PROPOSAL FOR 40TPD PYROLYSIS OIL

DISTILLATION PLANT MJZ-10


I. Client information

Client/Company Name: Mr. Emilio Brunetti


Capacity Requested: /
Raw Materials: PPyrolysis Oil
Place: Italy
Remark (Other requirement) Standard configuration

II. Technical Parameters

Raw material Plastic or Tyre Pyrolysis oi etc.


Structural form Horizontal
Model MJZ-10
Size of reactor D2200*H5100*T12mm
Material of reactor Q245R
24-hour handling 10MT
Rate of oil yield 60-70%
Power 46KW
Applicable fuel Oil, LPG, Nature Gas, Wood, Coal
Pressure Vacuum,negative Pressure

III. 3D Drawing ( for your reference)


IV. Technical Flowing for reference
V. Scope of Supply
No. Name Specification Unit Qty. Remark

1 Distillation reactor Ø2200*5100 pc 1

2 High temperature oil circulation pump 7.5kw Pc 1

3 Distillation tower ø530*3500 pc 1

4 Oil condenser for diesel fraction ø630*3600 pc 2

5 Oil condenser for heavy oil ø630*3600 pc 1

6 Oil tank 1# Ø1400*2000 pc 1

7 Oil tank 2# Ø1400*5500 pc 1

8 Vacuum generator Ø900*1500 pc 1

9 Vacuum pump 7.5KW pc 1

10 Hydroseal ø900*1500 pc 1

11 Control cabinet set 1

12 Flue condenser ø320*3000 pc 1

13 Chimney Ø420*3000 pc 1

14 Draft fan 4kw pc 1

15 Dedusting system 900*3000 set 2

16 Syngas burner pc 6

17 Air blower 2.2kw Pc 1

18 Anti explosive oil pump 2.2KW Set 2

19 Pressure oil pump 2.2KW Set 1

20 Centrifuge oil pump 2.2kw Set 3

21 Centrifuge water pump 2.2kw Set 1

22 Pipe, valve, instrument set 1


VI. Display of Main Parts

Reactor Condenser

Distillation tower Reactor base

Oil tank Control cabinet

Oil Burner Flue condenser


Vacuum tank Dedusting scrubber

VII. Mingjie After Sell Service


1. Solution designing, technical and financial proposal preparation, and market
analysis,

2. Provide installation, commissioning and training service, has a professional team


for after-sale service,

3. All the products from Mingjie has 12 months warranty since clients sign the act of
acceptance,

4. Life time technical support, technology upgrading from R&D department,

5. 24 hours on-line service.


VIII.Time Table of Project Setup

Manufacturing 40 working days

Loading containers plus customs declaration 7 calendar days

Shipping on sea Based on Client's destination

Customs clearance at destination and


7 calendar days
transport to installation site

Installation 40 days

Commissioning 7 days

Training 7 days