

PAGE 1 OF 1
PAGE 1 OF 1
TENTATIVE /LOCATION
PRELIMINARY LOCATION OF
OF EXISTING
ETP UNIT RMU
MEG

MEG :
EXISTING 11kV RMU
FOR CONSTRUCTION
POWER

ETP :
TENTATIVE LOCATION
OF11kV RMU
FOR CONSTRUCTION
POWER for ETP unit

SRR 822
SS-315 N

MEG 11kV RMU


FOR
CONSTRUCTION
POWER

LOCATIONS OF EXISTING MEG UNIT RMU INDICATED IN ABOVE ARE TENTATIVE. CONTRACTOR SHALL CONDUCT THE SITE
SURVEY TO FIND THE EXACT LOCATION OF EXISTING RMU.

PAGE 2 OF 2