DETAILED DESIGN TECHNICAL DRAWINGS

ISSUED FOR CONSTRUCTION


Lot 1: Mattan - Fahud
August 2021

ConsultancyServices
Consultancy Servicesfor
forFeasibility
Feasibility Study
Study and
and Detailed
Detailed Design
Design of Roads:
of the Roads:
FahudFahud
Fahud - Mattan, - Mattan,
- YibalFahud - Yibal,
and Qarn AlamQarn
- SaihAlam
Rawl- (Al
Saih Rawl Region)
Dakhiliyya

CLIENT:
PDO
Petroleum Development Oman CONSULTANT:
ViA International
Engineering Consultancy
PROJECT MANAGER:
Al Nahada Tower 2, Ghala,
Carillon Alawi Muscat, Sultanate of Oman INTERNATIONAL
info@via-int.com Engineering Consultancy LLC
LIST OF DRAWINGS

CLIENT: PROJECT MANAGER: CONSULTANT: DRAWING CODE REV. DATE DESCRIPTION PROJECT ID: W.2019.07
VIA INTERNATIONAL LLC Consultancy Services for Feasibility Study and Detailed
PETROLEUMDEVELOPMENTOMAN CARILLIONALAWI A
DRAWN:
Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat Design of Roads: B
C CHECKED:
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl D
INTERNATIONAL T. +968 24117507 - info@via-int.com E APPROVED:
Engineering Consultancy LLC
DETAILED DESIGN F
G
@A1: @A3:
GENERAL DRAWINGS

CLIENT: PROJECT MANAGER: CONSULTANT: DRAWING CODE REV. DATE DESCRIPTION PROJECT ID: W.2019.07
VIA INTERNATIONAL LLC Consultancy Services for Feasibility Study and Detailed
PETROLEUMDEVELOPMENTOMAN CARILLIONALAWI A DRAWN:
Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat Design of Roads: B
C CHECKED:
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl D
INTERNATIONAL T. +968 24117507 - info@via-int.com E APPROVED:
Engineering Consultancy LLC
DETAILED DESIGN F
G
@A1: @A3:
MUSCAT

0
00
WADI AL AIN R/A

00
0+

20+0
MATTAN

00
40+0
00
60+0
80+000
0
+00
00
00

100
129+5
0+0
00
+0
LOT1 - 129.5 km

00

1 0
+0
00

2 0
+0
44+ 00
420

0
0
FAHUD

3
40+
YIBAL LOT 2 - 44.4 km

20+000
000
QARN ALAM

40+000

00
41+400

0+000
30+

10+0
SAIH RAWL LOT 3 - 41.4 km

0 200km N N
0 75km 150km

MAP OF OMAN PROJECT AREA

LEGEND:

LOT 1: MATTAN - FAHUD 129.5 km

LOT 2: FAHUD - YIBAL 44.4 km

LOT 3: QARN - SAIH RAWL 41.4 km

CLIENT: PROJECT MANAGER: CONSULTANT: DRAWING CODE DD GE 01 REV. DATE DESCRIPTION PROJECT ID: W.2019.07
VIA INTERNATIONAL LLC Consultancy Services for Feasibility Study and Detailed
PETROLEUMDEVELOPMENTOMAN CARILLIONALAWI A 08/2021 ISSUED FOR CONSTRUCTION
DRAWN:
Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat Design of Roads: GENERAL B - -
C - - CHECKED:
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl D - -
INTERNATIONAL T. +968 24117507 - info@via-int.com Key Map E - - APPROVED:
Engineering Consultancy LLC
DETAILED DESIGN With Project area F
G
-
-
-
-
@A1: NTS @A3: NTS
TYPICAL CROSS SECTION OF CARRIAGEWAY SECTION DETAIL OF EXTENSION SLOPE PROTECTION
scale1:100
8.00 m 3.00 2.00 CARRIAGEWAY 2.00
CARRIAGEWAY 0.50
2.00 m 4.00 m 4.00 m 2.00 m 0.50 3.00m
UNPAVED LANE LANE UNPAVED 0.30 2.5%
SHOULDER SHOULDER UPSTREAM
EXISTING max 0.50
0.50
0.60 0.30
e% e% CROSS SECTION 1.00
GROUTED RIPRAP 1.00
GROUTED RIPRAP 0.60 DOWNSTREAM
GABIONS OR LOOSE
RIPRAP Ø 0.3m GABIONS OR LOOSE
RIPRAP Ø 0.3m
SUBGRADE ASPHALT
EMBANKMENT GRANULAR SUBBASE - TYPE B

8.00 TYPICAL CROSS SECTION - TRANSITION TO FLOODWAY


scale1:100

8.00 m

UNPAVED SHOULDER

UNPAVED SHOULDER
CARRIAGEWAY
EXISTING CROSS
3.00 m 2.30 m 4.00 m 4.00 m 2.30 m 3.00 m
LANE LANE SECTION IN FLOODWAY
UPSTREAM
to be maintained
MORTARED RIP RAP MORTARED RIP RAP
SECTION A
LOOSE RIP RAP LOOSE RIP RAP
2.5%

DOWNSTREAM

100 m

MORTARED RIP RAP

MORTARED RIP RAP


LOOSE RIP RAP

LOOSE RIP RAP


A A

200 m
PAVED SHOULDER
PAVED SHOULDER

LANE

LANE

40 m

NOTE: To be applied on both sides of floodway


11.00 m

11.00 m
CARRIAGEWAY PROPOSED
2.50 m 1.50 m 4.0 m 4.0 m 1.50 m 2.50 m
UNPAVED PAVED LANE LANE PAVED UNPAVED
CROSS SECTION
VERGE SHOULDER SHOULDER VERGE
FILL SLOPE 100 m
HEIGHT OF FILL SLOPE
0.5 0.5 0.5 0.5 1 - 1.5m 4H:1V
e% e%
1.5 - 3m 2H:1V
H
V

DESIGN BITUMINOUS LAYERS


DESIGN STRUCTURAL LAYERS
NOTE: EMBANKMENT/SUBGRADE EMBANKMENT MATERIAL
- Typical cross section widening. Structural layers can be different section by section

PAVED SHOULDER

PAVED SHOULDER
- *Total width of asphalt is 11.00m.

LANE

LANE
150 m
TYPICAL CONNECTION DETAILS TYPICAL EDGE DETAILS B B

scale1:20 scale1:20
VERGE SIDE SLOPE
H1
H2 H1
1 H1 500mm 500mm
H2 H1

1
1 H2
H3 H2 H1

1 11
1 H3 CARRIAGEWAY
1
1 11.00 m
1 1 PROPOSED
H3

1
2.50 m 1.50 m 4.0 m 4.0 m 1.50 m 2.50 m
1
VERGE LANE LANE VERGE CROSS SECTION
H4

SHOULDER

SHOULDER
PAVED

PAVED
SUB-GRADE edge marking line edge marking line SECTION B
SUB-GRADE *NOTE
Total width of asphalt is 11.00m 2.0% 2.0%

EXISTING LAYER 1 NEW DESIGN LAYERS


DESIGN LAYER 1 DESIGN LAYER 4
EXISTING LAYER 2 MATERIALS SUITABLE FOR EMBANKMENT
DESIGN LAYER 2 DESIGN LAYER 3
EXISTING LAYER 3 NOTE: Typical edge treatment. Pavement layers can be different section by section

CLIENT: PROJECT MANAGER: CONSULTANT: DRAWING CODE DD GE 02 REV. DATE DESCRIPTION PROJECT ID:W.2019.07
VIA INTERNATIONAL LLC Consultancy Services for Feasibility Study and Detailed
PETROLEUMDEVELOPMENTOMAN CARILLIONALAWI Design of Roads:
A 08/2021 ISSUED FOR CONSTRUCTION
DRAWN:
Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat GENERAL B - -
C - - CHECKED:
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl D - -
INTERNATIONAL T. +968 24117507 - info@via-int.com Typical Cross Sections and Details E - - APPROVED:
Engineering Consultancy LLC
DETAILED DESIGN F
G
-
-
-
-
@A1:VARIOUS @A3:VARIOUS
VERGE
INLET PLAN MORTARED RIPRAP VERGE MORTARED RIPRAP
OUTLET PLAN
NTS
2310 2310 NTS

300 300

5000

5000
TYPICAL CULVERT LAYOUT

2000

2000
SCALE 1:200 @ A1
SCALE 1:400 @ A3

4000

4000
SHOULDER

SHOULDER
VERGE

VERGE
LANE

LANE
30° 30°

2000

*(see note n.9)


*(see note n.9)
5000

5000
FLOW FLOW
A

2000*
2000*
A B B
4000

INLET OUTLET
4000

30 ° 30°
5000

5000

EDGE OF ASPHALT

EDGE OF ASPHALT
2000 2000

4000

4000
APPROACH SLAB

2000

2000
5000

5000
300 300
L=2000 2310 2310 L=2000
AT OUTLET:
LOOSE RIPRAP
AT INLET: MORTARED RIPRAP MORTARED RIPRAP
LOOSE RIPRAP APPROACH SLAB IF FILL
HEIGHT LESS THAT 0,60m
(THICKNESS : 0,30m)

APPROACH SLAB IF FILL


ELEVATION HEIGHT LESS THAT 0,60m
MORTARED RIPRAP
View of the Culvert (THICKNESS : 0,30m) GUARD RAIL AS REQUIRED
4000 4000

600
300 300

1000
2000*
*(see note n.9)
1250 1250
1
2 MORTARED RIPRAP

5000 5000
WEEP HOLES ø50
LOOSE
RIPRAP

Section A-A - INLET GUARD RAIL EDGE OF ASPHALT EDGE OF ASPHALT GUARD RAIL Section B-B - OUTLET
NTS
NTS

L=2000 2310 300 300 2310 L=2000


NOTES:
900

900
1. All dimensions are in millimeters;
2. Approach slab should be provided for fill
heights less than 0,60 m;
3. Concrete class: c25/30;
4. Steel reinforcement: Grade 60 (420 MPa);
1000

1000
5. Concrete cover to reinforcement is 50 mm;

600
6. Maximum allowable crack width is 0,25 mm;
7. Expansion Joint to be not more than 35 m;
300

300
8. Supervision engineer can vary scour depth if
deemed necessary, according to site
conditions;
1000

1000
9. Details of typical 2000x1000mm box culvert.
Structural dimension of 1000x1000mm
1500

1500
LOOSE LOOSE
culverts to be adjusted as per OHDS 2017 RIPRAP RIPRAP

500 500

CLIENT: PROJECT MANAGER: CONSULTANT: DRAWING CODE DD GE 03 REV. DATE DESCRIPTION PROJECT ID: W.2019.07
VIA INTERNATIONAL LLC Consultancy Services for Feasibility Study and Detailed
PETROLEUMDEVELOPMENTOMAN CARILLIONALAWI A 08/2021 ISSUED FOR CONSTRUCTION

Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat Design of Roads: GENERAL B - -


DRAWN:

C - - CHECKED:
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl D - -
INTERNATIONAL T. +968 24117507 - info@via-int.com New Single Cell Box Culvert E - - APPROVED:
Engineering Consultancy LLC
DETAILED DESIGN Inlet/Outlet Protection F - -
@A1: NTS @A3: NTS
G - -
TYPICAL CULVERT LAYOUT INLET PLAN OUTLET PLAN
SCALE 1:200 @ A1
NTS NTS

A
SCALE 1:400 @ A3

MORTARED RIPRAP MORTARED RIPRAP


VERGE VERGE
2310 2310
300 300

SHOULDER

SHOULDER
VERGE

VERGE

5000

5000
LANE

LANE

2000

2000
2000 2000

4000

4000
5000

5000
4000

30° 30°

INLET OUTLET

FLOW

*(see note n.9)

*(see note n.9)


FLOW
4000

2000*

2000*
5000

5000

B B

APPROACH SLAB

*(see note n.9)

*(see note n.9)


FLOW FLOW

2000*

2000*
NOTES:

1. All dimensions are in millimeters;


2. Approach slab should be provided for fill
heights less than 0,60 m; 30° 30 °
3. Concrete class: c25/30;
4. Steel reinforcement: Grade 60 (420 MPa);
5. Concrete cover to reinforcement is 50 mm;
6. Maximum allowable crack width is 0,25 mm;

EDGE OF ASPHALT

EDGE OF ASPHALT
7. Expansion Joint to be not more than 35 m;

4000

4000
8. Supervision engineer can vary scour depth if
deemed necessary, according to site

2000

2000
conditions;
9. Details of typical 2000x1000mm box culvert.

5000

5000
Structural dimension of 1000x1000mm 300 300
culverts to be adjusted as per OHDS 2017
L=2000 2310 2310 L=2000

SECTION B- B - INLET MORTARED RIPRAP


APPROACH SLAB IF FILL APPROACH SLAB IF FILL
MORTARED RIPRAP
A

NTS
HEIGHT LESS THAT 0,60m HEIGHT LESS THAT 0,60m
AT INLET: (THICKNESS : 0,30m) (THICKNESS : 0,30m)
LOOSE RIPRAP
GUARD RAIL EDGE OF ASPHALT

L=2000 2310 300 ELEVATION - Section A-A


View of the Culvert
900

APPROACH SLAB IF FILL APPROACH SLAB IF FILL


HEIGHT LESS THAT 0,60m HEIGHT LESS THAT 0,60m
MORTARED RIPRAP
(THICKNESS : 0,30m) (THICKNESS : 0,30m) GUARD RAIL AS REQUIRED
4000 4000
1000
300

300
600
1000

300 300

1000

1000
2000* 2000*
1500

LOOSE *(see note n.9) *(see note n.9)


RIPRAP 1250 1250
1
2 MORTARED RIPRAP
500
5000 5000
WEEP HOLES ø50
LOOSE
RIPRAP

CLIENT: PROJECT MANAGER: CONSULTANT: DRAWING CODE DD GE 04 REV. DATE DESCRIPTION PROJECT ID: W.2019.07
VIA INTERNATIONAL LLC Consultancy Services for Feasibility Study and Detailed
PETROLEUMDEVELOPMENTOMAN CARILLIONALAWI A 08/2021 ISSUED FOR CONSTRUCTION

Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat Design of Roads: GENERAL B - -


DRAWN:

C - - CHECKED:
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl D - -
INTERNATIONAL T. +968 24117507 - info@via-int.com New Multiple Cell Box Culvert E - - APPROVED:
Engineering Consultancy LLC
DETAILED DESIGN Inlet/Outlet Protection F - -
@A1: NTS @A3: NTS
G - -
TYPICAL CULVERT LAYOUT 8.00 m
SCALE 1:200 @ A1 CARRIAGEWAY
SCALE 1:400 @ A3

4.00 m 4.00 m
Culvert Extension LANE CL LANE

Inlet/Outlet Existing Culvert CROSS SECTION IN


as per DD GE 03-04 to retained EXISTING CULVERT
SCALE 1:100 @ A1
SCALE 1:200 @ A3

2.00 1.50 4.0 4.0 1.50


5.00

11.0 m
PAVED SHOULDER

PAVED SHOULDER 8.0 m


Existing Inlet/Outlet Culvert CARRIAGEWAY Existing Inlet/Outlet
5.00

Culvert to retain as per


LANE

LANE

to be demolished
0.60 1.50 m 4.0 m 4.0 m 1.50 m DD GE 03-04
LANE LANE
CL

PAVED SHOULDER

PAVED SHOULDER
1.00 m
New Culvert Extension PROPOSED NEW
1.50 m
Inlet/Outlet CULVERT EXTENSION
as per DD GE 03-04
SCALE 1:100 @ A1
SCALE 1:200 @ A3
10.00

2.0% 2.0%

1.50
Existing part of
Culvert to be
demolished
Per expansion joint
refer to DD GE 06 NOTES:
Center line of DETAIL 1 DETAIL 2
1. Refer to drawings DD L1 05 [Lot 1], DD L3 05
Existing Road [Lot 3] for schedule of culvert extensions
2. Side of extension to be approved by Engineer.
Symmetrical extension possible where
approved by Engineer without additional cost
implication
3. Guardrail to be removed on one side, stored
and re-installed after extension
Alignment shifting distance

DETAIL 1 DETAIL 2
SECTION SECTION
200.00

SCALE 1:50 @ A1 SCALE 1:50 @ A1


SCALE 1:100 @ A3 SCALE 1:100 @ A3

Edge of
Existing Road GUARD RAIL GUARD RAIL
EDGE OF ASPHALT
EDGE OF ASPHALT
L=2000 2310 0.30

900
PAVED SHOULDER
PAVED SHOULDER

LANE

LANE

1000

1000
Existing Center Line &
New Road Center Line
Overlap
1.00
1.50

LOOSE
RIPRAP

0.50

CLIENT: PROJECT MANAGER: CONSULTANT: DRAWING CODE DD GE 05 REV. DATE DESCRIPTION PROJECT ID: W.2019.07
VIA INTERNATIONAL LLC Consultancy Services for Feasibility Study and Detailed
PETROLEUMDEVELOPMENTOMAN CARILLIONALAWI Design of Roads:
A 08/2021 ISSUED FOR CONSTRUCTION
DRAWN:
Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat GENERAL B - -
C - - CHECKED:
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl D - -
INTERNATIONAL T. +968 24117507 - info@via-int.com Extension of Existing Box Culvert E - - APPROVED:
Engineering Consultancy LLC
DETAILED DESIGN F
G
-
-
-
-
@A1: VARIOUS @A3: VARIOUS
TYPICAL CULVERT LAYOUT
SCALE 1:100 @ A1
SCALE 1:200 @ A3

1.50 4.00 4.00 1.50 TYPICAL CROSS SECTION OF CULVERT


2.00
W1
W
W2 W W1

T2

5.00
D

WATERSTOP IN CASE OF
T1 HIGHT WATER TABLE
100

TYPICAL CROSS SECTION OF CULVERT


FOR FILL COVER LESS THAN 0.60 M
DETAIL 2

5% W1
W W2 W W1
5%
PAVED SHOULDER

PAVED SHOULDER
5.00 300
T2 300 300
LANE

LANE
APPROACH SLAB 300
4000 mm LENGTH 300
D
APPROACH SLAB
4000 mm LENGTH

T1
100

25 DIA DOWEL BAR 300 LONG


TYPICAL LONGITUDINAL SECTION OF CULVERT
SCALE 1:100 @ A1
SCALE 1:200 @ A3

CULVERT LENGTH

DETAIL 2
VERGE CARRIAGEWAY CARRIAGEWAY VERGE 25 DIA DOWEL BAR 300 LONG
3 LAYERS OF AT 500 C/C TOP PORTION
WALL LENGTH WALL LENGTH ROOFTING FELT TO BE WRAPPED IN DENSO TAPE
Y20 - 150

SLOPE SLOPE
DETAIL 1
4Y 16 12 mm. THICK FILLER
Y16 - 150

Y 16 - 150

100 BLINDING CUT OF WALL


CONCRETE SHOULD BE CAST
CONSTRUCTION EXPANSION AGAINST EARTH
JOINT JOINT
LENGTH OF CULVERT BETWEEN EXPANSION
LENGTH OF CULVERT BETWEEN CONSTRUCTION JOINT TO BE NOT MORE THAN 35 M
JOINTS TO BE NOT MORE THAN 15 M

CONSTRUCTION JOINT DETAIL LONGITUDINAL PART SECTION EXPANSION JOINT DETAIL DETAIL 1
CONTRACTION JOINT DETAILL
WATER STOP ON ALL SURFACES 20 E.J
SEALANT IN CONTACT WITH SOIL
TRANSVERSE STEEL TRANSVERSE STEEL 300
MATERIAL 400 400
300
JOINT FILLER
T T1
CAP WITH COMPRESSIBILE MATERIA
LONGITUDINAL BARS ON DEBONDED SIDE
REINF. STEEL JOINT SEALANT
WATERSTOP
20 DIA SMOOTH DOWEL BAR PIANTED & LUBRICATED
ON ONE SIDE ONLY TO PREVENT BOND LONGITUDINAL BARS TO BE BENT AS SHOWN
WITH CONCRETE AT 300 mm

CLIENT: PROJECT MANAGER: CONSULTANT: DRAWING CODE DD GE 06 REV. DATE DESCRIPTION PROJECT ID: W.2019.07
VIA INTERNATIONAL LLC Consultancy Services for Feasibility Study and Detailed
PETROLEUMDEVELOPMENTOMAN CARILLIONALAWI A 08/2021 ISSUED FOR CONSTRUCTION

Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat Design of Roads: GENERAL B - -


DRAWN:

C - - CHECKED:
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl D - -
INTERNATIONAL T. +968 24117507 - info@via-int.com Box Culvert Details E - - APPROVED:
Engineering Consultancy LLC
DETAILED DESIGN Structural Details F - -
@A1:NTS @A3:NTS
G - -
INLET/OUTLET DETAILS, BASE SLAB, R.C DETAILS
ONE CELL BOX CULVERT
TYPICAL PLAN (FOR 90º) SECTION A - A TYPICAL PLAN (FOR 75º)

TYPICAL VIEW SECTION B - B

ONE CELL BOX CULVERT HEIGHT FROM 0.30m TO 0.60m

ONE CELL BOX CULVERT HEIGHT FROM 0.60m TO 1.0m


ONE CELL BOX CULVERTS INLET/OUTLET DETAILS, BASE SLAB, R.C DETAILS

ONE CELL BOX CULVERT HEIGHT FROM 1.0m TO 2.0m

INLET/OUTLET DETAILS, WALL R.C DETAILS


PLAN WALL VIEW SECTION A - A PARAPET DETAIL FOR α 90°
TYPICAL

ONE CELL BOX CULVERTS INLET/OUTLET DETAILS, WALL, R.C DETAILS

CLIENT: PROJECT MANAGER: CONSULTANT: DRAWING CODE DD GE 07 REV. DATE DESCRIPTION PROJECT ID: W.2019.07
VIA INTERNATIONAL LLC Consultancy Services for Feasibility Study and Detailed
PETROLEUMDEVELOPMENTOMAN CARILLIONALAWI A 08/2021 ISSUED FOR CONSTRUCTION

Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat Design of Roads: GENERAL B - -


DRAWN:

C - - CHECKED:
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl D - -
INTERNATIONAL T. +968 24117507 - info@via-int.com One Cell Box Culvert E - - APPROVED:
Engineering Consultancy LLC
DETAILED DESIGN Structural Details F - -
@A1:NTS @A3:NTS
G - -
TWO CELLS R.C BOX CULVERT
INLET/OUTLET DETAILS, BASE SLAB, R.C DETAILS

TYPICAL PLAN (FOR 90º) TYPICAL PLAN (FOR 75º)

TYPICAL VIEW

SECTION B - B

TWO CELLS BOX CULVERT HEIGHT FROM 0.30m TO 0.60m


SECTION A - A

TWO CELLS BOX CULVERT HEIGHT FROM 0.60m TO 1.0m

TWO CELLS BOX CULVERTS INLET/OUTLET DETAILS, BASE SLAB, R.C DETAILS

TWO CELLS BOX CULVERT HEIGHT FROM 1.0m TO 2.0m

INLET/OUTLET DETAILS, WALL, R.C DETAILS

PLAN WALL VIEW SECTION A - A PARAPET DETAIL FOR α 90°


TYPICAL

TWO CELLS BOX CULVERTS INLET/OUTLET DETAILS, WALL, R.C DETAILS

CLIENT: PROJECT MANAGER: CONSULTANT: DRAWING CODE DD GE 08 REV. DATE DESCRIPTION PROJECT ID: W.2019.07
VIA INTERNATIONAL LLC Consultancy Services for Feasibility Study and Detailed
PETROLEUMDEVELOPMENTOMAN CARILLIONALAWI A 08/2021 ISSUED FOR CONSTRUCTION

Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat Design of Roads: GENERAL B - -


DRAWN:

C - - CHECKED:
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl D - -
INTERNATIONAL T. +968 24117507 - info@via-int.com Two Cell Box Culvert E - - APPROVED:
Engineering Consultancy LLC
DETAILED DESIGN Structural Details F - -
@A1:NTS @A3:NTS
G - -
THREE CELLS R.C BOX CULVERT INLET/OUTLET DETAILS, BASE SLAB, R.C DETAILS

TYPICAL PLAN (FOR 90º) TYPICAL PLAN (FOR 75º)

TYPICAL VIEW

SECTION B - B
SECTION A - A

THREE CELLS BOX CULVERT HEIGHT FROM 0.30m TO 0.60m

THREE CELLS BOX CULVERT HEIGHT FROM 0.60m TO 1.0m


THREE CELLS BOX CULVERTS INLET/OUTLET DETAILS, BASE SLAB, R.C DETAILS

THREE CELLS BOX CULVERT HEIGHT FROM 1.0m TO 2.0m

INLET/OUTLET DETAILS, WALL, R.C DETAILS

PLAN WALL VIEW SECTION A - A PARAPET DETAIL FOR α 90°


TYPICAL

THREE CELLS BOX CULVERTS INLET/OUTLET DETAILS, WALL, R.C DETAILS

CLIENT: PROJECT MANAGER: CONSULTANT: DRAWING CODE DD GE 09 REV. DATE DESCRIPTION PROJECT ID: W.2019.07
VIA INTERNATIONAL LLC Consultancy Services for Feasibility Study and Detailed
PETROLEUMDEVELOPMENTOMAN CARILLIONALAWI A 08/2021 ISSUED FOR CONSTRUCTION

Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat Design of Roads: GENERAL B - -


DRAWN:

C - - CHECKED:
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl D - -
INTERNATIONAL T. +968 24117507 - info@via-int.com Three Cell Box Culvert E - - APPROVED:
Engineering Consultancy LLC
DETAILED DESIGN Structural Details F - -
@A1:NTS @A3:NTS
G - -
FOUR CELLS R.C BOX CULVERT
TYPICAL PLAN (FOR 90º) TYPICAL PLAN (FOR 75º)

TYPICAL VIEW

SECTION B - B
SECTION A - A

FOUR CELLS BOX CULVERT HEIGHT FROM 0.30m TO 0.60m

FOUR CELLS BOX CULVERT HEIGHT FROM 0.60m TO 1.0m


FOUR CELLS BOX CULVERTS INLET/OUTLET DETAILS, BASE SLAB, R.C DETAILS

FOUR CELLS BOX CULVERT HEIGHT FROM 1.0m TO 2.0m

INLET/OUTLET DETAILS, WALL, R.C DETAILS


PLAN WALL VIEW SECTION A - A PARAPET DETAIL FOR α 90°
TYPICAL

FOUR CELLS BOX CULVERTS INLET/OUTLET DETAILS, WALL, R.C DETAILS

CLIENT: PROJECT MANAGER: CONSULTANT: DRAWING CODE DD GE 10 REV. DATE DESCRIPTION PROJECT ID: W.2019.07
VIA INTERNATIONAL LLC Consultancy Services for Feasibility Study and Detailed
PETROLEUMDEVELOPMENTOMAN CARILLIONALAWI A 08/2021 ISSUED FOR CONSTRUCTION

Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat Design of Roads: GENERAL B - -


DRAWN:

C - - CHECKED: RC
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl D - -
INTERNATIONAL T. +968 24117507 - info@via-int.com Four Cell Box Culvert E - - APPROVED:
Engineering Consultancy LLC
DETAILED DESIGN Structural Details F - -
@A1:NTS @A3:NTS
G - -
FIVE CELLS R.C BOX CULVERT INLET/OUTLET DETAILS, BASE SLAB, R.C DETAILS
TYPICAL PLAN (FOR 90º) TYPICAL PLAN (FOR 75º)

TYPICAL VIEW

SECTION A - A SECTION B - B

FIVE CELLS BOX CULVERT HEIGHT FROM 0.30m TO 0.60m

FIVE CELLS BOX CULVERT HEIGHT FROM 0.60m TO 1.0m FIVE CELLS BOX CULVERTS INLET/OUTLET DETAILS, BASE SLAB, R.C DETAILS

FIVE CELLS BOX CULVERT HEIGHT FROM 1.0m TO 2.0m

INLET/OUTLET DETAILS, WALL, R.C DETAILS

PLAN WALL VIEW SECTION A - A PARAPET DETAIL FOR α 90°


TYPICAL

FIVE CELLS BOX CULVERTS INLET/OUTLET DETAILS, WALL, R.C DETAILS

CLIENT: PROJECT MANAGER: CONSULTANT: DRAWING CODE DD GE 11 REV. DATE DESCRIPTION PROJECT ID: W.2019.07
VIA INTERNATIONAL LLC Consultancy Services for Feasibility Study and Detailed
PETROLEUMDEVELOPMENTOMAN CARILLIONALAWI A 08/2021 ISSUED FOR CONSTRUCTION

Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat Design of Roads: GENERAL B - -


DRAWN:

C - - CHECKED:
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl D - -
INTERNATIONAL T. +968 24117507 - info@via-int.com FiveCell Box Culvert E - - APPROVED:
Engineering Consultancy LLC
DETAILED DESIGN Structural Details F - -
@A1:NTS @A3:NTS
G - -
GRANULAR BACKFILLING
EXISTING UNDERGROUND GAS AND OIL PIPELINE Materials used for backfilling around, trenches, shall be selected approved backfill material. Peaty or organic soil shall not be used as backfilling.
Fill material used within 5 m of concrete structures shall have a soluble sulphate content not exceeding 2.5 g per litre tested in accordance with BS 1377: and chloride
SECTION A content shall not exceed 0.5 g per litre. If the Sulphate and Chloride contamination exceeds the limits, appropriate protection system is required for Concrete in
SCALE 1:25 @ A1, 1:50 @ A3 accordance with SP-1282. backfill is not to be compacted, due allowance shall be made by the Contractor for consolidation and shrinkage in both height and width.
Backfill to foundations, walls, trenches, pipelines, site preparation and grading shall be compacted in layers not exceeding 250 mm compacted thickness up to the level
WARNING TAPE EXISTING FINISHED ROAD LEVEL of 450 mm below the Final Grading Level (FGL). The last 450 mm shall be compacted in layers not exceeding 150 mm compacted thickness via suitable rollers and
sufficient number of passes to achieve the required density. The following table can be used as a guideline:

VAR *(see note) VAR *(see note)

VAR
200
REINFORCED CEMENT CONCRETE
CLASS C30

STEEL MESH TOP & BOTTOM


R/T Y16@125mm
1000

Each layer shall extend over the whole area before the next layer is spread. Backfill around and over the underground services shall be hand compacted up to 300 mm
above the top of the underground services.
Density after compaction shall be not less than 95% of maximum dry density. During compaction fill material shall have uniform moisture content within 2% of the
Ø

EXISTING PIPELINE (VAR Ø) optimum moisture content.


Utility pipe trenches should be backfilled as PDO Building Services Specifications.
NOTES: Mechanical rammers shall not be used within 300 mm of the top of any pipe. Backfilling material shall not be dropped from a height exceeding two metres.
VAR Ø VAR
1. Contractor to contact utility owner prior to works Excavations around structures shall not be backfilled before they have been inspected and approved by the Engineer.
to obtain approval
as per site condition 2. Minimum backfilling cover 1000m
3. *Width of slab to be 6m [3+3m] where depth of Granular Fill
pipe between 1m and 1.2m. width of slab to be Granular fill material shall consist of hard, durable particles or fragments of stone or gravel. Materials that break up when alternately wet and dried shall not be used. Fill
PLAN 4m [2+2m] where depth of pipe more than 1.2m. material shall have a percentage of wear, based on the Los Angeles Rattler Test of no more than 50%. Fine material passing 2 mm sieve shall consist of natural or
SCALE 1:25 @ A1, 1:50 @ A3 crushed sand. The composite fill material shall be free from vegetable matter, lump/balls of clay. PDO Type-B material shall be used for all granular filling work and shall
comply with the requirements given in Chapter 15 ('Roads & Paving Works') of this Specification.

EXISTING PIPELINE (VAR Ø)


RCC PROTECTION SLAB
MUST BE EXTENDED 2m
FROM ROAD SHOULDER
2m
GRANULAR FILL MATERIALS (CONTD.)
PAVED SHOULDER
PDO
MATERIAL SPECIFICATION Type B
LANE

4-day soaked CBR value: 80-60


RCC PROTECTION SLAB
When compacted to the following % max dry density :- 98-95%
LANE
Gradation Requirements to ASTM D1241 Type I-D
GRANULAR FILL MATERIALS (CONTD.)
AASHTO (ASTM E11/BS 410) Sieve Size
2m -
PAVED SHOULDER
2 inch 50 mm PDO
MATERIAL SPECIFICATION
AS PER SITE CONDITIONS 1 inch 25 mm 100 Type B

¾ inch 19 mm -
Liquid Limit AASHTO T89 ASTM D4318 35% max

3/8 inch 9.5 mm 60 - 100 Plasticity Index AASHTO T90 ASTM D4318 9% max
Sand Equivalent AASHTO T176 ASTM D2419 -
No.4 4.75 mm 50 - 85
Loss by Abrasion AASHTO T96 ASTM C131 50% max
No.10 2.0 mm 40 - 70
Required % Compaction As specified
No.40 425 µm 25 - 45
PROTECTION OF GAS AND LIQUID PETROLEUM UTILITIES No.200 8 - 15 Moisture Content
Should be between 2% below
75 µm and 1% above optimum
AS PER OHDS 2017

NOTES:
1. Coarse aggregates, retained on No.10 sieve, shall comprise hard, durable particle or fragments of stone or gravel. Materials shall not break up when wetted and
ROAD PAVEMENT dried and shall wear not more than 50%, based on the Los Angeles Rattler Test. Fine aggregate, passing No.10 sieve, shall comprise natural or crushed sand, and
B fine mineral particles passing No. 200 sieve. The composite soil-aggregate mixture shall be free from vegetable matter or lumps of clay.
A 2. Grading is based on aggregates of uniform specific gravity and the percentages passing the various sieves are subject to correction, to approval of the Engineer,
PROTECTION SLAB when aggregates of varying specific gravities are used. Grading curves represent the grading requirements after compaction.
3. All fill materials incorporated in the Works shall comply with the above requirements when delivered to the fill area. Fill shall not be hand picked or sorted.
Pipelines 4. All material shall be incorporated in an approved sequence of operations, including the dumping of materials, spreading, watering, mixing and compacting. Delays
EXISTING UTILITY PIPELINE between consecutive operations shall be kept to a minimum.
5. Fill material used within 5 m of concrete structures shall have a soluble sulphate content not exceeding 2.5 g/l tested in accordance with BS 1377.
6. Fill material shall not contain any deleterious or organic material or excessive lumps of salts or large clunks of gypsum. It shall be the discretion of the Engineer to
reject such fill should it be deemed.

CLIENT: PROJECT MANAGER: CONSULTANT: DRAWING CODE DD GE 12 REV. DATE DESCRIPTION PROJECT ID: W.2019.07
VIA INTERNATIONAL LLC Consultancy Services for Feasibility Study and Detailed
PETROLEUMDEVELOPMENTOMAN CARILLIONALAWI A 08/2021 ISSUED FOR CONSTRUCTION
DRAWN:
Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat Design of Roads: GENERAL B - -
C - - CHECKED:
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl D - -
INTERNATIONAL T. +968 24117507 - info@via-int.com Typical Pipeline Crossing E - - APPROVED:
Engineering Consultancy LLC
DETAILED DESIGN Protection Details F
G
-
-
-
-
@A1:1:25 @A3:1:50
0 5 10 15 20 25 50 TRANSITION DETAIL
SCALE 1:100
Meters

SCALE 1:500 @ A1

CARRIAGEWAY
8.00 m
TYPICAL CROSS SECTION OF
2.00 m 4.00 m 4.00 m 2.00 m EXISTING JUNCTION
to be maintained

SHOULDER

SHOULDER
UNPAVED

UNPAVED
LANE LANE
SECTION A
e% e%

A A

UNPAVED SHOULDER

UNPAVED SHOULDER
EXISTING MINOR/MAJOR PRIORITY
JUNCTION WITH GHOST ISLAND

100 m
TRANSITION DETAIL

Beginning central island

B B

200 m
PAVED SHOULDER
PAVED SHOULDER
50 m
22,34

LANE

LANE
DETAIL

CARRIAGEWAY

11.00 m
2.50 m 1.50 m 4.0 m 4.0 m 1.50 m 2.50 m PROPOSED
TRANSITION DETAIL
39,01

LANE LANE CROSS SECTION


VERGE PAVED PAVED VERGE SECTION B
SHOULDER SHOULDER

2.0% 2.0%

PROPOSED ROAD

CLIENT: PROJECT MANAGER: CONSULTANT: DRAWING CODE DD GE 13 REV. DATE DESCRIPTION PROJECT ID: W.2019.07
VIA INTERNATIONAL LLC Consultancy Services for Feasibility Study and Detailed
PETROLEUMDEVELOPMENTOMAN CARILLIONALAWI Design of Roads:
A 08/2021 ISSUED FOR CONSTRUCTION
DRAWN:
Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat GENERAL B - -
C - - CHECKED:
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl D - -
INTERNATIONAL T. +968 24117507 - info@via-int.com Typical Type B Junction E - - APPROVED:
Engineering Consultancy LLC
DETAILED DESIGN F
G
-
-
-
-
@A1: VARIOUS @A3: VARIOUS
PAINTED LIP CURB YELLOW AND BLACK
NOTES:
EXISTING JUNCTION
- ALL DIMENSIONS ARE IN METERS, UNLESS OTHERWISE NOTED
- STOP (S2) TO BE WRITTEN IN BOTH ARABIC AND ENGLISH
BEFORE THE L7 STOP LINE. DETAILS AS PER OHDM 2017
R=
VA R.
R. VA - ON EXISTING PAVED T-JUNCTIONS, CONTRACTOR TO EXTEND
R=
THE PAVEMENT UP TO 40m ON MINOR ROAD.
STOP
- ON UNPAVED T-JUNCTIONS, CONTRACTOR TO PAVE 40m ON
MINOR ROAD.

4.00 4.00
Existing - LIP CURB TO BE INCLUDED IN ALL T-JUNCTIONS
road

mm
00
12
SIGN 138

٤٠

900 mm
40 225 m

200 m
SIGN 226

LIMIT OF WORK
900 mm
900 mm

mm
00

5.00

5.00
12

١٠٠
100
0
.0

SIGN 136
5

SIGN 226
40.00
Center line of R2

English
Edge of

Arabic
Existing Road Existing Road

R25.0
SING 202

0
250m
EXTENSION OF CONTINUOUS LINE STOP
5.00 5.00

1.50

4.00 4.00
4.0
Proposal

Existing
Road

road
4.0
1.50

900 mm
250m
12
00 EXTENSION OF CONTINUOUS LINE
mm

Arabic Arabic
١٠٠
100

English English
SIGN 226

LEGEND:
SIGN 135

EDGE OF EXISTING ASPHALT ROAD


L4/2 ROAD MARKING - Yellow color, 120mm wide, solid
English
Arabic

L2A ROAD MARKING - White color, 120mm wide, solid

L5/2 ROAD MARKING - White color, 120mm wide, dashed


200 m
L7 ROAD MARKING - White color, 400mm wide, solid

225 m LIP CURB

CLIENT: PROJECT MANAGER: CONSULTANT: DRAWING CODE DD GE 14 REV. DATE DESCRIPTION PROJECT ID:W.2019.07
VIA INTERNATIONAL LLC Consultancy Services for Feasibility Study and Detailed
PETROLEUMDEVELOPMENTOMAN CARILLIONALAWI Design of Roads:
A 08/2021 ISSUED FOR CONSTRUCTION
DRAWN:
Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat GENERAL B - -
C - - CHECKED:RC
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl D - -
INTERNATIONAL T. +968 24117507 - info@via-int.com Typical Type C Junction E - - APPROVED:
Engineering Consultancy LLC
DETAILED DESIGN Structural Details F
G
-
-
-
-
@A1:1:500 @A3:1:1000
SCOPE OF WORK 3. ROAD MARKING 8. PAVEMENT MATERIALS
The Scope of work for the construction works includes: Unless otherwise stated and shown in the contract drawings, the contractor is requested to survey the existing horizontal road The Tender lets the Contrator the opportunity to bid for recycled/stabilized pavement solution and solution with conventional road
- Topographic survey of the existing road marking and apply it with the same criteria and layout on the new paved surface. construction materials.

- Road marking Road marking has to be of thermoplastic material. Thermoplastic road markings shall consist of binder, resin, intermix beads, pigment, Unless otherwise specified in the contract documents, material and road construction specifications to follow OHDS 2017.
plasticizing oil and such other constituents as necessary to reach the performance level required. Subject to the restrictions stated in this For reference, below the main construction materials for conventional method are reported:
- Demolition of existing pipe culverts and construction of new box culverts
Specification, the manufacturer is free to achieve the required performance level in any way suited to his manufacturing techniques. The
- Extension of existing box culverts Contractor shall submit a certificate from the manufacturer stating that the thermoplastic road marking contains no hydrocarbon resins.
- New road pavement The flashpoint for thermoplastic materials must be greater than or equal to 240C and drying (tack free) time should be between 2 and 10
- Rehabilitation of junctions min dependent on ambient road surface temperature and wind. SUBGRADE GRANULAR SUBBASE - CLASS B

- All related works to allow safe opening of the road and reinstatement of current conditions of elements in RoW Road Markings should be Type III as per OHDS 2017 with the following specifications:

1. TOPOGRAPHIC SURVEY
The Contractor shall carry out detailed survey of the exiting road and features in a Right of Way of 30m using the most up to date surveying
techniques, procedures and equipment.
The purpose of the survey is for the contractor to be able to record the current horizontal and vertical alignment of the road, physical
features such as culverts, floodways, signboards and road marking. AGGREGATE BASE COURSE
More extensive surveys shall be undertaken in urban areas, at junctions, floodways, culvert and pipeline crossing sites.
In order to prevent cracking of thermoplastic when the plasticizing oil content is reduced to prevent blackening of the road marking, good
quality resins (such as alkyd resins, rosin esters and maleic-modified resins) shall be used in the manufacture of thermoplastic material
1.1 Survey of Details
instead of the hydrocarbon resins. Road markings showing more than minimal cracking during the warranted life of the markings will be
Topographic data shall be captured in a manner suitable for the creation of a three-dimensional digital ground model in an appropriate
deemed to have failed.
modelling system. The model so produced shall accurately represent the existing road and natural ground features when a cross section is
The Contractor shall warrant markings will continue to achieve all similar applicable performance requirements for a minimum period of 3
generated from the data.
(three) years from the time of application, when used on the edges of the highway as yellow edge marking.
The start and end of all linear features must be recorded as well as their cross sectional shape (see tolerance table). All single point
In no case shall any materials be laid more than 6 mm thick. All white markings shall be reflectorized by means of spherical glass beads to *Relaxation is made for gypsum content. Small content of gypsum is allowed in subbase, up to 1%
features e.g. signs shall also be geo-referenced and recorded.
BS EN 1424 premixed during compounding and additionally by spherical glass beads to BS EN 1423 wet surface applied during application.
Elevation data shall be recorded at a maximum of 20m intervals along the proposed road centreline.
The glass beads shall not have more than 1,000 ppm of Arsenic Trioxide, 200 ppm of Lead and 1,000 ppm of Antimony. The Contractor
Spot levels along the cross-section shall be taken at maximum 20m intervals picking up all the manmade and natural topographic features shall supply test certificates showing compliance with these requirements.
and changes along the cross section. However, the interval of the spot levels shall be varied based on the condition/topology on site.
Before delivery to site, or during the course of the work, the Engineer may call for any tests that are considered necessary for the
At junctions, the Contractor is requested to survey the road edges, horizontal road marking and existing signage, in order to replace them acceptance of the materials or for the control of their application.
and recreate the same horizontal layout and vertical alignment.
Details of all features such as structures (culverts, drainage channels etc.), utilities (electrical transmission poles and pole mounted
4. DEMOLITION OF EXISTING PIPE CULVERTS AND CONSTRUCTION
transformers, underground pipelines and ducts), existing roads (points to be taken on centerline and sides), electric and telephone
installations, huts, buildings, fencing and trees (with girth greater than 0.3 metre) etc. falling within the extents of the survey shall be OF NEW BOX CULVERTS
recorded.
According to the details of drawings DD L1 05 [Lot 1], DD L3 05 [Lot 3], the contractor is requested to remove selected pipe culverts and
replace them with new box culverts.
1.2 Paved Road Surfaces The Contractor has to survey the inlet and outlet levels of the existing pipe culverts and follow the same for the new construction. The RECYCLING AND STABILIZATION MATERIAL
Sufficient strings are to be captured across road surfaces to ensure the shape is accurately defined to specified accuracies and tolerances. longitudinal gradient of the cells of the new box culvert has to be of a minimum of 0.5%, keeping the outlet at the surveyed level. Option with recycling and stabilization includes use of Recycler machine [Wirtgen WR2500 or similar] for milling the existing 200mm of
At a minimum, any paved road surface with a 'crown' requires a string to be surveyed approximately 1.0m either side of the crown Structural details of new box culverts to follow drawings DD GE 06 to DD GE 11. Subbase + asphalt course and stabilization of the ground material with stabilizing agent.
(centreline) This is in addition to geo referencing the crown itself. The contractor needs to reach, through proper mix design and import of borrow material if necessary, the ideal gradation, as recommended
Existing rip-rap protection to be removed and disposed. Existing steel barriers to be removed, stored and reinstalled if deemed in good
Cross fall and superelevation in curves has to be recorded to be successively reproduced after pavement works. condition by the Engineer. Protection bollards to be removed and disposed. in the graphics below.

1.3 Surface Accuracy and Point Density 5. EXTENSION OF EXISTING BOX CULVERTS
For road surfaces, sufficient points shall be captured such that the accuracy of any point on the surface defined is within the nominated According to the details of drawings DD L1 05 [Lot 1], DD L3 05 [Lot 3], the contractor is requested to extend existing box culverts. The
accuracy for the relevant classification, plus an error margin of 10mm. For all other surfaces, sufficient points shall be captured such that the proposed solution is to retain one side of the structure, remove the opposite end including riprap protection and guardrails, and extend the
accuracy of any point on the surface defined is within one and half the nominated accuracy for the relevant classification. Strings defining barrel for the required length. Side of extension to be decided and approved on site with the Engineer. The contractor can propose a
the road and formation shall be captured such that their respective points align perpendicular to the direction of the road. simmetrical both-sides extension if deemed more convenient and economical, if approved by the Engineer.
The tolerances for detail survey points shall comply with the values mentioned below. In case of asimettrial extension, the centerline of the road will be shifted of 2m towards the extended barrel. The Contractor has to survey
Planimetric Control the existing finished asphalt levels, do the necessary local realignment to shift the centerline according to the transition geometry defined in
drawing DD GE 05 and keep the local existing crossfall/superelevation.
The relative accuracy between permanent survey control stations shall, when checked, not exceed 1 part in 30,000 for distances exceeding
150 metres. For shorter distances the relative accuracy should be not exceed ± 5 mm. The absolute accuracy of any permanent survey The longitudinal gradient of the extended barrel has to follow the gradient of the existing culvert and not less than 0.5%.
control station shall, when checked, not exceed ± 25mm. Construction joints to be as per DD GE 06. Sealant to guarantee waterproofing of the connection.
LESS SUITABLE GRADATION
Vertical Control Structural details of new box culverts to follow drawings DD GE 06 to DD GE 11.
The relative accuracy of heights between any two site bench marks shall, when checked, not exceed ± 10mm x k, where k is the square root Existing rip-rap protection to be removed and disposed. Existing steel barriers to be removed, stored and reinstalled if deemed in good IDEAL GRADATION
of the distance in kilometres between the points being considered, or ± 5mm, whichever is the greater. The absolute accuracy of the one condition by the Engineer. Protection bollards to be removed and disposed.
permanent control station held fixed, when checked shall not exceed 20mm.

6. JUNCTIONS
Five different type of works are identified on the junctions:
2. FLOODWAYS - Upgrade/adapt existing junction to Type C. Contractor to keep the centerline of the existing paved/unpaved junction, maintain
Drawings DD L1 05 [Lot1] and DD L3 05 [Lot 3] illustrate the works to carry out on floodways. Three different kinds of works are identified: existing vertical alignment and upgrade geometry as per drawing DD GE 14. Asphalt on minor road to be extended to 40m from edge
of pavement of main road. Any obstruction not compatible with change of geometry, to be shifted, following approval of Engineer.
- Retaining of existing cross section and rehabilitation of the pavement. The scope of work includes the refurbishment of the
pavement as per details on DD L1 05 [Lot1] and DD L3 05 [Lot 3]. The width of cross section and existing riprap is to be maintained. Contractor to reuse existing signboards if compatible with design and istructed by Engineer.
- Keep geometry of existing junction and match with new wider cross section of main road. Contractor is requested to survey LESS SUITABLE GRADATION
The contractor to provide transition sections as per geometry defined in drawing DD GE 02. Vertical and horizontal alignment to be
maintained unless specified by the Engineer. vertical and horizontal geometry of existing junction, current road marking layout and signboards. Scope of work includes IDEAL GRADATION
rehabilitation of the pavement as per details within the same geometry and road marking as surveyed.
- Widening of cross section, rehabilitation of pavement and riprap protection. Existing riprap protection to be removed, road
pavement to rehabilitated and be widened as per drawing DD GE 02, new protection to be done. Vertical and horizontal alignment to - Change of layout. The scope of work is described in location specific drawings.
be maintained unless specified by the Engineer. - Road marking. The contractor is requested to reinstate the existing worn out road marking as per the existing layout, or as directed
- Extention of length of floodway. The contractor is requested to extend the length of the riprap protection as illustrated in drawings. by the Engineer.
Unless specifically mentioned, the existing width of pavement and cross section to be kept. Vertical and horizontal alignment to be - No intervention. Not in the scope of work. Existing paved/unpaved junction to be left as it currently is.
maintained unless specified by the Engineer.
Reference of existing material properties and geotechnical characteristics can be made to drawings DD L1 03 [Lot 1], DD L2 03 [Lot 2],
Part of the scope of work of the contractor is the clearance from boulders, trees and any obstruction objects of the bed of the wadi for a range
of 100m upstream and downstream of any drainage structure in the scope of work, being it a new culvert, an extension of culvert or floodway.
7. ROAD GEOMETRY DD L3 03 [Lot 3]. The contractor is required to carry out their own investigation and tests to assure the ideal mix for stabilization.
With appropriate machinery, the bed needs to be shaped in a way that the flow of the wadi is directed towards the inlet of the culvert. Road geometric features (such as horizontal and vertical alignment, crossfall and superelevation) to be recorded through topographic
survey.
Drawing DD L1 09 [Lot 1] describes the scope works to shape downstream wadi bed at ch. 48+000. Contractor shall raise the profile locally to avoid that widening of the pavement surface would incur in cut sections, even partially.

CLIENT: PROJECT MANAGER: CONSULTANT: DRAWING CODE DD GE 15 REV. DATE DESCRIPTION PROJECT ID:W.2019.07
VIA INTERNATIONAL LLC Consultancy Services for Feasibility Study and Detailed
PETROLEUMDEVELOPMENTOMAN CARILLIONALAWI Design of Roads:
A 08/2021 ISSUED FOR CONSTRUCTION
DRAWN:
Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat GENERAL B - -
C - - CHECKED:
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl D - -
INTERNATIONAL T. +968 24117507 - info@via-int.com Work and Material Specifications E - - APPROVED:
Engineering Consultancy LLC
DETAILED DESIGN F
G
-
-
-
-
@A1: NTS @A3: NTS
LOT 1
MATTAN - FAHUD ROAD

CLIENT: PROJECT MANAGER: CONSULTANT: DRAWING CODE REV. DATE DESCRIPTION PROJECT ID: W.2019.07
VIA INTERNATIONAL LLC Consultancy Services for Feasibility Study and Detailed
PETROLEUMDEVELOPMENTOMAN CARILLIONALAWI A DRAWN:
Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat Design of Roads: B
C CHECKED:
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl D
INTERNATIONAL T. +968 24117507 - info@via-int.com E APPROVED:
Engineering Consultancy LLC
DETAILED DESIGN F
G
@A1: @A3:
NIZWA
INTERVENTION SUMMARY

IBR
SCOPE OF WORK:
N

I
· from 0+030 to 19+710; 29
· from 53+000 to 64+600;
Al Maha

Wadi
· from 73+000 to 76+800;
· from 83+200 to 89+450;
· from 92+950 to 126+250;
Gas Station 31

ATE
VER RATE
- TOTAL LENGTH 74,63 Km

NOR
O
ILIYA OVERN
H GO
G
AD D AHIRAH

0+
03
0
AKH
H
29

0+000
AD D

0
km

00
8

2+
AL HUBI 9.6

0
.11
1

00
.L1
h: PD

4+
gt

00
n

8+000
Le

6+0
000
.12
.L1
PD

10+
00
+0
19+
3
PD.L1.1

12
0
4 31

+0
L1.1

710
PD.

14
0
.15

+0
.L1

0 00
PD

16
000

18+
.L1
.16 MATTAN

20+
00
PD

0
000

22+
.17
.L1
PD

24+
00
+0
0

26
00 +
000

28
000

30+
31

32+
0
00 +
00

34
+0
29

00

000

36
000

44+000
NATIH

46+0

42+000
50+000

38+
000
48+
ROUNDABOUT NAHDAH

40+
00 0 ADAM AIRBASE
2+

00
5

00

54+0
00

18
56+0
92+950

1.
.L
000

58+0

PD
0 0

60+
00

62+0
.L 1.1
9
53 31
th: PD

00

64+0
g +
0

n .20 00
92+000

90+00

Le km .L1

00

66+0
73+00
PD 0
6 km
000

00

68+0
000 3.8 : 11.

00
000

.21
th

70+0
88+

Leng
94+ .L1

00
PD

72+0
76+

0
86+

00
00

74+0
1.2

000
.L
0

800
PD
+0
PD.L1.28
6+

29

000
84
9

64+
1.

76+
.23
0
PD.
0

.L L1.2 +0 .L1

80+000
00

PD 7 PD

78+

600
+

82

m .24
8

3k Le .L1
9
00

PD
3. 6.2 ngth:
0

PD
450
0+

25
3
0

.L .
.L1
: 5k 1.
+00

10

30 26 PD
gth Shell Gas Station
1.
89+
0

.L m
+25

PD
n
102
00

Le AL MAHA PETROL STATION


0

200

FAHUD AIRPORT
4+
000
126

27
ADAM
0

83+
1

1
106+

.3
.L1
0

PD
4
000

00
56

8+
0
9+

0
128+

+00

10
00

2
0
12

1.3
+00

.L
+
126

PD
10
0

31
00

PD.
1

L1.3
124

7 0
+

00
0

12
00

2+ 33
1

1.
12
4+

MUSCAT
L
D.
0

PD. P
11

FAHUD
00

00
L1.3
6
+0
118+000

6+

0
12
11

PD 4
.L .3
1.3
5 .L1
PD 29 MATTAN

LOT1 - 129 km
FAHUD

YIBAL LOT 2 - 44 km

Uwaifaih Guest House


QARN
SAIH RAWL
LOT3 - 41 km
ATE

KEY MAP
TE
NOR

LEGEND:
ORA

LOT 1 : MATTAN - FAHUD - 129.5 km


ER
VERN

ARTERIAL ROADS
GOV

SECONDARY ROADS 31
H GO
RAH

UNPAVED ROADS
LIYA
HAHI

29 EXISTING ROUNDABOUTS
AKHI

VILLAGES
AD D

Q
AD D

AR

SALALAH
N
AL

0 7.500 15.000
AL
AM

METERS

CLIENT: PROJECT MANAGER: CONSULTANT: DRAWING CODE DD L1 01 REV. DATE DESCRIPTION PROJECT ID:W.2019.07
VIA INTERNATIONAL LLC Consultancy Services for Feasibility Study and Detailed
PETROLEUMDEVELOPMENTOMAN CARILLIONALAWI A 08/2021 ISSUED FOR CONSTRUCTION
DRAWN:
Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat Design of Roads: LOT 1 : MATTAN - FAHUD B - -
C - - CHECKED:
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl D - -
INTERNATIONAL T. +968 24117507 - info@via-int.com General Plan E - - APPROVED:
Engineering Consultancy LLC
DETAILED DESIGN F
G
-
-
-
-
@A1:1:150.000 @A3:1:300.000
N

0+000
0
+00
2
0
00
4+
00
8 +0 0 0

6+0
000
10+
0 0
+0
00

1 2
+0
0

4
00

1
+
000

16
000

18+
20+
000
0 00

22+
24 +
0 0
+0
0

26
0
+0
000

28
0

30+
00
32+
00
+0
00

34
+0
00

000

6
000

44+000

3
46+0

42+000
50+000

38+
00
48+

0
40+
0 0
2 +0

00
5

00

54+0
00

56+0
00

58+0
00

60+0
00

62+0
00

64+0
0
92+000

90+00

66+0
0
00

00

68+0
000

00
000

70+0
88+
94+

00

72+0
86+

0
00

74+0
00

000
+ 0

+
96

000
84

76+
0
0

+0

80+000
00

78+
+

82
8 9
0
+ 00
0

00
+00

1
2
0

0
00

1
4+
000

10
106+
00
4
000
56

0
8+
0
9+

00
128+

+00

10
0
12

0
+00

0+
126

11
0
+0
124

00
00

12

0
2+
+0

12
4
00

11

00
0

0
118+000

6+

0+
12
11

LEGEND:
MUSCAT

STRETCH IN GOOD CONDITION


STRETCH WITH LOW SEVERITY DAMAGES
MATTAN

LOT1 - 129 km
STRETCH WITH MEDIUM SEVERITY DAMAGES
FAHUD

STRETCH WITH HIGH SEVERITY DAMAGES


YIBAL LOT 2 - 44 km

QARN
SAIH RAWL
LOT3 - 41 km

KEY MAP 0 5.000 10.000

METERS

CLIENT: PROJECT MANAGER: CONSULTANT: DRAWING CODE DD L1 02 REV. DATE DESCRIPTION PROJECT ID: W.2019.07
VIA INTERNATIONAL LLC Consultancy Services for Feasibility Study and Detailed
PETROLEUMDEVELOPMENTOMAN CARILLIONALAWI A 08/2021 ISSUED FOR CONSTRUCTION
DRAWN:
Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat Design of Roads: LOT 1 : MATTAN - FAHUD B - -
C - - CHECKED:
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl D - -
INTERNATIONAL T. +968 24117507 - info@via-int.com Geological Plan E - - APPROVED:
Engineering Consultancy LLC
DETAILED DESIGN F
G
-
-
-
-
@A1: 1:150.000 @A3: 1:300.000
AD D AHIRA
ILIY
AKH
H
29

0+000
AD D
LEGEND: N MATTAN

0
00
Tpn AL HUBI

2+
00
MUSCAT

TRIAL PIT LOCATION

0
4+
00
ADAM Tp1

8+000

6+0
000
INTERVENTION AREA ROUNDABOUT

10+

2+
0
00
MATTAN

00
MAIN MATTAN - FAHUD ROAD Tp2

0
00

12
LOT1 - 129 km
FAHUD
31

+0
00

7+60
1
+0
YIBAL LOT 2 - 44 km
EXISTING PAVED ROAD

000
Tp3

16

NIZWA
0
00

18+
EXISTING UNPAVED ROADS

13
20+
000

+1
QARN 0 7.500 15.000

00

22+
SAIH RAWL

5
LOT3 - 41 km
Tp4

0
0
24+
00
KEY MAP METERS

+0

18
00

+4
2
+0
000

00
2 8
IBR

000

30+
31

32+
00
I

+0
0

34
0
+0
00

000

36
00 0

44+000
46+0

42+000
50+000

38+
000
48+

40+
00
NATIH AL MAHA 2+
0
ADAM AIRBASE

00
5

00

54+0
ROUNDABOUT STATION

00

56+0
00

58+0
00

60+0
00

62+0
Tp5 31

00

64+0
0
92+000

90+00

00

66+0
000

56+
00

68+0
000 Tp6

00
000

70+0
88+
94+

000
00

72+0
86+

0
0

74+0
0

000
Tp9

62+
+0

+0
6

00

000
84
9

76+

000
0

+0
Tp8

80+000
00
Tp7

91+000

78+
+

82
8 9
0
00

000
+
000

73+
0
10
SHELL GAS STATION

85+
+

300
102
00 0
4+
000

Tp10 ADAM 27
10
106+
0

10
4
000

00
56

1+
+
0
9+

08
0
128+

+00

65
00
0

1
12

Tp11
0
+00

+
126

0
0

31
11
00
124

00
10
+
0

12

+0
00

6+

2
1

12 Tp12
+

50
14
0

0
00

QA
00
1
118+000

+
11

0
16

RN
12
0+
1

55

AL
29

SALALAH
0

AL
Tp13

AM
FAHUD
118+750

UWAIFAIH GUEST HOUSE

NATIH ROUNDABOUT AL MAHA STATION

Tp13 Tp12 Tp11 Tp10 Tp9 Tp8 Tp7 Tp6 Tp5 Tp4 Tp3 Tp2 Tp1
118+750 110+550 106+500 101+650 91+000 85+000 75+300 62+000 56+000 18+400 13+150 7+600 2+000

BC Bitumen Content (%) 3.92% 3.31% 3.19%


50mm Gradation (Class) Class-B Class-B Class-B
Proctortests(OMC/MDD) 4.40% 2217 kg/m 3
5.70% 2200 kg/m 3
4.90% 2178 kg/m 3
4.10% 2421 kg/m 3
5.2% 2244 kg/m 3
5.30% 2274 kg/m3 4.10% 2373 kg/m3 4.60% 2302 kg/m3 4.60% 2236 kg/m3 4.3% 2325 kg/m 3
5.20% 2191 kg/m 3
5.50% 2170 kg/m 3
6.40% 2077 kg/m 3

Californiabearingratio-CBR 94% 100% 87% 100% 31% 100% 100% 100% 80% 100% 100% 100% 73%
GSB Atterberglimits(LL/Pl) N/A NP N/A NP N/A NP N/A NP 20% NP 21% NP 24% NP N/A NP N/A NP N/A NP 24% NP N/A NP N/A NP
150mm Gypsum content 0.3% 0.34% 0.63% 0.37% 3.55% 0.25% 0.37% 1.01% 0.37% 0.82% 0.27% 1.01% 1.05%
Sulphate content 0.23% 0.23% 0.42% 0.25% 2.09% 0.17% 0.24% 0.57% 0.18% 0.66% 0.69%
0.25% 0.61%
Proctortests(OMC/MDD) 5.30% 2105 kg/m 3 6.70% 2125 kg/m 3
5% 2096 kg/m3 4.70% 2217 kg/m3 6.30% 2003 kg/m 3

Californiabearingratio-CBR 93% 100% 100% 100% 100%


SG Atterberglimits(LL/Pl) N/A NP N/A NP 26% 9% N/A NP N/A NP
150mm
Gypsum content 0.44% 0.43% 3.46% 1.34% 0.80%
Sulphate content 0.32% 0.3% 2.37% 0.9% 0.53%

N/A = NOT APPLICABLE 0.23% (GREEN VALUE) - AS PER OHDS 2017


NP = NOT PLASTIC 0.34% (RED VALUE) - NOT MATCHING OHDS 2017

CLIENT: PROJECT MANAGER: CONSULTANT: DRAWING CODE DD L1 03 REV. DATE DESCRIPTION PROJECT ID:W.2019.07
VIA INTERNATIONAL LLC Consultancy Services for Feasibility Study and Detailed
PETROLEUMDEVELOPMENTOMAN CARILLIONALAWI A 08/2021 ISSUED FOR CONSTRUCTION
DRAWN:
Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat Design of Roads: LOT 1 : MATTAN - FAHUD B - -
C - - CHECKED:
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl D - -
INTERNATIONAL T. +968 24117507 - info@via-int.com Results of Material Investigation E - - APPROVED:
Engineering Consultancy LLC
DETAILED DESIGN F
G
-
-
-
-
@A1:1:150.000 @A3:1:300.000
12
9+
56
128+200
4
128+100

128+00
0

127+9

Fahud
00
127+8
00
127+
700
127+6
00
128+
127+
500
127+4
00
127+3
000
00
127+2
00
127+1
00
127+0
00
126+9
00

126+8
00

126+70
0

126+60
0

126+50
0

126+40
0

126+3
00

126+2
00
126+1
00
126+0
00
125+
900
125+
800
125+
700
125+
600
126
125+
500

125+
400
125+
300
+00
125+

CLIENT:
200

125+
125+

000
100
0 126
124+
900
124+8
00
124+
700
+25
124+6
00
124+5

124+
400
00
0
124+3
00
124+
200

124+1
00
124+0
00
123+
900
123+8
00
123+7
00
123+
124
600
123+5

FAHUD
00

YIBAL
123+4
00
123+
300
+00
123+
200
123+
0

SAIH RAWL
100
123+
000
122+
900
122+
800
122+
700
122+
600
122
+50
0
122
+40
0
122
+30
122 0
+2
12 00
2+
10
0

12
2+
00
0

121
+90

121
0

+80

121
0

+70

121
0

EMBANKMENT
+60

121
0

+50

121
0
FAHUD

+40

121
0
12
+30

121
0

+20

121
0

+10

121
0

+00

120
0
2

+90

120
0

+80

120
0

+70

120
0

+60

120
0

+50

120
0

+40

120
0

+30

120
0

+20

120
0

SUBGRADE
+0

150mm
+10

120
0

+00

119
0

+90

119
0

+80

119
0

+70

119
0

+60

119
0

+50

119
0

+40
00

119
LOT 2 - 44 km

12
+30

119
0

+20

119
0

+10

119
0

+00
0

118
11

+90
8+

0
80
118 0
+70
0
118+

GRANULAR SUBBASE
150mm
600
118+50
0

0+
118+40
0

118+30
0

0
118+2
00

118+10
0

118+000

117+900

117+800

0
117+70

00
00

BITUMINOUS SINGLE COURSE


50mm
117+6

KEY MAP
118+000
500
117+
0

QARN
+40
117 0
+30
117 0

LOT3 - 41 km
+20
117 0
+10
117
00
+0
117 00
+9
116

scale 1:20
0

116
+80

116
+70
0

0
00
+60
116 0
+50
116 0
+40
116 0

116
+30

116
+20
0

0
6+0
+10
116 0
+00
116 0
+90
115
0
+80
115 0
+70
11
115

115
+60

115
0

+50
0

0
+40
115 0
+30
115 0
+20
115 0
+10
115 0
+00
115
0
+90
114 0
MATTAN

+80
114
0
+70
114

114
+60
0

+50
0
0 0
114
0
+40
114
0
+30
114
0
+20
114

114
+10
0

+00
0
+0
114
0
LOT1 - 129 km

+90
113

113
+80

113
1 0

+70
0
14
0
+60
113
0
+50
113
0
MUSCAT

+40
113
0
+30
113
0
+20
113
0
+10

FAHUD AIRPORT
113 0
+00
113
0
+90
112

112
+80
0

+70
0
0
112
0
+60
112
0
+50

EXISTING ROAD PAVEMENT


112

112
+40
0

+30
0
+ 00
112
0
+20
112
0
+10
112
0
+00
112
0
+90
111

111
+80 10

+70
0
12
111
0
+60
111 0
+50
111
0
+40
111
0
+30
111
0
+20
111
0
+10
111
0
+00
111
0
+90
110
0
+80
110 0
110
+70

110
+60
0

0
0 00
+50
110
0
+40
110
0
+30
110 0
+20
110
0
+10
110

110
+00
0

+90
0
0+
109
0
+80
109
0
+70
11
109

109
+60
0

+50
0
109 0
+40
109 0
+30
109
0
+20
109
0
+10
109 0
+00
109

108
+90
0

+80
0
0
108
0

e
+70
108 0
+60
108
+50
0
00

r
108 0
+40
108 0
+30
108 0
+20
108 0
108
+10

108
+00
0

0
8+
+90
107
0
+80
107 0
+70
10
0

107 0
+60
107 0

Int Len
+50
107 0
+40
107 0
+30
107
0

n
+20
107 0
+10

g
107 0
+00
107 0
90

PETROLEUMDEVELOPMENTOMAN
6+
10 00
+8
106 0
+70
106 00
+6
106 0
+50
106 0
+40
106
0
+30
106

ve th:
200
106+
100
106+
000

n
00
106+0

00
105+9

00
105+8

105+

105
106+
700

+60
0

0
+50
105 0
+40
105 0
+30
105 0
+20
105 0
+10
105 0
+00
105 0

104
+90

104
+80
0

+70
0
0 00
104 0
+60

tio 33.3
104 0
+50
104 0
+40
104 00

P
+3
104 0
+20
104

104
+10

104
0

+0
00

0
4+
+90
103 0
+80

E
103
0
+70
10
103

103
+60
0

+50
0
103 0
+40
LEGEND:

103
0

TY km
+30
103
0
+20

2
103
100
103+
000
103+
900
102+
800
102+
700
102+
600
102+
500
102+
400
102+
300
102+

102+
200

100
+ 000
102+
000
102+
900
101+
0
+80
101
700
102
101+

101
+60
0

0
+50
101
0
+40
101 0
+30
101
0
+20
101
0
101
+10

101
+00
0

+90
0
00
100

100
+8
00

70
0
0

CBR ≥ 40%
EXISTING SUBGRADE
0+ 0
10 60
0+

0
10

50
0+
0

10
40
0+ 0
10 30
0+ 0
10 20
10
0+
10
0
0+
29

0+ 0
10 00
0+
10

99
+9
00

99
+8
00
000
+7
99
1 99
+6
00

+5
00

STABILIZED LAYER
99

250mm
00
+4
99
00

EMBANKMENT
+3
99
00
99
+2

99
+1
00

+0
00
0
99
00
+9
98
00
+8
98
00
+7
98
00
98
+6

98
+5
00

+4
00
00
98 00
7.500

+3
98 00
+

BITUMINOUS SINGLE COURSE


+2

50mm
98 00
+1
98
AD D
00
+0
98 00
+9
97

00
+8
97
00
+7
97
98 97
+6
00

00
+5
97

PROJECT MANAGER:
00
+4
97 00
HAHI
+3
97 00
+2
97 00
+1
97 00
+0
97 00
AD D RAH
96
+9

96
+8
00

+7
00
00
96 00
96
+6

96
+5
00

+4
00
0
SCOPE OF WORK

96 00
+3
96
AKHI
00
GOV
+2
96 00
+1
96 00
+0
6+
NATIH

96 00
+9
95

00
LIYA

+8
95
00
+7
95
9 95
+6
00

00
ERNO

+5
95
00
+4

000
95 00
+3
H GO
95 00
+2
95 00
+1
95 00
+0
95

00
+9
94
800
RATE

94+
00
+7
94
600
94+
500
VERN

94+
400
300

94+
200

94+
100

94+
00

94+
00

94+0
00
94+ 93+9
00
ORA

93+8
00

93+7
00

93+6
00

93+5
+4
93
TE

DETAIL
93+3
00

scale 1:20
93+
200

CARILLIONALAWI
93+
ROUNDABOUT

100
93+
000
92+
900
92+
800
92+
OUT OF SCOPE OF WORK

700
92+6
00
92+5
00
92+400

92+300
92+950
92+200

92+100

92+000

91+900

91+800

91+700

91+600
92+000
91+500

91+400

91+300

91+200

91+100

91+000

90+900

90+800

90+700

90+600

90+500
INTERVENTION TYPE 2 - 39.55 KM
INTERVENTION TYPE 1 - 35.08 KM

90+400

INTERVENTION TYPE 2
90+300

90+200

90+100
0
IBR
90+000
I
89+900
89+
METERS

89+800

89+700
90+00
29

89+600
- 74.63 km

89+500
450
89+4
00
89+3
00
89+2
00
15.000

89+1
00
89+0
00
88+9
00
88+8
00
88+7
00
88+6
00
88+5
00
88+4
00
88+30
0
88+2
00
88+10
0
88+0
00
87+90
0
87+8

Inte 00
AD D
87+70
0
87+6
00
88+ H
r
87+50

5k
0
87+40
0
87+3
00
000
87+20
0

RECYCLED AND STABILIZED PAVEMENT


87+1
00
87+00
0
86+9
00

m
86+80
0
86+70
0
AD D AHIRAH
86+6

6.2 gth:
00
86+50
0

86+20
86+4

86+30
00

0
AKH G
0
86+10
0
86+00
0
85+9
00
85+80
0
85+7
00
ILIYA OVER
85+6
00
86+
TY ventio
85+50
0
83+
85+4
00
85+30
0
000
85+2
00
Len PE 2 n
85+10
H GO
0
200
85+0
00
84+9
00
84+8
00

CONSULTANT:
84+7
00
84+
VER
600
84+
500
84+
400
84+
300
84+
200
84+
100
84+
000
83+
900
83+
800
83+
700
83+
84
600
83+
500
83+
400

Engineering Consultancy LLC


83+
300
+0
83+
200
83+
N

100
83+
000
82+
00
900
82+
800
82+
700
82+
600
82+
500
82+
400
82+
300
82+
200
82+
100
82+
000
81+
900
81+
800
81+
700
81+
82
600
81+
500
81+
400
81+
300
+0
81+
200
81+
100
81+
000
80+
900
00
80+
800
80+
700
80+
600
80+
500
80+4
00
80+3
00
80+20
0
80+100

80+000

79+900

79+800

79+700

79+600
80+000
79+500
0
79+40
00
79+3
00
79+2
00
79+1
00
79+0
00
78+9
00
78+8
00
78+7
00
78+6
00
78+5
00
78+4
00
78+3
00
78+2

78+1
00
000
76+
00
78+0
00
77+9
00
77+8

77+7
78+
00
800
00
77+6
00
77+5
00
77+4
00
77+3
00
77+2
00
r

77+1
00
77+0
00
76+9
00
76+8
00
v

76+7
00
76+6
00
76+5
00
76+4
00
76+3
e

00
76+2

76+1

76+0
00

00
000

CBR ≥ 40%
EXISTING SUBGRADE
3.8

00
STATION

75+9
AL MAHA

00
75+8

75+7
76+
00
g

00
75+6
00
75+5
00
75+4
00
75+3
00
75+2
00
75+1

EMBANKMENT
00

STABILIZED LAYER
200mm
75+0
ntio
Inte PE 1

00
74+9
00
TY th:

74+8
00
74+7
Len km

00
74+6
n

00
74+5
00
74+4
00
74+3
00
74+2
00
74+1
0
00

BITUMINOUS SINGLE COURSE


50mm
74+00

0
73+90

0
73+80

73+70

73+60
74+0
0

0
73+50

0
73+40

0
73+30

73+200

73+100

73+000
73+00
0
72+900

72+800

72+700

72+600

72+500

72+400

72+300

72+200

72+100

72+000

71+900
00
71+800

71+70

71+600
72+00

71+500

71+400

71+300

71+200

71+100

71+000

70+900

70+800

70+700

70+600

DETAIL
70+500

scale 1:20
70+400

70+300

70+200

INTERNATIONAL T. +968 24117507 - info@via-int.com


70+10

70+000
0
00
0
69+90
0
69+80

69+70
0
70+0
29

0
69+60

0
69+50

69+400

VIA INTERNATIONAL LLC


0
69+30
0
69+20
0
69+10

69+000
0
68+90
0
68+80
0
68+70

0
68+60

68+500
0
68+40
0
68+30
0
68+20

68+10

68+00
0
0
00
0
67+90
0
67+80

67+70
68+0
67+60
0

INTERVENTION TYPE 1
0
67+50
0
67+40

Al Nahda Tower, 2 - 5th Floor, Ghala - Muscat


67+300
0
67+20
0
67+10
0
67+00

0
66+90
0
66+80
0
66+70
0
66+60
0
66+50

0
66+40

66+300
0
66+20

66+10

66+00
0

0
00
65+900
0
65+80

65+70
66+0
0

65+60
0

65+500

65+400
0
65+30
0
65+20
0
65+10

65+000
0
64+90
0
64+80
0
64+70

64+600
0
64+50
0
64+40

RECYCLED AND STABILIZED PAVEMENT


0
64+30

64+200

64+100

64+00
0
00
0
63+90
0
63+80

63+70
64+0
0

63+600

63+500
0
63+40
0
63+30
0
63+20
QA 64+
0
63+10

63+000

62+900
600
0
62+80
0
62+70
RN
62+600

62+500
0
62+40
0
62+30
0
62+20

62+100
00
AL
0
62+00
0
61+90
0
61+80

61+700

61+600
62+0
AL
0
61+50
0
61+40
0
61+30

0
61+20
UWAIFAIH

0
61+10
AM
0
61+00
0
60+90

0
60+80
0
60+70
0
60+60
0
60+50

60+400
0
60+30
0
60+20

60+10
0

0
00
GUEST HOUSE

60+00
0
59+90
0
59+80

59+70
0

59+600
60+0
0
59+50
0
59+40
0
59+30
0
59+20

0
59+10

0
r

59+00
0
58+90
Le

0
58+80
0
58+70

0
v

58+60

58+500
0
58+40
0
58+30
0
58+20
e

58+100

58+000
00
0
57+90
0
57+80
n

57+70

57+600
58+0
0

0
57+50
0
57+40
0
57+30
0
57+20

57+100

57+000

0
56+90
0
56+80
0
56+70
0
56+60

0
56+50

56+400
0
56+30
0
56+20

56+10
0
00
Inte ngth: 11

56+000
0
55+90
0
T

55+80

55+70
0

55+600
56+0
55+500
0
55+40
0
Y

55+30
0
55+20

55+100
0
55+00
0
54+90
0
54+80

54+700

54+600
0
54+50
0
54+40
0
54+30

54+200
tion .6 km

0
54+10

54+00
0
00
00
53+9
NAHDAH

800
53+
700
54+0
53+
00
+6
0

53
00
+5

PE 1
53
00
+4
53
00
+3

CBR ≥ 40%
SUBGRADE
53
00
+2

SCARIFIED AND
COMPACTED GSB (Class B)
250mm
53
00
+1
53
00

EMBANKMENT
+0
53
00

150mm ABC (Class B)


+9
00

52
00
+8
52
00

60mm BBC (Class B)


+7
52
00
+6
52
00
+5
52
00
+4
52
00
+3
52
00
+2
2+
52
00

40mm BWC (Class B)


+1
52
00
+0
52
00
+9
51
00
5 51
+8
51
+7
00
51
+6
00
51
+5
00
51
+4
00
00
+3
51
00
+2
51

00
+1
51
000
51+
900
50+
800
50+
700
53

50+
00
50+6
0
50+50

50+400

50+300
+0

50+200

50+100

50+000

49+900

49+800
00

49+700

49+600
50+000
49+500

49+400

49+300

49+200

Design of Roads:
0
49+10
0
49+00
0
48+90
0
48+80
0
48+70
0
48+60
0
48+50
0
48+40

48+30
0

48+2
00
0 00
00
48+1
00
48+0
00
47+9
00
47+8

47+7

47+6
48+
00

00

0
47+50

47+400

47+300

47+200

47+100
INTERVENTION TYPE 2

47+000

DETAILED DESIGN
46+900

46+800

46+700

46+600

46+500

46+400

46+300

46+200

46+100

46+000

45+900

45+800

45+700

45+600
46+0
45+500

45+400

45+300
00
45+200

45+100

45+000

44+900

44+800

44+700

44+600

44+500

44+400

44+300

44+200

44+100

44+000

43+900

43+800

43+700

43+600
44+000
43+500

43+400

43+300

43+200

43+100

43+000

42+900

42+800

42+700

42+600

42+500

42+400

42+300

42+20
0
42+100

42+000

41+900

41+800

41+700

41+600
42+ 000
41+500
AS PER OHDS 2017

41+400

41+300

41+200

41+100

41+0
00
40+90
0
40+80
0
40+7
00
40+60
0
Consultancy Services for Feasibility Study and Detailed

40+50
0
40+400

40+300
ALTERNATIVE OPTIONAL

40+200

40+100
- Sultanate of Oman - P.O.Box. 805 - PC 114 - Fahud - Mattan, Fahud - Yibal, Qarn Alam - Saih Rawl 40+00

39+
0

900
000
800
39+
700
39+
40+
39+
600

500
39+
400
39+
300
39+
200
39+
100
39+
000
39+
900
38+
800
38+
00
38+7
00
38+6
500
38+
400
38+
00
38+3
00
38+2

38+
100

000
+000
38+
900
37+

37+8
00
38
00
37+7
600
37+
500
37+
00
37+4
CONVENTIONAL PAVEMENT SOLUTION

300
37+
200
37+
100
37+
000
37+
900
36+
800
36+
700
36+
600
36+
500
36+
400
36+

36+
300
00
200
36+
100
36+

36+
000

35+
900
+0
800
35+

35+
700
36
35+
600

500
35+
400
35+
300
35+
200
35+
100
35+
000
35+
900
34+
800
34+
700
34+
600
34+

34+
500

400
0 0
34+
300
34+
200
34+
200mm

100
34+

34+
000

33+
900
+0
800
33+

33+
34
700
DRAWING CODE

00
33+6
00
33+5
00
33+4
00
33+3
200
CBR ≥ 40%

33+
100
33+
00
33+0
INTERVENTION TYPE 1

900
32+
SUBGRADE

800
32+
00
32+7
00
32+6
00
32+5
00
32+4
00
32+3
EMBANKMENT

00
32+2

32+1

32+0
00

00
000
00
31+9
00
40mm BWC (Class B)

31+8
SCARIFIED AND

31+7

31+6
32+
00

00
50mm BBC (Class B)

00
31+5
00
31+4
00
31+3
00
31+2
00
150mm ABC (Class B)

31+1
00
31+0
00
30+9
800
30+
700
30+
600
30+
500
30+
00
30+4
00
30+3
00
30+2

30+1
00

00
0 00
30+0
DD L1 04

00
29+9
00
29+8

29+
700

29+
30+
600

500
29+
400
29+
00
29+3
00
COMPACTED GSB (Class B)

29+2
00
29+1
00
29+0
00
28+9
800
28+
700
28+

28+
600

28+
500
0
400
28+
300
28+

28+
200

28+
100
+ 00
000
28+
900
27+
800
27+

27+

27+
28
700

600

500
27+
400
27+
300
27+
200
27+
100
27+
000
27+
900
26+
800
26+
700
26+
600
26+

26+
500

400
0
26+
300
26+
00
Pavement

200
26+
100
26+

26+
000

25+
900
+
800
25+

25+
700
26
25+
600

500
25+
00
25+4
300
25+
200
25+
00
25+1
00
25+0
00
24+9
00
24+8
00
24+7
00
24+6
00
24+5
00
24+4
00
Intervention areas

24+3
00
24+2

24+1
00

24+0
00
000
00
23+9
00
23+8

23+7
00

23+6
24+
00

00
23+5
00
23+4
00
23+3

You might also like