You are on page 1of 1

M

ARCHITECTURAL COMMENTS:
1. CONTRACTOR TO VERIFY ALL DIMENSIONS AS PER IFC AND SITE CONDITIONS
2. ALL MATERIALS SHALL BE AS PER MATERIALS APPROVALS AND SAMPLES APPROVALS
3. IT IS CONTRACTOR'S RESPONSIBILITY TO COMPLETELY VERIFY ALL THE BEAMS AND CASES AS PER IFC
4. IT IS CONTRACTOR'S RESPONSIBILITY TO ENSURE STRUCTURAL STABILITY OF OF THE CLADDING SYSTEM PROJECT KEY PLAN:
5. FINAL APPROVAL IS SUBJECT TO
A. APPROVAL OF PULL-OUT TEST FOR THE MAIN BOLTS
B. APPROVAL OF MOCK-UP OF ALL THE THREE CASES
C. APPROVAL OF STRUCTURAL CALCULATIONS

29 JUN 2021
LEGEND :

GRID
CONTRACT REFERENCE DRAWING

SHOP DRAWING REFERENCE

SECTION DETAIL - 2
Description Date Drawn Chkd
28.06.2021

306
Client:

Project and Cost managers:

Design Consultant:

KHALID BIN AL-WALID ROAD


P O BOX 5620, DUBAI TELEPHONE +971 4405 9300
UNITED ARAB EMIRATES FAX +971 4405 9301
EMAIL office.dubai@atkinsglobal.com

Main Contractor:

AF Construction LLC.
P.O. Box 1811. Dubai, UAE,
Tel +971 4 308 9222, Fax +971 4 308 9136
email afc@afconstruction.ae
www.afconstruction.ae

Sub Contractor:

SECTION DETAIL - 1 Project Name:

DUBAI EXPO MALL


Project Location:

DWC - MADINAT AL MATTAAR, DUBAI


PARCEL ID: DWC-DEC-1A

SHOP DRAWING
Drawing Title:
TYPICAL BEAM
CLADDING SECTION
DETAIL AT FIRST
FLOOR
Drawing No: Rev.
SECTION DETAIL - 3 DEM/XXX/AFC/ARD/SD/AR/FFL-00011 00
DM Plot. No. Date: Scale Drawn by Chkd by
5219784 AS SHOWN DR DR

You might also like