Professional Documents
Culture Documents
ARCHITECTURAL COMMENTS:
1. CONTRACTOR TO VERIFY ALL DIMENSIONS AS PER IFC AND SITE CONDITIONS
2. ALL MATERIALS SHALL BE AS PER MATERIALS APPROVALS AND SAMPLES APPROVALS
3. IT IS CONTRACTOR'S RESPONSIBILITY TO COMPLETELY VERIFY ALL THE BEAMS AND CASES AS PER IFC
4. IT IS CONTRACTOR'S RESPONSIBILITY TO ENSURE STRUCTURAL STABILITY OF OF THE CLADDING SYSTEM PROJECT KEY PLAN:
5. FINAL APPROVAL IS SUBJECT TO
A. APPROVAL OF PULL-OUT TEST FOR THE MAIN BOLTS
B. APPROVAL OF MOCK-UP OF ALL THE THREE CASES
C. APPROVAL OF STRUCTURAL CALCULATIONS
29 JUN 2021
LEGEND :
GRID
CONTRACT REFERENCE DRAWING
SECTION DETAIL - 2
Description Date Drawn Chkd
28.06.2021
306
Client:
Design Consultant:
Main Contractor:
AF Construction LLC.
P.O. Box 1811. Dubai, UAE,
Tel +971 4 308 9222, Fax +971 4 308 9136
email afc@afconstruction.ae
www.afconstruction.ae
Sub Contractor:
SHOP DRAWING
Drawing Title:
TYPICAL BEAM
CLADDING SECTION
DETAIL AT FIRST
FLOOR
Drawing No: Rev.
SECTION DETAIL - 3 DEM/XXX/AFC/ARD/SD/AR/FFL-00011 00
DM Plot. No. Date: Scale Drawn by Chkd by
5219784 AS SHOWN DR DR