Professional Documents
Culture Documents
Kanakpura
Kanakpura
Final
Topic Pg No
List of Figures
List of Tables
List of Maps
PREFACE A
EXECUTIVE SUMMARY G
5. INFRASTRUCTURE 89
5.1 PHYSICAL INFRASTRUCTURE 89
5.2 SOCIAL INFRASTRUCTURE 107
7. PROBLEMS 119
PART II
1. ZONING REGULATIONS 186
1.4.3 Standards for Civic Amenities, Parks & Play Grounds 250
ANNEXURES i
LIST OF FIGURES
Figure No Title Pg No
Table No Title Pg No
3.1 Existing area under residential land use in major settlements in the 59
Kanakapura LPA
3.2 Organizational setup in the housing sector 63
3.3 Housing sites allotted under Ashraya Scheme in 2010-11 64
3.4 Houses constructed under Ashraya Scheme in 2010-11 64
3.5 Houses constructed under IAY in 2010-2011 65
3.6 Houses constructed under special scheme in 2010-2011 65
3.7 Houses constructed under special scheme in 2010-2011 66
3.8 Features of IHSDP 66
3.9 houses Constructed under IHSDP 66
3.10 Declared slums in Kanakapura TMC 68
4.1 Existing land utilization in the LPA, 2012 70
4.1 A Existing land use in the LPA, 2012 70
4.2 Existing Land use distribution in Kanakapura Town 71
4.3 Existing Land use distribution in Harohalli 73
4.4 Existing Land use pattern Sathanur 74
4.5 Existing Land use distribution in Kaggalipura 75
4.6 Road category in Kanakapura Taluk 80
4.7 Road inventory, Kaggalipura town 80
4.8 Road inventory, Harohalli town 81
4.9 Road inventory, Kanakapura town 82
4.10 Road inventory, Sathanur town 83
4.11 Vehicle distribution in Kanakapura Taluk 85
5.1 Water supply source for Kanakapura TMC 91
5.2 Water Supply standards CPHEEO 91
5.3 Present Domestic water requirement in Kanakapura LPA 92
5.4 Details of existing storage reservoirs 93
5.5 Municipal water supply source in Kanakapura Town 94
5.6 Sewage generation in the LPA, 2011 98
5.7 Solid Waste generation in the LPA 103
5.8 Municipal Solid waste management data 103
5.9 Tools and Equipment procurement under SWM Action Plan 104
5.10 Distribution of Educational facilities in Kanakapura Taluk 107
5.11 Health care facilities in Kanakapura Taluk 113
5.12 List of healthcare programs in Kanakapura Taluk 116
8.1 IMP land use analysis- Kaggalipura and Harohalli-2021 121
8.2 IMP land use analysis- Kanakpura and Sathanur- 2021 121
8.3 Population growth rate in Kanakpura LPA 122
8.4 Population growth rate in Kanakpura TMC 123
8.5 125
Natural growth of population calculated through various statistical methods
8.6 Population projection of the villages of LPA 125
8.7 Projected population in Kanakpura LPA 2031 129
8.8 Distribution of population in the four growth nodes 129
8.9 Population in Kanakapura LPA 2021, 2031 130
8.10 Conurbation area statistics- 2031 131
8.11 Distribution of population and area in the four growth nodes 131
8.12 Residential Area requirement for the LPA 132
8.13 Residential Area requirement for the LPA for the Conurbations 132
8.14 Landfill Area Requirement in the LPA 133
8.15 Educational facility Requirement in the LPA 134
8.16 Medical facility Requirement in the LPA 135
9.1 Density in the Growth Nodes of Kanakapura LPA 139
9.2 Kanakapura proposed landuse statistics-2031 141
9.3 Harohalli Proposed land use statistics-2031 142
9.4 Kaggalipura proposed landuse statistics 143
9.5 Sathanur proposed landuse statistics 144
9.6A Conurbation area statistics-2031 144
9.6B Proposed Landuse 2031, LPA (Four Conurbations) 145
Proposed Landuse 2031, LPA (including the four conurbations and developed
9.6C 145
area between Kaggalipura – Harohalli)
9.6D Landuse statistics of the agricultural zone 146
9.7 Road Inventory of Kanakapura LPA. 149
9.8 Road Inventory of BMR proposed roads 150
9.9 Inventory of Roads proposed to be widened in the Master plan 2031 150
9.10 Building Line proposed for major roads 150
9.11 Structure Plan proposals – land Utilization and Environment 151
9.12 Structure Plan proposals – Economy 153
9.13 Structure Plan proposals – Transport 154
9.14 Structure Plan proposals – Housing 155
9.15 Structure Plan proposals – Water Supply 156
9.16 Structure Plan proposals – Sanitation 156
9.17 Structure Plan proposals – Power 157
9.18 Structure Plan proposals – telecom 158
9.19 Structure Plan proposals – Soild Waste Management 158
9.20 Structure Plan proposals – Education 158
9.21 Structure Plan proposals – health 159
Sl.No Title
Map No.
Drawing
1 Location 1
2 Administrative boundary 2
Study Maps
3 Regional Setting 3
4 Climatological Studies 4
5 Forest, Drainage & Water bodies 5
6 Ground Water Potentional 6
7 Soil Classification 7
8 Demographic Studies 8
9 Civic Amenities And Facilities - local Plannig Area 9
10 Civic Amenities And Facilities - Settlement Wise 10
11 Problem Map 11
Existing Land Use
12 Existing Land Utilisation - local Planning Area 12
13 Kaggalipura Existing Land Use 13
14 Harohalli Existing Land Use 14
15 Kanakapura Town Existing Land Use 15
16 Sathanur Existing Land Use 16
Existing Landuse Maps 1 to 26 Grids 17 to 42
17 Proposed Land Use Maps
18 Proposed Land Utilisation - local Planning Area 43
19 Kaggalipura Proposed Land Use 44
20 Harohalli Proposed Land Use 45
21 Kanakapura Proposed Land Use 46
22 Sathanur Proposed Land Use 47
23 Proposed Landuse Maps 1 to 26 Grids 48 to 73
Circulation Pattern Maps
24 Kaggalipura Circulation Pattern 74
25 Harohalli Circulation Pattern 75
26 Harohalli Circulation Pattern (PartA) 75 A
27 Harohalli Circulation Pattern (Part B) 75 B
28 Kanakapura Circulation Pattern 76
29 Kanakapura Circulation Pattern (Part A) 76 A
30 Kanakapura Circulation Pattern (Part B) 76 B
31 Sathanur Circulation Pattern 77
Kanakapura LPA Master Plan 2031 Preface
PREFACE
Bangalore Metropolitan Region Development Authority prepared the Structure Plan (SP) for
Bangalore Metropolitan Region (BMR) with an inductive approach with the prime objective of
decentralising growth away from Bangalore to harness and constrain its increasing primacy in the
region, lessen the regional disparities and in the process relieve the developmental pressure within the
conurbation. The strategic issues considered to be key determinants to future growth patterns were
How effectively they would counter anomalies and negative development trends identified
in the BMR.
The structure plan was intended to provide a generic model for formulation of such plans for other
regions in Karnataka besides providing a strategic policy framework for planning & development
control locally to ensure that provision of development is realistic and complements with national state
& regional policy guidance and securing consistency between local plans for contiguous or
neighbouring areas.
Structure Plan has proposed five Area Planning Zones and Interstitial zones in the entire
Bangalore Metropolitan Region. For the purpose of planning and development of important and
potential zones, Karnataka Town and Country Planning Act, 1961 has been extended to various Area
Planning Zones and Planning Authorities have been constituted for controlling and regulating the
developments in these Local Planning Areas. With the increase of Bangalore’s population and spatial
spread in the last 2 decades owing to its increasing global recognition as a preferred IT destination.
Page |A
Kanakapura LPA Master Plan 2031 Preface
With increasing outgrowth of Bangalore and the proposed population influx into the
Kanakapura Local Planning Area, BMRDA has rightly taken the preparation of Interim Master
Plan to dovetail the regional policies of development the local requirements of the ever-increasing
population and as a result guide & regulate urban growth for a planned & compatiable physical
development of the region. The preparation of Interim Master Plan started during 2006 and the govt.
have approved the five IMP’s provisionally in 2007 and finally approved them during 2009.
A Master Plan (MP) is defined as “A plan for the development and re-development of the
area within the jurisdiction of the planning authority”. The Master Plan has to be prepared not
later than 2 years from the declaration of the LPA as per Sec 9 of The KT & CP Act. According to the
Reservation of land for the purposes of Central Govt., State Govt etc.
Phasing of development
BMRDA prepared scientific base maps for the Local Planning Area by acquiring Quick Bird
data based on 2009 data as there were no proper base maps. The Planning Authorities incorporated all
Government constituted a committee vides its G.O. dated 28-11-2012 under the chairmanship of
Metropolitan Commissioner to finalise the Master Plans for five Local Planning Areas and along with
Page |B
Kanakapura LPA Master Plan 2031 Preface
Meanwhile there was a petition in High court of Karnataka for delayed preparation of Master
Plans for BMRDA submitted an affidavit saying that the plans would be finalised by June 2012 and
subsequently another affidavit that it would be finalised on 31-1-2013. But, we could not finalise the
plans within date and immediately the committee met on 24-1-2013 and reviewed the progress made
in the preparation of Master Plans. During the discussion it was also observed that notification under
section 10/1 of Karnataka Town and Country Planning Act, 1961 was not declared so far and it would
be further delayed if we notify it now (2 months) and therefore, it was decided that If BMRDA is to
prepare the Master Plans, then the notification under section 10/1 is not required. However, it was
opined that in one case law the govt. has to delegate/empower the preparation of Master Plans under
section 9/2 of Karnataka Town and Country Planning Act, 1961. Accordingly, BMRDA requested the
govt. and govt. have empowered the preparation of Master Plans for five Local Planning Areas to
BMRDA under section 9/2 Karnataka Town and Country Planning Act, 1961 on 4-3-2013.
The committee formulated broad guidelines’ for the preparation of Master Plans and directed
1. Existing developments
2. Approved IMP
3. Change of land uses approved by the govt. and P.A. under section 14-A (3)
Page |C
Kanakapura LPA Master Plan 2031 Preface
4. Major road alignment (STRR/IRR/ITRR) was incorporated as per the Karnataka Gazette
Based on the above guidelines BMRDA with full support of all Planning Authorities, Cistup
(IISc) and DULT finalised the Master Plan and it was unanimously approved in the committee
constituted under the chairmanship of Metropolitan Commissioner for the finalisation of Master Plans.
Now, BMRDA is submitting the Master Plan for Kanakapura Local Planning Area with plans &
reports for provisional approval as required under section 13 (1) of Karnataka Town and Country
Govt. has approved the Draft master Plan vide no UDD153BMR2013 Bangalore, dated
16.09.2013. Public objections and suggestion has been called as per section 13(1) KTCP Act for a
period of 60 days from 9.10.2013 to 7.12.2013. The Authority has received 373 objections/
Govt. has constituted an official scrutiny committee headed by the Commissioner BMRDA
vide no UDD 27 BMR 2014 Bangalore dated 5.3.2014. The details of the committee are as below.
Page |D
Kanakapura LPA Master Plan 2031 Preface
The committee has held 4 meetings to hear the objections and suggestions after considering
suitable suggestions and recommendations some modifications have been proposed. Based on the
committee decision necessary changes have been incorporated in the Master Plan 2031. And master
plan has prepared for Kanakapura LPA, maps and report for final approval as required under section
13(1) of the KTCP Act, 1961.
We take this opportunity to thanks to Sri. D.K. Shivakumar Honorable minister for energy
Government of Karnataka and Sri. D.K. Suresh Honorable member of Parliament and Sri. M.D.
Vijaydev chairmen, members of Kanakapura Planning Authority who have given there valuable
suggestions for preparation final master plan and staff of planning authority.
We take this opportunity to thank each member of the committee, stakeholders and everyone who
have diligently assisted, reviewed and supported in the completion of Kanakapura Master Plan 2031.
Page |E
Kanakapura LPA Master Plan 2031 Executive Summary
EXECUTIVE SUMMARY
The Kanakapura Local Planning Area was declared by the BMRDA in 2006. It is located in the south-
west part of the Bangalore Metropolitan Region (BMR). The total extent of the LPA is 412.78 sqkm
and consists of 86 settlements consisting of 85 villages and Kanakapura TMC. The LPA is well
connected by the NH-206, connecting Bangalore with Mysore via Kanakapura LPA. The Interim
Master Plan of the LPA was commissioned in 2007. It was provisionally approved in April 2007 and
finally approved by the BMRDA in May 2009. The process of Master Plan preparation started with the
preparation of the Basemap and Existing Landuse Map which were prepared by Pixel using 0.6 m
resolution Quickbird satellite Image. The maps were scrutinised by the KSRAC and submitted to the
BMRDA in 2012.
The Master Plan of Kanakapura was prepared with to promote the LPA’s role as a counter magnet to
Bangalore. The Bangalore Mysore Infrastructure Corridor passes in close proximity to the LPA on the
north-east which increases its development potential. There are four important growth nodes in the
LPA – Kaggalipura, Harohalli, Kanakapura and Sathanur. Likewise all Master plan Proposals have
made as per the four conurbations – Kaggalipura, Harohalli, Kanakapura and Sathanur.
Kaggalipura is located along the NH 206 and is closest to Bangalore. There is rapid urbanization in
the area with the construction of residential apartments. International schools and spiritual institutions
have come up in the area. Harohalli is characterized by the KIADB industrial estate which has few
industries at present. Kanakapura is the Taluk headquarter of the Kanakapura Taluk and is also a
Town Municipal Council as per Census. The area is mainly residential with few institutional buildings
to cater to the civic needs. Sathanur is the southern-most settlement in the LPA. It consists of
residential areas as few commercial and institutional setups. A township of 65 sqkm has been
proposed at Sathanur by the BMRDA – to form a hub of agro processing industries with work-home-
play concept. The township would further increase the development potential of the LPA.
Page |G
Kanakapura LPA Master Plan 2031 Executive Summary
The river Arkavathi flows through the LPA and is the only perennial source of water. Depletion of
The Master Plan 2031 has been prepared to uphold the potential of the areas. There have been
some changes in landuse in the LPA under KTCP Act. All changes and approved layouts have been
retained in the Master Plan proposal. Guidelines and standards have been followed and additional
The concept of ‘phasing of development’ has been introduced as required under section 12 (g) of
Karnataka Town and Country Planning Act, 1861 to bring about gradual and compact development in
the Local Planning Area. The primary objective of act is to guide and regulate the developments
within the Local Planning Area in a phased manner so as to facilitate planning for the provision of
infrastructure services like water supply, sanitation, drainage, transport and social infrastructure.
Page |H
Kanakapura LPA Master Plan 2031 Salient Features of Kanakapura
6 District Ramanagara
CHAPTER 1
INTRODUCTION
1.1 BACKGROUND
Karnataka is one of the fastest growing states in India. It is the 9 th largest state in India in terms of
population with a decadal growth rate of 15.67%1. 38.57% of the state is urbanised with a growth rate
of 31.27%. The BMR has an area of 8005 sq km and a population of 10.57 lakhs as per census 2011.
The decadal population growth rate in the BMR is 25.68%. Needless to say, this fast growth calls for
a strategic planning to sustain the additional pressure on services and maintain the quality of life.
The BMR at present faces the challenges of a rapidly urbanising region on the verge of becoming an
international metropolis. While the strategic location, economic potential and an efficient workforce of
the area provides impetus to the process of globalization, lack of perennial water availability, rising
pressure on infrastructure in core are inevitable constraints in the process of the same. Hence a
policy of decentralisation advocates spatial distribution of population from the core to the outer less
congested areas.
Planning in India, traditionally had been largely socio-economic, restricted to a few urban centres.
The three tier planning system was often overridden by state agenda. The 73rd and 74th
Constitutional Amendment Acts, implemented in the year 1992, provide a spatial framework for
integration between all levels of planning. Known as the decentralisation agenda, the aim was to
facilitate a gradual shift in power to the grass root levels. As a part of the functional devolution, the
local bodies (LB) are now expected to perform urban planning including town planning, regulation of
land use and construction of buildings, planning for economic and social development, planning for
the poor in the society, slum improvement and up gradation and urban poverty alleviation.
The Master Plan for Kanakapura Local Planning Area has been prepared in the context of the BMR
to redefine its role for the future within the overall framework of Structure Plan 2031.
1
Census 2011
Page |1
Kanakapura LPA Master Plan 2031 Chapter 1 | Introduction
The BMR is disaggregated into six local planning areas and the Bangalore Metropolitan area which
more or less coincides with the limits of the BBMP. In order to provide sectoral and spatial synergy a
Structure Plan had been formulated for the BMR which is more or less a regional perspective plan.
The Structural Plan provides a framework for the master plan of the Kanakapura LPA.
The Structure Plan (SP) 2011 had an inductive approach to planning since it was governed by the
decentralisation policy in the BMR. Hence, the SP 2011 proposed a targeted induced population
distribution of over 7.4 lakhs in the south Karnataka Region, of which 4.9 lakhs were to be
accommodated in the BMR. The Interim Master Plan (IMP) prepared for the Kanakapura LPA for the
plan period 2021 envisaged a population of 11.22 lakhs in the LPA by the year 2021 also prepared by
an inductive approach.
The vision and the growth directions stated in the SP 2011 had not been able to live up to the pace of
growth in the BMR. Hence a Revised Structure Plan (RSP) has been prepared for the region for the
year 2031, to provide strategic policy framework for planning, ensure sectoral development and
coordination and securing consistency between the various local plans.
Page |2
Kanakapura LPA Master Plan 2031 Chapter 1 | Introduction
LAND
Land being a limited and fixed resource, there is competing demand on agriculture and allied
activities, non-agriculture sectors like industries, communication systems, buildings, and power
projects, new townships, mining and so on.
Demand for land from both agriculture and non-agricultural sectors are exerting a great pressure on
land resources. The demand for firewood, timber and fodder for livestock has resulted in excessive
pressure on forest and pasture lands which has progressively affected the grass and tree cover
resulting in accelerated forest and greenery (pasture) degradation leading to ecological imbalance
and environmental problems.
Pasture lands have to be provided to facilitate grazing of animals and also fodder augmentation in
community/government lands. In the LPA the pasture land appears to be significant contributor to live
stock. In the LPA special efforts have to be made to develop pasture lands to encourage animal
husbandry.
PHYSIOGRAPHY
The elevation falls from 833 m to 620 m from north of the LPA to the south up to Arkavathy valley and
increases in elevation generally towards the south-west. Terrain shows undulating topography with
varying elevation between 833 meters to 620 meters above MSL. The lowest elevation being 620 m
is found around Kanakapura town in the valley portion. The slopes vary from 20-150
metres/kilometre.
The Kanakapura LPA lies in the Cauvery basin. The main tributary of Cauvery, river Arkavathy, flows
in the LPA. LPA is covered by the sub basin of Arkavathy and drains southwards. The drainage
density and stream frequency are moderate to high (hilly zone, in northern, eastern and western part)
and medium to low in central part. Drainage map shows the drainage network is integrated with
surface water body within the LPA. The drainage pattern is dendratic and parallel. It encourages for
infiltration than runoff, as the stream frequency and density are medium to low and have good
constant channel maintenance. These drainages are controlled by structures and lithology.
Page |3
Kanakapura LPA Master Plan 2031 Chapter 1 | Introduction
GEOMORPHOLOGY
Kanakapura LPA lies predominantly in Pedi plain geomorphic unit. Small patches of Structural and
Denudational hills are also traced in north eastern and southern part. The figure shows geomorphic
pattern within the LPA. This map clearly indicates that, infiltration zones are larger in area than runoff
and are suitable for ground water recharge. The potentiality will also be moderate to good.
Apart from the structural valleys, supported by the surface water bodies as showing better prospects
for ground water developments.Ground water potential clearly shows that the ground water prospects
in the valley portion is good and in majority area of the LPA, it is moderate. This can be converted as
good potential zone by adopting artificial recharge techniques.
The area is underlain with grey and pink granites and granite gneisses and intruded by dolomatic
pegmatite and quartz veins. The map shows the general lithological units in and around Kanakapura
LPA. The inclusions of dolorate and amphibolite dykes are also traced. The general trend of the
peninsular genesis is North West – South East to North East – South West. These show a steep dip
of about 70 to 80 degrees due South East. According to the Earthquake Map of Karnataka, the LPA
belongs to very low damage risk zone and is in stable belt.
Major portion of the LPA consists of red loamy sandy soils, which is moderately porous and medium
permeability. The patches of loamy, loamy clayey, sandy type of soils are noticed within the LPA.
The clayey and loamy types of soils are more in area extent in southern part than in the rest of the
LPA. Uplands show these types of soils. The map shows the soil types in and around the LPA.
The soils are favourable zones for ground water recharge. As permeability and porosity for the soils
are medium, the infiltration rates will be medium to high. Since, the characteristics are almost uniform
across the LPA; it is advisable to avoid the water polluting industries in the entire LPA to avoid
contamination of water.
There is a need for striking a balance between the competing claims of different sectors. It is
imperative to think of a systematic and scientific long range plan to harness the land resources not
only for satisfying the competing demands from various sectors, but also for ensuring sustainability
of the systems.
Page |4
Kanakapura LPA Master Plan 2031 Chapter 1 | Introduction
The soils belong to the Alifisols order. Red soils are predominant. These soils have developed on
gneisses and granites and up to little extent on metamorphic rocks. These soils occur on hills, ridges,
rolling to undulating and gently sloping lands of LPA.
These are moderately eroded and severely eroded lands, which need appropriate soil, and water
conservation measures for both agricultural and non-agricultural areas for preventing further
degradation of soils.
CLIMATE
The climate in the region is hot, moist, semi-arid Ecological Sub Region with length of growing period
of 150-180 days.2 The Kanakapura Local Planning Area belongs to the Eastern Dry Agro-Climatic
Zone. The LPA experiences pleasant weather almost all throughout the year. March, April and May
are the predominant summer months while December and January constitute winter.
The nearest IMD station giving the rainfall, humidity, temperature and wind is at Bangalore. Hence,
the data was collected from the IMD station from 1998 to 2008 for the mentioned parameters to
understand the climate in the area.
2
Agro-ecological sub regions of India. Bull. No. 35.NBSS&LUP, Nagpur 1993.
Page |5
Kanakapura LPA Master Plan 2031 Chapter 1 | Introduction
WIND DIRECTIONS
It is seen from the wind roses collected from the Indian Meteorological Department (IMD) at
Bangalore that the wind direction is mostly east to west. In the morning i.e., 0830 hrs, the wind is
towards west during May to September and east during November to February. Whereas, in the
evening i.e., 17:30hrs, the wind blows towards west during June to September and east in November
to March. Hence, it can be taken that the wind generally blows towards west. The strongest winds
(>19 kmph) are observed in the months from June to August.
N
2.1%
8.6%
8.0%
14.0% 10.6%
1.6%
It is also observed from figure 2.1 that the annual analysis of the wind direction indicates west and
east winds. The percentage wind from the north, however, slightly outweighs the one blowing from
south.
It is seen from the IMD data from 1951-80, that the mean wind speeds are greatest in the months of
June and July .According to the Wind Map of Karnataka, the LPA belongs to Low Damage Risk Zone.
Hence, the structure design of infrastructure in the LPA with respect to wind, loading may be taken
into consideration while planning and constructing high rise structures only. Further, the location of
Page |6
Kanakapura LPA Master Plan 2031 Chapter 1 | Introduction
industry, generally, should be located in a direction where wind force is going away from the human
habitation.
RAINFALL
Bangalore IMD station recorded an average rainfall of around 875 mm over the years 1998-2010. It is
observed from the IMD data provided that there are two peaks in the rainfall in Bangalore namely
May and September months. But the highest rainfall months are mainly August, September and
October.
1200
1000
800
600
400
200
0
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
Kanakapura Taluk avg annual
1056 554 413 510 938 1261 494 635 640 807 975
rainfall
The average rainfall is around 665.5 mm for Kanakapura. There are 11 raingauge stations in the
Kanakapura Taluk.
TEMPERATURE
The annual temperature in the LPA is around 24-25oC. Generally the mean minimum (January) is 14-
18 oC and the mean Maximum (May) is 32-35oC. The maximum temperature recorded is around 34oC
and the minimum temperature is around 14.1oC. The most appropriate building materials with respect
to temperature in the LPA are bricks and stones which are locally available.
Page |7
Kanakapura LPA Master Plan 2031 Chapter 1 | Introduction
40
35
30
25
20
15
10
5
0
JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC
Monthly mean maximum temperature (0C) Monthly mean minimum temperature (0C)
The table below shows the mean temperature and mean wind speed for the LPA. It is observed
from table, that the temperature peaks around 350C in April and May months. The lowest
temperatures (15-17 oC) are observed in months of November and December.
Page |8
Kanakapura LPA Master Plan 2031 Chapter 1 | Introduction
Source: www.imdbangalore.gov.in
HUMIDITY
The relative humidity is generally 86% during monsoon months and 63% during dry months. It can be
seen from the Figure below that, that the mornings have exhibited more humidity mean relative than
67 per cent with the highest in the months of July and August (around 87 per cent) and the lowest
humidity in the month of March. The evenings have exhibited humidity more than 31 per cent with the
highest in the months of August and October (around 69 per cent) and the lowest in the month of
March. Generally nearly 25 per cent difference is observed from mornings to evenings with the
highest differences seen in the months of January, February and March (> 35 per cent).
Page |9
Kanakapura LPA Master Plan 2031 Chapter 1 | Introduction
KANAKAPURA
Situated to the (56 km from Bangalore) South of Bangalore is on the right bank of the river Arkavathy.
The place was originally under the Gangas and later under the Cholas, who administered it as a part
of Kilalainad. Later, the Hoysalas made it a major headquarters of province („sime‟). Its name was
changed as Kanakapura from its original Kanakanahalli. But earlier it is mentioned as
„Kanikaranahalli‟ in two Hoysala records dated 1319 and 1317 A.D. from Hachchalu and Nyakanahalli
(Kanakapura tq) villages respectively. Even a recent record dated 1662 A.D by Mysore rulers from
Malagala also mention the place as „Kanikaranahalli‟ being the headquarters of a „sime‟. The local
people universally call it as „Kanikaranahalli‟, which is otherwise corrupted as Kankanahalli, says
Buchanan. He further says Kanikaranahalli has a Tamil origin – „Kani + Karna‟ or „Kanikara‟ signifies
a proprietor of land. „Kanikara‟ literally means an accountant (Karanika) or a teller of fortune. The
fort here is said to have been erected by Jagadeva Raya, the chief of Channapatna. The remains of
the fort can be now seen near the Arkavathy bridge. The town was twice burnt or laid waste by Tipu
Sultan to prevent its being of use to the British army on their march to Shrirangapattana. The place
was conquered by Mysore rulers in 1630 A.D.
The place has temples dedicated to Ranganatha, Valakotamma, Kodandarama, Anjaneya (two), etc.
The Ranganatha temple is a huge structure with a spacious inner Prakara and a gateway having a
Rayagopura. Over the Mukhamantapa along the hara are niches enshrining are in Vijayanagara
style with a cell to the right having images of Rama, Lakshmana and Seetha. Facing this is a shrine
with a seated image of Anjaneya. The Navaranga has a seated image of Vishnu with attributes like
Shankha, Chakra, Gada and Abhaya. Perhaps, this must have been the main deity as it is locally
said that the present image of Srinivasa was installed as the original image was broken. The central
garbhagriha has a ShalaShikhara. There is an Ardhamantapa having niches without images.
Besides the main sanctum is another cell outside to the right having a recent image of Ranganatha.
To the left of the main temple is another shrine of a Padmavati with a small Ardhamantapa and a
Navaranga.
The annual Jatra is held for a span of nine days beginning from Ugadi, when a cattle fair is also held.
The Ganesha temple is an ordinary square structure having an image in Vijayanagara style. In front
of this is a modern Kalyanamantapa. The Kodandarama temple is also an ordinary structure in
Vijayanagar style. The Garbhagriha has a brick and mortar shikara. There is an open
Mukhamantapa in front of the spacious Navaranga. Facing this temple is the KoteAnjaneya, a small
structure. The Kenkeramma temple is about 200 years old with a huge compound. The deity is
P a g e | 10
Kanakapura LPA Master Plan 2031 Chapter 1 | Introduction
regarded as Gramadevata, will have special attraction for the devotees during its Jatra held for a
week after Ugadi when about 5000 people assemble. Nearby is another Anjaneya temple whose
image is believed to have been installed by Vyasateertha.
The Valakotamma, another temple of the village deity has an image resembling Durga. The place
has one VeerashaivaMatha called DegulaMatha. It has a stone inscription dated 1667 of
DevarajaWodeyar of Mysore, announcing certain grants made in the Virupasamudra village by one
Timmamma, mother of a Dalavayi to the Matha.
The place has three mosques and the Jamia mosque inside the town is old, perhaps of Tipu‟s time.
There are three Dargahs one ascribed to Hazrath Syed Yakhub Ali, who is said to have lived here
about 200 years ago. The Urus is held at this Dargah during the month of Bakrid when more than
5,000 people assemble. The second Dargah one ascribed to Kambli Peer and the Urus is held
during Ramzan. There is also one more Dargah ascribed to Khan Khan Sab, an official perhaps of
Tipu‟s time and the Urus is held here during Ramzan.
The place has a Roman Catholic church locally called the St. Rita built in 1964. Tippu was running a
huge workshop at Kanakapura with a steel foundry. The place has a Government Silk Filature
Factory founded in 1943. The Rural College here is a good memorial to noted Gandhian constructive
worker S Kariyappa. Malagala (two km from Kanakapura) situated across the Arkavati river (now
within Municipal limits) has a huge temple of Mahadeshwara with a spacious Navaranaga, two
Ardhamantapas and a Garbhagriha. Over the Garbhagriha is a brick and mortar Shikhara with many
stucco images. The pillars of the Navaranga are in later Vijayanagara style. This temple is older
than those in Kanakapura proper. To the left of the main temple is a separate modern shrine of
Parvati.
Outside the temple are two inscriptions. One damaged record dated 1375 A.D. of BukkarayaOdeya‟s
son HariharaOdeya announces one MahasamantaDoddaKallimayaNayaka making some grants to
the temple. The second record dated 1662 of DevarajaWodeyar of Mysore records rich grants for the
maintenance and car festival at the temple of Mahadeshwara and it also mentions „Kanikaianahalli‟,
obviously referring to Kanakapura. The annual Jatra and the car festival are held during Chaitra.
There is also a Sidikamba in wood. Other temples of the place are Morasandamma (Gramadevata)
and one more small shrine of Mahadeshwara. Kallahalli (five km from Kanakapura) is to be
approached by a deviation road to the left from the Kanakapura-Bangalore road. The place is noted
for its huge Srinivasa temple built in Vijayanagara style. The Garbhagriha has a standing image of
Srinivasa (about two meters tall). There is a brick and mortar Shikhara over it. There is a spacious
Navaranga in front of the Ardhamantapa with plain Vijayanagarapillas. The annual Jatraand car
P a g e | 11
Kanakapura LPA Master Plan 2031 Chapter 1 | Introduction
festival is held during MaghaPoornima when more than 15 to 20,000 people assemble. The village
also has an Anjaneya temple. There is also a choultry managed by the Dharmasthala trust.
HAROHALLI
Located on the main road (16 km from Kanakapura) appears to have gained prominence under the
Vijayanagara rulers. The place name is referred as „Haruvahalli‟ in a record dated 1532 A.D. from the
same place. This must have been an old Agrahara granted to the Brahmanas. The place has
temples dedicated to Arunachaleshwara, Krishnaswami, Basaveshwara (old), Anjaneya, etc. The
Arunachaleshwara temple is a huge structure with a spacious inner Prakara having many small
shrines such as Someshwara, Narayana, Lakshmi and Subrahmanya. The Garbhagriha has a
Shivalingaperphas of the Hoysala times and also has a Shikhara in Dravidian style. The Navaranga
has four Vijayanagara pillars and all of them have fine relief sculptures. There is an outer Mantapa
said to have been added by the Subedars of Haider and Tippu, SuryanarayanaIyer and
VenkateshIyer respectively. Inside the Prakara, there are a few broken images of Hoysala
workmanship. To the left of the main temple is the shrine of Ammanavaru (Parvati). The entrance to
the temple is from the south which has a tall brick Rayagopura in Vijayanagara style and has many
stucco sculptures on Shiava themes. This temple is in an area described as fort built or expanded
during Tipu‟s times.
The Krishnaswamy temple seen in the fort area has been totally renovated. The Garbhagriha and
the Ardhamantapa have some later Vijayanagara features. There are two cells on either sides of the
Garbhagriha and one to its right has an image of Lakshmi in it. The other to the left has an image of
Venkatesha standing with Shridevi and Bhudevi. This must be the image referred to a Vijayanagara
record found at the western wasteweir of Vengallayyanakere (outskirts) and is dated 1532 A.D.
issued by ViraPratapaAchutaraya. It states that God Tiruvengadanatha was brought to Haruvahalli
by an official VaradaTimmaya who also made land grants to the deity. In the outskirts of the village,
amidst fields is an old Bhimeshwara temple of later Vijayanagara times. The pillars of the Navaranga
have no sculptures but are square with Vijayanagara brackets atop. There are impressive
Dwarapalas in relief at the entrance of the Garbhagriha. The shining Shivalinga rises above the
ground level from the centre of a circular hidden (underground) Panipeetha. To the left of the main
temple is the small shrine of Ammanavaru. The village proper has two mosques in recent style.
P a g e | 12
Kanakapura LPA Master Plan 2031 Chapter 1 | Introduction
SATHANUR
Situated at a distance of 10 km from Magadi has been mentioned as „Sathanur‟ in a record dated
1497 A.D. from the same place. The place has temples dedicated to Kabbalamma, Maruti,
Svayambeshwara, VithalaGopalaswami, Shanidevaru, etc. Kabbalamma temple has a deity made
out of clay. The temple is built in Vijayanagara style with octagonal as well as square pillars. The
image of Maruti, about two meters tall, is associated with noted theorist on Hindustani Music
PundarikaVithala, the celebrated author of Ragamala, Ragamanjari, SadragaChandrodaya, etc., who
hailed from this place. The Svayambeshwara temple outside the village amidst fields is perhaps the
earliest monument built in early Vijayanagara style. Interestingly there are a few cylindrical pillars
with cushions atop in typical Ganga style. Inside the temple are placed images of Vishnu (two)
Ganapati and Durga (small). The Garbhagriha has a brick mortar Shikhara in Vijayanagara style.
One inscription stone lying to the south-east corner of the temple is badly damaged but mentions one
official Manchayya, son of Chandra Suri (perhaps a JainaPandita) granting lands to one individual
HiriyaMallinatha of Satanur in the originally of Lakshmi.
One of the striking monuments of the place is the VithalaGopalaswamy with an ordinary structure but,
an impresiveHoysala image. The black stone image of the deity is about one metre tall with two
hands, both placed on the waist. The right hand holds a mouth tied with a rope. The god is flanked
by consorts who hold a Chauri in one hand and a lotus in the other. The Prabhavali or halo has in the
upper portion well curved Dashavatara in relief amidst MakaraTorana. The inside wall of the temple
has a Nagari inscription dated 1497, which announces certain grants made by the children of one
official TirumalaSomayaji of Kaliyuru to God Vithala of Sathanur. Apparently PundarikaVithala might
have been named after this deity. Hujigallu, an interior place situated on a deviation road (four km)
from the Sathanur-Magadi road, is a place with pre-historic antiquities. There is an irregular country
road to reach the place. The place is full of dolmens situated on the verge of a hill. The hill has many
inaccesible caves. On some of the boulders at the foot of the hill there are some Jaina images and
inscriptions not so legible and they must be Nishidhi memorials. The place is fit for pre-historic
excavations.
ACHCHALU
Situated 10 km from Kanakapura and can be approached form a deviation road before Sathanur from
Kanakapura. The place name is found mentioned as Achala, headquarters of a nadu in a hoysala
record of 1318 A.D. (of Ballala III) from the same place. The village has a tall hillock having an
P a g e | 13
Kanakapura LPA Master Plan 2031 Chapter 1 | Introduction
ordinary cave on in enshrining a Shivalinga called locally as the GaviMuneshwara temple. The annual
Jatra here is held during MakaraSankranti. The village proper has interesting antiquities all over and
particularly within the precincts of the Hanumantha temple. The Hanumantha image in profile is about
one meter tall and the god holds a branch of a tree in one of his hands. Nearby is a Basaveshwara
temple over a small hillock, below which is many hero-stones. There are in all, three inscriptions in
the area around the Anjanaya temple. One lying in a field is illegible but refers to the rule of
HoysalaNarasimha. The second inscription, also found in a field, states that when HoysalaBallal III
was ruling (1318 A.D.), one Maradeva of Sigalanadu made some grants to one Allappanayaka, son
of Madappa of Kanikaranahalli (modern Kanakapura) for the maintenance of a temple at Achalanadu.
The last record also found in a field is damaged, but tries to say that under Ballala III one
Mahapradhana Someya‟s son Javideva made certain grants to Pattanaswamy Setti, etc.
ARALALU
Situated on the banks of the Arkavathi (3 km from Kanakapura) appears to be an ancient place with
political importance especially in early Vijayanagara times when nearly a dozen hero-stones in the
places are taken into account. In a record from Nayakanahalli dated 1295 AD of HoysalaBallala II the
place is mentioned as “Arulahalu” under Singalanadu in a later record dated 1312 AD from the same
village. The place was the headquarters of Singalanada Prabhus. One record (Kn 97) also speaks of
“Arulahalu Rajya”. All the hero-stones are found in fields around the village and of these one in the
field of one Chikkamarigowda has a horse rider wielding a javelin, beautifully wrought in relief. In
same field remains of an ancient Shiva temple have been unearthed with a huge Shivalinga, perhaps
of the Ganga times. The Narayanaswamy temple here is a considerably big and its outer Mantapa
has fine pillars in Vijayanagara style with relief sculptures on them. In a field called
NarayanswamyKodugeJameenu is an inscription dated 1393 AD. This states that under King
ShangaAppa of Sigalanadu one ArulahalaMaragudana‟s son ChikkaAyivanna made certain land
grants to God Narayana (Kn 100). The annual Jatra is held here in Phalguna. The Venkataswamy
temple here is considerably big and old, and a Jatra is also held here. The Basaveswara, Maramma
and the Kollapuramma are the other temples and shrines of the place, and behind the last named are
two hero stones in a field. There is one more hero stone enshrined in a slab Mantapa across the
river, and two more hero stones in a nearby field. There is also a Basavanna shrine there.
In the Harijana colony is a hero stone illustrating a terrible war scene. Of the other two inscriptions
from the place, the one in the Agrahara to the north-east of the village is dated 1400 AD speaking of
the strengthening the sluice of the local Marasamudra Tank by a Minister Channa Vodeyar under
Hariahara – II of the Vijayanagar when Malla Raya‟s son Narayanadeva was ruling at Arulahala. The
P a g e | 14
Kanakapura LPA Master Plan 2031 Chapter 1 | Introduction
other inscriptions at the same village on a stone in the yard of Muddamma Ganiga dated 1390 AD
states that Siddaya, the Minister of Bukka Raya‟s Son ChannaVodeyar accepted the rules of
Arulahala in the Sigalanadu and further states that Marappa, son of AralahalaSiddaya, was wounded
in the Hegabe hill. The place also has a Gadduge of Manteswamy.
KABBAL
A border village in the taluk (14 km from Kanakapura) is noted for a vertical steep hill resembling a
Shivalinga. The place is mentioned as Kabbahala in Hoysala record by Ballala – III from the same
place. At the foot of the hill is the village with a temple locally called Kabbalamma. It appears to have
been a flourishing marketing centre in that time. The deity here is referred as „Kalikadevi‟ in a
Vijayanagara record from the same place. This temple is an ordinary structure in Vijayanagara style
with square pillars without any figures. The Garbhagriha is an ordinary brick and mortar Shikara of
recent times. Besides this is a Basaveswara temple (modern). The Jatra of Kabbalamma is held
during Shivaratri for a span of one week and more than 20000 people assembled. Special poojas are
offered on every Tuesday and Friday when on an average, 500 people visit the temple. Facing the
temple is a long Konda (pit) where fire walking ritual is held during the Jatra Adjacent to this in an
enclosure having two hero stones, also being worshipped by devotees and both have inscriptions.
On the first hero stone is a record dated 1291AD by Ballala-III which states that one Sahuranna, son
of Somagunda ofKabbala died while fighting with robber son his return from HanikyurJatra. The
second hero stone has an inscription which announces several grants made by PratapaDevaraya of
Vijayanagara before goddess Kalikadevi to Veerapanchalas belonging to different crafts. To the north
of the temple is Bhairava shrine which has two masks described as of Kenchanna and Kariyanna. It
has a Prakara and a small Mukhamantapa. Above the tall vertical hill are located an old Bhimeshwara
temple, a granary, Magazine house, a small pond, etc. To climb the hill one can use the regular steps
as well as footpath having severe gradient. In the middle of the hill is a small cavern being converted
into a temple enshrining an image of god Srinivasa, measuring about half meter in height. Above the
rocky ceiling is a Shikara and there are two ponds within the precincts of this temple. The top most
portion of the hill has one more pond. The hill has fortifications all around. It was used as a durgeon
for political prisoners by Mysore rulers and Prince Chamaraja VII was confined to this place by
DalvayiDevarajayya and the Prince died here in 1734. Hyder too had confined many prisoners here
and MurarraoGorpade of Gutti was also confined to this place and was killed in 1779. Tipu changed
the name of the place as Jafferabad. Viewing from this hill in the evening, one can undergo sublime
experience of enjoying the enchanting scenes including green fields, the gold coated horizon, etc. If
necessary, amenities are further provided; this can become a lovely hill station in the district.
P a g e | 15
Kanakapura LPA Master Plan 2031 Chapter 1 | Introduction
The K-LPA had been declared by the Govt. of Karnataka vide notification no BMRDA/KTA/2006-07,
with effect from 29.4.2006. The LPA is located in the south-eastern part of the BMR between 12º23‟N
77º41‟E and 12º51‟N 77º31‟E and spans over Ramanagara and Bangalore Urban district. It is located
at an average distance of 30km from Bangalore city. The major town in the LPA is Kanakapura which
is a Town Municipal Council.
The NH 209 is the major connector that passes through the LPA linking the LPA to Bangalore city
and Mysore. There is no railway connectivity in the LPA.
The area of the LPA is 412.78 sq. km. It comprises of parts of the Kanakapura Taluk and the
Bangalore South Taluk. It consists of 86 villages and one TMC and has a total population of 1.81
lakhs. The total urban population in the LPA is 54,021 while the rural population in 1.27 lakhs. The list
of the villages and the town are given in the table below.
P a g e | 16
Kanakapura LPA Master Plan 2031 Chapter 1 | Introduction
P a g e | 17
Kanakapura LPA Master Plan 2031 Chapter 1 | Introduction
P a g e | 18
Kanakapura LPA Master Plan 2031 Chapter 1 | Introduction
72 Sathanur Yadugowdanahalli 84
The LPA also consists of a class III census town, Kanakapura, with an area of 3.71 sq. km and a
population of 54,021.
P a g e | 19
Kanakapura LPA Master Plan 2031 Chapter 1 | Introduction
The KPA has been declared as per the government order Number
87 villages has been declared as per section 4a of KTCP act 1961, were in the villages Uttari,
Naganayakanahalli & K.Choodalli of Bangalore South Taluk have also been notified by the
government for BMICAPA. These three villages are overlapping in both the planning authorities & in
this regard correspondence with BMICAPA has been made requesting their opinion to delete these
villages from BMICAPA as for these three villages, the IMP has been prepared & as per that the KPA
has issued many planning permissions but BMICAPA has opined that they will retain three villages as
their notification was made quite earlier to KPA. With all these details KPA submitted a proposal to
BMRDA & In turn BMRDA already requested the government to take immediate decision in respect of
these three villages. So far government has not any decision in this regard hence master plan is
prepared including these three villages as per the earlier notification for final approval of the master
plan.
The Master Plan provides scope to redefine circulation pattern and landuse of the LPA in accordance
with the present trend of development. Existing problems of the study area has been addressed and
best possible solution has been provided for them.
The Limitations of the Master Plan process is the lack of primary household data and primary traffic
survey data.
3
Census 2011
P a g e | 20
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
CHAPTER 2
Demography is the study of human population with respect to size, composition, spatial distribution,
and changes in the populationthat occur over time. Future growth scenarios, infrastructure
requirements and utilisation of human resource for different sectors depend on the population of an
area. Hence study of population – size, composition and distribution is important to Planning.
Size of the population gives an overall dimension of the physical environment and supplies a basic
yardstick for the estimation of space requirements for various categories of land use.
Studies of population composition extend this analysis to qualitative considerations like age groups,
household sizes, income levels, and needs of each segment of the life cycle. They can be used to
assist in determining the space required for facilities for all segments of the population.
Analysis of population distribution provides clues as to how these various land uses and facilities
should be located in the urban area.
The population of Kanakapura LPA, as per census 2011 and other thematic data from census 2001
has been studied and analysed to arrive at future growth scenarios and determination of
infrastructural requirements.
Karnataka State‟s population according to 2011 Census is 6.11 crores (Table 1). It is observed that
(a) the percentage growth in population has reduced from 17.25% in 1991-2001 to 15.67% in 2001-
2011. (b) the urban percentage growth in population has increased from 29 per cent in 1991-2001 to
31.27% in 2001-2011, and (c) the urban population in Bangalore Urban District has increased from
88 per cent in 2001 to 90.94% in 2011.
P a g e | 21
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
The BMRDA area includes Bangalore Urban and Rural Districts. As per census 2011, the population
is around 105, 76,167 (105 lakhs). The percentage rural population in the area has reduced from 27
per cent in 2001 to 15.02% in 2011 and the percentage urban population has increased from 73% in
2001 to 84.98% in 2011. Hence, the area has gone through a great deal of urbanization.
Population of the BMRDA area represented 16% of Karnataka‟s population in 2001 and represents
17.3% of Karnataka‟s population in 2011. The rural population of BMR has decreased from 7% of
total rural population of Karnataka in 2001 to 4.2% of total rural population of Karnataka in 2011.
Whereas, urban population which was 34 per cent of Karnataka‟s total urban population in 2001 is
now 8.11%. The growth of the rural and urban population in 2011 is 7.63% and 31.27% respectively.
The urban and rural population figures of Karnataka, Bangalore Urban District, Bangalore Rural
District and BMRDA area are presented in the table below.
AREA ( sq.
1971 1981 1991 2001 2011
km)
Karnataka
Ramanagara District
P a g e | 22
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
Total 1,082,739
Urban 267,353
BMR
Kanakapura Town or TMC is the only urban settlement in the Kanakapura LPA. It has an area of 7.31
sq. km1. The table below shows population in Kanakapura TMC from 1961 to 2011. The present
population of the TMC is 54,021.
50000
40000
POpulation
30000
20000
10000
0
1961 1971 1981 1991 2001 2011
Kanakapura 15000 20000 29000 38000 47000 54021
1
Present municipal limits
P a g e | 23
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
It can be noted that the population growth in the town is less which can be attributed to lack of
economic activity and growth generators in the LPA.
The Kanakapura LPA is composed of 86 villages and 1 town. The present population of the LPA
villages (census 2011) is 126,916. Total population of the LPA, including Kanakapura TMC is
180,931. Figure 2 below shows the population growth in the LPA from1961 to 2011.
120000
100000
80000
60000
40000
20000
0
1961 1971 1981 1991 2001 2011
Kanakapura LPA 83194 95887 125993 151998 170278 180937
It can be seen that the increase in population in the LPA over the years have been extremely less.
The figure below shows the growth rate from 1971 to 2011.
P a g e | 24
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
25%
20% 21%
0%
1971 1981 1991 2001 2011
It can be seen that there is a negative growth rate in the LPA. The trend suggests out-migration which
can be attributed to the lack of economic activities in the area.
The table below shows a comparison between the population growth in the BMR, the Bangalore
urban, Bangalore Rural+ Ramanagara and the Kanakapura LPA.
It can be seen that the growth of population in the Kanakapura LPA has not been significant as
compared to the other areas of the BMR. The decadal growth rate of Kanakapura LPA is 6.25%. The
slow growth rate may be attributed to the slow pace of industrial development in the LPA. The LPA is
P a g e | 25
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
rich in agricultural produce but the agro-industry has not been supported. Migration has been a major
trend in many villages in the LPA
The total area of the Kanakapura LPA is 412 sq. km (approx.). The figure below shows the population
density in the Kanakapura LPA.
140.00
120.00
Gross density
100.00
80.00
60.00
40.00
20.00
0.00
Doddamaralawadi Harohalli Kasaba Sathanur Uttarahalli kanakapura TMC
Series1 3.04 2.82 3.79 2.63 4.46 145.61
It can be seen that Kanakapura TMC has a high density of 145 persons/ Ha3 while the population
density in rest of the LPA, expressed in Hoblis is extremely low, ranging in the order of 3 to 5 persons
per hectare. The population density of the Ramanagara district is 30 persons per Hectare. The low
density is attributed to the clustered growth in the outer BMR.
The Structure Plan 2031 advocates clustered growth around exiting growth nodes; hence the future
scenario for the LPA would also follow the present trend of concentrated growth. However, new
growth centres would be promoted in the LPA around Harohalli and Sathanur to create a spur of
economic activities.
2
Analysis is done Hobli wise, taking average value of individual village, municipal boundary has been considered for Kanakapura TMC
3
Census of India and Analysis
P a g e | 26
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
The urban and rural population distribution can be seen in the figure below. The urban population is
contributed by the Kanakapura TMC while the population in the villages constitute the rural
population. It can be seen that 30% of the population lives the urban areas while rural population
constitute 70% of the total population in the LPA.
URBAN RURAL
30%
70%
SEX RATIO
Sex ratio is defined as number of females per 1000 males. The sex ratio of the Kanakapura LPA has
been shown in context of the larger framework. It can be seen that the sex ratio in Karnataka is 968 4
females per 1000 males, while that of the BMR is 935. Sex ratio is alarmingly low in the Kanakapura
Town where it is 923 females per 1000 males. The table below shows a comparative list of sex ratios
according to census 2011. Ramanagara ranks 18th among the 30 districts of Karnataka in terms of
sex ratio.
4
Census 2011
P a g e | 27
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
The reasons behind low sex ratio in the urban areas may be the influx of male workers from the
surrounding areas in search of job. However, the ratio is also skewed in the overall Kanakapura
Taluk, indicating poor development.
The proportion of child population in an area determines the educational infrastructure demand.
According to census 2011 data the 9.38% of the total population of the Ramanagara district belongs
to age group 0-6 years. The table below shows a comparative table of the child population proportion
in Bangalore, Bangalore rural and Ramanagara.
Table 2.3: Comparative list population under of 0-6 years,
Ramanagara Kanakapura
AREA Bangalore Bangalore Rural
district Taluk
Percentage of
population in age 9,88,482 (10.31%) 1,02,019 (10.33%) 1,01,565 (9.38%) 31,868 (9.1%)
group 0-6 years
It can be seen that the proportion of population in the 0-6 year category is almost similar in all the
three areas, though actual population count is much higher in Bangalore district. Hence the education
sector needs to be promoted in the LPA.
LITERACY RATE
According to census data 2011, the literacy rate in Ramanagara district is 69.2% which is 9% higher
than that of 2001. Literacy rate among men is 76.92% compared to 69.88% in 2001 an that among
5
Census of India 2001
6
Census of India 2001
P a g e | 28
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
women is 61.33% compared to 51.22% in 2001. The average literacy rate of Kanakapura Taluk is
65.1, while that in urban areas in 80.5% and in rural areas is 62.5%. Though there has been
considerable increase in the literacy rate in the region, it is abysmally poor compared to the rest of
BMR. The literacy rate of Bangalore is 88.48% the figures below show the comparative data for the
literacy rates in the district.
90 LITERACY RATE
80.5
80 73.9
70 66.7 65.1
62.5
60 56
53.1
50 46.3
43.1
40
30
20
10
0
KANAKAPURA URBAN KANAKAPURA RURAL TOTAL
AVERAGE LITERACY RATE MALE LITERACY RATE FEMALE LITERACY RATE
The human development index data, according to Karnataka Human Development Report 2005
shows that Bangalore Rural district has a human development index of 0.653 7 . The table below
shows the composition of HD8I in Bangalore Urban and Bangalore Rural district.
7
Karnataka Human Development Report 2005
8
The HDI for districts is computed on the basis of the methodology used in UNDP Human Development Report 1999. Due to the non-
availability of data on adult literacy rates for 2001, literacy rates for 7 years plus, the combined gross enrolment ratios of primary and
secondary level education (class I-XII) have been substituted. Hence, there is element of double counting in the age group 6-18 years for
educational status. It may be noted that due to changes in methodology, i.e. adopting the logarithm method in computation, there has been
a sudden increase in the values of the income index. Another important factor is that changing the base year from 1980-81 to 1993-94 for
estimation of GDP at constant prices for India and the states (introduced by the CSO) has contributed to higher values of income indices for
1991-92 and 2001-02. In Karnataka, the estimates of life expectancy at birth for districts and the state have been made on the basis of the
regression method involving the crude birth rate, the crude death rate, the rate of natural increase in population and the infant mortality rate
P a g e | 29
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
It is noted that the HDI of the Bangalore Rural district is poor compared to Bangalore Urban district. It
is however higher than the national HDI of 0.621. Care should be taken at policy and proposal level to
augment the HDI status of the area and bring it at par with that of the Bangalore Urban District.
for 2001. In order to enable for the districts and the state are higher than the HDI values in KHDR I. The GDI values have also been revised
for 27 districts for 1991, so as to facilitate a comparison of GDI estimates for 1991 with those of 2001.
P a g e | 30
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
Kanakapura Taluk has been classified as “Most backward” Taluk in the BMR 9. The population of
Kanakapura LPA has grown from 1.7 lakhs in 2001 to 1.8 lakhs in 2011. The net growth in population
over the last decade is ten thousand, the decadal growth rate being 6.25% and the annual growth
rate being 0.58%. The annual growth rate of Bangalore urban district however is 5.1%10. Needless to
say, the growth of the LPA has been slow. It is evident that the intensity and scale of economic
activities in the LPA are in tandem with this pace of growth.
Under the framework of the draft RSP 2031, a scenario of 75-25 population sharing between the core
and the outside is being aimed for. Since this includes inducing a considerable amount of population
from the core to the outside, there is a need to provide an economic impetus to the LPA.
Bangalore has been experiencing rapid development because of accelerated industries and
economic activities. This has resulted in growth of congestion of Bangalore, because of which there is
tremendous pressure on infrastructure. Land is becoming scarce and hence costly day by day.
Investors are opting to move outwards from Bangalore to the nearest town. Investors prefer
Kanakapura Taluk as their investment destination. Since Harohalli is nearer to Bangalore and
already has a developed industrial base, more and more projects are proposed in this location. Thus
Kanakapura Taluk is expected to register faster economic growth.
These initiatives taken viz, development of infrastructure & housing facilities in mega scale have
enthused major investors to opt Kanakapura taluk for their investments.
WORKFORCE PARTICIPATION
The BMR RSP 2031 states the work participation rate of the BMR as a little over 41%. The workforce
participation rate of the Kanakapura town is however 17.5%11. The industrial work participation rate of
the BMR is considered to be 21%12.WPR13 of Kanakapura Taluk is 49%.
9
NewIndustrial Policy 2006-2011 report, Karnataka Industrial Policy 2009-2014
10
According to Census 2011 data
11
BMR Revised Structure Plan 2031
12
Interim master Plan 2011, Kanakapura LPA
13
Work Participation rate
P a g e | 31
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
WORKFORCE DISTRIBUTION
Performance of the government employment programmes such as the PMRY, MGNREGA etc should
be analysed in the LPA to uncover the cause of unemployment in the LPA. Economic activities
should be introduced to combat unemployment and reduce out-migration.
The figure below shows the gender wise distribution of the total workforce in the Kanakapura Taluk. It
can be observed that 62% of the total workforce is composed of males while the female share is
much lower comprising of just 38%
The gender wide distribution of the workers in
Gender wise distribution of workforce in
Kanakapura Taluk
each worker category can also be analysed. It
can be seen that the males constitute almost two
FEMALE
38% third of the main workers, while in the marginal
category females workers constitute the
MALE
62% majority. In the non-worker category, we can see
that there are much more unemployed males in
the Taluk than females. The figure below shows
the gender wise distribution of workers in each
category.
Figure 2.9: Gender wise distribution of workers ; Source: census 2001
P a g e | 32
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
120000
100000
PERSONS
80000
60000
40000
20000
0
MAIN MARGINAL NON-WORKERS
MALE 90598 12,709 70,413
FEMALE 37,741 24,660 101,087
As seen in the chart above, the proportion of male „main workers‟ is almost double that of the female
„main workers‟. Women are more marginally employed or unemployed than their male counterparts.
Measures should hence be taken at policy and proposal level to augment the share of female
workforce in the economy.
P a g e | 33
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
20,000
16,000
PERSONS
12,000
8,000
4,000
0
MAIN MARGINAL NON-WORKERS
MALE 12,727 579 11,311
FEMALE 3,935 372 18,136
The gender wise distribution of workers in each category shows that, male workers constitute the
majority among Main workers. In the marginal worker category, the population of men is slightly
higher than that of women. There is a huge population in the non-worker category; clearly depicting
that unemployment rate is high among both men and women.
P a g e | 34
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
MARGINAL
10%
P a g e | 35
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
50,000
40,000
PERSONS
30,000
20,000
10,000
0
AGRICULTURAL HOUSEHOLD
CULTIVATORS OTHER WORKERS
LABOURERS INDUSTRY WORKERS
MALE 52,461 14,953 1,619 20,968
FEMALE 25,953 19,673 1,504 10,964
P a g e | 36
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
OCCUPATIONAL STRUCTURE
PRIMARY SECTOR
Marginal farmer land Small Agricultural land Medium agricultural land large agricultural land
holdings holdings ( 1-2 Ha ) holder ( 2-4 Ha) holder (10 Ha and above)
14
Agricultural Census 2005
P a g e | 37
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
The figure above shows the agricultural land holdings in Kanakapura Taluk. 43133 Ha is the total
land under agricultural land holdings. 10.2% of the land is under large holdings, 43.88% under
medium land holdings and rest under marginal farmer held lands. It is noted that the largest
proportion of agricultural land falls under small holdings. While 14 Ha is the average size of large land
holdings, 2.64 Ha is the average medium holding size and 1.4 is the average plot size for small
landholders.
PRINCIPAL CROPS
Kanakapura LPA falls in the eastern dry agricultural zone. It consists of red loamy soil in major areas
and clay lateritic soil in other areas. Ragi, Avare, Ground nut and Niger are important Kharif crops in
the area. Major Rabi crops are paddy, horse gram, maize and castor. The table below shows the
important crop types in each category.
Principal pulses tur, horse gram, black gram, green gram, avare, cow pea
Principal oil seeds ground nut, sun flower, castor, sesame, niger seeds etc
cotton, sugar cane, tobacco, castor seeds, linseed, soya bean, sun
Principal commercial crops
flower
Principal horticulture crops coconut, areca nut, .mango, banana, guava etc
SL CROP PRODUCTION (MT) The State and Central Government have signed a MoU
for establishment of Agri Export Zones (AEZ)
1 Coconut 631.5
covering gherkins, rose-onion and flowers. Bangalore
2 Arecanut 130
Rural District including the Taluk is covered under AEZ
3 Banana 4
for gherkins and flowers. The climate of the Taluk suits
4 Mango 2.1 the cultivation of these commodities.
5 Sapota 2.05
P a g e | 38
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
Pisciculture is also practiced in small scale in the Taluk. There are about 145 tanks in the Taluk
belonging to Panchayat and minor irrigation. There are almost 430 families that depend on
pisciculture for their livelihood. The no of beneficiaries in the Taluk under The Mahasasraya
Schemeare 17015. There are no fish markets in the Taluk.
SERICULTURE
Sericulture forms an important activity in the Kanakapura LPA as well as in the BMR. Government
has set up 10 silk exchanges in the region to facilitate trading of silk. One of the silk exchanges is
located in Kanakapura Town.
Table 2.7: Sericulture statistics of Kanakapura Taluk
Kanakapura 1278 69 66
The National Research and Development Corporation (NRDC) through CSB and in turn NSSO, in
Bangalore and CSR&TI, in Mysore had drawn schemes to identify and support financially and
technologically the sericulturists of Kanakapura area. The components are as follows:
15
Ramanagara District Book 2011-2012
P a g e | 39
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
The Chawki Rearing Centre has shown improvement in yield and also adoption of better methods of
sericulture farming in and around 20 villages of Kanakapura Taluk. The training program to the
farmers drawn from the villages is continuing batch wise at CSR&TI, Mysore. The table below shows
the infrastructure facilities available in the Taluk for sericulture.
Kanakapura Taluk is classified in Zone 2 i.e. potential taluks for textile development, under the
Karnataka Suvarna Vastra Neethi- 2008-2013 (Textile policy), which entitles it to receive normal
incentives for textile development. Hence, sericulture can be developed as a foremost sector using
the incentives of this scheme.
At present however there exists a cocoon market and an area earmarked for Silk industries in the
Kanakapura TMC. Industrial activity is however extremely meagre.
P a g e | 40
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
QUARRYING
Kanakapura is known for its granite quarrying potential and its products are known for their export
potential.
SECONDARY SECTOR
Existing Industrial Activities in the LPA is concentrated mainly in the Harohalli region. The KIADB
Industrial Estate stage 1 and 2 host a number of small scale and medium scale industries.
According to the Industrial Perspective Plan of Kanakapura Taluk, the Taluk has potential for
investment of around Rs. 176 crores in 794 units in tiny & SSI sector including services. These units
are expected to generate employment opportunities for about 9000 persons. The investment
opportunities have been identified mainly in the following relatively more potential sectors:
P a g e | 41
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
Apart from these relatively more potential sectors, there are other segments, which also have
potential which include electrical, information technology, construction materials, services,
metallurgical, chemicals & pharmaceuticals and other industries have also been identified and
presented.
310
200 104
87
15 165
1 1 11 95
7 17 1 19 16
0 1 4 32
1 30
11
NO OF UNITS NO OF WORKERS
It is evident from records that most of the tiny and SSI units in Kanakapura Taluk have been
registered in the District Industries Centre. However, there are few un-registered units in the Taluk. It
is estimated that, un-registered units are in the range of 350 to 450 units and are mainly tailoring,
carpentry, pottery, bamboo, masonry, jelly crushing units. An estimated investment from these units
is in the range of Rs. 350 lakhs to Rs. 400 lakhs. The employment generated from these units is in
the range of 1000 to 1100 nos.
Details of proposals in the ‘Tiny and SSI Sector’ are given in Annexure 5.
Artisans
There are about 5910 artisans working on different artisans based crafts in the Taluk. The major
artisans are tailors, carpenters, Handloom weavers, masons, etc. The details are furnished in the
Table.
Table2.10: Artisan Base in the LPA
Sl.
Category No. of Artisans
No.
1. Tailors 2000
P a g e | 42
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
2. Carpenters 1000
3. Handloom weavers 1000
4. Masons 350
5. Blacksmiths 200
6. Leather workers 200
7. Bamboo workers 200
8. Dhobi 200
9. Stone crushers 200
10. Others 200
11. Gold smiths 100
12. Potters 100
13. Electricians 60
14. Mat weavers 50
15. TV Repairers 50
Total 5910
The Taluk has potential for investment of the order of Rs.1250 crores in 168 units in Large & Medium
Scale. These units are expected to generate employment opportunities for about 50,000 persons.
The investment opportunities have been identified mainly in the following relatively more potential
sectors:
Information Technology
Textiles
Precision Engineering & Machine Tools
Infrastructure
Plastic & Rubber
Tourism
Construction Materials
There exist 4 medium scale industries in the Kanakapura LPA16 at present. Details of proposals for
‘Medium and Small Scale Industries’ is given in Annexure 5.
16
Ramanagara District Book, 2010-2011
P a g e | 43
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
Trade and commerce is mainly concentrated along the major roads of the town. Dense commercial
establishments exist along the NH 209 near the KSRTC bus stand and also along the State Highway
in parts. Commercial activities mainly consist of retail activities and few whole sale activities. There
exists an Agricultural Produce market along the NH 209 which is a daily market used for exchange of
farm produce.
A commercial centre is absent in Kanakapura town.Since Kanakapura is the only town with urban
facilities in the LPA; a regional commercial centre should be located which can amalgamate functions
of a retail as well as a wholesale market.
P a g e | 44
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
EMPLOYMENT PROGRAMMES
The District Industries Center (DIC) is conducting self-employment programmes in the Taluk mainly
to provide self-employment opportunities to unemployed educated persons. In the recent times,
Under PMRY scheme, the number of persons seeking assistance has increased substantially. During
the year 2003-04, 237 cases were recommended to Banks, of which only 106 cases were
sanctioned.
During 2005-06, 211 persons received assistance out of 439 cases recommended. There is a need
to encourage more number of persons to take up self-employment activities under the scheme by
increasing the allocation of funds. The details are furnished in the Table
No. of cases
Cases
Year Target Recommended to
Sanctioned(Nos
banks .)
2003-04 102 237 106
Swarnajayanthi Shahari Rozgar Yojna (SJSRY) has benefitted more than 250 people in the
Kanakapura LPA. Almost 125 people are engaged in wage employment and 40 people are self
17
Swarnajayanthi Shahari Rozgar Yojna Website
P a g e | 45
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
employed. There exist 57 groups who are benefitted under this scheme. 57 women groups have also
been taken up by SJSRY.
Table2.13: No of people benefitted by Swarnajayanthi Shahari Rozgar Yojna
Kanakapura Taluk Swarnajayanthi Shahari Rozgar Yojna (SJSRY)
Wage
Employment Type Self-employment Groups Women groups
employment
The Mahatma Gandhi National Rural Employment Guarantee Act aims at enhancing the livelihood
security of people in rural areas by guaranteeing hundred days of wage-employment in a financial
year to a rural household whose adult members volunteer to do unskilled manual work18. The table
below shows a list of benefitted people under MGNREGA.
No of people in employment
20098 1647
program
Source: Ramanagara district book ,2011
18
MGNREGA website
P a g e | 46
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
land
scheme in Kanakapura Taluk. It
irrigation canals development
irrigation 11%
can be seen from the figure above
1%
facilities
26%
that 33% of the completed works
Drought
proofing
other works were flood control works, 24% for
12%
14%
Rural
rural connectivity enhancement
connectivity
Renovation
10% and 18% for land development.
of traditional Flood controll
water 11% The figure below shows the
Rajiv gandhi
bodies Seva Kendra
4% Water 1% distribution of „in-progress‟ works in
conservationan
d water the Taluk.
harvesting
10%
Figur2.22: Works in-progress under MGNREGA in Kanakapura Taluk ;Source: mgnrega.nic.in; work status report
P a g e | 47
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
The figure shows a more uniform distribution of works in the various sectors. Majority of the works are
for development of irrigation facilities. Land development, rural connectivity enhancement, flood
control, water conservation and water harvesting, drought proofing and renovation of traditional water
bodies constituted the other major works.
Kanakapura is a class II town so public and semi-public buildings are few and dispersed. The Taluk
office forms a central node around which schools, colleges, hospitals and commercial activities are
centred. The BWSSB office and the BESCOM electric substation and office are the major public and
semi pubic offices in Kanakapura Town.
FINANCIAL INSTITUTIONS
Banks are important financial institutions that are indispensible for economic growth. Kanakapura
has fairly good banking network. There are 21 nationalised banks, 5 grameen banks, one DCC and
one KSCARD bank, 22 credit cooperatives and one non-credit cooperative in the LPA.
20
No of institutions
15
10
0
Credit co Non credit co
Nationalised Grameen KSCARD
DCC Banks operative operative
banks banks Banks
societies societies
Kanakapura taluk 21 5 1 1 22 1
P a g e | 48
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
CREDIT FACILITIES
NABARD, the apex Development Bank, has been preparing District-wise Potential linked Credit
plans (PLPs), with a view to bringing about a qualitative improvement in the credit planning exercise
undertaken annually by banks.
The Potential Linked Credit Plan looks at the resource endowments of the District, the present stage
of development in Agriculture & Rural sectors and estimates the potentials for rural economic
activities both in physical and financial terms. It also takes into consideration the present state of the
infrastructure of the District, institutional support available, the policy/thrust being given to various
sectors of the economy, etc. while estimating the realizable potential for various sectors.
Potential linked plan (PLP), prepared by NABARD for Bangalore Rural District projects a credit
requirement of Rs.462.48 crores of which Rs.41.36 crores (9%) were for non farm sector and balance
amount for other sectors.
The erstwhile Bangalore houses a substantial percentage of Fortune 500 Companies and
other MNCs in diverse sectors such as apparel, automobile, food processing, machine tools,
precision engineering, software, IT enabled services, etc.
The State Cabinet has approved the Mega Plan envisaged by Bangalore Metropolitan
Regional Development Authority (BMRDA) for infrastructure development of Bangalore Urban
& Rural and Ramanagara Districts. Some industry groups are expected to be re-located from
Bangalore (Urban) to the outskirts.
The Mega Plan proposes a network of 8-lane / 6-lane 734 km. roads comprising 284 km.
Satellite Towns Ring Road (STRR), 188 km. Intermediate Ring Road (IRR) and 262 km.
Radial Roads, to improve connectivity to all the taluks of outer BMR.
P a g e | 49
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
The existing Bangalore –Dindigal Road which passes through the Taluk has been upgraded
to National Highway (NH 209) by the National Highway Authority of India and has potential for
investment in industry and tourism related projects.
The Bangalore International Airport is about 75 km from Kanakapura, is likely to provide a vital
link to international destinations enhancing the overall economic development.
The flow of investment into Bangalore (Urban) will be constrained due to non-availability /
expensive land.
Ramanagara District will be the emerging investment destination for industrial segments such
as pharmaceuticals, automobiles & auto components, aerospace, apparel, food
processing, machine tools, floriculture, precision components, tooling, etc., because of
the proximity to Bangalore and due to the constraint on the availability of land in Bangalore
Urban District.
Kanakapura is known for Granite quarrying and processing and the products have export
potential.
Ramanagara District is covered under Agri Export Zone (AEZ) for gherkins, rose onion and
flowers. The climate of the Taluk suits for cultivation of these commodities.
Ramanagara District including the Taluk ranks third in milk production in the State.
Continuous market availability for milk products in Bangalore
Kanakapura Taluk is rich in attractive tourist spots viz, Sangama and Makedatu.
Scope for improvements at Sangama and Chunche falls, construction of hanging bridge at
Makedatu.
Opportunity for attracting investment in good holiday resorts, recreation clubs, hotels,
ethnic food courts, community / convention centers, nursing homes etc.
P a g e | 50
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
ISSUES
Agriculture is the primary activity in the LPA and the yield is high, but in order to induce
population industrial base has to be created. Care has to be taken in the process to conserve
precious agricultural land.
Industrial activity is concentrated in the Harohalli region while activity in the rest of the LPA is
extremely low.
Even though earmarked provision for sericulture industries exists in Kanakapura town, its
growth and productivity is slow .
There is a inadequate power infrastructure in the LPA for large industrial setup.
There is no perennial water source in the LPA. Ground water sources are depleting fast -
hence water availability is a major constraint of development.
Transport infrastructure in the LPA is poor with poor maintenance of major arterial roads.
HAROHALLI
Anjaneya temple
P a g e | 51
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
Basappa temple
Anjeneya temple
Veerabhadra temple
Maruthi temple
Mudenahalli
Muguthamma temple
Adishakti temple
Basaveswar temple (Pyramid spiritual
Hosakote
temple)
Muthurayanaswamy temple
Kaggalahalli Church
Bisilmaramma temple
Maruthi temple
Basaveswara temple
Gabbadi
Gabbalamma temple
Maramma temple
Basaveswsara temple
Maramma temple
Vaderahalli
SidiKambaDoddamma temple
Kollapuradamma temple
Muthuraya temple,
Cave (Hulugavi, Kardigavi)
Yadumodu
Maruthi temple
Maramma temple
Sri Maruthi temple
Medamaranahalli
Basaveswara temple
Arunachala temple (1/1)
P a g e | 52
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
Maramma temple
Byrappa temple
SATHANUR
Maruthi temple
Dandinadevi temple
Kadahalli Kadahalli
Basaveswara temple
Basaveswara temple
Honniganahalli
Uttarayana temple
Darga
Sathanur
Honniganahalli Basaveswara temple
Saslapura
Maremma temple
Valamahadeswara temple
Siddapajiswamy Temple
Bommanahalli
Muneswara temple
Basaveswara temple
Anjaneya temple
Thotahalli
Achalu Ramadevi temple
Kardimaremma temple
Muneswara temple
P a g e | 53
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
Narayanaswamy cave
Maruthi temple
Dhabaleswara temple
Maremma temple
Ram temple
Parangi (British) bungalow
Darga
KASABA
Narasimhaswamybetta
Someswara temple
Chikkamuduwadi Chikkamuduwadi
Basaveswara temple
Gangaleswara temple
Maramma temple
P a g e | 54
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
Narayanaswamy temple
Chikkammana temple
Aralalu
Venkataramana temple
Mahadeswara temple
Veerabhadraswamy temple
Anjaneyaswamy temple
Shivanahalli
Kyathammana temple
Dabbagulappa temple
Venkataramaswamy temple
Hanumanahalli
Maramma temple
Doddamana temple
Anjaneya temple
P a g e | 55
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
UTTARAHALLI
Patalammatemple – 19
Anjaneyatemple (GramaTana)
Kaggalipura Kaggalipura
Basaveswaratemple (18)
Anjaneyatemple
Anjaneyatemple
Uttari
Basaveswaratemple
Venkataramaswamytemple
Anjaneyatemple
Basavannatemple
Chellapuradammatemple
Marammatemple
Uttarahalli
Jeevalammatemple
Anjaneyatemple
Nelaguli Muttalammatemple
Siddeswaratemple
Anjaneyatemple (GramaTana)
Maramma temple
Nettigere
Pattaladammatemple
Muneswaratemple - 103
Gundanjaneyatemple
Ravugodlu
Uttarayaswamitemple
Somanahalli Anjaneyatemple
P a g e | 56
Kanakapura LPA Master Plan 2031 Chapter 2 | Demographic and Economic Base
CHENNEKESAVA TEMPLE
P a g e | 57
Kanakapura LPA Master Plan 2031 Chapter 3 | Housing and Urban poor
CHAPTER 3
3.1 HOUSING
INTRODUCTION
Housing comprises the largest land use component in any urban planning. Further, it is a multi-
faceted and multi-dimensional activity. Today it is understood that housing transcends much beyond
the concept of physical planning parameters and embraces socio-economic components as well.
Good housing is linked to good health and nutrition, better employment opportunity, better living and
quality of life.
Housing is certainly a basic human need. No single type of housing can serve the varied needs of
today‟s diverse households. Whether a home owner or renter, senior citizen, school aged child or
disabled adult, all residents need an affordable, comfortable and safe place to live. A place is better
to live and work when a variety of appealing and affordable housing options exist.
Affordable housing has a positive impact on educational outcomes, health, and wealth accumulation.
Hence housing initiatives must be viewed in the back ground of overall economic development and
the needs of the people. The State Housing Policy aims to provide “Affordable Housing for All”. The
poorer sections of the society often do not have access to formal land markets and access to
financial institutions. Supplementing the condition is the severe mismatch of demand and supply
arising from dynamic socio-economic conditions and inadequate land policies which make affordable
housing scarce.
Providing housing is not limited to provision of a built structure. The Karnataka Housing and Habitat
policy, 2009 therefore advocates a „Habitat‟ approach to housing, which translates into access to
basic services such as water, sanitation, clean fuel, electricity, healthcare, education and livelihood.
Hence the aspects of water supply, sanitation and waste disposal should be taken into account
during spatial planning of residential areas.
P a g e | 58
Kanakapura LPA Master Plan 2031 Chapter 3 | Housing and Urban poor
The area under residential land use in the major settlements in the Kanakapura LPA is shown in the
table below. The total area under residential Landuse in Kanakapura LPA is 550.87 Ha which is
approximately 1.34% of the total area. However, majority of the LPA is undeveloped; hence the
developed residential area forms 6.8% of the total developed area.
HOUSING CHARACTERISTICS
HOUSEHOLD SIZE
Household size: Ramanagara District It can be seen from the figure that the
9+ members 1 member
3% 5% 2 member average household size in the district is 4,
11%
represented by 30% of the total households.
6-8 member
17%
3 member
There are about 17% of 3 members, 6-8
5 member 17%
17% member and 5 member households and 11%
4 member
of 2 member households. The average
30%
household size in the district is 3.72.
It can be seen that 63% of the population
have household size of 4 and below, which might be a result of migration in the Bangalore Region
from other parts of the state.
Figure3.1: Distribution of Household size in Ramanagara district; Source:
Census 2011
P a g e | 59
Kanakapura LPA Master Plan 2031 Chapter 3 | Housing and Urban poor
FLOOR MATERIAL
The distribution of households by
Flooring Material:Ramanagara DISTRICT
flooring material in Ramanagara
Others
Mosaic floor
tiles
0% district shows that 68% of the
Wood/bamboo
8%
Mud 0% houses have cement floors, 22%
22% Burnt stick
1% have mud flooring while 8% have
Stone mosaic floor tiles. Stone, burnt stick,
1%
wood and bamboo constitute minor
Cement proportions of the flooring material.
68%
Hence majority of the houses are of
pukka character.
1
Census 2011 data was available for Ramanagara District level only
P a g e | 60
Kanakapura LPA Master Plan 2031 Chapter 3 | Housing and Urban poor
WALL MATERIAL
ROOF MATERIAL
The major roofing materials in the district are grass/thatch, plastic/polythene, tiles, brick, stone/slate,
G.I. sheets/metal/asbestos sheets etc. It can be seen from the figure below that 49% of the houses
have tiles as their roofing
Roofing Material-RAMANAGARA DISTRICT
materials, while 22% have
Others; 0% Grass/Thatch;
10% G.I./metal/asbestos sheets.
Plastic/Polythen
e; 0%
Concrete; 16% 16% of the houses have
G.I. concrete roofs, while 10% have
sheets/metal/as
bestos sheets; grass or thatch. Plastic, stone
22% Tiles; 49% and slate also constitute the
roofing material in minor
Stone/slate; 3% proportion of the houses.
Brick; 0%
P a g e | 61
Kanakapura LPA Master Plan 2031 Chapter 3 | Housing and Urban poor
AVAILABILITY OF FACILITIES
The figure below shows the distribution of houses in Ramanagara district by the availability of
facilities. It can be seen that 75.3% of the houses avail bathroom facility, 10.2 have bathroom
enclosure without roof and 14.5% have no bathroom. 54.6% of the houses have open drainage, 13.4
% have closed drainage while 32% houses have no drainage facility. Kitchen facility is available for
88.8% of the houses, 7.6% of the houses have no exclusive cooking space while 3.3% cook in open.
100
90
80
no of households
70
60
50
40
30
20
10
0
Bathroom cooking
no closed open kitchen cooking in
Bathroom enclosure no drainage inside no cooking
bathroom drainage drainage available open
without roof house
RAMANAGARA DISTRICT 75.3 10.2 14.5 13.4 54.6 32 88.8 7.6 3.3 0.3
HOUSING TYPOLOGY
The houses in the LPA are predominantly of permanent nature. Single and double story houses are
predominant, though three and four story houses are also frequent in a few pockets. Most of the
houses are self-owned plotted developments. The plate below shows the major housing types in the
LPA.
P a g e | 62
Kanakapura LPA Master Plan 2031 Chapter 3 | Housing and Urban poor
Low rise
apartments
Mud walled – tin roofed
ORGANISATIONAL SETUP
The principal housing supplier in Karnataka is the Department of Housing which consists of three
departments through which the various schemes are implemented. The table below shows the
institutional setup in the housing sector.
P a g e | 63
Kanakapura LPA Master Plan 2031 Chapter 3 | Housing and Urban poor
scheme of GPHP.
Urban Ashraya Housing Scheme.
Rural and Urban Ashraya Sites Schemes
Dr.Ambedkar Housing Scheme
Neralina Bhagya
Housing for Special occupational groups
Gram Panchayat Housing scheme
Navagrama Housing Scheme
Karnataka Housing Board “Hundred Housing Schemes” programme
(KHB) Chief Minister‟s Model town Housing programme
Slum Improvement
Karnataka Slum Site and Services programme
Development Board (KSDB) Nirmala Jyothi Scheme
Valmiki Ambedkar Awas Yojna
The Ashraya scheme is a housing scheme introduced by the Govt. of Karnataka to aid people in
economically weaker section, in both urban and rural areas to avail improved housing through
financial assistance in the form of loans and subsidies. The maximum value for financial assistance
including both loan and subsidy is 20,000 in rural areas and 25,000 in urban areas. Under the
Ashraya rural housing sites scheme free house sites may be distributed to the houseless
beneficiaries of the EWS in rural areas. The tables below shows a list of housing sites allotted and
houses constructed under Ashraya scheme in Kanakapura Taluk.
P a g e | 64
Kanakapura LPA Master Plan 2031 Chapter 3 | Housing and Urban poor
It can be observed that a total of 1062 sites have been allotted under the Ashraya scheme. 174 sites
have been allotted to scheduled castes and 119 to scheduled tribes, while the rest have been allotted
to other castes. 617 houses have also been constructed under these schemes. 153 houses have
been for scheduled castes, 12 for scheduled tribes and 452 for others.
Indira Awaas Yojana (IAY) is a flagship scheme of the Ministry of Rural Development to provide
houses to the poor in the rural areas. The objective of the Indira Awaas Yojana is primarily to help
construction/up gradation of dwelling units of members of Scheduled Castes/Scheduled Tribes, freed
bonded labourers, minorities in the below poverty line category and other below poverty line non-
SC/ST rural households by providing them a lump sum financial assistance.
Ambedkar Housing scheme is an initiative for providing housing to the economically weaker section
and the scheduled castes and scheduled tribes in rural areas. Under this scheme a maximum
financial assistance of 20,000 may be provided for construction of houses.
Table3.6: Houses constructed under special scheme in 2010 -2011
Scheduled Caste Scheduled Tribe Total
P a g e | 65
Kanakapura LPA Master Plan 2031 Chapter 3 | Housing and Urban poor
The basic objective of Integrated Housing and Slum Development programme is the holistic slum
development with a healthy and enabling urban environment by providing adequate shelter and basic
infrastructure facilities to the slum dwellers who do not possess adequate shelter and reside in
dilapidated conditions as identified by the Urban Local Body.
The sharing of fund between Central Government and State Government/ ULB/ Parastatal is 80:20.
Under the ISHDP scheme, 720 units have been constructed in Kanakapura LPA.
Table3.9: houses Constructed under IHSDP
Town No of units
Kanakapura 727
P a g e | 66
Kanakapura LPA Master Plan 2031 Chapter 3 | Housing and Urban poor
The total no of census houses in Ramanagara district is 3,51,784 out of which 33,840 are vacant and
3,17,944 are occupied. The total population of Ramanagara district is 10,82,739 2. The number of
households in the district is 2,35,378 3. It can be seen that housing shortage does not exist in
terms of number of houses as per census data of Ramanagara District; hence primary housing
survey is required to estimate the housing shortage in the LPA.
However, census data suggests that the „housing indicators‟ performance (facilities in dwelling unit,
no of habitable rooms per person‟) in the LPA is poor, implying poor condition and congestion in
dwelling unit which is an indicator of housing shortage.
There is an increasing trend of township development in the LPA. Private developers have entered
the housing market with elaborate housing schemes. Residential townships are presently under
construction near Kaggalipura and Harohalli in properties abutting the NH 2094. Needless to say,
industrial development and proximity to Bangalore will increase population in the LPA and would
augment the current trend of residential township development.
The total slum area in the Kanakapura LPA is 16 Acres and 31 gunta. There are 13 slums in total out
of which only 8 are registered. The ownership and the details of the declared slums are specified in
the table below.
2
Census 2011, source – census2011.co.in
3
Assuming a household size of 4.6 for Karnataka according to National Health Survey 2007
4
Primary Survey
P a g e | 67
Kanakapura LPA Master Plan 2031 Chapter 3 | Housing and Urban poor
TOTAL 10436
P a g e | 68
Kanakapura LPA Master Plan 2031 Chapter 3 | Housing and Urban poor
ISSUES
2. CONDITION OF DWELLING UNITS: Condition of dwelling unit is poor in many parts of the
LPA. As such they would not contribute to the housing stock in future.
3. Low „habitable rooms per person‟ in the LPA suggesting housing shortage.
P a g e | 69
Kanakapura LPA Master Plan 2031 Chapter 4 : Existing landuse and Transportation
CHAPTER 4
The Kanakapura LPA is comprised of part of the Kanakapura Taluk and the Bangalore South Taluk. It
is a part of the Ramanagara district. The major growth nodes in the LPA are Kanakapura town, which
is a class III census town, Harohalli which has been identified as an industrial growth node due to its
spatial proximity to Bidadi and Ramanagaram town, Sathanur which has been identified as a potential
growth centre and is the location of the upcoming township and Kaggalipura in the north, which has
the potential of being developed into the fourth node in the LPA. Besides these nodes the rest of the
LPA has sparse development, as their economic mainstay is agriculture.
Tables below show the existing land utilisation and landuse in the LPA.
P a g e | 70
Kanakapura LPA Master Plan 2031 Chapter 4 : Existing landuse and Transportation
The total area of the Kanakapura Town developed area is 3.13 sqkm. The table below shows the
existing land use of Kanakapura is shown in the table below.
The Residential area contributes to around 68.90 per cent of the developed area. These are mainly
concentrated in wards 3 to 9. The older areas have higher density when compared to the new
extensions. These wards have organic growth pattern with irregular plot sizes and irregular pattern of
roads. The newer extension shows a regular grid iron pattern of growth.
P a g e | 71
Kanakapura LPA Master Plan 2031 Chapter 4 : Existing landuse and Transportation
the people and mostly consist of petty shops. Other daily commercial setups are distributed sparsely
in various wards. Most of the main roads have developed mixed land use.
Parks/Playgrounds/Open Spaces
Parks, Playgrounds & Open spaces is around 1.78percent of the total area. There are no organized
parks in Kanakapura. Hence the playgrounds and open spaces some of which are burial ground
contribute to the area. The area under play grounds is bare minimum. The old areas having high
density do not have lung spaces. Incidental open spaces are found due to the irregular growth pattern
of the town.
P a g e | 72
Kanakapura LPA Master Plan 2031 Chapter 4 : Existing landuse and Transportation
Harohalli is a village in the Kanakapura LPA, has a population of 12988 persons as per census 2011.
The land use distribution is shown in the table below:
Residential
The above table indicates the existing land use of Harohalli conurbation area in Kanakapura LPA.
Out of the total area in Harohalli, residential forms the major land use and accounts to about 69.13
percent of the total area.
Transportation
17% of the land comes under traffic and transportation. The major connectivity is through the NH 209.
The road widths vary according to the levels of accessibility. The KSRTC bus stand is located at the
critical junction of the NH 209 and Maralwadi-Anekal road.
4.60% of the land is under Public and Semi Public use and is located along the NH 209. This land
use consists of government schools, hospitals, religious buildings, hostel and gram Panchayat offices
and related buildings.
P a g e | 73
Kanakapura LPA Master Plan 2031 Chapter 4 : Existing landuse and Transportation
Commercial
Commercial accounts for 3.32% of the total land use and most of them are daily commercials in the
form of petty shops. These are mainly distributed linearly along the State Highway and the Maralwadi
– Anekal road.
The land under parks, playgrounds and open spaces accounts to 1.42%. Harohalli village does not
have any type of organized parks or open spaces.
Sathanur conurbation area has a population of 4698 as per census 2011 and an area of 72.27
hectares. The land use distribution is shown in the table and figure below.
PUBLIC UTILITY 0 0 0%
VACANT LAND 0 0 0%
The figure indicates the existing land use of Sathanur village. Out of the total area, 66.22% of land
use is under Residential. The residential density is very low and the households are sparsely
P a g e | 74
Kanakapura LPA Master Plan 2031 Chapter 4 : Existing landuse and Transportation
distributed. Parks, Playgrounds and open spaces account for 1.99% of the total land use. These are
located next to the public and semi-public uses.
16.01% of land is under Transportation and 13.58 % of land is under Public and semi-public use,
mostly concentrated along the south eastern end of the village. The public buildings include schools,
PHC, religious buildings and government offices.
Kaggalipura has a population of 12070 as per census 2011 and a developed area of 185.71 hectares.
The table below shows the distribution of land use in Kaggalipura.
AREA AREA
LANDUSE PERCENTAGE
(IN HECTARES) (IN SQ KM)
The pie diagram indicates the existing land use of Kaggalipura village. Out of the total area, 40.28%
of land is under Residential land use. The residential density is very low and the households are
sparsely distributed. Parks, playgrounds and open spaces account for 2.83% of the total land use.
16.86% of land is under transportation and 12.10% of land is under public and semi-public mostly
distributed linearly along the Kanakapura Bangalore road passing through the village. These public
P a g e | 75
Kanakapura LPA Master Plan 2031 Chapter 4 : Existing landuse and Transportation
buildings include schools, PHCs, religious buildings and Government offices. Commercial accounts to
1.07% of the total developed area located along the Kanakapura road.
The total area of the Kanakapura LPA is 412 sq km or 101270 Acres approximately. The total govt.
land ownership is 19603 Acres. The distribution of government and private land in the LPA is shown
below.
total private
land; 81%
P a g e | 76
Kanakapura LPA Master Plan 2031 Chapter 4 : Existing landuse and Transportation
This chapter presents the transportation scenario in Kanakapura Local Planning Area. Key issues like
road network and its characteristics, impact of enhanced regional connectivity due to formation of the
STRR, PRR, ITRR, its potentials and drawbacks have been discussed here. 2.23%of the total area in
the LPA is devoted to transportation.
REGIONAL LINKAGES
ROAD LINKAGE
The Kanakapura LPA is well connected to the various urban centres of the region. It is intercepted by
the NH 209 which connects Bangalore to Mysore. Traffic volume on this road is low as major traffic in
the Bangalore-Mysore corridor flows through SH 17 (Mysore road). The PRR, the STRR and the IRR
are proposed regional roads that pass through the LPA. The PRR is the northernmost road in the
LPA which connects to NICE corridor in the north-west and the Bannerghatta Main Road in the east.
The IRR connects Harohalli to Bidadi in the west and Anekal in the east. The STRR connects
Kanakapura town with Ramanagaram town in the west and Anekal in the east.
Harohalli is intercepted by NH209, which connects the town to Bangalore in north and Kanakapura in
the south. Harohalli is connected to Bidadi by a regional road, which joins the Mysore Road (SH 17)
near Bidadi town. The Anekal-Harohalli road connects it to Anekal town in the east. The Maralwadi
road is another regional road in the town that connects Harohalli to Dhodda Maralwadi.
Kanakapura town is a class III census town. It is intercepted by the NH 209 which connects the town
to Harohalli in the north and Sathanur in the south. The SH 3 connects Kanakapura to Ramanagara
in the west and Hunasanahalli in the east. The SH-92 (Kanakapura-Sangam road) is another important
regional road.
P a g e | 77
Kanakapura LPA Master Plan 2031 Chapter 4 : Existing landuse and Transportation
Sathanur is a village that lies in the southern end of the LPA. The NH 209 connects it to Kanakapura
in the north and Malavalli in the south. Sathanur is connected to Channapatna in the north and to
Cauvery river valley and the elephant corridor in the south.
There is no rail
linkage at present in
the LPA. The draft
RSP 2031 however
proposed a railway
corridor in the region,
connecting Sathanur,
Kanakapura and
Harohalli with
Bangalore.
SEAPORT
The nearest seaport is at Mangalore, which is about 380 km and Chennai Seaport is around 415 km
from Kanakapura Town. The existing Mangalore Port is an all-weather port-providing gateway for
exports & import trade throughout the year.
AIRPORT
The nearest airport at present is the Bengaluru International Airport, Bangalore at a distance of
about 90 kms from Kanakapura Town.
P a g e | 78
Kanakapura LPA Master Plan 2031 Chapter 4 : Existing landuse and Transportation
Major travel demand between Bangalore and Kanakapura is catered by KSRTC buses which forms
the major mode of transport in the LPA. KSRTC bus stands are located in Kanakapura town,
Harohalli and Sathanur. Private bus service is also present in Kanakapura Town and Harohalli
connecting the villages and towns of the LPA with Bangalore.
PARATRANSIT SERVICE
Para-transit or Intermediate-transit service like Auto-rickshaw service exists in Kanakapura Town and
Harohalli. Both intra-settlement and inter-settlement service is available. Organised auto stand is
located in Kanakapura town beside the KSRTC bus stand.
P a g e | 79
Kanakapura LPA Master Plan 2031 Chapter 4 : Existing landuse and Transportation
The total area under the Kanakapura LPA is 412 sqkm. The total area under traffic and transportation
landuse is 2.23%. The table below gives a list of major road categories in the LPA.
Kaggalipura
The National Highway (NH) 209 runs from north to south forming the major arterial road in the
transport network in the LPA. The Bannerghatta Road is a major regional road that originates in
Kaggalipura and connects the town to Bangalore in the east. The Agara main Road connects the
town to Dinnepalya and further west. Local roads form the rest of the road network in the town.
Table4.7: Road inventory, Kaggalipura town
Carriag Metalled/ Foo
Name of RoW No of Street
Sl Hierarchy eway Non- Median tpat
road (ft) lanes Lights
(ft) metalled h
Yes
(within
1 NH 209 NH 70 30 Metalled 3 Yes No
municip
al limits)
Bannerghatta Arterial
2 30 21 Metalled 2 Partial No No
Road Road
P a g e | 80
Kanakapura LPA Master Plan 2031 Chapter 4 : Existing landuse and Transportation
Harohalli
The National Highway running North-South forms the arterial road in Harohalli town. The Anekal-
Bidadi road forms a major link in east-west connectivity, connecting Anekal in the east and Bidadi in
the west. Local streets form the rest of the road network in the town.
Table 4.8: Road inventory, Harohalli town
Metalled/
Name of RoW Carriageway No of Street Foot
Sl Hierarchy Non- Median
road (ft) (ft) lanes Lights path
metalled
Yes
(within
1 NH 209 NH 70 30 Metalled 3 Yes No
municipal
limits)
Anekal-
2 Bidadi Arterial 35 24 Metalled 2 Partial No No
Road
P a g e | 81
Kanakapura LPA Master Plan 2031 Chapter 4 : Existing landuse and Transportation
Kanakapura
Road network inventory has been carried along the major roads in the Kanakapura Town. After an
initial reconnaissance survey, the following roads have been shortlisted as major roads in the town.
All major roads are metalled and all roads besides the national Highway consist of two lanes. Median
is present on the National Highway within the municipal limits. Streetlights are present in almost all
major roads. Footpath is not present in any of the major roads in the town. The table below lists out
the inventory of the major roads in the LPA.
Carriagewa Metalled/
Name of Hierarch RoW No of Street
Sl y Non- Median Footpath
road y (ft) lanes Lights
(ft) metalled
Yes
National (within
1 NH 209 70 30 Metalled 3 Yes No
Highway municipal
limits)
2 SH 3 SH 24 20 Metalled 2 Yes No No
NH-SH link
3 Collector 26 20 Metalled 2 Yes No No
road
Kanakapura
4 - Malagalu Collector 24 18 Metalled 2 Yes No No
Rd
P a g e | 82
Kanakapura LPA Master Plan 2031 Chapter 4 : Existing landuse and Transportation
Sathanur
The major roads in Sathanur besides the NH 209 is the Sathanur Channapatna Road which connects
Channapatna to Sathanur and the Sathanur-Muthathi Road which connects Sathanur to the Cauvery
river valley and the „Elephant Corridor‟ in the south. The Road network in Sathanur is composed
mainly of local roads. The inventory of major roads is listed in the table below.
Carriag Metalled/
Name of Hierarch RoW No of Street Media Footpat
Sl eway Non-
road y (ft) lanes Lights n h
(ft) metalled
Yes
(within
1 NH 209 NH 70 30 Metalled 3 Yes munici No
pal
limits)
Sathanur-
2 Muthathi Arterial 21 18 Metalled 2 No No No
Road
Sathanur-
3 Arterial 36 14 Metalled 2 No No No
Channapatna
P a g e | 83
Kanakapura LPA Master Plan 2031 Chapter 4 : Existing landuse and Transportation
The connectivity of the region is measured in terms of length of roads in km per sq km of area. The
road density of the Planning area is 0.948 km per sq. km of area, compared to the national value of
.115 km of road per Sqkm1.
The World Bank report for Rural accessibility index says Rural access is measured in terms of no of
people within 2kms (walking distance of 20-25 min) of an all-weather road as a percentage of the
total rural population. An “all-weather road” is a road that is accessible all year round by the prevailing
means of rural transport (typically a pick-up or a truck which does not have four-wheel-drive).
Occasional interruptions of short duration during inclement weather (e.g., heavy rainfall) are
accepted, particularly on lightly trafficked roads.
“The relationship between transport and poverty reduction is neither straightforward nor automatic.
However it is apparent that improvements in transport have the greatest impact on poor people when
made in concert with activities in other sectors. It is similarly apparent that development in other
sectors will be hampered without attention to transport issues.”
Accessibility in urban areas can also be defined in terms of kilometres of road length per 1000
people. As per data, the accessibility index for Kanakapura Taluk is 4.47 km per 1000 population.
TRIP CHARACTERISTICS
There is no defined Central Business District or Commercial Area in the Kanakapura Town, though
commercial activities are concentrated mainly along the National Highway and the State Highway.
More over the entire town has a predominant residential land use. So deriving specific trip directions
is not possible. However, the KSRTC bus stand can be considered as the origin and destination of
major outstation trips in the peak hours.
1
(*Source World Bank report: India, Transport at a glance)
P a g e | 84
Kanakapura LPA Master Plan 2031 Chapter 4 : Existing landuse and Transportation
As per Ramanagara district statistics 2010-2011, there are approximately 23,000 registered vehicles
in Kanakapura Taluk. The table below shows the vehicular statistics of Kanakapura Taluk. The figure
below shows the share of the vehicle types in the Taluk.
SL CATEGORY NO OF VEHICLES
2 Buses 39
8 Cars 2239
9 Jeeps 3
10 Omni Bus 45
11 Tractors 1251
12 Trailers 1237
13 Ambulance 1
14 Others 275
TOTAL 23008
Source: RTO
It can be seen from the figure below that, two wheelers constitute the largest share of the vehicles in
the Taluk followed by four wheelers.
P a g e | 85
Kanakapura LPA Master Plan 2031 Chapter 4 : Existing landuse and Transportation
Buses
motor cabs
0%
0% 1% maxi cabs
1% 1%
0%
5% 6% three seated vehicles
0% 6% 4%
4% four to six seated vehicles
10%
two wheelers
cars
jeeps
omni bus
tractors
62%
trailers
ambulance
others
FREIGHT MOVEMENT
The KIADB industrial estate is the major industrial area in the Kanakapura LPA. Since the National
Highway 209 is the primary regional linkage, it forms the major corridor of freight movement. Phase 1
and 2 of the Industrial Estate has been commissioned presently and occupancy of the plots is
presently low2, hence the impact of freight movement on the traffic flow is not visible presently.
However, with increase in the number of industries in Harohalli and development of Harohalli-Bidadi
Industrial corridor, a separate freight route would be necessary, especially around the Kanakapura
Town, which sees heavy traffic on the NH 209.
2
Primary Survey observation
P a g e | 86
Kanakapura LPA Master Plan 2031 Chapter 4 : Existing landuse and Transportation
MAJOR ISSUES
Road hierarchy is non-existent in the road network of Kanakapura Town. As such all major
traffic flows through the NH 209 and SH 3. Proper segregation of intra-settlement and inter-
settlement traffic is essential to ensure unhindered flow to regional traffic.
Regional Freight route originating in the industrial areas should be delineated to avoid conflict
with normal traffic flow.
On street parking of two wheelers and four wheelers on NH 209, SH 3 and other major roads
cause hindrance to regional traffic flow. Adequate parking facility should be provided in the
commercial areas.
P a g e | 87
Kanakapura LPA Master Plan 2031 Chapter 4 : Existing landuse and Transportation
The regional roads in the LPA – SH3, Bannerghatta main Road, and Anekal-Bidadi Road
have inadequate carriageway width and are ill maintained3. Initiative should be taken to
improve the existing regional linkages of the LPA.
The National Highway has given rise to major commercial activities in the adjacent properties
in Kanakapura Town. Pedestrian-vehicular traffic movement conflict is hence a major problem.
Footpaths and adequate pedestrian transfer facilities are required in the areas.
3
Primary Survey observation
P a g e | 88
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
CHAPTER 5
INFRASTRUCTURE
WATER SUPPLY
Water supply is related to the main themes in the development agenda – poverty alleviation,
environment protection, private sector led growth, participatory development and good governance.
The growth process and the expansion of economic activities inevitably lead to increasing demands
for water for diverse purposes of which drinking and domestic needs attains paramount importance.
However this essential commodity for sustenance of life is not adequately available to a large number
of people especially in the rural areas and even in parts of urban settlements. Domestic and industrial
water needs have largely been concentrated in and around principal cities but with steep population
hike, demand for water is increasing at a superfast pace. As a result water, which is already a scarce
commodity, is going to become a scarcer commodity in future.
Water quality deterioration has also set in and maintaining water quality is a foremost requirement. It
is one of the most crucial elements in planning. Efforts to develop, conserve, utilize and manage this
immensely important resource have to be whole heartedly made keeping the National perspectives in
view. AT the same time a strong database needs to be prepared to monitor and integrate the water
based activities like city planning, industrial planning and development etc. Serious wastage of water,
water loss in transmission, wastage by public are also issues that need to be addressed.
The figure below shows the distribution of households in Ramanagara district by the source of
drinking water. According to census 2011, 80% of the households are supplied by tap water and 16%
by tube wells. Smaller number of households is supplied by wells (0.7%), hand pumps (1.6%) and
spring water (0.1%).
P a g e | 89
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
BWSSB supplies water to Kanakapura Town along with Bangalore. Hence there are no town level
pumping, distribution and treatment facilities for the surface water source. Cauvery is the surface
P a g e | 90
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
water source to the LPA. The surface sourceis Cauvery River at a distance of 10km from the town.
An average of2.5 MLD of water is drawn from thesource through BWSSB pipelines.
SOI maps followed by field observations supplemented by WRDO reports, indicates that there exists
many lakes and tanks network systems in the conurbation area and neighbouring villages. The
ground water source includes134 borewells out of which 74 borewells are fitted with power pumpand
the remaining bore wells arefitted with handpumps. A total of 1.5MLD of water is extracted from
borewell sources. The present water supply to thetown is 4.8 MLD 1with per capita rate of water
supply being 75-80 lpcd.
The per capita domestic requirements as per norms prescribed by Central Public Health and
Environmental Engineering Organization (CPHEEO), Ministry of Urban Development, and Govt. of
India are as under:
1
Kanakapura Town Municipal Council website: www.kanakapuratown.gov.in
P a g e | 91
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
The present water demand in the Kanakapura LPA has been calculated as follows:
Table 5.3: Present Domestic water requirement in Kanakapura LPA
PER CAPITA
WATER WATER DEMAND
SL AREA POPULATION
CONSUMPTION (MLD)
PER DAY (litres)
1 Kanakapura TMC 54021 135 7.3
2
2 Villages in LPA 126916 55 6.9
TOTAL 14.27
The domestic water requirement of the Kanakapura TMC @ 135 lpcd is calculated to be 7.3 million
litres per day, while that of the villages is 6.9 million litres per day.
The present supply of water in Kanakapura town is 4.8 MLD while the present demand calculated
according to CPHEEO norms is 7.3 MLD. As such there is a deficit in supply
2
CPHEEO norms
P a g e | 92
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
724 acres of industrial area have been proposed in the Landuse Plan of the LPA. According to the
Industrial Perspective Plan, 794 Tiny and SSI Units have been proposed and 168 Large and Medium
Industries have been planned. The water requirement is calculated (from existing supply at Bidadi
cluster) to be 3.3 MLD for the industrial area,
There is no water treatment plant in Kanakapura Town. The head works are located at
Jakkegowdnadoddi constructed on banks of River Cauvery at a distance of about 10 KM from the
town. The town doesnot have separate town level water pumping and raw water storage system for
the surface water source.The BWSSB which provides water to Bangalore city also provideswater to
the Kanakapura town. The treated water is distributed through the BWSSBpipelines to the service
reservoirs.The borewell water is pumped by pumping stations located at Malagala road and Rural
police station. The pump house at Malagala road is situated on the banks of Arkavati River. It pumps
water from 3 borewells and supplies to a 75 KL sump.From there it is pumped to OHT at
Chamundeshwara choultry using submersible25HP pump with 100% standby. The pump house at
rural police station also has asump of 75KL and pumps water from 3 borewells by 25 HP pump with
100% standby. It is further pumped to the service reservoir.
There are 4 Over Head Tanks (OHTs) and 2 Ground Level Storage Reservoirs (GLSR) in the town.
The total storage capacity of the reservoirs in the town is 3.05ML (2.45 ML in OHT and 1.5ML in the
GLSR). The details of the service reservoirs in the town are listed in the table below.
OHT
P a g e | 93
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
2 Near IB 10.00
GLSR
TOTAL 30.5
The total length of existing distribution network in the city is 50 km. The distribution network coverage
is 75% with comparison to existing road length of 67 km. The status of water supply in Kanakapura
Town is shown in the table below:
Source: www.kanakapuratown.gov.in
Surface water, tanks and ground water are the primary sources of drinking water in rural Kanakapura.
The Major and Medium irrigation projects are potential sources for drinking water supplies in their
respective command areas. Cauvery if the major source of drinking water in the urban areas though
P a g e | 94
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
rural areas are excluded from its coverage. There is a recorded history of providing priority to tank
development in each village. They were primarily meant for irrigation and as a source of drinking
water. Their development was mostly done on a aquifer basis and was in a networked and cascading
manner i.e. over-flow of upper (higher elevation) tank used to reach the next tank and so on until the
last tank (lower most elevation) was filled. Their capacity was decided more on the basis of local
needs. Geology and soil type make ground water recharge favourable in the LPA. Hence ground
water is a major source of drinking water.
WATER QUALITY
With increasing industrialization, urbanization and deforestation, the quality of water resources
available to mankind is deteriorating day by day. The supply of drinking water in terms of both quality
and quantity is a major concern now. Out of many chemical and biological contaminants in drinking
water, excess Fluoride and arsenic are of the utmost concern due to their serious health impacts. The
study conducted by Rajiv Gandhi National Drinking Water Mission during 1990-1992 has reported 15
States (including Karnataka) endemic for the Fluorosis. Therefore, effective surveillance and
monitoring of water quality becomes very important in the state of Karnataka.
The quality of drinking water affects health of the consumers because certain bacteria and microbial
diseases, toxic chemical compounds etc. can be transmitted to the human body through water.
Experience has shown that community health and water quality is directly related to each other and
that an improvement in the quality of drinking water supply is followed by an improvement in
community's health. The „Karnataka Ground Water Quality Data‟ report3 says that out of 612 villages
in the Kanakapura Taluk, 16 villages were affected with excess fluoride in drinking water while 4
villages were affected with excess Iron.
ISSUES
1. The per capita water supplied to Kanakapura Town at present is 75-80 lpcd, which is
considerably lower than the 135 lpcd stipulated by the CPHEEO norms. As such there is
water scarcity in the LPA. The gap between supply and demand would increase in future as
shown in figure 9.3.
3
Prepared by Karnataka Rural Water Supply and Sanitation Agency
P a g e | 95
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
2. At present only 75% of the Kanakapura TMC is covered by the water supply network,
whereas ideally the entire town should have access to potable water.
3. Excess fluoride (above 1.5 ppm)4 and iron in drinking water has been reported in the villages
of Kanakapura posing serious threat to health.
4. Brackishness in water has also been reported in ground water in rural areas. Such
characteristics of water are highly harmful for public health and should be removed by
treatment.
5. Only 20% of the total population get treated water from taps. Water treatment is an important
aspect of water supply
6. 14% of the population avail water from a source away from their dwelling unit. Care should be
taken to provide potable water within or near the dwelling unit for the entire population.
7. Water supply system should be designed in consideration with the natural topography of the
land, to assure adequate water pressure in all areas.
4
Karnataka Rural Water Supply and Sanitation Agency report
P a g e | 96
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
CPHEEO suggests standards for physical level of sanitation services according to population of
urban and rural centres. For sanitation, it is envisaged to achieve 100% of population coverage for
Class I urban areas (population 1 lac and above), 80% of population coverage in other urban centres
with provision for sewerage, sewage treatment facilities and low cost sanitation methods. However
the shortfall in achieving the target is significant. According to projection of Census of India 2001, only
73.7% of the urban population has access to latrine facilities of various types and it is estimated that
by the year 2025, more than 50% of the country‟s population will settle in urban areas when issue
related to sanitation in urban areas will assume a very serious dimension. Needless will be to
mention, sanitation has a close and direct link with environment, water supply and its cleanliness,
health and hygiene. The problem of sanitation, associated with steep influx of population in urban
areas, therefore needs to be addressed forth with, debated and deliberated at length, by the policy
planners for the development of urban/city areas. The capital-intensive nature of sewerage system
has put many roadblocks in urban planning primarily due to weak financial positions of most of the
ULBs
INTRODUCTION
Efficient sewerage and sanitation system is a pre requisite for maintaining health and hygiene in
society. Diseases, especially water borne diseases spread due to unsanitary conditions. Due to rapid
growth of population in Kanakapura LPA, additional pressure would be created in the existing
network. Hence, upgradation and extension of the system is necessary.
DRAINAGE NETWORK
The general topography of the town slopes towards the River Arkavathy which flows adjacent to the
town. The total length of drains in the town is approximately 55km out of which 8km of drains is in
major valley portions. 33 km of the total drains is of pukka type and 13km is kachha type. The storm
water drains also receive partial sullage since the town is only partially covered by underground
drainage system.
With respect to the existing road network, there is 70% coverage of storm water drains in the town.
P a g e | 97
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
The sewage generation is approximately assumed to be 80 % of total net water supply has
beenconsidered out of which water supplied for green areas, washing streets, Horticulture, Fire
fighting would cover the ground water infiltration. Present sewage generation in the LPA is calculated
as shown in the table below.
Kanakapura Town is only partially covered by underground sewerage system. A total of 71.6 km of
sewerage network is proposed to be laid to cover the entire town area. 19.28 Ha land has been
acquired in Aralalu village for construction of Sewage Treatment Plant (STP).
Open
toilet facility present within their
defecation
56% premises. 1.8% uses the community
toilet while 42% go for open
Community defecation.
Toilet
2% Figure 5.4: Availability of
sanitation facilities in
Ramanagara district, Source: census 2011
P a g e | 98
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
90
80
70
60
50
40
30
20
10
0
Bathroom
Bathroom Bathroom Toilet facilty-
facility - Toilet facilty- Toilet facilty-
facility-Rural facility- Kanakapura
Kanakapura Rural Areas Urban Areas
Areas Urban Areas Taluk
Taluk
Percentage 53.4 48.1 87.4 24.8 15.6 83.6
It can be seen from the statistics of the Kanakapura Taluk that, 53.4% of the households in the Taluk
have access to bathroom facility while only 24.8% had access to a toilet. Thus more than half the
population in the LPA lives without a toilet facility. In urban areas however, 87.4% of the households
have access to a bathroom and 83.6% have access to a toilet. The situation is alarming in the rural
areas where only 15.6% of the households have access to a toilet.
RURAL SANITATION
Promotion of rural sanitation is being carried out through the implementation of Nirmala Grama
Yojane. Providing toilet facilities to primary schools with water supply facility is also a component of
the programme. Efforts have also been made to create awareness among the people on hygiene and
cleanliness through the Total Sanitation Campaign (TSC).
ISSUES
The critical issues for sewerage and sanitation in the Kanakapura LPA are as follows:
P a g e | 99
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
1. Access to toilets in rural areas is alarmingly poor (15.6%). Abandoning of open defecation is
needed not only for human health but also for economic and social development. It pollutes
ground water, contaminates ground water and spreads diseases like diarrhoea and cholera.
2. Underground sewerage system has only partial coverage in Kanakapura town whereas ideally
the entire town limits should be under coverage.
3. In majority of the urban area – surface drains are either absent, improperly constructed and
maintained or are blocked.
4. There is lack of municipal maintenance of the drainage system.
5. Total coverage of the town area is absent.
P a g e | 100
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
INTRODUCTION
Solid waste can be defined as material that no longer has any value to the person who is responsible
for it, and is not intended to be discharged through a pipe. It is generated by domestic, commercial,
industrial, healthcare, agricultural and mineral extraction activities and accumulates in streets and
public places.
The production of solid waste in an urban area is an attribute of the socio – economic profile of the
population and activities in the area. More the city is developed; more is the generation of wastes.
Again, the pre dominance of the industrial and commercial land use in the city increases the
generation of wastes.
It is estimated that about 1, 00,000 MT of Municipal Solid Waste isgenerated daily in the country. Per
capita waste generation in major cities rangesfrom 0.20 Kg to 0.6 Kg. Generally the collection
efficiency ranges between 70 to90% in major metro cities whereas in several smaller cities the
collectionefficiency is below 50%. It is also estimated that the Urban Local Bodies spendabout Rs.500
to Rs.1500 per tonne on solid waste for collection, transportation, treatment and disposal. About 60-
70% of this amount is spent on street sweepingof waste collection, 20 to 30% on transportation and
less than 5% on final disposalof waste, which shows that hardly any attention is given to scientific and
safedisposal of waste.
Commercial waste:Included in this category are solid wastes that originate in offices, wholesale and
retail stores, restaurants, hotels, markets, warehouses and other commercial establishments. Some
of these wastes are further classified as garbage and others as rubbish.
P a g e | 101
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
Municipal Waste:Municipal wastes include wastes resulting from municipal activities and services
such as street waste, dead animals, market waste and abandoned vehicles. However, the term is
commonly applied in a wider sense to incorporate domestic wastes, institutional wastes and
commercial wastes.
Industrial Waste:In the category are the discarded solid material of manufacturing processesand
industrial operations. They cover a vast range of substances which are uniqueto each industry. For
this reason they are considered separately from municipalwastes. It should be noted, however, that
solid wastes from small industrial plantsand ash from power plants are frequently disposed of at
municipal landfills.
Municipal Solid Waste Management (MSWM) involves management of activities associated with
generation, storage, collection, transfer and transport, processing and disposal of solid waste.
Management of Industrial Solid Waste (ISW) is not the responsibility oflocal bodies. Industries
generating solid waste have to manage such waste bythemselves and are required to seek
authorizations from respective State PollutionControl Boards (SPCBs) under relevant rules. However,
through joint efforts ofSPCBs, local bodies and the industries, a mechanism could be evolved for
bettermanagement.
Assessment of industrial solid waste management problem greatly variesdepending on the nature of
the industry, their location and mode of disposal ofwaste. Further, for arriving at an appropriate
solution for better management ofindustrial solid waste, assessment of nature of waste generated is
also essential.
Industries are required to collect and dispose of their waste at specificdisposal sites and such
collection, treatment and disposal is required to bemonitored by the concerned State Pollution Control
Board (SPCB) or PollutionControl Committee (PCC) in Union Territory. The following problems
aregenerally encountered in cities and towns while dealing with industrial solid waste
There are no specific disposal sites where industries can dispose their waste;
Mostly, industries generating solid waste in city and town limits are ofsmall scale nature and
even do not seek consents of SPCBs/PCCs ;
P a g e | 102
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
Industries are located in non-conforming areas and as a result they causewater and air
pollution problems besides disposing solid waste.
Industrial estates located in city limits do not have adequate facilities so thatindustries can
organize their collection, treatment and disposal of liquid andsolid waste;
There is no regular interaction between urban local bodies andSPCBs/PCCs to deal such
issues relating to treatment and disposal of waste
and issuance of licenses in non-conforming areas.
By comparing the per capita waste generation in different Indian cities, CPHEEO has suggested
norm for solid waste generation according to different activities.
Residential refuse: 0.3 to 0.6 kg/cap/day Commercial refuse: 0.1 to 0.2 kg/cap/day
Street sweepings: 0.05 to 0.2 kg/cap/day Institutional refuse: 0.05 to 0.2 kg/cap/day
Hence the total waste generated in the LPA can be computed as follows:
The solid waste generation details of Kanakapura Municipal area at present as per Kanakapura TMC
are as under
P a g e | 103
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
19 16 05 10.01 45%
Source: www.kanakapuratown.gov.in
Action plan for Solid Waste Management in the Kanakapura town has been approved and is currently
in the state of implementation. Tools, equipment and vehicles have been procured as seen in the
table below.
Tractor placers 02
Push cart 26
Litter bins 10
Ghamela 32
Source: www.kanakapuratown.gov.in
Information, Education, Communication (IEC) activities are carried out the TMC by engaging the Self
Help Groups5.
Collection: Door-to-door collection is carried out in 21 out of 27 wards. Manual scavenging does not
exist in the TMC area.
Secondary Collection and Transportation: Metal containers of dimension 3 cum are being used for
secondary storage which is handled mechanically through tractor placers.
5
Policy on Integrated Solid Waste Management, Government of Karnataka as prescribed by the Karnataka Urban Infrastructure Corporation
KUIDC for compliance by the local bodies.l
P a g e | 104
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
ISSUES
A landfill site of 10 acres has been allocated in Kanakapura TMC. Even though it is adequate for
2011, it would be inadequate for 2031. Provision for landfill sites is also required at Harohalli,
Kaggalipura and Sathanur.
2. INADEQUATE RESOURCE
There is inadequacy of resource in terms of municipal workers, solid waste management tools and
equipment in the municipality.
3. NO WASTE SEGREGATION
Concept of segregation of waste is largely absent and people are totally ignorant about the
significance and necessity of segregation of Solid waste
The process of collection, which requires substantial man and logistics management, is very poor.
This coupled with lack of proper transportation has resulted in a situation wherein 50-70% of the
waste is not collected at all.
There is no awareness among the general public about the solid waste management. People are not
aware of the way to dispose the waste. Careless disposal of waste on streets has resulted in littering
of waste.
P a g e | 105
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
INTRODUCTION
The power supply is an important component of physical infrastructure for any city or town to work
efficiently. Efficient supply of power ensures proper working of all other infrastructure facilities like
water supply, sanitation etc.
Based on the estimated requirements of power supply in urban area as per the new master plan of
Delhi, the consumption works out to be about 2kw per household/day. The allocation of electric sub-
stations is to be done as per the population that is one 11 kV of sub-station for every 15000
population. (UDPFI guidelines) It is the general standard for all categories of towns/ cities.
Street Light
installations
1%
P a g e | 106
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
EDUCATION
INTRODUCTION
Education is recognised as a fundamental human right, along with other necessities, such as food,
shelter and water in The Universal Declaration on Human Rights (1948). The advantages it confers
on individuals and nations are multi-dimensional and multi-faceted. It sustains economic growth by
providing basic as well as specialised skills that ensure increased productivity and higher per capita
incomes.
Achievements in education in Karnataka have been quite remarkable, and the state is moving
towards universal literacy at a steady pace. The literacy rate increased from 56.04 per cent in 1991 to
66.64 per cent in 2001
According to Department of Public Instruction, Govt. of Karnataka there exist 324 primary schools
and 185 higher secondary schoolsin Kanakapura Taluk. The table below shows the distribution of
educational facilities in the Taluk.
Table5.10: Distribution of Educational facilities in Kanakapura Taluk
Source:
Educational Facility No of units in Kanakapura Taluk
High schools 74
PU colleges 15
Engineering Colleges 2
P a g e | 107
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
1200
1000
800
600
400
200
0
Govt Schools Govt aided schools Unaided schools
Primary 1424 31 171
Secondary 123 58 102
The Department of Public Instruction, Govt. of Karnataka lists out the infrastructure provision in the
schools in the districts. There are 946 lower primary schools, 455 upper primary schools and 106
high schools. It can be seen from the figure below that almost 80% of the schools have drinking water
facility, 80% of upper primary and almost 60% of the primary and high schools have a separate girl‟s
toilet. 80% of lower and upper primary schools and 60% of high schools have electricity supply. The
details of the facilities can be seen from the figure below.
600
500
400
300
200
100
0
RAMANA Common Play Compoun Drinking
Girls toilet Electricity Ramps Library
GARA toilet ground d walls water
Lower primary 946 875 625 891 205 396 923 533 883
Upper primary 455 447 417 445 217 339 454 342 447
High schools 106 80 74 66 71 17 103 67 89
P a g e | 108
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
There are 324 lower primary schools and 185 higher primary schools in Kanakapura Taluk, while the
number of high schools is 74.
LITERACY RATE
According to census data 2011, the literacy rate in Ramanagara district is 69.2% which is 9% higher
than that of 2001. Literacy rate among men is 76.92% compared to 69.88% in 2001 an that among
women is 61.33% compared to 51.22% in 2001. The average literacy rate of Kanakapura Taluk is
65.1, while that in urban areas in 80.5% and in rural areas is 62.5%. Though there has been
considerable increase in the literacy rate in the region, it is abysmally poor compared to the rest of
BMR. The literacy rate of Bangalore is 88.48% the figures below show the comparative data for the
literacy rates in the district.
100
80
60
40
20
0 KANAKAPURA URBAN KANAKAPURA RURAL TOTAL
AVERAGE LITERACY RATE 80.5 62.5 65.1
MALE LITERACY RATE 66.7 43.1 46.3
FEMALE LITERACY RATE 73.9 53.1 56
P a g e | 109
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
LITERACY RATE
Percentage of literates
100
80
60
40
20
0 Total Male Female
Ramanagara literacy rate 2001 60.71 69.88 51.22
Ramanagara literacy rate 2011 69.2 76.92 61.3
90
80
70
60
50
40
30
20
10
0
Total Male Female
literacy rate Ramanagara 69.2 76.92 61.3
literacy rate Banaglore 88.48 91.82 84.8
ENROLLMENT
According to Department of Public Instruction, Govt. of Karnataka there exist 504 primary schools in
Kanakapura Taluk and 74 higher secondary schools. The enrolment rate for 2009-2010 for
Ramanagara District for 1st to 10th grade is shown below.
P a g e | 110
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
16,500
16,000
15,500
15,000
14,500
14,000
13,500
13,000
12,500
CLASS
CLASS 1 CLASS 2 CLASS 3 CLASS 4 CLASS 5 CLASS 6 CLASS 7 CLASS 8 CLASS 9
10
ENROLMENT 2009-10 15,546 15,813 15,543 16,093 16,464 15,910 16,642 16,403 16,963 14,152
It can be seen that the enrolment after 9th grade shows a sharp decrease. The reason for such high
dropout rate should be investigated. It can be absence of senior secondary schools in the villages
which makes commuting an obstacle for education. It can also be absence of proper incentives which
make literacy difficult.
Figure9.11: Distribution of
school children in age
group 6-14
Source: Ramanagara District Book, 2010-11
P a g e | 111
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
The total no of students in the LPA is 54,359 while the total no of teachers is 2124. Hence the student
teacher ratio is 26:1. The ‘Right of Children to Free and Compulsory Education Act 2009’ states the
student teacher ratio in 1st to 5th standard as 1:30 and that from 6th to 10th as 1:35. Segregated class
wise and school wise data is not available, but the aggregate data meets the national standards of
education.
EDUCATION SCHEMES
The Akshara Dasoha program is an initiative to provide free food to school children and improve their
health and nutrition. It is anticipated that improvement of health and nutrition would automatically
improve the education level and would also support the education objectives of the state.
“Akshara Dasoha” program aims at providing hot cooked meals to all the children studying in 1 st to 5th
standard in all the Government Primary Schools of the State. The Mission of the program is to free all
the primary school children from hunger, improve their learning abilities and bring about equity.
P a g e | 112
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
HEALTH
INTRODUCTION
Health status is an important indicator of the socio economic conditions of a society since it has far
reaching effects across all socio economic strata. Hence commitment to improvement of health status
especially among women, children and vulnerable population such as schedule casts and scheduled
tribes, is an important goal of any planning process. Efficient planning requires an appraisal of the
current infrastructure and policies, assessment of progress, identification of gaps and proposals to
Health care infrastructure in Kanakapura Taluk consists of one Taluk headquarter hospital, 22 govt.
hospitals, one nursing home and 22 clinics. The table below shows the distribution of healthcare
facilities in the Taluk.
Table5.11: Health care facilities in Kanakapura Taluk.
Source: Ramanagara district book
Nursing Homes 1 20
Clinics 22 -
Allopathic Hospitals 1 50
Private Hospitals 1 20
P a g e | 113
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
TOTAL 538
Population of Kanakapura Taluk as per census 2001 is 3, 37,208. Hence the no of hospital seats per
1000 population is less than 2, which is much less than the standard value of 4 seats per 1000
population.
0
KANAKAPURA Taluk STANDARD
P a g e | 114
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
HEALTH SCHEMES
The National Rural health mission has been introduced to provide universal access to equitable,
affordable and quality healthcare which is responsive to the needs of the people. Initiatives for
reducing child and maternal mortality, stabilising population along with gender and demographic
The key features for delivery of NRHM in Karnataka includes making public health delivery system
fully functional and accountable to the community, working in a mission mode, decentralised
monitoring and evaluation against standards, convergence of health related programs and flexible
financing.
Promotion of maternal and child health: Maternal ill health and death impacts families, communities
and societies and has far reaching impacts across all socio-economic strata. Promotion of maternal
and child health is an important objective of NRHM, since mother hood encompasses reproductive
In view of the above goals, an umbrella scheme has been initiated called the “Thayi Bhagya”
scheme which consists of three sub schemes – Janani Suraksha Yojna, Prasooti Araike and Madilu.
Under Janani Suraksha scheme, poor pregnant women are given financial and institutional
assistance through a decentralised medical infrastructure system. Prasooti Araike is also a part of the
maternal healthcare program in which health care and check up facilities are provided to women.
Madilu is another scheme that was devised to encourage women to deliver in hospitals for which they
would be entitled to medical kit for the baby and the mother.
P a g e | 115
Kanakapura LPA Master Plan 2031 Chapter 5 : Infrastructure
Child health care: Health and well being of children during their intra-uterine period, toddler years,
school age and adolescence needs intervention which is reached out through Maternal and child care
programs and the public delivery system, Anganawadis, ASHAs and schools.
Immunisation: It is the most cost-effective and effective intervention in public health system. Polio,
DTP, BCG, Measles, TB and Hepatitis B vaccines are administered through the various PHCs and
FRUs. Beside this childhood diseases and neonatal illnesses are taken care of through IMNCI
Disease control program: In order to provide health care facilities to patients with diseases like AIDS,
Leprosy, Tuberculosis and terminal diseases like cancer, several programs have been introduced at
the Taluk level, like AIDS control program, Leprosy control program, TB control program and Cancer
Inter-sectoral convergence: In additional to the above, facilities like ambulance service have also
been introduced. One ambulance per 1.1 lakh population has been provided for rural areas with a
1 Immunisation program
5 TB Control program
8 Madilu Yojna
P a g e | 116
Kanakapura LPA Master Plan 2031 Chapter 6 : Environmental Issues
CHAPTER 6
ENVIRONMENTAL ISSUES
AIR POLLUTION
There is no formal report on air quality in Kanakapura. However approximately 6000 Ha of industrial
area has been proposed in the master plan 2031 out of which manufacturing consist of almost fifty
per cent. Hence, air pollution might be a reality in the area in near future. Proposals have been made
in the master plan for action for prevention of industrial pollution.
SOIL EROSION
Kanakapura has good quality agricultural land within its limits which would transform into urbanised
land due to growth pressure. Sustainable agricultural practices should therefore be adopted in the
remaining agricultural land form maximising and sustaining productivity.
Rainwater system is an alternative plumbing system that helps to conserve our limited water
supply. Currently, most of us use clean drinking water straight from the tap to water our gardens.
Rainwater system gives another water choice for irrigating and can save money. Using non-potable
water to irrigate your gar-den can also help replenish local aquifers.
Rainwater harvesting is collected precipitation from rooftops and other above-ground impervious
surfaces that is stored in catchment tanks for later use. Rainwater harvesting systems can range from
a simple barrel at the bottom of a downspout to multiple cisterns with pumps and filtration. The
harvested rainwater is low in sodium and chloramine and fluoride free.
There are two main types of rainwater harvesting systems that vary in complexity, volume of water
stored and permitting requirements.
P a g e | 117
Kanakapura LPA Master Plan 2031 Chapter 6 : Environmental Issues
Rain Barrel A rain barrel system is a simple rainwater collector that captures and stores a portion of
the runoff from a roof downspout. A hose attached to the bottom of the rain barrel can be used to
irrigate your garden. A rain barrel will only capture a small fraction of the rainwater that flows off your
roof, the rest of the runoff will still need to drain to a safe overflow location.
Cisterns Cisterns are larger systems that can hold much more water and may include pumps to move
the rainwater to the garden. More complex systems can involve plumbing and electrical work, soil
excavation or other structural work. For rainwater collection projects of this scale, consult a
professional to review design, construction and safety considerations. Permits and zoning certificates
are required for cistern systems.
Proposal has been forwarded in the Master Plan 2031 for rainwater harvesting techniques in the LPA.
Till recently, the approach to Disaster Management have been reactive and relief centric. A paradigm
shift has now taken place at the national level from the relief centric syndrome to holistic and
integrated approach with emphasis on prevention, mitigation and preparedness. These efforts are
aimed to conserve developmental gains as also minimize losses to lives, livelihood and property.
A typical Disaster Management continuum as shown below, comprising of six elements i.e.,
Prevention, Mitigation and Preparedness in pre-disaster phase, and Response, Rehabilitation and
Reconstruction in post-disaster phase, defines the complete approach to Disaster Management.
P a g e | 118
Kanakapura LPA Master Plan 2031 Chapter 7| Problems
CHAPTER 7
PROBLEMS
The following issues have been identified in the Kanakapura Conurbation Area
5. Inadequate connectivity.
8. Requirement of additional Residential area for population in 2031. Presently 11% residential
area exists.
12. Lack of Park and Open Spaces in the urbanised area. Presently 0.24% park and open space
exists.
The following issues have been identified in the Harohalli Conurbation Area
1. Lack of commercial center. No segregation of inter settlement and intra settlement traffic.
3. Inadequate connectivity.
5. Requirement of additional Residential area for population in 2031. Presently 4.29% residential
area exists.
P a g e | 119
Kanakapura LPA Master Plan 2031 Chapter 7| Problems
8. Lack of Park and Open Spaces in the urbanised area. Presently 0.13% park and open space
exists.
The following issues have been identified in the Kaggalipura Conurbation Area
5. Requirement of additional Residential area for population in 2031. Presently 5.9% residential
area exists.
8. Lack of Park and Open Spaces. Presently 0.43% park and open space exists.
The following issues have been identified in the Sathanur Conurbation Area
5. Requirement of additional Residential area for population in 2031. Presently 4.26% residential
area exists.
8. Lack of Park and Open Spaces. Presently 0.13% park and open space exists.
P a g e | 120
Kanakapura LPA Master Plan 2031 Chapter 8 |Visualising the Future
CHAPTER 8
P a g e | 121
Kanakapura LPA Master Plan 2031 Chapter 8 |Visualising the Future
The Kanakapura LPA is composed of 85 villages and 1 town. The present population of the LPA
villages (census 2011) is 126,916. Total population of the LPA, including Kanakapura TMC is
180,931. The figure below shows the population growth in the LPA from 1961 to 2011.
120000
100000
80000
60000
40000
20000
0
1961 1971 1981 1991 2001 2011
Kanakapura LPA 83194 95887 125993 151998 170278 180937
P a g e | 122
Kanakapura LPA Master Plan 2031 Chapter 8 |Visualising the Future
Kanakapura Town or TMC is the only urban settlement in the Kanakapura LPA. It has an area of 7.31
sq. km1. The table below shows population in Kanakapura TMC from 1961 to 2011. The present
population of the TMC is 54,021.
50000
40000
POpulation
30000
20000
10000
0
1961 1971 1981 1991 2001 2011
Kanakapura 15000 20000 29000 38000 47000 54021
It can be noted that the population growth in the town is less which can be attributed to lack of
economic activity and growth generators in the LPA
.
Table 8.4: Population Growth rate in Kanakapura TMC
Year Decadal growth rate Annual growth
1
Present municipal limits
P a g e | 123
Kanakapura LPA Master Plan 2031 Chapter 8 |Visualising the Future
The growth of the LPA would largely be dependent upon the industrial proposals in the region.
However, this may not be the sole contributing factor. The other factors that are expected to affect
population dispersal to the Kanakapura LPA are as follows:
Development of Major roads near and passing through the LPA like the IRR passing through
Harohalli, STRR ( approximately coinciding with SH3) connecting Anekal and Ramnagaram,
via Kanakapura, proposed Ring road around Kanakapura, PRR passing through Kaggalipura
and Uttari, Bangalore-Mysore Infrastructure Corridor to the north of LPA and NH 209 passing
right through the LPA by 2021.
KIADB industrial estates in Harohalli-Bidadi area: The industrial estates would create
employment opportunities for people in and around the region and spur development and
growth in eth LPA.
Availability of ground water in the region as compared to the others: The Kanakapura LPA has
a higher availability of ground water as compared to the rest of the BMR since it is closer to
the Cauvery region. Hence developments are more sustainable and feasible in the LPA.
The Taluk Industrial Plan for the Kanakapura Taluk envisages promoting around 800 tiny & SSI
units including services. The Taluk also has potential for promotion of 168 units in large & medium
sector spread over five years. These investments are likely to generate direct employment for about
60,000 persons and indirect employment to about 24,000 persons.
P a g e | 124
Kanakapura LPA Master Plan 2031 Chapter 8 |Visualising the Future
- Inmigrating population
The natural increase in the population has been calculated through statistical methods like arithmetic
progression, geometric progression and ANGM (Annual National Growth Method). It has been
observed from the data that many of the villages have a negative growth rate while some of the
villages have compounding positive growth rates. The growth of the population calculated through
various statistical methods is as follows:
All the statistical methods adopted for projection of population in the LPA yield more or less similar
results.
P a g e | 125
Kanakapura LPA Master Plan 2031 Chapter 8 |Visualising the Future
P a g e | 126
Kanakapura LPA Master Plan 2031 Chapter 8 |Visualising the Future
P a g e | 127
Kanakapura LPA Master Plan 2031 Chapter 8 |Visualising the Future
2.8 lakhs has been considered as the natural growth in the LPA till the year 2031.
The Revised Structure Plan 2031 envisages a 70%-30% population distribution between the core and
the outside by 2031. Hence the local planning areas must be planned to create job opportunities to
realize the regional vision.
In IMP and Provisional Master Plan 410 Ha were earmarked for KIADB 1st and 2nd Phase. New
industrial areas (800 Ha) under KIADB phase III & IV has been added to the existing Industrial area in
Harohalli.
The Kanakapura LPA has about 450 tiny and SSI unit at present. KIADB industrial area also exists in
Harohalli area. As such the Industrial Perspective Plan for the Kanakapura Taluk envisaged
promoting around 800 tiny & SSI units including services till 2011. The Taluk also has potential for
promotion of 168 units in large & medium sector spread over five years. These investments are
likely to generate direct employment for about 60,000 persons and indirect employment to about
24,000 persons by 2011.
Since, maximum potential of job creation has not been reached presently; it has been assumed that
the LPA has the potential to create 80,000 jobs by the year 2031. Hence an additional 3.2 lakhs
population will be inmigrating in the LPA by the 2031, out of which 1.25 lakhs is envisaged to be
migrating in 2021 and rest by 2031.
P a g e | 128
Kanakapura LPA Master Plan 2031 Chapter 8 |Visualising the Future
Hence the total projected population in the LPA till the year 2031 is as follows.
Hence 6 lakhs has been taken as the projected urban population in the LPA till the year 2031.
There are four important growth centres in the LPA – Kanakapura, Kaggalipura, Harohalli and
Sathanur. The urban population in the LPA has been distributed in these growth centres which
includes natural growth and inmigrating population. The table below show the distribution of
population in the four growth nodes and the villages of the LPA.
Kaggalipura 1,50,000
Harohalli 1,80,000
Kanakapura 1,80,000
A population 6lakh will be accommodated in the four urban areas and a population 90,000 will be
accommodated in the villages in the agricultural zone.
P a g e | 129
Kanakapura LPA Master Plan 2031 Chapter 8 |Visualising the Future
A township has been proposed at Sathanur by the BMRDA to host textile and apparel industries. The
township would accommodate a population of 3.2 lakhs. The master plan proposals do not take into
account the population of the township since facilities would be planned separately for it.
600000
600000
500000
400000
350000
300000
280000
151998 170278
200000 125993
83194 95887 225000
100000 180937
0
1961 1971 1981 1991 2001 2011 2021 2031
EXISTING POPULATION PROJECTED URBAN POPULATION NATURAL GROWTH
The requirement of area is calculated on the basis of 53 pph gross density to accommodate the
projected population of 6 lakhs in the four conurbations.
Table 8.9: Population in Kanakapura LPA 2021, 2031
TOTAL URBANISABLE AREA
YEAR POPULATION
(@53 pph)
The total urbanisable land required by the year 2031 is 11233.27Ha (@ 53 persons per Ha gross
density)
The overall statistics of the LPA as per proposal of Master Plan 2031 is given in the table below. The
total conurbation area is 11233.27Ha excluding water bodies, agricultural land, forests and hillocks as
shown in the table below.
P a g e | 130
Kanakapura LPA Master Plan 2031 Chapter 8 |Visualising the Future
There are four important growth centres in the LPA – Kanakapura, Kaggalipura, Harohalli and
Sathanur. The urban population in the LPA has been calculated for these growth centres which
includes natural growth and inmigrating population. The table below show the distribution of
population and the density in the four growth nodes.
Table 8.11: Distribution of population and area in the four growth nodes
POPULATION IN Conurbation Gross Density
AREA IMP 2021
2031 area (Ha)* (pph)
TOTAL URBAN
POPULATION 2031
6,00,000 11233.27 53
*Excluding water bodies, agricultural land, forests and hillocks and quarries
P a g e | 131
Kanakapura LPA Master Plan 2031 Chapter 8 |Visualising the Future
The requirement of housing for the LPA for the year 2031 has been calculated as shown in the table
below. The housing requirement of the LPA has been calculated by considering 4.5 persons per
households. The total number of houses required for the LPA is 2 lakhs. The required residential area
is 3500 Ha @40dwelling unit/Ha. The detail housing requirement for each conurbation has been
shown in the table below.
Table 8.13: Residential Area requirement in the LPA for the Conurbations
P a g e | 132
Kanakapura LPA Master Plan 2031 Chapter 8 |Visualising the Future
a. WATER SUPPLY
The total requirement of the LPA has been calculated using CPHEEO standards for domestic water
supply. Total domestic water requirement in the LPA in the year 2031 is 81 MLD.
80
70
60
50
40
30
20
10
0
2011 2021 2031
DEMAND 4.8 47.25 81.00
SUPPLY 4.8 4.8 4.8
The total area required for solid waste management has been calculated based on CPHEEO norms
for Municipal Waste Management. Total area requires for landfill management in the LPA till 2031 is
30 acres.
Table 8.14: Landfill Area Requirement in the LPA
Category 2031
Domestic Waste generated (in kg) @ 0.3 kg per capita per day 180 tonne
Non-domestic Solid waste generated (in kg) @ 0.1 kg per capita per day 60 tonne
P a g e | 133
Kanakapura LPA Master Plan 2031 Chapter 8 |Visualising the Future
a. EDUCATION
Requirement for educational facilities have been calculated using UDPFI guidelines for urban areas.
The total area required for educational facilities in each of the conurbations have been tabulated in
the table below.
Table 8.15: Educational facility Requirement in the LPA
Educational
facility UNITS REQUIRED AREA REQUIRED (Ha)
requirement
Educational
Kanakapura Harohalli Kaggalipura Sathanur Kanakapura Harohalli Kaggalipura Sathanur
facility
Nursery
school @
72 66 66 36 6 6 6 3
1/2500
population
Basic primary
school @ 1/
72 66 66 36 6 6 6 3
2500
population
Higher
secondary
school @ 24 44 27 2 38 35 35 20
1/7500
population
Colleges @
1/1.25 lakh 1 1 1 1 6 3 3 3
population
Technical
institutions @ 1 1 0 0 4 2 0 0
1/ 1000000
P a g e | 134
Kanakapura LPA Master Plan 2031 Chapter 8 |Visualising the Future
ITI @ 1 /
1 0 1 0 1.4 0 1.4 0
1000000
Engineering
Colleges @ 2
1 0 1 0 60 0 60 0
in urban
extension
medical
Colleges @ 2
1 0 1 0 15 0 15 0
in urban
extension
b. HEALTH
Requirement for healthcare facilities have been calculated using UDPFI guidelines for urban areas.
The total area required for educational facilities in each of the conurbations have been tabulated in
the table below.
Table 8.16: Medical facility Requirement in the LPA
UNITS REQUIRED AREA REQUIRED (Ha)
Medical Kanakapura Kanakapura
Harohalli Kaggalipura Sathanur Harohalli Kaggalipura Sathanur
facility Town Town
General
Hospital @ 1
per 2.5 lakh 1 1 1 1 6 6 6 6
population-
500 beds
Intermediate
Hospital (
category A) @
2 2 1 1 8 8 4 4
1 per 1 lakh
population -
200 beds
Intermediate
Hospital (
category B) @
2 2 1 1 2 2 1 1
1 per 1 lakh
population -
50-80 beds
polyclinic @ 1
per lakh 2 2 1 1 .6 .6 .3 .3
population
Dispensary @
1per 0.15 lakh 10 10 10 5 1.2 1.2 1.2 .6
population
P a g e | 135
Kanakapura LPA Master Plan 2031 Chapter 8 |Visualising the Future
Nursing Home
@ 1 per .45 to
1 lakh 3 3 3 2 .6 .6 .3 .3
population-25
to 30 beds
Child Welfare
& Maternity
Centre@ 1 per
4 4 1 4 1 5 1 1
.45 to 1 lakh
population- 25
to 30 beds
TOTAL 20 25 15 15
P a g e | 136
Kanakapura LPA Master Plan 2031 Chapter 8 |Visualising the Future
As per the provisions of KTCP Act 1961, the Master Plan would be put up for public display after
provisional approval of the plan by the government. The issues and objection raised by the public
would be then considered and included in the proposal if found feasible and for the greater good.
The RTI Act provides scope for gaining information by the public. The Disclosure Act also provides
scope for discussion on the Master Plan.
STRENGTH WEAKNESS
THREAT OPPORTUNITY
P a g e | 137
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
CHAPTER 9
As per the act, the Master Plan should contain a series of maps and documents indicating the
manner in which the development and improvement of the entire planning area within the jurisdiction
of the Planning Authority are to be carried out and regulated, such plan shall include proposals for the
following, namely –
a. Zoning of land use for residential, commercial, industrial, agricultural, recreational, educational
and other purposes together with Zoning Regulations.
b. A complete street pattern, indicating major and minor roads, national highways and state
highways and traffic circulation pattern, for meeting the immediate and future requirements
with proposals for improvement;
c. Areas for parks, playgrounds and other recreational uses public open spaces, public buildings
and institutions and area reserved for such purposes as may be expedient for new civic
developments;
e. Reservation of land for the purposes of central Government, the State Government, Planning
Authority or public utility undertaking or any other authority established by Law, and the
designation of lands being subject to acquisition for public purposes or as specified in the
master plan or securing the use of the landing in the manner provided by or under this Act;
f. Declaring certain areas, as areas of special control and development in such areas being
subject to such regulations as may be made in regard to building line, height of the building,
floor area ratio, architectural features and such other particulars as may be prescribed;
P a g e | 138
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
3. To enhance linkage between the LPA with other areas of the BMR.
9.3 DENSITY
There are four important growth centres in the LPA – Kanakapura, Kaggalipura, Harohalli and
Sathanur. The urban population in the LPA has been calculated for these growth centres which
includes natural growth and inmigrating population. The table below show the distribution of
population and the density in the four growth nodes.
P a g e | 139
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
Since the process of land pooling through Town Planning Schemes present definite advantages to all
stakeholders, it should be adopted as a means to develop infrastructure in the LPA.
Town Planning Schemes could be adopted for pooling land for development of the major roads
STRR, IRR, ITRR and RR.
1. Existing development in the area: The existing developments have been given priority in
determining the proposed landuse of the Master Plan 2031. In most of the cases the existing
landuse has been retained to minimise public distress and loss of property.
2. IMP Proposals: IMP proposals for landuse have been retained in all places barring places
where it conflicts with the existing landuse.
3. Scientific landuse allocation: New areas have been brought under the proposed land use to
integrate the existing and IMP proposed landuse judiciously. New areas have also been brought
under proposals to satisfy the requirements of the population in 2031.
7. Change of land uses approved by the govt. and P.A. under section 14-A (3)
P a g e | 140
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
9.6 PROPOSALS
Kanakapura is the Taluk headquarters of Kanakapura Taluk as well as the only TMC in the LPA. As
such it is a node of prime importance owing to already superior administrative stature. The town has
enormous economic potential in terms of agriculture, sericulture and other small scale industrial
activities. The Landuse of the town has been proposed as to boost its economic potential and
supplement its hierarchy in the region.
The total urbanisable area of the conurbation is 27.92 sqkm and 1.8 lakhs population is proposed in
the town by 2031. 14.11% of the total area is proposed for industrial use while whereas 4.59% of the
total area is dedicated to public and semi-public uses. 40.15% of the total area is reserved for
residential purposes. 9.02% of the total area is commercial and 11.40% is under parks and open
spaces. The rest of the area is comprised of quarries, water bodies and agricultural landuse as
shown in the table below.
Table 9.2: Kanakapura proposed landuse statistics-2031
P a g e | 141
MASTER PLAN -2031
FOR
755619 A 757619 B 759619 C 761619 D 763619 E 765619 F 767619
4 69 71 88 65
5 77 64 56 55
GANALU
155 157 128 171 207
203 197 198 191 63 64 5
6
4 183 27 28
35
34 48 44 19 2 1 150 258 149 259 326
325
316 KANAKAPURA LOCAL PLANNING AREA
09
158 8 37 103
VADEDODDI
69 206 196 192 62 61 7 24 36 17 148 252 101
154 9 8
NH-2
170 5
215
159 205 6 7 23 21 25 45 3 147 257 324
1393064
1393064
195 193 9 253
63 149 240
160
169 153
210 211 10 60
10 13 15 38 39 40 12 15 142 254 ¬
«
57 22
TUNGANI
90 151 168 209 194 11 12 14 19 41 16 14 146 256
150 62
61 40
241
242 144
148
149
161 ¬
«
163 166 299 213
212
214
1
2 3 4 11
59 57
56
53 15 17 18
48
45 42
10 13 4
140
143
144 145
255
251
249 248
328
KEY MAP
58
254
239 147 150 164 108 107 58
50 49 46
11
7 141
109 12 13
14
216 105 106 15 55 52 51 47 8 6 5
110 235
9
146 54
253 145 S T 16 65
NH-20
60 104 67 9 318 250 224 235
9 70 218
RR 111 101 100 99 138
RAYASANDRA
59 3
10 15 11
d
288 234 40 38 17 18 2 66 ¬
« 236
a
21
ALLIMARANAHALLI
252 113 22 139
Ro
112 102 47 48 35 20 63 79 137
R 289 295 259 97 41 50
37 19 4 8 12 71 23 223
R 251
294 114 115 96
98
85 46 34
21 1 14 13 24
135 136 317 MD R
Kaggalipura
256 298 84 52 51 33 20
250 116 95 45 22 7 15 62 29 28 27 222 !
64
(
291 5 6 247
«
¬
15
249 143 233 94 83 42 44 54 55 53 74 123 120 234
«
¬
118 23 134
30
16 31 25 219
¬
«60 247 292 297 93
87 81 43 58 57
32
25 60 34 26 124 122
246
248 119 92 82 121 119
246 293 296 120
86 59 31 24 61 59 19 17
18 68 75 32
33 35 T RR
NH - 9
63 27 26 242 245
1 124 91 58 126 1
ARALALUSANDRA
245
20
243 76 78 238 241
255 219 90 88 80 64 61 60 30 28 57 133 125 118 104
TRR 53 56
244 232 72 69 36 244
226 121 89 79 65 29 77 43 42 127 117 239 240
3 44 128
77 76 78 66 2 1 45 55 73 114 116 110 MD
40 37
223 224 225
125 75
68
67
46
44
45 12 131 108 220 ¬
« 107 106 R Harohalli
SH
122 231 73 71 70 5 50 427 41 39 132 130 115
69 4 6 51 54 46 M DR
!
(
126 74 72 54 47 43 166 20 129 113
3
49 38 43 111 109
TIGALARAHALLI
222 221 142 218 127 19 18 50 19 47 426 40 41 112 319 105
243
220
238 260
129
17 22 21 48 42 44 45 46 ¬
«
90
22 21 20
128 229 9 18 425 39 38 47 48 76 77 78 S
NH-2 09
264 17 51 41 16 12 37 25 70 98 97
139 130 23 27 28 12 52 33 40 23 31 32 429 36 26 ¬
« 24 75 -3
16 42 15 423
«
¬
15
265
H
138 228
14 15 30
27
23
79
237 24 29 39 ¬
« 28 22
! !
35 96 49
266 25 30 31 34 33 29 MD R
¬
11 10
«
12
! !
137 24 29 430 21
34 30 74
!
35 431 422 50 95 88 D
¬
«
26 9
12
19 12 M
R
267 18
!
34 14
!
12 428
SH
136 17 83
! ! !
135 18 14 38 ¬
« 20 73 89
!
!
!
35 432 421
!
27
! !
¬
«
36 7 25
!
19
15
140 134 133 21 15 7 72 94
!
33
! ! !
217
3
16 13 8 28 1 2 419 6 MD R
37 8 16 71 87 ¬
« 86
Kanakapura
!
23 12 13 26 436 32 31 99
261 26 10 5 6 ! 36 434 433 420 5 12 13 92
!
141 11 9 85
31 25 9 161 163 4 1 2 418 82 100
! !
12 33 27 ¬
! ! ! ! !
37 438 439 ¬
« 4 93 84
!
(
!
37 30 «
5 6 8 160 162 164 2 3
!
40 417 416 1 14 15 91
! ! !
257 36 35 187 41 2 3 10 11 M DR
! ! ! ! ! !
28
KALLAHALLI
SH
7 441 440
TRR
34 4 159 437 81 69
29 190 43 42 39 415 80 53 52 51 90
-3
230 3 2 1 189 188 51 ! ! 442 55 54
38
!
39 155 154 44 38 62 56
SH - 92
116 52 57
1391064
1391064
223 191 111 117 67
118 157 68 58 32
220 120 187 156 46 49 53 443 414 30 31
!
52 447 61 33
MD
40 119
!
112 35 34 09
H-2
446
153 47 90 95
! !
444
! !
R
«
110 55
Sathanur
30
128 48
! ! ! !
73 115 185 150 57 59
56 66 STRR
ARANAKUPPE
1 2 ¬
« 445 412 36
N
217 123 183 182 43
! !
231 129 151 59 9 (
43 44 51 53 109 113 184 65 64
-20 MDR
!
126
¬12
«
218 130 127 167 60 69 24
74 61 411 27 37 41 45 H
!
114 144 149 58 N
!
68 23 42 99
! ! ! !
42 55 216 181 12 62
!
NH-209
221 45 50 54 108 107 132 146 66 452 453
¬
« 454 409 21 100 90
!
410 25 28 49 ¬
«
!
49 180 141 40
! ! !
!
71 18 56 106 65 ! 71 407 408 20 19 44 50 98
¬
« 178 179 79 448 457 26
!
228 75 46 105 134 143 144 147 140 135 405 48 46
65 78 70 38 39
! !
47 48 215 139 80 451 459 406 51 47
INDEX
!
17
! ! ! !
77 142 81 404 396
¬
«
103
12
66 64 177 175 174 136 403 18 97 101
72 70 102 145
146
173 1 84 77 450 461 401 402 79 89 94
! ! ! !
¬
«
58 136 2 133 83 82
12
62 104 148 ¬
« 397 395 16 3 52 54 96
63 61 101 214 140 176 172 1 2 85 73 72 1 80 55 56
69 57 159 170 132 90 464 ¬
« 400
77 71 57
¬
«12
149 129 128 76 399 15 4 2
99 100 137 139 National Highway
! ! ! ! ! ! ! !
67 60 157 465 466
L.P.A. Boundary
¬
«
15
224 68 59 2 98 150 171 169 89 91 470 469 389 398 394 82 60
195 1 ¬
« 151 158 168 124 127 86 5 83 78 76 72
70
¬
« 213 156
! !
468 467 14 87 66 64 59
90
78 97 96 95 152 160 167 92 390 391 88 86 61
2 196 89 125
75 74 477 476 472
393 84 75 74 73 2
Conurbation Boundary
87 12 67 63
State Highway
162 6 68
SH
!
197 154 166 1 2 126 ¬
« 385 386 ¬
« 388
392 69 62
94 93 13
KANAKAPURA
474
! !
122 92 91
3
219 161 163 165 88 478 383 384
88
90 91 531 529 528 120 121 115 485 480 479
387 332 7 34 35 36
108 12
Municipal Boundary
!! !
532 530 333 33 37
(P)
79 523 94 381 28 31
8 11
Major District Road
202 1 93 525 164 107 490 482 382 336 328 9 29 30
!
203 527 106 487 38 39
! !
«
¬ 118 116 109
! ! ! ! ! ! !
533
!
488 33
! !
198 207 541 526 517 114 95 327 10
!
206 87 518 105 380 329 326 15 32 131
!
92 378 26
!
521 334
! ! !
542 515 ! ! 117 96 491 373 377 27
!
! !
516! 320
! !
212 86 519 113 112 102 103 496 17 18
208 534 535 540 372 116
Village/Other Road
BARADANAHALLI
97 114 14 19 24
!
82 192 18 543 520 513 514 ! ! 376 314 118 319
! !
¬
« !
110 101 99 15 494 344 15
! ! ! ! !
¬
! !
539 ¬
« 5 7 13 122 «
!
83 536 497 371 23
!
312 119
! ! !
512
Survey No Boundary
!
508 499 366 113 54
!
537 544
310 105 313 Railway Line
!!
3
¬
364 351 123
!
«
20
85 120
! !
498
!
2 8
!
!
10
TR
225 80 592 511 507 369 55 52 40
!
20
! !
22
! ! ! ! !
194 590 548 365 353
! !
21
! !
!
!
9
!
! ! !
591 104
! ! ! ! !
125
! !
538 545
THAMMASANDRA
558 106
R
506 502 501 56
Building
110 88 87
!
368 ! 363 355 309 103 84 51
!
Railway Station
199 593 500 85 82 11 126 62
193 547 549 557 130
!! !
210 503 295 362 b
Æ
589 588 546 307 102 83 81 63 61 57
209
! !
555 556 560 296 297 367 86 50
107 109 89
¬
«
200 504
18
595 602
Electric power lines
550 554 357 305 80 60
101
! ! !
594 64 129
<>
<>
<>
<>
505 294 293 79 Existing Road to be Widened
! !
108 49
! ! !
559 90
30
740 24 587 553 299 361 304 65 66 59 58
100 78 128
!
603 579¬
«
! !
719 561 287 289 291
!
551 91 127 136
! ! ! !
!
!
227 580 48
226 596 563
565 300
360 303 98 97 94 72
70
67
Drainage
! !
599 586 552 99 76
!
604 562 301 302 47
597 581 578 92
Proposed Roads
!
1389064
68 46
!
SH 566
! !
93
Cadastral Hillock
751 600 584 576 278 9 11 96 75 121
! ! !
718 606 582 - 3 572 571 132 32 45
¬
«
605 284 10 17
12
598 575 567 8 12 74 133 43
!
84 577 280 276 274 18
583 16 134 31 NH - 209 By-Pass
¬
«
574 573
90
13 44
!
722 ! ! ! 607 570 283 281 279 24 26 41
569 20 19
Cadastral Tank
2
!
!
! !
229 720 608 269 273 7 1 25 33 111
! ! !
18 282 23 135
¬
« 265 3 30
609 614 615 15 112
261 272 132 133
PRR
! !
232 618 622 14 21 136
233 637 610 18 262 22 137 118
100
¬
«
6
24
¬
!
! !
! !
¬
616 267 5 110 102 101 113
633 263 138 39 40
«9
613 619
726 ! ! ! ! 635 634
733 612 231 100 99 98 STRR
!
631 266 109
762 ! ! ! 750
!
639
90
620 50
779 734 237 97 96 42
!
752 628 626 259 256 233 232 230 60 59 57
666 104 56 51
!
140 49 43
!
108 95
IRR
640 ! 761 650 630 629 625 667 255 103 58
!
627 258 238 139 53
!
735 767 623 236 105 94 61 47
90
!
755 763 651 668 257 254 234 93 66 67 54 52 41 120
12
!
624 664 665 ¬
« 251 229 46 48
!
649 235
!
636 724
!! !
661 669 253 711 106 142 63 64 68
732 648 659
TRR
114 45
! ! !
663 107
¬
«
657 92
15
245 62
!
! !
«9
¬
754 647 652 658 662 670 69 121 90
660 241 !
! ! ! !
70
! ! ! ! !
!
642
!
250 226 228 ! 186 184 91 127
!
768 244 223
! ! !
83 71
18 641 764 182 115 116
! !
672 671 183 84
¬ RR Road
« 243 122
«
¬
222 224 225
90
3 716 653 654 656 187 90 72 3 60
766 737 676 673 246 181 82
! ! ! !
646
!
736 0 188
! ! ! !
675 707 221 73 117 128
! !
643 3
!
177 180 130
! !
85
!
655 ¬
«
! ! !
248 247 227 189 123
!
74 144
!
KANAKAPURA
774 775 776 88
!
770 739 674 708 217 178
705 1 15 2 191 89
!
645 738 706 81 124
!
214 193 ¬
«
!
!
753 727
702 703 179 168 87 80
!
20 4 194 192
!
772 679 -
Landuse Analysis - Kanakapura Conurbation
! ! ! !
171
¬
«
86
30
!
773 712 771 699 700 NH 704 206 199 198 195 173 169 79
125
!
7
! !
723 110
¬
«
715 695 748
12
201 113
!
778 681 165 44 149
!
«
¬
30
686 71 73 77 78 79 164 148
!
682 683 696 9 107 745
VIRUPASANDRA
!
694
Symbol Landuse Area in Hectare %
20 19
! !
115 114
! ! !
678 687 13 70 75 80
! ! !
11 82 81 92
!
69
! !
! !
692 22
Residential 1121.18 40.15%
688
! ! ! !
429 18 116
! ! ! ! !
394 14 68 102 119
!
105 413 84 12 63 83 103 121 129
691 132
!
21 66 67 126
! ! ! !
102 17 16 15
!
432 86 23 84 89 117
65
Commercial 251.89 9.02%
9
85 64
! !
690 61 88 101 122 130
104 100 104
0
100 83 131
SH-3
-2
60 85 91 125 133
NH
101 99
106 62
!
24 147
! !
27 100 95
!
! !
103 25 98 87 123
414 26 97 124 135
!
1387064
1387064
23 22 96
¬
«
415 12 11
12
426 57 25 86 138 149 759 758
! ! ! ! !
! ! ! !
120 119 107 89 139
153 108 90
81 75 29 30 33 34
50 56 97 26
19
21 17 88
1
87
85 84 83 136
147
152
151
743 742 146
Public & Semi-Public 128.13 4.59%
99 80 78 10 2 82 756
152 74 49 27 18 13 44 146 148 159 760
151
127 110 109 91
! 77
76 73
31
32
36
48
55
54
20
14
9
43 47 80 140 141
153 158
161 717 Park & Openspace 318.28 11.40%
128 48 49 50 81 144 145
!
!
411 150 79 96 29 16 7 46 744
3
!
427
Public Utility 32.74 1.17%
92
¬
8
«
122 37 154 741
12
! ! !
149 35 51 45 160
410 47 46 95 30 15
!
53 143
CHEERANAKUPPE ¬
! !
98 148 121
98 93 72
39 38 31 4 156
126 15 94 70 94 155
111 ¬
« 42 43 18 52
«
! !
71 5
Transportation 410.47 14.70%
90
154
! !
09
96 408 118 41 52
SHIVANAHALLI
41
! !
101 109 146 40 40 105
!
76
! ! ! ! ! !
! !
95 123 102 110 114 68 180 182 34 101 102
!
! ! ! ! ! ! ! ! !
96 152 64 65
Agriculture 0.00 0.00%
125 155 91
! ! ! !
407 38 213
!
108 145 419 117 210 146 147 179 35 37 39 53 54 55
153 154 78 75
! !
138 133 115 383 151 183 185 219 218 214 60
126 104 111 156 144 5 178 90 63 66 71
107 124 116
15 1 191 ¬
« 220 236 103 73
Water Bodies 78.04 2.79%
94 125 217 74
SH
! !
388 «
¬ 216 215 61 62
¬
«
241
30
-3
148
! !
186
¬
«
15
!
113 114 399 164 40 177 193 235 69
Forest 0.00 0.00%
1 398 397 158 39 239 149 226
! !
93 396 142 140 44 187 190 233 70
179 176 223 222 232
!
136
!
181 180 402 141 18 66 24 157 188 189 194 231
!
! !
378 36 25 211 196 225 227
!
14 287 285
Hillock's/Quarry's 57.35 2.05%
178 355 45 46 240 174 224 228
177 165 24 264
!
TRR
173 34
!
12 357
! !
166 54
GrandTotal
55
2792.17 100.00%
172
! !!
49
!
20
20 48 161
!
!
358 248 276
«
¬
15
90 3
!
169 22
«
¬
175 172 33 56
24
!
! !
1 162 262 57
«
¬
30
! !
89 17 30 2 ¬ 247
! ! !
5 7 10
18
401 173 188 350
352 353 360 359 32 19
21 50
51
« 164 168 204 38 50 58 274 284 259
«¬12
185 174 18
¬
«
12
165 205 29 30 39 49 59
122 420 349 370 374 17 52 53 ¬
«
8 9 20 19 187 348 18 166 28 40 48 283
88 116 361 375 16 59 54 246 144 142
6 186 58
µ
87 346 347 13 141 26 41 47 60 289 256
198 189 56 55 258
121 12 14 282
21 345 365 373 57 245 140 23 255
199 190 363 15 60 296 143 263 42 45 46
22 203 197 377 297 4 43 44 265 281
362 387 298 139 1 20 268 257
120 202 200 191 217 11 67 138 237 266
196 215 344 364 2 10 209 135 2 18 19 208 77
23 204 3 0 343 ¬
« 376 63 433 302 300 299 244 136 16 79 238 267 280
192 366 371 134
¬12
«
137
¬
78 270
«
¬
61 5 17
15
28 24 421 1 5 6 386 304 303 1 8 279
HANUMANAHALLI
216 218 219 372 9 145 132 76 269 ¬
« 291
27 25 194 342 340 62 64 307 242 7 254
193 305 128 133 74 294
381 220 7 129 130 131 15 293
393 390 341 8 308 73
1385064
1385064
26 207 382 339 3 4 273 8 80 75 278 277
208 367 243 124 290 253
29 30 392 431 430 224 222 221 338 1
65 127
113
112 111 72
292 0 250 500 1,000 1,500 2,000
ARALALU
209 227 226 225 368 369
308 307 297 2 295 ¬
« 272
271 295 125 126
14 82
35 31 210 380
223 -2 09 309
TR 296 123
110 9 81 65 64 Meters
¬
«
NH 115 71
30
337 70
¬
«
336 108
12
228 240 310 10 12 84
¬
«
R
15
243 61
«
30
¬
1«
85 332 291 117 96 90
2
83 44 192 175
74
73 42 232 245
329 328 318 316 95 98 176 12 105 100 93 173 ¬
«
236 96 12 153 202
234 235 97 97 94 92 91
SH-3
77 248 319 290 103 ¬
« 11
DEVELOPMENT AUTHORITY
72 327 405 287 94 4 154
233 412 322 320 317 285 286 99 3 193 155 99 10 12
82 30 246 325 284 90 100 95 260 13
249 92
70 71 117 324
321 ¬
« 288 93 5¬
« 6 7
194
177 151 150 146 145 98 8
¬
«
78
15
12 124 167
270 279 85 66 56 50 20 19 123 113 111 SH- 17
51 50 49 266 267 275
83 59 25 112 3 18 168 169
213 129 271 51 49 28 130 166 170
65 152 11 265 84 60 21 19
64 149 143 72 65 52 22 23 122 114 108 106 172
141 128 24 186 131 115 20 165
52 53 147 199 140 9 273 82 74 55
130 20 13 36 105 138 139 199
119 150 142 - 73 37 35 31 121 104 21 164
148 H
N 9 10 272 64 61 23 30
58 54 137 135 21 80 81 38 185 118 117 107 65
63 62 416 15 18 268 48 42 41 32 30 103 141 37 31 198
57 171 14 77 54 40 29 66 163
136 148 147 8 7 16 19 22 274 85 63 43 44 184 97 116 29 200
59 417 139 269 75 62 45 46 34 102 64 197 MEMBER SECRETARY METROPOLITAN COMMISSIONER
SEEGEKOTE
29 79 47 33 96 67 159 159
162 ADDITIONAL DIRECTOR OF
118 56 55 138 158 53 98 101 32 196
SH-9
60 31 119 99 63 28 140 KANAKAPURA PLANNING AUTHORITY TOWN & COUNTRY PLANNING BMRDA
169 168 230 231 232 94 98 SH
61 159 23 28
30 76 84 229 146 90
93 92
100 62 -3 44 34 25
195 KANAKAPURA BMRDA
TIGALARAHOSAHALLI
146 6 5 4 78 118 143 70 69 68 38
2
1383064
1 80 79 37 36 145 87 88 96 95 113 125 81 78 50
Proposed Landuse
128 159 160 85 84 78 178 158 167 124 129 130 83 76 60
M a p T itle
A B C D E F S ca le : 1:20,000
755619 757619 759619 761619 763619 765619 767619
Kanakapura
Map No: 46
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
Harohalli is one of the most significant nodes of the Kanakapura LPA and a growing industrial cluster.
It is proposed to host more than 1.8 lakh population by 2031. The total area proposed as the
conurbation limit of Harohalli is 43.49sqkm (4348.77ha).
29.67 % of the area has been dedicated to industries, since it is the future economic mainstay of the
town. 33.24% of the total area is reserved for residential purposes where as 12.58% of the area is
devoted to transportation. 4.24% of the area is reserved for commercial purposes to serve the future
population. 11.63% of the area is park and open space to maintain adequate balance with the
anticipated built up area in the town. 2.72% of the area is proposed to be under public and semi-
public use. The rest of the land use is under quarries, water bodies and agriculture as shown in the
table below.
Table 9.3: Harohalli Proposed land use statistics-2031
Landuse Area (Ha) Area (sq km) Percentage
RESIDENTIAL 1445.50 14.46 33.24%
COMMERCIAL 184.30 1.84 4.24%
INDUSTRIAL 1290.13 12.90 29.67%
PUBLIC & SEMI PUBLIC 118.49 1.18 2.72%
PARK & OPEN SPACE 505.94 5.06 11.63%
PUBLIC UTILITY 83.49 0.83 1.92%
TRANSPORTATION 547.16 5.47 12.58%
AGRICULTURE 0.00 0.00 0.00%
WATER BODIES 156.86 1.57 3.61%
FOREST 0.00 0.00 0.00%
HILLOCK'S/QUARRY'S 16.89 0.17 0.39%
GRAND TOTAL 4348.77 43.49 100%
Kaggalipura is also recognized as an important growth node of the LPA and approximately 1.5 lakh of
the future population of 2031 is distributed in this town. Industrial area on the cue to 37.77(1.71%) Ha
have been proposed in the area for form the future economic base. The town has been proposed
primarily as an institutional hub for the LPA.
P a g e | 142
MASTER PLAN -2031
FOR
758936 A 761486 B 764036 C 766586 D 769136 E 771686 F 774236
1408480
1408480
16 32 14 13 90
17 20 21 12 22 1
TEMPLE 15 16 17
41 13 POST OFFICE 93 21
YADAMADU
35 24
96 NURSERY
12 GOVT
5 10 9 SCHOOL 36
6 OFFICE
7
KEY MAP
8 37 91
4 89 39 18
40 19
83 3 2 WATER 41 45
46 92
95 84 20 50
82 TANK
80
81
86
42
61
44 24
¬
«
87 88 43 47
94 73 85 105
62 48 106
78 54 49
63 60 103
74 55 102 104
71 72
77 56 53
KAGGALAHALLI
52
MD R
Kaggalipura
76 66 59
68 67 58
75 70 69 65 64 57 !
(
30 35 51 97 98
202
208 210 211
32 34 30
¬
« 100
29
37
¬
«
201 203 28 31 36
30
213 33 48 49
¬
«
212
30
NH - 9
209 214 27 TEMPLE 38 41
1 1
20
40 51
IRR
199 204
24
¬
NURSERY SCHOOL
« 39215
43 44
47 255
195 216
198 23 HIGH NURSERY 16 45 46
217 SCHOOL 17 50 52 MD
Harohalli
106 219 SCHOOL
105
194 196 197 200 205 218
PRIMARY 18
15
56 256
R
172 PRIMARY SCHOOL 21
SCHOOL
14 55
57
M DR
MUDENAHALLI
!
(
173 193 226 225 222 53 66
220 6 7
192 234
233 221 254 5
224 20 10 11 24
¬
« 54
67
97 191 232 227 223 8 58
From
109 111 98 PRIMARY 4
9 64
228 229 3 68
99 190 235 SCHOOL 60 65
S
NH-2 09
110 102 96 170
251 2 113 59
112
-3
¬24
«
100 171 230 250 61 63 69
95 189 115 110 70
GABBADI
H
108
R am
103 188 239 116
GABBADIKAVAL
107 101 244 WATER 114 112
109 108
62
249 73
MD R
245 TANK 111
127 83 74 71
114 84
178 246 248
117 72
D
118
M
R
(P)
SH
113
a na
126 175 247 75 80 81
93 181 179 119 77
128 125 120 107
91 3
3
115 90 82
124 82 89 165 180
172 141 136 134 130 121 78 MD R
Kanakapura
gar a
129 130 81 161 129 76 79
164 171 83
88 159 167 142 133 123 106 100
133 123 116 86 87 163 140 127 122
117 158 160 166
131 80 85 169 128 101 99 98 !
(
119 118 157 162 145
m
132 122 132 124 84 259
147 126
M DR
SH
TEMPLE 79 156 155 146 105
77 78 148 131 96 97 91
52 125 103 85
1405955
1405955
164 165 166 176 177 178 134 135 120 76 54 53 4 95
-3
153 150
154 149 13 15
¬
«
179 51
90
25 75 86 257
55
SH - 92
23 61 60 81 5 8 2 104 93 94 258
¬
«
90
27 28 136 72 151
71
GABBADIKAVAL
24 80 14 87 88
74 62 12 6
MD
137 56 152 90
09
21 22 38 68 89
17 18
H-2
13 29 73 92
14 37 70 59 50 79
168 11
R
260
Sathanur
20 138 66 69 67 49 82 21
7 15 30 36 39 139 63 13 BUS 1
N
8 16 58 57 78 14 23 96
198 17 12 140 160 161 83
9 (
-20 MDR
167 19 40 65 48 STAND 102
!
6 35
¬
«
18 64 47 25 33
12
24 163
42 142
90
H
¬
«
141 162 84 10
197
196
2 3 9
11
PRIMARY
34 41
143
¬
« 159 41 MOSQUE
77 87 2 26
29
30 91
24 ¬
« 90 N
90 5 GOVT 1 PETROL BUNK PRIMARY 97
SCHOOL 165 42 MOSQUE 86
¬
«
74 144 44 3
15
9 15 32 SCHOOL
78 24 79
4 OFFICE 167 45 5
80 75 ¬
« 32 33
52 44 45
157 158 166
MOSQUE
85 88
76 PRIMARY SCHOOL 8 16 17 92
98
170 169 73 65 76 77 TEMPLE 145 146 169 168 33 75
1 30
INDEX
66 74 59 TEMPLE
64
46
147
156 ¬
« TEMPLE
30
28 73 62 58
BUS STAND 19
18
101
103
33 34
155 62 WATER 53 155 3 2 72 60 100 99
61 57
43 42
¬
«
TANK 49 148
30
154 72 68 48 4 24 26 61 20 Pyramid
47
90 TEMPLE 71
«
¬
90
27
117 156
87
86
63
60
54
51
50 149¬
« NURSERY HIGH 68 70 64
63 44 21
26 1 8
Valley
L.P.A. Boundary National Highway
111 ¬
«
¬
«
HOSAKOTE
57
18
116 126 59 150 45
127 83 635 SCHOOL SCHOOL 22 95
PRIMARY 88 28 32 104
¬
55
«
54
18
55 TEMPLE 633 153 8 65 25
56 46
2 2
84 56 151 7 41
SCHOOL 19 52
Conurbation Boundary
634
State Highway
114 115 118 153 123 125 97 96 85 92 636 20 23 31
95 94 93 726 152 94
82 91
1 8 24 30 93
09
66 51
113 21 98 89 69 9 ¬
« 22 53 29
NH-2
119 99 100 101 632
124 20 631 638 637 10 11 17 105
80 110 WATER 730 641 12 40 39 35
89
Village Boundary
120 121 122 19 104 103 642 21 37 36
Major District Road
111 18 TANK 731 18 18
109 102 630 646 647 17 48
¬
«
639
15
81 648 50
103 157 17 105 106 107 625 TEMPLE 49 29
161 70 640 14 38 16
100 110 627
643 649 13 10 19 30
14 15 16 16 15
9
Survey No Boundary
107 108 811
108 623 645
¬
« 0 25 9 28
Village/Other Road
12 812 626 15 334 24 35
172
105
TEMPLE 9 10 162 661 13
106 129 109 71 PRIMARY SCHOOL 621 622 650 31 36
102 130 151 622 667 22 11 20 27
104 8 652 654 655 665 23
99 7 195 30 644
26 24
¬
134 133
«
628 14
24
¬
«
¬
«
32
30
180 94 WATER 131 2
609 816
547 619
620 651 658
660
IR ¬
« 21
Building Railway Line
666 34
546 24 612 21
R
TANK 95 96 135 726 618 49
PRIMARY 3 4 5 6 ¬
« 610 653 656 12 22 26
MARASANDRA
93 702 548 659
136 158 657 WATER 28 8
143 SCHOOL
187 92 545 27 33 37
90 815 24 23
22 549 674 TANK 38
«
¬15
611
HAROHALLI
138 607 25
Electric power lines
91 TEMPLE 32 31 544 552 20 7
Railway Station
89 29 800 671 670 6 5
139 GOVT 41
<>
<>
<>
<>
188 88 26 550 606 675 673 29 39
85 163 551 b
Æ
86 141 FAIR 35 34 802
728 733 605 PETROL 2 PRIMARY 42 40
87 30 28 24 604 VETINARY 669 3
84 PRICE SHOP 36 536 543 559 672 BUNK SCHOOL 44
Drainage
53 23 576 HOSPITAL TEMPLE
189 83 54
27
734 ¬
« 18 603
¬ 18 BANK 31 32 59
174 82
39 52
55
159 25 535 542
PRIMARY
577 602
«
HOSTEL 58
57
45 Existing Road to be Widened 30
190 181 56 160 560 573 601 33 47
40 38 37 50 150
539
8 SCHOOL 578 599 677 GOVT OFFICE 18 34
182 81 48
Cadastral Hillock
191 183 51 57 848 572 579 600 56
41 808 561 570 580 36 52 39
35
689 COLLEGE
44 PRIMARY 17 71
1403430
1403430
199 67 856 571 598 WATER 53 50
54 51
Proposed Roads
186 68 49 149 740 538 809 569 TEMPLE 681 37
43 SCHOOL
66 42 751 581 596 597 TEMPLE 1 5 55 TANK NURSERY SCHOOL 70
DYAVASANDRA
810 14
79 185 76 75 74 73
45 48 47 145
537 582 693 ¬
« 15 39 101
Cadastral Tank
65 171 60 847 536 567 568 586 696 699 NURSERY 53
HULUGONDANAHALLI
739 583 595 51 56
152 184 161 164 72 70 148 817 843 584 692 HOSPITAL SCHOOL 41
563 593 765
165 69 739 587 585 PRIMARY SCHOOL
NH - 209 By-Pass
78 160 163 820 529 403 BANK 700 50
153 154
71 818 532 564 566 591 592 594 42 38 72 91 90 89 100 102
77 159 TEMPLE 8 9 WATER 96
823 826
166
64 63 62 61 819 830
533
2
¬
« 4 588
590 8
404 698
TEMPLE 7 43 49 58 59 854 95
152 155
167 169 527
822 825 828 530
531 518 450
449
446 589 ¬
« 1 436 422
HOSPITAL 769
TANK 6 44 47 57 727 74
856 69 37 93
94
87 88 99 103
PRR
222 156 158 247 192 147 194 525 517 448 4 48 98
705
«
¬
438
2 46 105
90
443 1
TEMPLE 168 193 702 5
1 61 9 854 92
« «¬
832 456 447 100
220 244 HIGH
151
157
833 526 831
829 524
519 515 457 453 455
445
442 440 439 430 BUS
704 30 MOSQUE SCHOOL ¬
« 60
1
¬5 0 85 84
¬
« 62 859
¬
«
218 219 NURSERY 146 521 520 86
24
246
245 733
523 454 392 393 394 444 424 STAND 70 853 97 83 104
425 426 NURSERY SCHOOL
STRR
PRIMARY SCHOOL 145 SCHOOL 227 200 838 63
779 512 PRIMARY SCHOOL 391 395 427 108
775 TEMPLE 86 65 69 36 76
140 399 412 422 92 90 89 88 87 HIGH 82 90
¬
«
15
150 146 223 226 743 396 420 TEMPLE 761 71 852 728 35 52 51
138 741 459 458 34 50 81
149 142 200 778 742
522 513
511 510 400 411 414 415 419 107 93 TEMPLE 64
SCHOOL
144 136 397 777 763 98 155 790 24
139 TEMPLE 65 68 873 25
IRR
225 509 508 401 TEMPLE 766 131 138 149 161 84 72 23 49
148 137 192 409 407 188 22 77 80
147 143 131 135 744 745 746 507 388 402 TEMPLE 104 105 140 148 729 27 53 54
90
462 461 164 33
806 30
228 119 189 26 48
221 134 506 386 66 67 73 75 19 21 32
130 133 193 188 224 251 170
479
480 481
379
385
413 414
«
¬ 356
109 115 118 168 191
190 83
83 77 76 838
IR
47 43
TRR
125 126 799 505 20 55
113 194 464 463 384 116 186 56 41 40
¬
«
482 112
191 WATER
R
12
24 504
132 800 529 706 374 373 354 28 46
483 357 192 80 79 90
124
122 129
114
TANK 836 TEMPLE ¬
« 466 382
405
PRIMARY 353
111 117 170 185
5
81
79 29 30 31
57 WATER
194 1 197 198 203
127 195 787 375 184 17 16 8
128 190 187 484 503 465 381 110 171 ¬
« 213 NURSERY
RR Road
120 107 TEMPLE 834 708 502 377
12 SCHOOL 352 351 TANK 79
3 119
116
196 1 2 3
171 871
781
709
485 501 ¬
« 376
TEMPLE 337
322 321
173 181
182 180
199
15 204 208 214
212
1 PRIMARY SCHOOL SCHOOL 58 44 42
TEMPLE 6 PRIMARY 3 60
117
115 TEMPLE 173 NURSERY SCHOOL 500
499 498 466
378
366 369 371 350 336
326 172 174 ¬
« 15
GOVT OFFICE SCHOOL
R
IR
112 5 4 186 WATER 365 318 200 206 9 5 59
118 707 784 486 467 346 349 178 1
104 105
106
7 6 185 172
174 175 870 798 710 PRIMARY 493 TANK 493
367
368 370
358
348 ¬
«338 15 328 176
177 205 232 217
13
14 10 68
60
73
9
111 469 319
0
494 495 359 15 240
¬
«
4 3
15
SCHOOL
-2
¬
335 329
«
108
¬
«
12
103 100 8 184 179 178 470 364 175 11 74
NH
747 339 317 241
Proposed Landuse Analysis - Harohalli Conurbation
99 110 181 180 748 492 496 318 218 867
478 782 361 344 330 315 316 244 2
176 234 66 65 61
To An
102 10 9 12 488 491 44 363 239
109 177 340 231
28 41 43
24 219
¬ e
47 49
81 84
83 86 98 97
96 95
11
13
183 182
749 750
489
783
711
471 472
46 48 59
362
360
345
334 331 314 313 311 242 « 220
866 801 858
12
65
67 62 75
k al
85 89 23 233 490 245 243 238 236 230 66 48 64
14 232 474 51 57 859 63
80 20 27 59 347 312 864 68 46 47
90 93 53
18
712 4
BHEEMASANDRA
94 15 24 333 221 860
56 60 61 343
BANNIKUPPE
88
¬
« 36 305 307 246 247 239
¬
475
«
15
76 77 197 55 304 310
60 39
37 35 34 342 306 248 228 222 865
214 56 54 62 341 332
75 57 80 29 33 308
785 226 861 5
74 92 22 473
32 3 797 303 309 284 54 43 TEMPLE
¬
«
72 1
24
477 476
¬
«
54 217 85 32 29 28
24
73 21 239 25 37 33 31 225 6
71 8 6 75 27 28 302 252 SCHOOL 3
254
¬
«
55 68
30 64 31 25
18
9 296 726 24
13 10 51 76 ¬
«24
DEVARAKAGGALAHALLI
50 61 14 50 79
MARALAGERE
84
¬
«
15
60
58 57 65 69 262 265 325 34 8
¬
«
¬
«
279
¬
«
860
¬
«
18
18
18
18
16 292
1400905
44 45 ¬
« 241 257 51
59 63 229
201 92 91 PRIMARY SCHOOL 3 21 38 73 45 68 63 80
288
¬
« 1 5 264 10
¬
«
60 19 44 205 290
18 20 69 844 21
BHEEMASANDRA
46 215 242 87 72 278 271 41
43 238 18 74 73 843 849 289 723 849 40
79 72 18 65 277 324
208 26 43 19 8 281 70 69 61
42 32
202 29 28 148 35 82 9 42 70 804 273 272
20 71 23
¬
«
36 35
(P)
31
15
24 25 26 60
H-
Park & Openspace 505.94 11.63%
41 33 237 279 275
171 136 GOVT 85 287
884
59 57
19
27 40 N 274 TEMPLE 71
¬
«
24
75
18 OFFICE 86 41 16 73 56
¬
«
¬
«
37
¬
«
18
¬
«
280
18
203
18
(P)
63 66 67 74 352 47 46 43 39 33 189 153 10 9 719
37 36
Transportation 547.16 12.58%
186 90 43 41 182 285
60 141 180 88 89 92 46 187 181
2 4
KEERANAGERE
231 44 183
¬
«
144
18
144 149
59
64 65 68
73 72
77
95
350 351 353
206
205 ¬
« 48
45 38 27 32
190 188 185
177
37 36
53 52 355 146 28 184 99 114 132
49 25 86 91
18
51 48 70 192 53 85 95
¬
«
JAKKASANDRA
94
18
27 28 146 173
18
24 166
«
18
105 18 7 109
88 363 8 OFFICE 97 147 76 17 13
89 87 158 63
Grand Total
145 101
4348.77 100.00%
85 10
339 TEMPLE 12
13
11
14
116
114 109
130 132
¬
« 108
141
138 148
139
147
56
54
57
PRIMARY
SCHOOL COLLEGE
100 82
81
164 166
170 139
74
21 24
27
31
34
176 105
8 146 84 165 140 28 29 32 33
335 VETINARY 10 7 117 115 129 133 136 137 149 156 58 HIGH 102 79
78 167 138
25 26 3
1 9 134 83 145 77 4
334 HOSPITAL 381 118 150 153 154 157
437 SCHOOL 76 75 137 141
22
23 1
5 429 59 143 73
332 6 151 103 43 47
333 344 349 2 128 152 155 158
60 109 116 117 74 73 191 142 2 6 48
3 167 166 105 136 40
308 156 49
337
18 135
µ
121 428 42 44
306 307
328
309 327
342 348 126
125
120
119 380 168 18 164 ¬
« 163
159 61
114 115 118 120
«
¬
72 169 157
123
72
39 41 TEMPLE 34
7 51 50
305 324 345 379 121 134 133 38 37 35 53 52
170 18
CHIKKADEVARAHALLI
209
347 71 168
¬
¬
«
311 «
165 160
12
425 27 9
18
192
¬
« 135 143
18
294 65 144 23 12 56
14 46
297 283 282 280 319 422 421
24 191
412 411 134 133 154 1 8 ¬
« 22 21 15 11
293
¬
« 374
1398380
1398380
316 Jain 132 159 145 155 55
R R Ro
39 298 284 177 179 178 181
410 160
289 285 420 University 161 146 154 8
0 315 630 1,260 1,890 2,520
292 286 279 317 383 419 127 180 187 226 183 225
288 384 7 9
291 391 418 444 378 182 160 141 163 162 176 11 223
370 64 6
¬
«
¬
«
185 152 10
18
15
a
386 377 166 173
37 273 277 416 415 ¬
« 371
d
268
274 275
220
385
414 407
18 ¬
« 214 167
170
174 2
4 WATER TANK
35 272 PRIMARY 165 164 169 12 206
206
¬
«
199 213
18
CHEELURU
245 393 218 445 TEMPLE 120 28 211
21 22 260 217 212 201 118
401 369 27
DEVELOPMENT AUTHORITY
19 198 246 247 257 261 202 198 132 114 29 26 23
200 215 216 200
195 254 197 109 25 24
20 18 256 389 213 1 112 30
180 17
435 244 248 249 250 255
216
215 8 199 ¬
« 400 136
111
31
33
178 197 243 225 224 TEMPLE 36 32 212
238 214 398 207 37 35 34
181 182 15 203 251 253 397 399 404 110 38
14 204 252 229 39
12 241 242 447 237 226 223 222 195 202 201 40
WATER 10 396 68 60 58 43 42
TANK
183
184 13 9
196 205
240
446 236
232 229 227
18 ¬
« 196 403 451
108 69 61
56 52 44 41
440
176 185 4 8
202
394 235 395 221 TEMPLE PRIMARY SCHOOL 73 72 59 57
55 53 51 45
46
187 239 TEMPLE 438
441 242 64 66
TEMPLE 50 49
5 5
PRIMARY SCHOOL PRIMARY 387 71 54 48
GOVT 194 36 231 450 107 63 62 PRIMARY 98 47
OFFICE TEMPLE 5 6 7 192 190 23 25
35 37 SCHOOL 388 449 74 86 87 88 SCHOOL 97 100
193 75 85 99
2 56 191 42 30 34 448 186
DODDAMUDUWADI
33 227 101
31
¬
80
«
30
¬
«
24 128 82 92 93
18
43 22 79 76 90 96
26 194 83
29 32
38 129 169 168 302 235
188 79 196 103 102
27 43 78 167 81 94
66 62 60 59 58 41 28 160 81 84 85 187 189 77 78 80 95
42 304 91 209
44 20 19 77 82 83 86 301
53 54 44 41 40 130 131 166 303 195 228
71 64 63
55
18 39 87 194
189 45 17 75 93 92 88 167 238 190 218 205 222
74 52 47 76 305 237
90 89
51 46 306 221 197
73 75 46 21 16 73 TEMPLE 91 165 313 300
239
219
48 49 74 113 217
76 77 50 13 14 15 45 94 312 193
96 NURSERY
BANDIGANAHALLI
49 97 307 299
78 48 47 SCHOOL 95 178 179 308 192 104
MEMBER SECRETARY ADDITIONAL DIRECTOR OF METROPOLITAN COMMISSIONER
111 81 164
83 84 51 98 311 298 240 191 KANAKAPURA PLANNING AUTHORITY TOWN & COUNTRY PLANNING BMRDA
RAMAPURA
79 52 71 68 100 310 220
82 7 6 GOVT 65 PRIMARY 309 WATER 297
110 49 50
12
10 62 52
69 315 241 236 KANAKAPURA BMRDA
80 86 85 54 FAIR PRICE 67 99 101 163 314 TANK217
109 47 9 66 SCHOOL
88 53 11 1 SHOP 53 64
102 106
234
87 48 63 196
107 150 67 57 59 60 61 65 197
90 66 162 296
NH-20
RAYASANDRA
61 232
9
CHIKKAMUDUWADI
SCHOOL
Proposed Landuse
57 58 60 294
1395855
70 108 191 190 340
147 145 142 139 72 71 56 54 109 159
160 161
206 207 337 338 320 163 322 161
53
M a p T itle
S ca le : 1:25,000
Harohalli
758936 A 761486 B 764036 C 766586 D 769136 E 771686 F 774236
Map No: 45
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
53.52% of area has been proposed for residential use while 5.48% of area is under commercial use.
12.21% is devoted to public and semi-public use. 13.24% of the area is dedicated to transportation
and 7.51% of the area is under parks and other open spaces. The rest of the area is comprised of
quarries, water bodies and agriculture as shown in the table below.
Sathanur has been proposed as a major growth node in the LPA in future. Almost 0.9 lakh population
has been distributed in Sathanur. The total proposed conurbation area is 18.81 sqkm. 40.61% to the
total area has been reserved for residential purposes while 32.57% has been reserved for industrial
use. 5.03% of the land is proposed to be under commercial use while another 2.20% has been
reserved for public and semi-public use. 3.86% of the area is under parks and open spaces. The rest
of the area has been dedicated to quarries, water bodies and agriculture as seen in the table below.
P a g e | 143
MASTER PLAN -2031
FOR
746542 A 748077 B 749612 C 751147 D 752682 E 754217 F
33 179 169 177 103 106 108 33 61 58 124 85 86 110 106 107 106 KANAKAPURA LOCAL PLANNING AREA
KABBAL
142 35 89
HOSAHALLI
31 30 180 155 119 90 109
34 37 96 110 57 145 84 108 105 105
156 176 36 56 59 58 81 80 136
31 120
20 105 109 116 32 100
172 37 91 95 102
KACHAVANAHALLI
42 55 104 101
32 157 41 83 100
KEY MAP
38 99 101 103
Township Area
158 30 63 82
122
THOTAHALLI
154 45 38 103
94 96 97 98
43 44 79 99 97
39 178 182 197 160 161 29
28 54 92
102
HALASINAMARADAHALLI
123 55
Township Area
183 45 78 85 98 96
87 44 40 62 93 78
159 64
183 185 184 46 47 43 41 26 39 46 56 6 77 77 79 9 87 95 61
263 186 42 27 -20 86
54 59 NH
264 121 65
198 199 76 MD R
153 25 114 47 60 5
4 144
76 84 89 94 93 62 Kaggalipura
262 39 7 53 75 81 88 !
(
261 150 151 121 8 48 7 74
266 32 181 152 40 52 57 58 75
149 38 61 12 80
259 148 24 3 90 92 63
260 139 34 31 144 37 49 8 66 73 83 91
146 9 12 13
NH - 9
1 147 ¬
« 72 82
1
20
265 145 6 62 67 73
418
258 143 36 5 50 74 365
143 140 138 33 35 23 2 10 11 66
30 52 48 51 9 72 365 364 423
10 73 63 14 70 369
68 370 MD
187 188 257
137 136 140 142 71
70 15
71 72 67 R Harohalli
164 34 33 32 4 69 366
¬
«
15
26 368 M DR
!
(
142 141 50 22 1 28 70
69 71 371
152 185 13 53 51 49 141 12
¬
« 3 74 64 16 68
267 269 30 12 11 29 27 25 17 69 367
YADUGOWDANAHALLI
151 186 168 31 68
ACHALU
75 376 375 372 S
NH-2 09
163 2 1
153 12 23 13 67 -3
144 272 54 15 55
¬
« 167 66 377
H
27 56 29 76 65 374
DALIMBA
154 189 28 29 28 21
NARIPURA MD R
150 20 19
12 ¬18
«
oad
162 59 58 135 ¬
« 83 78 23 D
77 373 M
R
20 24
ANAMANAHALLI
184
SH
149 60 14 79 80
145 27
RR R
11 194 22 112 81 73
113
3
155 191 22 23 173 19 84 MD R
190 192 137 15
¬
«
26 53
24
256 165 164 193
24 165 61 57
170 134
24 16 111
85
82
22
Kanakapura
74
148 146
10 26 18
17 HOLA 110 91
348 75 67 !
(
139 25 29
1379057
1379057
163 156 108 90 21
118 349 M DR
195 194 25 65 63 62 133 109 92 ¬
« 86
SH
166 168 21 21
60
64 132 174
147 21 192 18 28
-3
167 9
174 162 138 190 15
¬
« 107 87 23 69
¬
«
18
SH - 92
271 131 104 102 100 89 19 20 70 68
157 203 196 197 20 7 175 93 27
8 191 130 20 19 17 101 88
MD
173 66 67 24
09
¬
«
18
171 68 71 31
H-2
103 99 98 22 72 32
175 161 16 94 21
R
160
170 270
19 1
128
105
18
25 Sathanur
N
169 6 196 129 4 297 97
204 202 15 287 106
25 30 9 (
-20 MDR
86 5 64
!
172 159 3 293 296 96 95
71 70 69 193 17 22 57 33 H
158 201 200 2 188 2 N
198 18 127 294 298 3 1
¬15
«
255 166 189 187 14 65
¬
«30
181 14 15 2 1 16 35 66
¬
182
«
5 3 ¬
«
12
6 289 292 299 306 26
178 100 13 295 6 34
¬
«
18
254 179 199 72 136 15 5
177 73 102 117 27 58
125 300 14
305 307 18 4
INDEX
205 126 286 62
176 4 12 288 290 «
¬ 56 61
180 301 55 54
DESHOHALLI
208 17 101 76
114 74 171 119 317 316 302 28 7 12
115 117 206 7 11 285 291 303 304
13
16 99 10 12 ¬ L.P.A. Boundary National Highway
15
10 «
«
¬
112 115 29 8
8 9 77 98 315 308 26
12 40 60
113 11 207 15 75 124 18
¬
« 120
108
109 114 280 281 319
¬
« 12 42
46
118 119 318 13 41
2 246 244 243 110 209 103 116 9 11 11 2
Conurbation Boundary
116 314 30
245 122 97 282 283 284 313 309 0 9 344 47 59 State Highway
SASALAPURA
5
¬
«
15
76 -2
277 7 85 320 321 NH 48
242 210 95 96 8 323 9
276 109 12 312 311 31
273 107
106
120 3
12
79 80
113 279
278 335 334
¬
« 322
310 10 32 10 14 15
43 44 45
52
Village Boundary Major District Road
275 241 121 94 93 112
92 9
¬
«
12
108 105 107 110 324 49
274 1
13 211 212
81 84 88 91 273
277 12
8
37
39 51 Survey No Boundary Village/Other Road
101 105 2 106 336 337 335 326 ¬
« 325 33 16
«
¬
12
111 102 89 268 274 37
240 82 39
Building
104 15 78 90 111 38 36
16 14 125 38
239
103 214 213
104 267
270
272
276 338 331
327 7 42
41
40 36 34 17
20
53
50 63 Railway Line
¬
«
100 265 266
24
99 83 246 257 260 275 19
Township Area
97 271 57
245 261 15
¬
«15
253 328
89 17 217 269 208
339 6 35 ¬
« 56 18
Electric power lines Railway Station
<>
<>
<>
<>
1 134 98 18 215 210 207 5 47 55
253 256 262 224 214 4 43 48 b
Æ
¬
238 88 254 205 330 329
«9
237 91 124 252 226 225 206
93 216 54 58
96 92 19 244 247
346 227
218 212
211 53 23 24 Drainage Existing Road to be Widened
21 20 46
30
94 90 243 222 213 209 70 59
SATHANUR
255 44 60
217 250 251 340 341 50
1377522
1377522
95 85 22 249 219 204 1 69
Cadastral Hillock
251 250 242 345 146 49 74
78 87 218 248 230 9
229 3
Proposed Roads
23 219 123 155 228 -20 2 45 72
252 86 NH 203 52
18
221 62
«
¬
41 79 80 220 145 71
84 130 31 137 186 201 51 73
158 342 141
Cadastral Tank
240 61
«
¬
18
¬
«
76 200
12
77 25 24 220 120 121 241 239 147
156 138 231 75 78 68
«
¬12
221 232 142
¬
278 185 140
«9
144
NH - 209 By-Pass
119 159 199 67
32 237 184 202 198 139 77 79 80
39 133 148
¬12
75
«
40 81 82 129 26 123 136 238 233
83 118 183 108
Township Boundary
139 66
38
279 224 223 222 122
140 182 12 187
¬
« 143 138 76
2 63
PRR
74 124
236 234 188 196 197 151 347 1
70 235
24
194 150 149 137
81 ¬
« 100
¬
«
71
24
36 35 34 249 232 27 28 187 125 ¬
« 189 195 152 18 135 136 ¬
« 107
88 65 64
73 69 153 135 133 109
MUDALASWAMIKUPPE
193
29 33 181 180 343 134 STRR
12
¬
«
230 152 134 141 191 165 82
161 153
90
231 117 127 190 192 132 114 111 110 89
68 229 126 179 167 166 160 130
72 175 154 106 87 86 83
225 128 131 113
IRR
31 154 133 142 174 168 162 155 129
2 280 183 143 112 90
29 248 247 132 144 172 115 85 84
67 226 105 145 164 159 128 90 91
37 184 130 131 104 178 176 105 104
33 58 177 171 127 116
3 281 233
234 228
227
34 160
185 129 106 173 170 157 125
117
124 119
120
103
102 92
TRR 90
90 89 30
30 236 235 268 ¬
« 122 98 94
32 8 101 100 99
164 109 146 150 8 97
9 7 40 163 99
60 65 126 -20
9
88 147 96 95
64 30 NH 110 98
10 28 37 96
282 38 166 3 5 6 12
11
19
20 21 56
39 41 111
97
87 157
1 10 Landuse Analysis - Sathanur Conurbation
115 95 151
12 55 54 127 112 91 86
18 48 116 93 92 85
22 131 94 7 13
27 51 47 114 113
13 17 135 52 46 84
23 42 4
Symbol Landuse Area in Hectare %
24 17 53 14
16 26 79 82
14 49 70 77 78
4 18 19 69 80 81 83 15
25 50
763.73 40.61%
17
Residential
15 168
5 6 43 18 16
42 128 19
3 76
20
94.56 5.03%
103 105 106 16 15
Commercial
7 67
20 182 167 68 71 75
104 60
8 14 30
¬
« 171 169 74 59 58 48 21 23
1375987
1375987
45 49 25
612.48 32.57%
102 22
Industrial
107 2 170 66
9 21 57
173 181 180 72 61 27
109 13 22 73 28
41.43 2.20%
101 10
Public & Semi-Public
108 179 30
¬ 50 26
KEMMALE
100
1
23
174 176 « 46 29
110 12 44 175 56 54 47
178
72.61 3.86%
99 31
52 51 Park & Openspace
30
111 112 11 51 50 65 62
97 177 32
HONNIGANAHALLI
82 52 24 55 53 44
81 45
98
83 80 26 105 33 Public Utility 8.60 0.46%
79 54 63 42 43 34
96
247.22 13.14%
95 25 64
77
91 90 84
78 -20
9 65
55 53 49
27
28 67 85
104
106 41 36 35 Transportation
94 NH 66 107 38 37
75 48
93
92 89 85
76 66 64
63 56
46
45
47
65 68
72
83 84 86 103 40 39 Agriculture 0.00 0.00%
30 29 73
82
40.12 2.13%
44
88 70
67
62 42
32
87
93
108 Water Bodies
¬
«
86 43 69 81
30
74 64
0.00 0.00%
71 74
4 87 73 71
69 68
57
40 41 31 33 78
80 88 102
110 109
4
Forest
61 37 92
r 39 94 111
0.00 0.00%
a ga
72
35 30
34
63
101 Hillock's/Quarry's
jan 60 38 36 ¬
« 62 70 75 76 79 100
112
Total
58
1880.77 100.00%
77
a 89
ar
59 113
am
91 96 99
58 95
Ch
61 59 57 90 114
60
To 51 97 115
50
56 31
30 29 98 116
55
µ
28
25
54 32
53 27 24
52 49 26 125
33 118 126 131
34 117 133
47 35 23 127 130 134
48 36 136
129 139
46 42 37 22
1374452
1374452
39 119
38 140
135 137
43 41 120 141 0 187.5 375 750 1,125 1,500
¬
«
124
30
16 171
DEVELOPMENT AUTHORITY
187 167
8 178 198
4 166
9 179 165
186
180 164
3
163
2 181 162 160 197
5 185 161 5
183 143
184 182 154 155 157
156 159
158
153 152
149
KADAHALLI 199
151
196 193
150
MEMBER SECRETARY ADDITIONAL DIRECTOR OF METROPOLITAN COMMISSIONER
144 BMRDA
194 KANAKAPURA PLANNING AUTHORITY TOWN & COUNTRY PLANNING
148 147 KANAKAPURA BMRDA
201
200 145
146
D a te :
1372917
Proposed Landuse
M a p T itle
A B C D E F S ca le : 1:15,000
746542 748077 749612 751147 752682 754217
Sathanur
Map No: 47
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
KANAKAPURA LPA
The overall statistics of the LPA as per proposal of Master Plan 2031 is given in the table below. The
total conurbation area is 11233.27 Ha as shown in the table below.
Table 9.6 A: Conurbation area statistics-2031
Category AREA (In Ha) Percentage
TOTAL CONURBATION AREA 11233.27 27.2%
DEVELOPED AREA BETWEEN KAGGALIPURA - HAROHALLI 204.42 0.5%
AREA BEYOND CONURBATION (agricultural zone) 29840.31 72.3%
TOTAL LPA 41277.99 100.00%
P a g e | 144
MASTER PLAN -2031
FOR
768298 A 769528 B 770758 C 771988 D 773218 E 774448 F
KANAKAPURA LOCAL PLANNING AREA
KEY MAP
4
5
152
¬
«24
MD R
129
402
Kaggalipura
144 !
(
130 157
121 403
re
3 7
NH - 9
1 120 6 1
alo
20
156
153 415
ng
416 162 163
122 128 1 143 414
Ba
119 158 MD
R Harohalli
m
413 164
17 M DR
o
!
154
(
155 161
Fr
118 16 154 435
123 18 153
«¬ 15 159 160 165 S
¬
«
NH-2 09
117 142
12
8 152 166 -3
9 155
H
116 2 19 151 167 MD R
127 22 156 181 D
PR
M
R
171
SH
126 23 172 173
115 409
R
114 124
3
24
145 180 MD R
21
31 168 Kanakapura
25 170 179
125 26 412 174 182
!
(
84 14 175
1418291
1418291
10 150 M DR
SH
82 411 410
83 15 20
-3
86
¬
«
85
12
45 27 169 176 178 183
79
SH - 92
88 80 46 28 432
44 43 29 184
MD
177
89
81 78 39 ¬
«
12 243 H-2
09
R
147 87 47 423 109 112 149 186 Sathanur
40 30
N
42 38 113 9 (
192 187 -20 MDR
!
77 122 143 241 H
48 41 417 148 N
UTTARI
146 37 188 189 242
92 15 123 144
90 ¬
« 36 107
NH-20
49 145 141
76 35 111 147 191
97 50 108 142 190 185
96 418 106 146 140
9
34
INDEX
93 91 73 53 52 114 124 194 195
74 51 139 240 244
110 138 18
75
57
32
33 115
119 120 137 136 ¬
« 193 201 202
148 95 54 121 200 L.P.A. Boundary National Highway
113 72 56 126 245
159 58 46 125 203
2 99 98 71 134 135 246 2
94
59 196
199 Conurbation Boundary State Highway
¬
«15
160
104 100 70
¬
«15 55 60
395 116
422 117 127
133 239
247
105 101 118
132 198 204 Village Boundary Major District Road
128 131 197
106 68 62 131 130 205
102
107
103 69 61 151
105
212 206 12 ¬
« 238 248 Survey No Boundary Village/Other Road
149 393 103 211
108 102 129 214 208 207
¬
«
213 Building
15
109 63 96
215
209 237 250
252 37 Railway Line
158 67 434 95
12 64 104
¬
« 94 225 210 251
Electric power lines
¬
«
15
<>
<>
<>
<>
217 224 249 254 253 b
Æ
65 97 231
18 38 36
¬
« 141 100 93 218
219
223 230 236 255 256
257 Drainage Existing Road to be Widened 30
66 ¬
« 18
392 99
91
¬
« 12 232 262
¬
«
1417066
1417066
Cadastral Hillock
12
134 90 226 129
425 92 220 235 261 39
112 170
229 233 258 Proposed Roads
¬
«
88 263 40
12
132 42
Cadastral Tank
R
111 135 63 79 86 234
PR
169 78 87 221 228
421 419 89
222
260 259 NH - 209 By-Pass
45 41 12
¬
«15
157 168
420 77 80 266
264
43
¬
« 8
9
136 167 62 64 84 227
391 76 81 375
85
265
49 47
46 7 10 PRR 100
60 73 82 53
15
74 19
18
¬ 66
12 IRR
138 « 59 70 380 368
275
54
270 20
90
¬
«
71 379 57
18
272 269 56 4
381
15 67 3 367 274 55 60 13 17 TRR
¬
« 69
1
366 KAGGALIPURA 271 61 3 16 18 21
90
¬
«
2
30
58
3 4 78 3 RR Road
GULAKAMALE
62
60
113
51 68 365 276
363 279 280
5 63 2 112
52 277 79 77 111 22
6
¬
364
«
47 64
18
¬
«
50 10 76 23
15
«
¬
389 278
12
189 7 361 362
281 282
65 1 114
108 Proposed Landuse Analysis - Kaggalipura Conurbation
53 80
57 56 11 8 359 109
388 48 360 283 75 115
49 358 66 120 24 31
49 430 110
65
161
162 163 429 54
9
355
356 357
284 81 ¬
« 18 67
25
128 Symbol Landuse Area in Hectare %
55 351 354 82 119
327 350 74 68 118
190
164 428 12 353 286 116 107 32
Residential 1183.62 53.52%
¬
«
330 73
12
43 347 352
9
50 436 40
0
156 13 349 287 83
-2
329 87
288 72
Commercial 121.30 5.48%
NH
160 39 38 37 328 348 346 69 33
159 35 326 285 88 121 127
60 52 387 336
¬
157
«
158 36 14 332 117 106
15
57 34
Industrial 37.77 1.71%
«
¬
1415841
1415841
51 166 28
18
44 45
46
48
56 152 153 155
165 41
18
325
333 335
334 337
344 345 289
290
¬
« 291 84
86
89 71 70
122 26
27 30
42
47
154
167
427 33 34 16 324 338 343 85 29
126
Public & Semi-Public 270.11 12.21%
40
NAGANAYAKANAHALLI 55 426 42 15 21 323
339 340
292
90
91 92 99 123 104
Park & Openspace 166.12 7.51%
41 53 3 4 321 342 169 101
151 150 149 168 24 46
43 17 309 320 341 93 100 125
38 39
36 1
169
170
32 18
310 322 319 294 168
170
178 179 180
94 95
105 103 124 Public Utility 78.99 3.57%
2 5
31
35 144 46 22 311 293 177 102
59 37
145
146 147 49 44 406 15 307
317 318
¬
« 166
171 96 18
10 47
¬
« Transportation 292.71 13.24%
6 148 23 25 30 316 167 17 21 48
295 174 176 97 98 45
18 54
22 50 45
15 20
308
¬
«312 299 296
173
181 18
53 ¬
« Agriculture 0.00 0.00%
¬
«
172
18
34 26
¬
171
«
175 182
12
«
¬
143 19 48 28 162 44
15
8 8
17 33 10 172 18 53
384
407 24 23 306 314 301 155 163
160 183
6 19 Forest 0.00 0.00%
64 21 302
4 174 17 27 52 383
156
157 184 4
11
14
27 305 154 159 13
15
24
43 Hillock's/Quarry's 0.00 0.00%
¬
23
«
25 303 14
18
16 24 16 47 8 158 7
K CHUDAHALLI
31 304 1
15
23 12
29
45 54
382
228
149 152
153
185 ¬
« Total 2211.56 100.00%
22 28 177 15 28 46 26 240 5 4 25
13 146 42
25 30 13 32 241 150 151
29 43 145 1 41
58 33 44 55 26
148
12 31 30 42 12 147
27
63 138 34 ¬
« 226 227 229 239 142 75 36
THARALU
14 11 69 2 3 27
26 178 144
141 141 28 ¬
«
µ
61 176 18 35 39
10 40 254 143 79 29
139 175 35 36 41 70
137 140 73 72 71 30 38
68 56 139 78 77 70 31 34 37
9 8 7 225 255 137 81
179 180 138 136 76 74 68
62 37 231 34
140 67 242 83
72 71 253 135 33 32
182 181 38 66 230 256 82 88 86 84
32
35 36 69
39 134 37
«
¬
1414616
40
2 5 65 132 80 19 38 33 61
234 133 89
17
186 185 1 74 29 40 43 44 67 63 0 150 300 600 900 1,200
SOMANAHALLI
134 73 57 30 92 90 20
64 93 60 59
63 30 31 41 66
133 187 4
75
31
130
94
42
49
45
65 Meters
132 233 129 16 21 46 64
188 3 76 77 236 29 58
125 127 131 62 58 128 95 28 26 48
237 15 22 27 47
79 235 123 14
ALAKABELALU
124 128 129 108 97 78 61 28 32 25 54
126 130 96
60 243 244 124
96 13 50 55 Government of Karnataka
95 222 33 122 126 97 23 24 51 56
81
BANGALORE METROPOLITAN REGION
109 80 59 27 18 12 11 52 53 57
123
122 120
119
118
110
107
101
83 82
257 217
121
125
125
¬
«9
8
3
2 62
55 57 58
220 218 245 98 124
DEVELOPMENT AUTHORITY
111 102 98 213 7 1 61 60
85 212 63 59
86 84 09 221 26 25 34 127 99 126 133 6 4
121 117 112 103 100 88 H -2
211 120 64 66 67 71
115 106 N
143 116 89 223 100 132 4 5 65 68 69 72
114 113 105 99
210 123 5 76 70
169 87 224 219 101 127 56
216 215 214 24 35 103 73
104 94 119 131 6 75
90 104
168 167 170 209 23 105 102 8 9 74
5 144 122 128 134 21 5
142 172 205 106 130
166 165 171 91 197 208 37
196 115 3 2 7 20
204 248 246 7 19 22 23 24 25
162 207 36 129
20 118
THATTAGUPPE
164 203 247 121 135 10
176 174 195 19 114
107 120 136
144
141 93 206 249 22 116 108 18
161 163 175 92 199 38 113 119 118 117 1
140 110 32
NELAGULI
173 18 202 5 8 140 11 26
145
160
177 16
17 19
194
185
198 191 200
201 4
24
18
17 117 109
¬
« 109 111
112
116 137
139 143
12
142
17
MEMBER SECRETARY METROPOLITAN COMMISSIONER
192 21 115 141 33 ADDITIONAL DIRECTOR OF
159 178 1 2 3 4 15
20 184 194 110 156 KANAKAPURA PLANNING AUTHORITY TOWN & COUNTRY PLANNING BMRDA
139 157 158 21 190 47 113 114 138 43 14 KANAKAPURA BMRDA
156 14 183 186 2 16 112 108 107 44 13
16
193 1 35 155
5 12 181 189 52 34
154 155 10 13 161 3 6 9 10 14 39 101
51 41 37 15
162 188 48 47
152 153 11 182 15 46 111 102 106 50 46 D a te :
22 187 40 42 36
151 56 7 175 157 158
138 8 9 25 23 176 105 45 38 28
150 180 179 11 49 103 53 40
Proposed Landuse
54 6 177 45 41 98 49
1413391
137 148 149 57 55 53 26 24 158 159 163 178 13 99 100 104 54 48 30 39 159
M a p T itle
S ca le : 1:12,000
Kaggalipura
768298 A 769528 B 770758 C 771988 D 773218 E 774448 F
Map No: 44
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
The overall statistics of the four conurbations and developed area between Kaggalipura – Harohalli is
given in the table below. Residential area forms 42.26% of the total combined conurbation limit and
developed area between Kaggalipura - Harohalli, commercial, industrial, public and semi-public,
parks & open spaces, public utility and transportation forms, 5.93%, 21.35%, 5.12%, 9.69%, 1.87% and
13.78% respectively.
Table 9.6C: Proposed Landuse 2031, LPA (including the four conurbations
and developed area between Kaggalipura – Harohalli)
LANDUSE AREA ( IN HA) AREA ( IN SQKM) PERCENTAGE
RESIDENTIAL 4660.09 46.60 40.74%
COMMERCIAL 653.95 6.54 5.72%
INDUSTRIAL 2354.00 23.54 20.58%
PUBLIC & SEMI PUBLIC 564.45 5.64 4.93%
PARK & OPEN SPACE 1068.90 10.69 9.35%
PUBLIC UTILITY 205.87 2.06 1.80%
TRANSPORTATION 1519.01 15.19 13.28%
AGRICULTURE 0.00 0.00 0.00%
WATER BODIES 337.19 3.37 2.95%
Forest 0.00 0.00 0.00%
HILLOCK'S/QUARRY'S 74.23 0.74 0.65%
GRAND TOTAL 11437.69 114.38 100%
P a g e | 145
MASTER PLAN -2031
733639 A 743229 B 752819 C 762409 D 771999 E 781589 F
FOR
RE
G
AL
O
KANAKAPURA LOCAL PLANNING AREA
B AN
M
O
FR
KEY MAP
UTTARI
KAGGALIPURA
GULAKAMALE
Kaggalipura IZ
1 NAGANAYAKANAHALLI 1 BIAAPA
K CHUDAHALLI THARALU
Nelamangala
ALAKABELALU Hosakote
THATTAGUPPE
SOMANAHALLI
Magadi
NELAGULI
BMICAPA
APZ-1 (Kaggalipura
09
Anekal
!
SUNKADAKATTE VADDARAPALYA
2
NETTIGERE IZ
NH-
Harohalli
1410859
1410859
!
(
SH
3-
VADERAHALLI
3
RAVUGODLU (SKanakapura
H-
SH-
(P) !
3
VADERAHALLI
Sathanur
!
(
BETTAHALLIKAVAL Kanakapura IZ
YADAMADU
KAGGALAHALLI
INDEX
FROM GABBADI
BIDAD
I GABBADIKAVAL
(P)
2 2 L.P.A. Boundary
MUDENAHALLI GABBADIKAVAL
HOSAKOTE
MEDAMARANAHALLI
Conurbation Boundary
MARASANDRA
HULUGONDANAHALLI Harohalli
Village Boundary
DYAVASANDRA
HAROHALLI
CHULAKANAKEREKAVAL
TO AN
E KAL
National Highway
9
- 20
BANNIKUPPE H
N
1401269
1401269
MARALAGERE
BHEEMASANDRA
BHEEMASANDRA
State Highway
(P)
TO
R
Major District Road
A
KEERANAGERE
M
A
N
A
JAKKASANDRA
G
A
R
A
SINGASANDRA CHIKKADEVARAHALLI
CHEELURU Cadastral Hillock
DODDAMUDUWADI
ANAJAWADI
T-HOSAHALLI
Settlement
3 3
BANDIGANAHALLI
CHIKKAMUDUWADI RAMAPURA
K AL
TO ANE
Proposed Land Utilisation Area Analysis
VADEDODDI
SH
-3
ALLIMARANAHALLI GANALU TUNGANI RAYASANDRA
1391679
TIGALARAHALLI
ANAMANAHALLI FOREST 945.1 2.3%
KALLAHALLI
THAMMASANDRA ARANAKUPPE
TOTAL 29840.31 72.3%
KANAKAPURA
(P)
CONURBATION 11437.69 27.7%
BARADANAHALLI Grand Total 41278.00 100.0%
Kanakpura
KANAKAPURA
VIRUPASANDRA
09
-2
H
SH
4 4
N
CHEERANAKUPPE
3
TAILURU
FOREST SHIVANAHALLI
µ
KAMBASAGARA
NH
SH-3
CHOKASANDRA
BEKUPPE
SH -92
9
- 20 SEEGEKOTE TIGALARAHOSAHALLI
NH
1382089
1382089
KABBAL
TO
BOMMANAHALLI
Meters
DI
HA
HOSAHALLI
LL
KACHAVANAHALLI
TO S
HALASINAMARADAHALLI
I
THOTAHALLI
Government of Karnataka
NGG A
ACHALU
BANGALORE METROPOLITAN REGION
AM
YADUGOWDANAHALLI
DEVELOPMENT AUTHORITY
DALIMBA
NARIPURA
09
-2
ANAMANAHALLI
DESHOHALLI
NH
SASALAPURA Sathanur
SATHANUR
5 5
MUDALASWAMIKUPPE
KEMMALE
HONNIGANAHALLI
MEMBER SECRETARY ADDITIONAL DIRECTOR OF METROPOLITAN COMMISSIONER
AR KANAKAPURA PLANNING AUTHORITY TOWN & COUNTRY PLANNING BMRDA
N AG BMRDA
R KANAKAPURA
C.
TO KADAHALLI
Da te :
Ma p T it le
Sc al e : 1:90,000
1372499
733639 A 743229 B 752819 C 762409 D 771999 E 781589 F Local Planning Area
Ma p . N o : 4 3
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
The statistics of the agricultural zone (area beyond the four conurbation limit) is as follows
Progress follows the lines of transportation. Transportation Corridors are generally considered as
lifelines of any town / city. An efficient Traffic and Transportation system promotes socio - economic
activities. Kanakapura LPA hasone National Highway (NH-206), one State Highway (SH 3), four
Major District Roads with good network of roads. One of the major objectives of MP is to provide
broader roads within Kanakapura LPA with good hierarchy of roads. Its aim is to provide an efficient
and feasible circulation plan for the entire LPA.
The total area covered by traffic and transportation use in the conurbation area is 105 ha,
constituting 4.1% of developed area. By and large the inter town traffic movement is convenient. But
due to very narrow road network in the town area, there are many intra town traffic problems and
proposals for the same are to be made.
P a g e | 146
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
Parking space needs to be proposed along commercial access roads and around bus-stand
areas by undertaking detailed studies.
Improvements of major intersections: Sufficient space for pedestrians, signals and utilities
along with wide footpath and cycle tracks are to be provided along main market,
shopping/commercial street through detailed studies.
Wherever feasible cycle tracks are separately provided.
Buffer zones/green spaces are proposed for NMT.
Pedestrian Refugee islands and other road features are to be proposed for road width above
18 m ROW.
Any road development/ redevelopment/ widening proposal shall be done according to the
road sections annexed (Annexure 8) are implemented.
City Traffic and Transportation Studies (CTTS) are made for BMR, 2031. This CTTS would
be referred to for provision of Traffic Management proposals in the Kanakapura LPA. Road
circulation plan for the entire LPA is prepared under this master plan exercise showing the
alignment and pattern of all existing and proposed roads in the LPA.
PROPOSALS
P a g e | 147
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
analysis for new road development. Roads should be constructed as per accepted road
design norms.
5. Improvement of Intersections
Improvement of major intersections at all conurbations should be carried out as per the
accepted road design guide lines. Signalization of intersections should be carried out
wherever feasible. Detailed studies (DPRs) should be taken up for this purpose.
P a g e | 148
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
11. Truck Terminals/ freight complex/ logistics hub and Provision of Infrastructure near
Truck Terminals/ freight complex/ logistics hub
As far as possible the traffic and transportation use should be located as per the envisaged
activity. It is desirable to have truck terminal/ freight complex/ logistics hub next to or along the
side of the industrial use/ KIADB industrial areas.
Map no 27 shows the proposed Circulation Pattern in the Kanakapura LPA. The following tables
show the statistics of the roads in the LPA.
12 58.56 0.70
15 74.75 1.12
18 101.62 1.83
24 80.92 1.94
30 100.85 3.03
90 13.62 1.23
Besides the roads proposed by the Master plan there exists BMR proposed roads in the LPA (IRR,
STRR, and TRR). The statistics of the roads are given in the table below.
P a g e | 149
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
RR 60 8.64 0.52
The following roads have been identified in the LPA for widening.
Table 9.9: Inventory of Roads proposed to be widened in the Master plan
2031
SL ROAD NAME EXISTING WIDTH (m) PROPOSED WIDTH(m)
1 NH 209 20 30
2 SH3 12 18
4 PIPELINE ROAD 8 20
5 SANGAMA ROAD 12 30
The Proposed building line from the major roads has been listed in the table below.
NOTE:
P a g e | 150
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
For National Highways, State highways, Major District roads, other district roads and village roads
standards specified (road width, building lines etc.,) by the Ministry of Surface Transport, Government
of India are to be followed vide Govt. Notification No: UDD 251 BMR 2005, dated 22-12-2005 and
other circulars of Government of Karnataka)
For all existing roads of width more than 15m shall be provided minimum of 3m building line.
The land utilization study along with the LCA lead to the formation of the following policy sets. The
policy set in the BMR RSP 2031 is universally applicable to all LPAs. The table below lists the
policies and their recommendations.
SL POLICY RECOMMENDATIONS
2 LU2 Designating urban areas that serve as urban reserves or transition zones
Urban agriculture should be encouraged to achieve urban food security and local employment
4 LU4
generation
6 LU6 Minimizing conflicts between the proposed industrial estates and ecologically sensitive areas.
P a g e | 151
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
All mining and quarrying activities should be strictly monitored and controlled to effectively
19 GEV 10
address development and environmental issues in a balanced manner.
ECONOMY
The existing situation shows that the major industrial locations are concentrated on the North-West
part of the region, starting from Peenya and extending towards Nelamangala and beyond. The rest of
the region dominated by textiles and agro industries are concentrated in and around the existing
towns. An analysis of the present investment trend, as depicted by the BMR RSP 2031, however
shows the presence of major investment attraction potential along Kanakapura road, Mysore road
and BMIC. The national and state level strategies have spurred economic growth in the regions in the
post 2000 period. The emergence of the SMEs and creation of major infrastructural facilities like the
BIA have given rise to a major growth to the Bangalore region. However, basic infrastructure like
power, transport and water are still concerns for sustained economic growth. High land prices have
lead to a shortage of affordable housing leading to increasing informality in housing and longer travel
hours. In view of the above economic situation the draft BMR RSP 2031 proposes the following
economic policies as listed in the table below.
SL POLICY RECOMMENDATION
1 E1 A comprehensive and elaborate land allocation strategy should be formulated for BMR
2 E2 Industrial and any other economic locations should be identified based on land capability.
P a g e | 152
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
BMR should be developed as a nodal area for locating educational, healthcare facilities
6 E6
and research institutions
7 E7 BMR should be developed as centre for high-end scientific and engineering industries.
Spatial developed initiatives like new townships / residential areas outside BBMP should
9 E9 be made integral with the local economy of existing settlement and in conjunction with
larger hinterland.
10 E 10 Small scale and medium scale polluting industries should be located outside the BBMP
The areas within the city and emerging investment destinations across BKR and existing
12 E 12 towns (cluster and growth nodes) should be connected with efficient public transport
system.
Local Economic Development (LED) policy should be developed at each town level as a
13 E 13
part of the Local Area Development Plan to boost employment in the surrounding towns.
Special hawking zones within the Bangalore city and in identified locations in each zone
14 E 14
should be earmarked.
TRANSPORT
The BMR draft RSP 2031 compliments the policy recommendations of the SP 2011 for a balanced
regional growth. The policies are hence aligned towards removing the regional imbalances and
increasing the efficiency of the transport systems. The table below highlights the policies of the draft
RSP 2031 for transport sector.
P a g e | 153
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
SL POLICY RECOMMENDATION
Public Transport be developed taking into account the size of the urban settlement
5 T5
i.e. smaller towns vis a vis the core
The Intermediate Ring Road (IRR) and the Peripheral Ring Road (PRR) should be realigned
in locations where they intersect ecologically sensitive areas and in areas where there are
existing major roads nearby.
The right of way (RoW) of the major roads, i.e. arterial road ( 55m) , sub-arterial roads (35m)
and other major roads (25m), have been specified. Exclusive bus lanes have been suggested
for the arterial roads and the sub-arterial roads. Access from arterial roads shall be only
through service roads whose access would be controlled. Sub-arterial roads shall have
access to adjoining properties but interval for median opening and intersections should at
least be one kilometre.
P a g e | 154
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
There is a proposal for development of integrated freight hub at Kanakapura near Harohalli.
HOUSING
The draft Revised Structure Plan 2031 makes policy recommendations for reducing the demand-
supply gap in the housing sector and to reduce the regional imbalance in terms of housing types. The
RSP recommends provision of serviced land with transport and employment facilities to give the
growth nodes and the clusters a spur of development. It also suggests about shifting the role of the
KHB from housing builder to more of a housing facilitator and providing housing to the poor at
subsidized rates. In-situ up gradation programmes of the slum areas should be undertaken and
housing needs of the urban poor should be addressed as a part of the housing strategy. The table
below lists out the housing policy of the draft RSP 2031 which remains same in aggregate as the SP
2011.
SL POLICY RECOMMENDATIONS
Government land should be provided within the priority growth centres and new urbanisable
1 H1
blocks for ‗composite‘ and ‗joint venture‘
A policy to restructure the functions, roles and operations of the Karnataka Housing Board (
KHB), through innovatory changes in the regulatory framework, should be implemented to
2 H2
shift focus from house builder to land assembler and infrastructure facilitator as a joint
venture partner with the private sector for the provision of housing
Measures are required to be taken to provide land for group housing for the urban poor at
3 H3
subsidized or controlled prices
The main focus of the Karnataka Slum Clearance Board (KSCB) should be on in-situ up-
4 H4
gradation through self-help processes incorporating the participation of appropriate NGO‘s.
A programme to carry out regular housing needs surveys and to maintain an appropriate
6 H6 housing management information system in support of the formulation of effective housing
policy and supply targets.
P a g e | 155
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
Unauthorized layouts to be regularized within the overall strategic intent of the BMR RSP
7 H7
2031
The RSP 2031 has the following recommendations for water supply and sanitation.
Table 9.15: Structure Plan proposals – Water Supply
SL POLICY RECOMMENDATIONS
1 W1 Adequate measures to augment supply from surface water source in the BMR
SL POLICY RECOMMENDATIONS
1 S1 Maximise the utility and efficiency of the existing sewerage systems in the BMR
POWER
The BMR RSP 2031 proposed increase in power generation in the region by using alternative and
ecologically friendly sources and municipal wastes. It also envisages private players on the power
generation region. It strives to ensure quality supply of power by use of clean coal technology and
renovation of the old power plants in the region. Stringent efficiency standards and emission norms
P a g e | 156
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
on vehicles to reduce demand of conventional fuels is also proposed. Operational and financial
performance of distribution network should be improved and demand may be reduced by replacing
power intensive industries through R&D.
Table 9.17: Structure Plan proposals – Power
SL POLICY RECOMMENDATIONS
TELECOM
Table 9.18: Structure Plan proposals – telecom
SL POLICY RECOMMENDATIONS
TC2 Provide fair and transparent policy environment forth e telecom market
The BMR draft RSP 2031 provides policy guidelines for the up gradation of the solid waste
management process in the BMR. It proposes the setting up of an integrated solid waste
management facility in the region and utilization of advanced technology to make solid waste disposal
a safe and profitable affair. It also proposed involvement of people for better facilitation of MSW
management by creating awareness through concepts like concepts of source segregation. The
table below lists out the policy guidelines.
P a g e | 157
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
SL POLICY RECOMMENDATIONS
Encourage decentralized small waste treatment and disposal facilities with the
SWM 4 support of community based organizations to reduce pressure on the
centralized facilities and to extend the life of the centralized facilities
The RSP 2031 proposed the establishment of integrated solid waste management facility at
Kanakapura. These facilities are proposed to be centres for waste storage, processing and disposal
in the area. A buffer zone of 500 m should be created around the site as no development zone by
notifying the prohibition of development in a buffer zone.
EDUCATION
The draft RSP envisages removing the regional disparity in education level and raising the general
education level in the region. It also provides policies to create a workforce more apt to the
requirements of the region.
Table 9.20: Structure Plan proposals – Education
SL POLICY RECOMMENDATIONS
3 ED3 Improve access and availability of quality education in the rural areas
P a g e | 158
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
HEALTH
There exists regional disparity in terms of health status as in reported by the Task Force on Health
and Family Welfare 2001. The high level of privatization in the health sector in the Bangalore Urban
district creates a sophisticated pool of medical resource which is absent in the surrounding Bangalore
rural and Ramanagara district. The heath policies of the draft RSP hence aims at up grading the
health scenario in the region.
Table 9.21: Structure Plan proposals – health
SL POLICY RECOMMENDATIONS
1 HE1 Improved access and availability of quality healthcare in Bangalore rural district
ECONOMY
The work participation rate in the LPA (Kanakapura Taluk) is 38% that of Kanakapura Town is 17.5%,
whereas that in Karnataka is 41% and at the national level it is 39%1. An increased work participation
rate of 40% should be targeted for the entire LPA (including Kanakapura Town) till the horizon year
2031.
The industrial potential of the area should also be used to generate employment for local people.
Industrial estates and large investment destinations should be so developed as to integrate with the
local economy. Open settlements should be preferred over closed or gated communities.
1
Census 2011
P a g e | 159
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
Small scale, tiny and cottage industries should be promoted through proper financial, marketing and
distribution schemes. Small scale and cottage industries requires less start-up capital, are labour
intensive, offer better employment opportunities to women and are often better platforms for local
craftsmanship. Hence promotion of such industries serves the purposes of employment generation,
preserving local craft and empowering women.
The industrial perspective plan for Kanakapura Taluk lists a range of industries in small scale and
medium scale sector as potential investment options. However, the LPA along with the entire BMR
region is under a threat of water scarcity. Hence proper water management plan should be prepared
before commencement of industrial activities to address issues like ground water depletion, ground
water recharge through water treatment, ground water pollution etc.
The RSP 2031 specifies relocation of industries from BBMP limits to outer BMR as one of the
economic strategies. Viability of relocating these industries in the LPA may be looked into, to
introduce industries with established markets into the area. Total of 1168.3 HA of land has been
proposed under KIADB industrial area in four phases. 101.17 Ha of land has been allocated for
women entrepreneurs in phase IV of KIADB industrial area.
Local economy should be strengthened in the entire LPA. Planned commercial centers should be
introduced at the major growth nodes in the LPA – Kanakapura, Harohalli-Kanakapura and Sathanur.
The influx of population in the LPA would demand a proper commercial network within the LPA for
basic service delivery. Regularization of Delivery chains and markets should be taken up as a major
project
The provisions of the ―Suvarna Vastra Neethi 2008-1013‖ should be utilised to develop sericulture as
the prime activity in the LPA.
The centrally sponsored ―Catalytic Development Programme" should be implemented with the
assistance of Central Silk Board. Schemes under Catalytic Development Programme like Drip
P a g e | 160
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
irrigation, construction of rearing houses, raising of mulberry saplings, Installation of multi end reeling
machines, Incentive for Bivoltine Silk etc. are very popular. In order to ensure production of better
quality cocoons and silk with increased productivity, these programmes under Catalytic Development
Programme should be stepped up for which adequate funds will be made available under the State
and Central sector.
The initiatives of The National Research and Development Corporation (NRDC) should be supported
and expanded to establish Chawki Rearing Centre (CRC) and for capacity building and skill
development of the local farmers.
Detailed study should be undertaken to investigate the cause of slow development of sericulture
despite high potential and necessary investment plan for the sector. Kanakapura Town should be
used as the focal center for the LPA for development of capacity building, processing and marketing
facilities subject to its viability during the detailed study.
Large industrial units have been planned in the Harohalli Bidadi Cluster. Precision Engineering and
Machine Tools, Textiles, Plastics, Construction Material and Rubber and Agro and Food based
Industries have been proposed in the Taluk Industrial development Plan.
These are some of the sectors with highest backward and forward linkages. Forward and backward
linkage of these units should be analyzed in detail to boost the local economy. Art silk, Synthetic
textile manufacturing, Land based Transport, Petroleum products, retail, rubber tyre manufacturing,
recycling industries, Real estate should be used as key industries for boosting the local economy.
Detail studies should be carried out for estimating the quantum of forward and backward linkage and
the investments required.
AGRICULTURE
Food Park has been proposed at Harohalli by the department of Horticulture/ Food Karnataka Ltd.
Agro and Food Industries have been proposed as primary industries in the Taluk Industrial Plan. The
Taluk is also an AEZ for Gerkins and Rose onions. Processing industries should be promoted for
value addition.
Capacity building of the farmers in terms of knowledge development and awareness of latest
technologies, soil health improvement (by crop rotation etc.), water conservation and micro irrigation,
integrated post-harvest processing, crop insurance and credit facilities should be undertaken.
P a g e | 161
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
Soil moisture conservation and soil fertility improvement program through watershed approach.
Composting/green manuring/ tank silt recycling should be promoted.
Promoting alternate land use systems like Agri-horti system for arable lands (mango, sapota,
tamarind, jack fruit etc.) and Horti-silvi system (mango, sapota + silver oak, casurina, teak),
Silvipasture (block plantation of acacia, silver oak, casurina, D.Sisso, Meliaazardicta, cassia and
muthuga + S.hamata, S.scabra, calaproimum, anjan, Guinea macuaena, etc.) for non-arable lands.
Dryland vegetables (chilli, beans, brinjal, tomato, cluster bean, gourds etc.), Floriculture
(chrysanthemum, jasmine, crossandra marigold, roses etc.) fruits (guava, papaya, banana),
sericulture and coconut plantations should be promoted.
Livestock component (local draught animals, dairy, sheep, piggery, rabbit, apiculture) should be
developed.
There is an absence of a commercial center in the LPA. Since Kanakapura is the Taluk headquarters,
a regional commercial level should be planned in the town. The proposed landuse plan hence shows
a large area dedicated for commercial activities.
HOUSING
Housing Stock for both affordable and other categories has to be augmented to support the induced
population in the LPA.
Private real estate development should be encouraged and properly planned along with other models
of housing for viability and utilization of common delivery chains.
Composite and Joint venture housing schemes of the government along with private sector should be
encouraged.
P a g e | 162
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
25% of proposed industrial area2 should be used or housing workers and model of housing should be
subsidized by the industrial authority.
Housing Schemes such as Indira Awas Yojna, Dr.Ambedkar Housing Scheme, Ashraya Schemes
should be promoted to increase its reach among people.
SLUM IMPROVEMENT
Slum development should be brought under National Programmes such as the Rajiv Awas Yojna.
Internal ear-marking of local body funds should be carried out for provision of basic services to the
poor. Security of tenure at affordable prices, improved housing, water supply, sanitation and ensuring
delivery of other already existing universal services of the government for education, health and
social security should be planned for. Earmarking at least 20-25% of developed land in all housing
projects (both public and private agencies) for EWS/LIG category with a system of cross-
subsidization should be carried out.
Development programmes for Slums should also be carried out under the programmes funded by
The Karnataka Slum Development Board.
ENVIRONMENT
The Kanakapura LPA has some of the most fertile agricultural land in the BMR and has been
designated as an Agri Export Zone (AEZ). Hence all new developments and landuses have been
planned protecting the productive agricultural lands in the LPA.
Sustainable agricultural practices should be followed in the LPA. Soil health should be continuously
monitored and programmes such as "Bhumi-TayiyaArogya" should be promoted to recover soil
quality and fertility. Drip Irrigation should be introduced for crops which do not require flooded fields.
2
According to Industrial Policy 2009-14
P a g e | 163
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
Crop rotation practices should be introduced into the cropping practice to ensure soil fertility and
productivity.
Integrated Water management programmes should be adopted by the municipalities and urban local
bodies to ensure sustained supply of water to the LPA. Incessant digging of bore well should be
controlled and water loss during transmission and distribution should be minimized. Waste water
treatment should be introduced to recycle and reuse waste water. All surface water bodies should be
protected, maintained and enhanced for long term ecological well-being and water supply.
Uncontrolled mining and quarrying activities should be stopped. Mining and Quarrying activities
should run with proper licensing along with detailed survey and inspection of potential damage to
natural resources, human settlements and otherwise.
PHYSICAL INFRASTRUCTURE
WATER SUPPLY
Any plan on water supply must be preceded by a land use plan. New water treatment should be
planned to serve principally first to serve new development areas and then to serve the deficit areas.
Dead end system of distribution of water supply should be adopted as the network system due to its
cost advantage. Minimum capacity for water purification system must be for 1 MGD from economic
point of view, below which it is not recommended.
PROPOSALS
The area experiences shortage of water and wells are the main modes of sustenance in rural areas
as well as part of urban areas. Ground water in this area is fast depleting. The water supply demand
P a g e | 164
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
for future has been discussed above. Hence supply of tap water to the LPA needs to be augmented
for both domestic and industrial use.
It has been shown in the study that at present only 20% of the population in the LPA avails treated
tap water supply. At present there are no treatment plants in the LPA. Water treatment has to be
made an integral part of the water supply scheme to supply water free of iron and fluoride.
NEW WATER SUPPLY SCHEMES
The study shows that 14% of the population avail water away from their dwelling unit. Water source
close to dwelling unit should be provided in all areas – urban and rural. New water supply schemes
should be introduces to make drinking water available to all.
Water treatment plants need to be created in the LPA for providing clean drinking water. 0.22 sq. km
area has been assigned for utilities in the proposed Landuse plan of the Kanakapura LPA while
Harohalli and Kaggalipura have 0.69 and 0.19 sq. km of area assigned for utilities and services.
Treatment plants can be setup centrally for the entire LPA or decentralised in north and south zones.
Operation and maintenance of water supply pipes and water treatment plant is necessary to meet
the future demand of water. All the above strategy will fail if there is no proper maintenance. All
pipeline leakages need to be identified to prevent loss of water. While ULBs shall enhance the tariff
base over a period of time to ensure that O&M is payable from the revenues, there is an immediate
requirement of O&M funds so as to ensure that the assets created under the scheme are properly
maintained.
A series of workshops should be organised across the region to create public awareness on the
importance of water as a national resource and the severe consequences of wasting and polluting
water. Industrial clusters are a source of severe water loss which can pose a serious threat in future.
The State Government along with NGOs should come forward for campaigning.
P a g e | 165
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
Private sector participation is desirable in the PPP format in the sector so that there is a balance
between risks and responsibilities between the government Agencies and the Private Sector.
In view of the same, private Sector Participants shall be invited to leverage on the following possible
benefits:
1. Industrial growth should be effected in a planned manner and it will be mandatory for the
units to allow periodical monitoring of water quality from nearby wells on a regular basis by
agencies like SPB/PHE and should be open for cross checking;
2. For ground water based industries, regular water level and quality monitoring have to be
made compulsory;
3. Rain water harvesting measures have to be adopted by all the industrial establishments
where the water level is not shallow;
Considering that there is virtually no systematic drainage system, it is felt necessary for each city to
draw up an integrated drainage and sewerage system for the entire area. Accordingly it will be the
endeavours of the city to design and implement an integrated system on a phase wise basis. The
drainage system will be set up initially in Kanakapura and then extended to the other areas of the
region. The drainage plan shall be worked out on the basis of Master Plan, GIS, Land Use & Control
Plan and the existing Drainage Channels. Generally, drains shall be provided along the existing
roads, existing rails and proposed roads and rails. The cost of the Integrated Drainage System shall
be worked out through Detailed Studies and Assessment and will be taken up for implementation
thereafter.
P a g e | 166
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
However, the present situation merits urgent attention and requires implementation of immediate
improvement schemes. In view of the same, immediate action plans have been worked out for
implementation.
OBJECTIVES
To develop and improve the storm water drainage in KLPA and the new developing areas by
2031.
To solve the water logging problems in the urban areas with better networking of drains.
To achieve complete coverage of sewer network in newly developing areas along with
progress of development.
To achieve complete coverage of sewerage network by 2031, since laying of sewer lines in
already developed and congested areas would be difficult.
To make KLPA free from open defecation by 2031 as per Government of India‘s total
sanitary campaign.
The Industrial waste generation has not been considered in the above calculation. Industrial waste
has to be treated separately before releasing into the network. The tolerance limit of the of the
release fluids must conform with the standards prescribed in IS:3306-1974. The volume of industrial
waste would depend on the type of industrial units proposed.
The design volume of the sewerage system would therefore be calculated on the basis of domestic
and industrial waste generated in the LPA.
PROPOSALS
The surface drains do not have total coverage in the LPA. Kanakapura town has surface drainage
system in the 5 percent of the total area. In rural areas surface drains are absent. Surface drains
have to be constructed to cover all settlement areas. Drain covers to be provided to all new and
existing drains.
P a g e | 167
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
The sewerage system has to be extended to cover all settlements in Kanakapura LPA. 71.6 km of
sewerage system is already under proposal to be constructed in Kanakapura town. The total area
proposed to be developed in the LPA is 27 sqkm and the total length of road network proposed is
10152 km.
Hence an additional 10125 km of sewerage network has to be constructed in order to bring the
coverage up to 100 percent. The design period of the sewerage system should at least be 30 years.
The trunk sewer line from the sources to STPs shall be laid along the contour. The advantage of
natural slopes along the streams, rivers and road network should be adopted while designing the
trunk sewer line.
Provision has to be made for assistance to BPL households to build sanitary toilets and upgrade their
septic tanks and construct soak pits, to extend sanitation facilities in the entire LPA.
Sewage treatment plants have to be constructed in the LPA for treating sewage. Tertiary treatment of
sewage can be used as a strategy for ground water recharge through reclaimed sewage, since water
scarcity is a major issue in the LPA. For treated industrial wastes to be released for irrigation
purposes, the final fluid must conform with BIS code IS: 3307-1965.The STPs shall be accessible for
ease in construction and repairing of plant and machineries.
A community awareness campaign is needed to make people aware about the benefit of sewer
connections and how it can enhance the present living conditions and environmental quality in their
areas.
Appropriate measures have to be taken for safe disposal of septic tank and other wastes. Detachable
dumping chutes should be constructed at selected points in the sewerage system for disposing of the
P a g e | 168
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
night soil collected from individual houses. The sewage after treatment should be disposed of either
into a water body like lake, stream, river, ocean or into the land.
The sewage may be utilised for several purposes such as (i) Industrial reuse or reclaimed sewage
effluent in cooling systems, boiler feed, process water etc., (ii) Reuse in agriculture and horticulture,
watering of laws, golf courses etc. (iii) Ground water recharge for augmenting ground water
resources.
PUBLIC TOILETS
Provision of public toilets in the market areas and in the LIG areas.
Construction of common effluent treatment plants (CETP) must be made mandatory in the industrial
areas for treatment of industrial wastes before release into the sewerage network.
Proper fund allocation must be made for operation and maintenance of the sewage system.
Appropriate organisational/ institutional framework must be provided in the newly developed areas of
Harohalli, Kaggalipura and Sathanur for operation and maintenance of sewage network.
In, India municipal wastes have to be managed as per the provisions of Municipal Solid Wastes
(Management and Handling) Rules, 2000 promulgated under Environment Protection Act, 1986. As
per these rules, all the biodegradable municipal solid wastes shall be required to be processed by
appropriate biological processing method.
Municipal Solid Waste (Management and Handling) Rules 2000 has made MSWM the Litigation
responsibility of Urban Local Bodies (City Corporations and Municipal Corporations), which asks for
source segregation of waste for cleaner composting and recycling. Further, the Supreme Court of
India, acting on Public interest Litigation directed all urban local governments to install scientific solid
waste treatment plants before a set deadline. Thus the installation of a scientific solid waste
management system, though a costly proposition for most of the urban bodies, has become an
P a g e | 169
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
imminent necessity. Also the Ministry of Environment and Forest (MOEF), Government of India, has
issued the Municipal Solid Wastes (management and handling) Rules in the year 2000, which identify
the CPCB (Central Pollution Control Board) as the agency to monitor the implementation of these
rules.
PROPOSALS
In view of the projected growth in population and absence of any MSW facilities it is proposed to have
Integrated Solid Waste Management (ISWM) complex.
Existing municipal solid waste management system would follow the following strategies for efficient
management in the future.
COLLECTION OF WASTE
Increasing the coverage and efficiency of collection mechanism would help in better management
and in reducing the formation of unhygienic and open dump sites. Segregation of waste into
biodegradable and non-biodegradable Components shall be carried at source or at primary collection
centres.
On the basis of availability of land and financial resources with the service provider, either of the
methods — aerobic composting, anaerobic Digestion or sanitary land filling could be adopted for
treatment and disposal of waste. However, since it appears that land filling would continue to be the
most widely Adopted practice in India in the coming few years, in which case certain Improvements
need to be done to ensure sanitary land filling and not mere dumping of Waste.
AWARENESS CAMPAIGN
Awareness Campaign shall be carried out in order to educate the general public about the disposal of
solid waste at the right place. Awareness campaign shall also be carried out to show and illustrate the
segregation of solid waste. Benefits about cleanliness and hygienic environment should be taught.
P a g e | 170
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
LANDFILL FACILITY
Landfill facility is present for Kanakapura town, though it is not adequate for horizon year 2031. Land
has been allocated for utilities and services in the Landuse plan of Harohalli, Kaggalipura and
Sathanur. Land fill facilities should be located within those areas after proper design considerations.
Strengthening urban local bodies to perform efficiently in managing the waste and ensuring
strict enforcement of the recently introduced municipal solid waste (Management and
handling) rules.
It is also imperative to harness and integrate the role of three emerging actors in this field —
the private sector, NGOs, and rag pickers — into the overall institutional Framework.
WASTE SEGREGATION
Many wastes are mixtures of hazardous and non-hazardous wastes. Much of their contents may
even be water. By segregating key toxic constituents, isolating liquid fraction, keeping hazardous
streams away from non-hazardous wastes, generator can save substantial amounts of money on
disposal or find new opportunities for recycling and reuse of wastes. The Ministry of Environment,
Government of India, had identified toxicity of different chemicals, through the ‗Manufacture, Storage
and Import of Hazardous Chemicals Rules, 1989‘ in exercise of power conferred by Section 6, 8 and
25 of Environment Protection (E.P). Act, 1986, and had notified mandatory requirements for its
management. In India quantum of generation of wastes (solid/liquid and hazardous/non-hazardous)
for different industry has not been detailed, which is necessary for wastes exchange system or for
adopting treatment/ disposal alternatives for different wastes segregated.
The unsatisfactory state of storage of hazardous wastes can be remedied to a large degree by such
low-cost measures as restricting access, fencing off the storage area to minimize any wind-blown
nuisance, providing separate covered storage for putrifiable of hazardous wastes, and ensuring
regular and frequent collection. There are certain measures a municipal authority can take to control
the transportation of industrial wastes, even if it does not want to become actually involved itself. For
instance, contractors should be licensed after ensuring that they are technically competent and
P a g e | 171
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
environmentally aware and should be allowed to handle industrial wastes. Labelling and coding of
hazardous waste load can be made mandatory so that in the event of an accident, the emergency
services know how to handle a spillage. Municipal authorities can be given the responsibility to
monitor the contractors to minimize cases of fly-tipping and ensure that industrial wastes are
disposed at the appropriate sites. If a municipal authority can also collect industrial waste; industries
must pay the charge which will be based on the quantity and nature of the waste. This might minimize
the quantity of waste produced by industry and at the same time the programme will become
financially viable and self-sustaining. The principle ‗the polluter pays‘ should be adhered to in all such
cases.
Small-scale industries, which contribute about more than half of the total production, also generate
huge quantity of wastes. The small-scale industries are not in a position to treat their solid wastes or
liquid effluent because of space, technical know-how and financial constraints. It is, therefore,
deemed that in a cluster of small-scale industries the different wastes are characterized, identified,
quantified and stored for treatment through a combination of recycling, recovery and reuse of
resources such as, raw material, bio-gas, steam and manure, besides providing an efficient service
facility, to make the system less expensive. The combined effluent treatment plants (CETP) are to be
operated by the local bodies, where the cost of construction, operation and maintenance need to be
shared by individual industries depending upon the quality and quantity of wastes generated.
However, such common treatment facility may require pre-treatment at individual industry to the
extent specified by the State Pollution Control Board. With regard to availability of wastes along with
their identification, quantum of waste generated should also be ascertained so that technology
development/adoption can be considered on economic grounds for a small-scale or organised sector
of industry. If economics justify movement of wastes over longer distances for a centralised plant,
specific subsidies for storage, collection and transportation could be considered. CETPs are being
successfully operated in Gujarat and Andhra Pradesh and such facilities should be promoted in other
States. Small scale industries having waste characteristics similar to those of nearby large industry
having waste treatment facilities can take help in treating their wasteson payment basis.
DISPOSAL METHODS
Depending upon the characteristics of the wastes, different types of disposal methods can be used
for hazardous and non-hazardous industrial wastes. The most predominant and widely practiced
methods for wastes disposal are: (a) Landfill, (b) Incineration and (c) Composting.
P a g e | 172
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
Landfilling is still the major disposal method in many countries. Yet in many instances landfilling sites
are not properly chosen in terms of geophysical soil properties, hydrogeology, topography and
climate. On a proposed site there is a need to carefully consider the potential for ground or surface
water contamination from pollution by leachate migration or surface run-off from the site.
Nonetheless, even when a site appears to have the right geophysical properties, its selection and use
are not an absolute guarantee that contamination of ground water can be avoided. Hence, continuous
surveillance of the site and its surroundings must be maintained to check that the disposal of
hazardous wastes can continue without posing a threat to the environment and to the general public.
To reduce this threat landfill sites have been lined, for example with plastic materials, in order to
prevent leaching into groundwater supplies.
Landfill sites for industries should be proposed in the industrial Landuse area after proper
consideration of contours and design specifications of the industrial park.
P a g e | 173
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
SOCIAL INFRASTRUCTURE
The pivotal role of social infrastructure in development has been recognized in the various national
and state level planning policies. In conformation with the national and state agenda, healthcare has
been given prime importance during the master planning process. A stock of existing facilities has
been taken and the deficiencies and requirements for year 2031 have been calculated. The existing
indicators of the health have been analysed and targets have been set till the year 2031.
HEALTH
Healthcare facilities should be set up for every village, cluster and major town so that basic
healthcare is accessible to all people. Regulatory and administrative framework should be
strengthened to ensure availability of medical professionals in all healthcare institutions.
Mobile health clinics can be introduced to improve accessibility in remote areas. Healthcare should
also be made a part of corporate social responsibility (CSR) for the industries that would be set up in
the region.
Technology like telemedicine should be used to make healthcare accessible in remote corners of the
LPA.
HEALTHCARE MONITORING
Regular monitoring of health statistics should be undertaken in the LPA to prepare a database and
monitor increase or decrease in health status. Monitoring should be specially undertaken in and
around industrial areas to analyse the impact of industries on public health.
INSTITUTIONAL FRAMEWORK
Institutional and administrative framework should be strengthened and organized to ensure swift
service delivery and strict monitoring and operation of healthcare services. Decentralization of
healthcare service should also be accomplished at LPA level, wherein monitoring can be done
through Panchayats and Civil Societies.
P a g e | 174
Kanakapura LPA Master Plan 2031 Chapter 9|Master Plan Proposals
EDUCATION
The following table shows the requirement of educational facilities in the LPA. Basic education would
be strengthened by providing primary and secondary schools at settlement level ensuring proper
accessibility and connectivity from all areas of the LPA. Colleges would be provided at the three
major clusters i.e. Kanakapura, Harohalli – Kaggalipura and Sathanur. Technical Institutions,
Engineering colleges and Medical colleges would be planned across the LPA to increase technical
capacity in the workforce to match the employment potential of the region.
The literacy rate of Kanakapura Taluk is 65.1%, whereas that in Karnataka is 75% and the national
literacy rate is 74.5%. Basic education facilities need to be strengthened to increase the literacy rate.
Education programmes such as mid-day meals, free bicycles, free uniforms and bags should be
promoted in order to achieve the goal.
There is a sharp decrease in enrolment rates in the LPA in secondary schools. Schools should be set
up within communicable distances from villages so that education is accessible to everyone.
Incentives should be provided so that students do not have to leave education to support their
families economically.
Student teacher ration should meet the standards prescribed by the ‗Right of Children to Free and
Compulsory Education Act 2009‘. A ratio of 1:30 should be maintained in primary schools and 1:35
should be maintained in secondary schools.
Infrastructure facilities should be improved in schools across the LPA. Separate girls‘ toilet should be
provided in every unit. Drinking water facility and play grounds should be made compulsory in all
schools. Universally accessible design of structures should be followed for all units.
P a g e | 175
Kanakapura LPA Master Plan 2031 Chapter 9A: Proposed land use analysis from MP to final Approval
CHAPTER 9A
P a g e | 176
Kanakapura LPA Master Plan 2031 Chapter 9A: Proposed land use analysis from MP to final Approval
P a g e | 177
Kanakapura LPA Master Plan 2031 Chapter 9A: Proposed land use analysis from MP to final Approval
P a g e | 178
Kanakapura LPA Master Plan 2031 Chapter 9A: Proposed land use analysis from MP to final Approval
P a g e | 179
Kanakapura LPA Master Plan 2031 Chapter 9A: Proposed land use analysis from MP to final Approval
P a g e | 180
Kanakapura LPA Master Plan 2031 Chapter 9A: Proposed land use analysis from MP to final Approval
P a g e | 181
Kanakapura LPA Master Plan 2031 Chapter 10|Financial Implication
CHAPTER 10
In many ways, Master plan lays down the blueprint for the development of a region and direction in
which growth of the region must be shaped. The proposals of Master Plan have to be implemented
by all concerned stakeholders for it to be an effective instrument for urban planning. The
implementation of Master plan proposals must be reviewed on a periodic basis and a mechanism
must be in place for evaluation of the extent to which identified actions are successfully
accomplished.
10.1 ACTIONS
Compact community is a high density urban settlement and is the most sustainable urban form.
Compactness has many advantages, less cost of providing services, less carbon footprint, forging
strong community links being the foremost. A complete urban form has a well-defined and developed
street network with equitable allocation of road space for all modes; mixed land use that reduces the
need and length of a trip; focus on public transport and walking and cycling.
Density of development; Completeness of street network with specific focus on completion of missing
links; width and quality of footpaths; creation of bus-bays; development of bus terminals; priority to
public transport by providing dedicated lanes for buses; development of cycle tracks etc.
P a g e | 182
Kanakapura LPA Master Plan 2031 Chapter 10|Financial Implication
2) To enhance the character and quality of public realm to suit the varied requirements of
the community.
What makes an urban community liveable? Historically, many towns/cities always had a main market
streets, public plazas etc. where people could congregate and interact. The public realm comprises of
the places where the children could play; the old could meet and chat and the young could hang-out,
and the people in other age-groups could catch up with their friends after work or exercise in the
mornings or do their shopping without the threat of being run over by a passing vehicle. Public realm
must have something for every age group. Well-developed Parks, play grounds, pedestrianized
areas etc. enhance the quality of public realm.
Parameters for review: Development of parks on hierarchical basis (neighbourhood/ city /town
level); Networking of green spaces along nalas, lakes, rivers etc./ buffer spaces to form a network of
green links for walking/cycling; Pedestrianization of market streets, temple streets, heritage areas etc.
Unbridled growth of personal vehicles adds to congestion, air-pollution and increase in unproductive
time spent in commuting for the community. Many indirect costs like parking costs are not considered
when people make a choice to buy a two-wheeler or a car as parking is free in many of our
cities/towns. Parking on streets also reduces the road width available for movement of
people/vehicles and further causes congestion problems. Like good habits that need to be inculcated
from childhood, paid parking has to be implemented irrespective of the fact that the city/town has
manageable traffic.
Parameters for review: Implementation of parking policy with parking pricing; demarcation of areas
where vehicles can be parked and where they cannot be parked; enforcement measures;
4) To facilitate seamless freight movement while ensuring that the ambience of the city is not
affected due to movement of trucks etc. through the city.
Parameters for review: Development of designated parking areas for heavy goods vehicles/logistic
hubs.
5) To preserve historically and culturally important landmarks, and to ensure that public
infrastructure and facilities within the city/town are aesthetically designed and constructed
P a g e | 183
Kanakapura LPA Master Plan 2031 Chapter 10|Financial Implication
from architectural and functional point of view, and contribute to enhancing the ethos of the
city/town.
Parameters for review: Identification of historically and culturally important buildings and
development of plans for their preservation; developing design guidelines for new public
buildings.
6) To enhance the per-capita green space in the city/town with attention to protection of
local bio-diversity.
Parameters for review: Development of guidelines for city plantation; extent of plantation proposed
during the year etc.
A master plan review committee is set up under the Deputy Commissioner of the district as follows,
for this purpose.
Sl. Members
1 Deputy Commissioner of concerned District Chairman
The committee is expected to meet every quarter to review the performance with respect to specific
targets that must be identified in the first meeting of the committee. All the proposals/ projects/
schemes identified for implementation or enforcement are prioritised to be developed in phases over
the plan period of 20 years depending on the mode of development and funding.
P a g e | 184
Kanakapura LPA Master Plan 2031 Chapter 10|Financial Implication
An independent evaluation of master plan will be done by BMRDA every five years to gauge
the effectiveness of the implementation of the Master plan proposals.
The fiscal requirement for infrastructure provision based on the proposals of the Master Plan 2031,
have been calculated as shown in the table below. Unit prices have been considered from similar
projects elsewhere.
Table 10.1: Financial proposals
ROADS
LAND TOTAL
WIDTH DEVELOPMENT
SL CATEGORY LENGTH (km) ACQUISITION FINANCIAL
(m) COST
COST (CRORE) REQUIREMENT
STRR 90 9.08 781.89 72.64 854.53
1
TRR 90 24.67 2124.37 19.74 2144.10
2
MASTER PLAN
5 PROPOSED ROADS 18 101.62 1575.12 121.94 1697.07
MASTER PLAN
6 PROPOSED ROADS 24 80.92 1672.36 97.10 1769.47
MASTER PLAN
7 PROPOSED ROADS 30 100.85 2605.32 121.02 2726.34
13983.59
TOTAL FINANCIAL OVERLAY 24507.12
The total cost of provision of transport infrastructure including the BMR proposed roads (STRR, IRR,
RR, TRR) is 4330.65 crores. Provision public amenities in the LPA till 2031 would require a capital
sum of 13983.59 crores. The total capital required is 24,507.12 crores.
P a g e | 185
PART II
ZONING REGULATIONS
Kanakapura LPA Master Plan 2031 Zoning Regulations
ZONING REGULATIONS
1.1 INTRODUCTION
In order to promote public health, safety and the general social welfare of the community, it
is necessary to apply control and reasonable limitation on the development of land and
buildings. This is to ensure that most appropriate, economical and healthy development of
the entire Kanakapura Local Planning Area including Kanakapura Town takes place in
accordance with the land use plan, and its continued maintenance over the years. For this
purpose, the LPA is divided into number of use zones, such as Residential, Commercial,
Industrial, Public and Semi Public, Park and Open Space etc. Each zone has its own
regulations, as the same set of regulations cannot be applied to the entire area.
Zonal Regulations protects residential areas from the harmful invasions of commercial and
industrial uses and at the same time promotes the orderly development of industrial and
commercial areas, by suitable regulations on spacing of buildings to provide adequate light,
air, protection from fire, etc. It prevents overcrowding in buildings and on land to ensure
adequate facilities and services.
Zoning is not retrospective. It does not prohibit the uses of land and buildings that are
lawfully established prior to the coming into effect of these Zonal Regulations. If these uses
are contrary to the newly proposed uses, they are termed non-conforming uses and are
gradually eliminated over years without inflicting unreasonable hardship upon the property
owner.
The Zonal Regulations and its enforcement ensure proper land use and development and
form an integral part of the Master Plan. It also ensures solutions to problems of
development under-local conditions.
The Zonal Regulations for Kanakapura Local Planning Area prepared under the clause (a) of
sub-section (1) of section 12 of the Karnataka Town and Country Planning Act, 1961 are
detailed below:
P a g e | 186
Kanakapura LPA Master Plan 2031 Zoning Regulations
The local planning area is divided into use zones such as Residential, Commercial,
Industrial, etc., as shown in the enclosed maps.
The regulations governing minimum size of plot, maximum plot coverage, minimum front,
rear and side setbacks, minimum road widths and maximum number of floors and height of
structures are set out in these regulations.
NOTE:
a. Where there is uncertainty as regards to the boundary of the zones in the approved
maps, it shall be referred to the Authority and the decision of the Authority in this
regard shall be final.
b. For any doubt that may arise in interpretation of the provisions of the Zonal
Regulations, the Authority shall consult BMRDA or the Director of Town & Country
Planning, Government of Karnataka, Bangalore.
c. Where there is uncertainty in identifying alignment of nala, canal, river, existing public
road, railway line, high-tension line and any religious building position and also
survey number boundaries in the approved maps, it shall be referred to the actual
position on ground and decision taken by the Authority in this regard shall be final.
P a g e | 187
Kanakapura LPA Master Plan 2031 Zoning Regulations
1.1.3 Definitions
In these Zonal Regulations, unless the context otherwise requires, the expressions given
below shall have the meaning indicated against each of them.
1. “Act” means the Karnataka Town and Country Planning Act (K.T.C.P. Act), 1961.
2. „„Addition or Alteration” means a structural change including an addition to the
area or change in height or the removal of part of building, or any change to the
structure, such as the construction or removal or cutting of any wall or part of a wall,
partition, column, beam, joist, floor including a mezzanine floor or other support, or a
change to or closing of” any required means of access ingress or egress or a change to
fixtures or equipment „„as provided in these Zonal Regulations.
3. „„Amalgamation” means clubbing of two or more authorized plots.
4. „„Amenity” includes roads, street, open spaces, parks, recreational grounds,
playgrounds, gardens, water supply, electric supply, street lighting, sewerage,
drainage, public works and other utilities, services and conveniences.
5. „„Apartment” means a room or suite or rooms, which are occupied or which is
intended or designed to be occupied by one family for living purpose.
6. „„Apartment building / multi dwelling Unit” means a building containing four or
more dwelling units, or two buildings blocks, each containing two or more dwelling
units on a given property. This word is synonymous with residential flat.
7. "Applicant” means any person who gives notice to the Authority for any approval
with an intention to take up any development work.
8. “Auditorium” means Premises having an enclosed space to seat audience and
stage for various performances such as concerts, plays, music etc.
9. “Authority” means Planning Authority constituted for Kanakapura Local Planning
area under the Karnataka Town and Country Planning Act, 1961.
10. “Balcony” means a horizontal cantilever projection including a handrail or
balustrade, to serve as passage or sit out place.
11. “Basement storey or cellar” means any storey, which is partly / wholly below the
ground level. The basement height should not project more than 1.2 m above the
average ground level.
12. “Bifurcation” means bifurcation of a plot into two.
13. „„Building” includes;
a. A house, out-house, stable, privy, shed, well, verandah, fixed platform, plinth,
door step and any other such structure whether of masonry, bricks, wood, mud,
metal or any other material whatsoever;
P a g e | 188
Kanakapura LPA Master Plan 2031 Zoning Regulations
c. A ship, vessel, boat, tent and any other structure used for human habitation or
used for keeping animals or storing any article or goods on land.
14. “Building Line “means the line up to which the plinth of buildings may lawfully
extend within the plot on a street or an extension of a street and includes the
line prescribed, if any, or in any scheme.
15. “Building Set Back” is the minimum distance between any building or structure from
the boundary line of the plot.
16. “Bus Depot” means premises used by public transport agency or any other agency
for parking, maintenance and repair of buses. These may include the workshop.
17. “Bus Terminal” means a premises used by public transport agency to park the
buses for short duration to serve the public. It may include the related facilities for
passengers.
18. „„Carriageway” means the clear motorable width within the road right of way without
any obstructions such as drains, trees, electric poles, etc. The carriageway surface
may be or may not be paved. Width of the carriage way or the width of the
pavement depends on the width of the traffic lane and number of lanes.
19. „„Chajja” means a continuous sloping or horizontal cantilever projection provided
over an opening or external wall to provide protection from sun and rain.
20. “Chimney” means a structure usually vertical containing a passage or flue by which
the smoke, gas, etc., of a fire or furnace are carried off and by means of which a
draught is created.
21. “Civic Amenity" means a market, a post office, a bank, a bus stand or a bus depot,
a fair price shop, a milk booth, a school, a dispensary, a maternity home, a child
care centre, a library, a gymnasium, a recreation centre run by the Government or
Local Authority, a centre for educational, religious, social or cultural activities or
philanthropic service run by a co-operative society or society registered under the
Karnataka Societies Registration Act, 1960 (Karnataka Act 17 of 1960) or by a trust
created wholly for charitable, educational or religious purposes, a police station, fire
station, an area office or a service station of the Local Authority or the Karnataka
Urban Water Supply and Drainage Board or the Karnataka Electricity Supply
Companies, State and Central Govt. offices and such other amenity as the
Government may by notification specify.
22. “Clinic”: A premises used for treatment of out–patients by a doctor.
P a g e | 189
Kanakapura LPA Master Plan 2031 Zoning Regulations
23. “Clinical Laboratory”: A premises used for carrying out tests for diagnosis of
ailments.
24. “Commercial Building” means a building or part of a building, which is used as
shops, and/or market for display and sale of merchandise either wholesale or retail,
building used for transaction of business or the keeping of accounts & records for
similar purpose; professional service facilities, corporate offices, software services,
offices of commercial undertakings and companies, petrol bunk, restaurants,
lodges, nursing homes, cinema theatres, multiplex, kalyana mantapa, banks
,community hall and clubs run on commercial basis. Storage and service facilities
incidental to the sale of merchandise and located in the same building shall be
included under this group, except where exempted.
25. “Common Wall” means a wall built on land belonging to two adjoining owners, the
wall being the joint property of both owners.
a) If two adjoining owners build a dividing wall on their property, they are not
common walls and no part of the footings of either wall shall project on to the
land of the adjoining owner, except by legal agreement between the owners.
b) Any such „„common” or “dividing” wall shall be considered for the purpose of
these byelaws, as being equivalent to an external wall as far as the thickness
and height are concerned.
26. “Community Hall” means congregational place to be developed by Government or
Local Bodies, Trust, Society, etc., and having a Hall without separate kitchen and
dining. No upper floor shall be permitted.
27. “Convention Centre” means premises having enclosed space for conducting
seminars, conferences and exhibitions without cooking facilities.
28. “Corner Plot/ Corner Site” means a plot facing two or more intersecting
Streets/Roads.
29. “Corridor” means a common passage or circulation space including a common
entrance hall.
30. „„Court yard” means a space permanently open to the sky either in the interior or
exterior of a building within the site around a structure.
31. “Covered Area” means area covered by building / buildings immediately above the
plinth level, but does not include the space covered by;
a. Court yard at the ground level, garden, rocky area, well and well structures,
plant, nursery, water pool, swimming pool (if uncovered) platform around a tree,
tank, fountain, bench with open top and unenclosed sides by walls and the like;
b. Drainage, culvert, conduit, catch-pit, gully-pit, chamber gutter and the like;
P a g e | 190
Kanakapura LPA Master Plan 2031 Zoning Regulations
c. Compound or boundary wall, gate, un-storied porch and portico, chajja, slide,
swing, uncovered staircase, watchman booth including toilet. The area covered
by watchman booth or pump house shall not exceed 15 sqm depending on the
size of the plot and its requirement.
d. Sump tank and electric transformer.
32. “Cross Wall” means an internal wall within the building up to the roof level or lintel
level.
33. “Cultural Building” means a building built by a Trust, Society, Government or Local
body for cultural activities.
34. “Density” means concentration of population expressed in terms of number of
persons per hectare in a particular area.
35. “Development Plan” means Plan containing proposal for construction of one or
more buildings.
36. “Detached Building” means a building, the walls and roof of which are independent
of any other building in the same plot with open spaces on all sides, except the
portion covered by the garage.
37. „„Duplex” means a residential apartment in two levels connected with an internal
staircase.
38. “Drains” means natural valleys intended for flow of storm water /rain water.
39. „„Drainage” means the removal of any waste liquid by a system constructed for this
purpose.
40. “Dwelling Unit /Tenement” means an independent housing unit with separate
facility for living, cooking and sanitary requirements.
41. „„Exit” means a passage, channel or means of egress from any floor to a street or
other open space of safety.
42. “External Wall” means the outer wall of the building not being a partition wall even
though adjoining a wall of another building and also a wall abutting on an interior
open space of any building.
43. “First Floor” means the floor immediately above the ground floor or stilt, on which
second and other floors follow subsequently.
44. “Flatted Factory” means a premises having group of non-hazardous small
industrial units as given in Schedule I having not more than 50 workers and these
units may be located in multi-storeyed industrial buildings.
45. “Floor” means the lower surface in a storey on which one normally walks in a
building. The general term “floor” does not refer basement or cellar floor and
mezzanine.
P a g e | 191
Kanakapura LPA Master Plan 2031 Zoning Regulations
46. „„Floor Area Ratio”(FAR) means the quotient of the ratio of the combined gross area
of all floors, except the areas specifically exempted under these regulations, to the
total area of the plot, viz.
Total floor area of all the floors
Floor Area Ratio = ----------------------------------------------
Plot Area
47. “Footing” means the projecting courses at the base of a wall to spread the weight
over a large area.
48. "Foundation” means that part of structure which is below the lowest floor and which
provides support for the superstructure and which transmits the load of the
superstructure to the bearing strata.
49. “Frontage” means the width of any site/land abutting the access/public road.
50. „„Garage” means a structure designed or used for the parking of vehicles.
51. “Government” means the Government of Karnataka.
52. “Ground Floor” means immediately above the level of the adjoining ground level on
all sides or above the basement floor.
53. “Guidance Value” is the value fixed by the Sub-Registrar for the land/building as per
The Karnataka Stamp Act -1957.
54. “Gas godown” means premises where LPG cylinders are stored.
55. “Ground Coverage” means the total area covered by building immediately above
the plinth level. Swimming pool, sump tank, pump house and electric substation,
utilities are not included.
56. „„Group Housing” means apartments or group of apartments on a minimum plot size
of 1 hectare or more with one or more floors and with one or more dwelling units in
each floor. They are connected by an access of not less than 3.5 m in width, if they
are not approachable directly from the road.
57. “Habitable Room” means a room occupied or designed for occupancy by one or
more persons for study, living, sleeping, Eating, cooking but does not include
bathrooms water closet compartments, laundries serving and storage pantries,
corridors , cellars, attics and spaces that are not used frequently or during extended
periods.
58. “Hazardous Building” means a building or part thereof used for:
a. Storage handling, manufacture of processing of radioactive substances or of
highly combustible or explosive materials or of products which are liable to burn
with extreme rapidity and/or producing poisonous fumes or explosive
emanations;
P a g e | 192
Kanakapura LPA Master Plan 2031 Zoning Regulations
P a g e | 193
Kanakapura LPA Master Plan 2031 Zoning Regulations
P a g e | 194
Kanakapura LPA Master Plan 2031 Zoning Regulations
80. “Loft” means a residual space above normal floor level which may be constructed or
adopted for storage purposes.
81. “Lift” means an appliance designed to transport persons or materials between two
or more levels in a vertical direction by means of a guided car platform.
82. „„Master Plan” means Master Plan, 2031 prepared for the Local Planning Area of
Kanakapura approved by the Government under the Karnataka Town and Country
Planning Act, 1961.
83. “Mezzanine Floor” means an intermediate floor between Ground floor and First floor
only, with area of mezzanine floor restricted to 1/3 of the area of that floor and with a
minimum height of 2.20m. Mezzanine floor is permitted on commercial uses only.
Such Mezzanine floor shall be accessible only from the Ground floor.
84. “Multilevel Car Parking (MLCP)” means multilevel R.C.C. structure used for vehicle
parking connected to all floors by means of ramps or ramps with mechanical
elevators. MLCP can be an independent structure or part of a building with other
land uses.
85. “Multiplex” means, a building housing an entertainment and cultural centre including
cinema theatres, restaurants, food courts, shops etc.
86. “Nursing Home” means, a premises having medical facility for in-patient and out-
patient patients, providing up to 30 beds.
87. „„Open Space” means an area forming an integral part of the plot, left open to sky in
a building.
88. “Parapet” means a low wall or railing built along the edge of a roof or balcony.
89. “Parking Space” means an area enclosed or unenclosed, covered or open sufficient
in size to park vehicles together with a drive-way connecting the parking space with
a street or any public area and permitting the ingress and egress of the vehicles.
90. “Park”: An area used for leisure, recreational activities, it may have related
landscaping, public toilet and fence.
91. “Playground”: An area used for outdoor games, it may have on it landscaping,
parking facilities and public toilet.
92. “Penthouse” means a covered space not exceeding 10 sqm on the roof of a
building, which shall have at least one side completely open.
93. „„Plinth” means the portion of a structure between the surface of the surrounding
ground and surface of the floor immediately above the ground.
94. “Plinth Area” means the built up covered area of the building.
95. “Plinth Level” means the level of the floor of a building immediately above the
surrounding ground.
P a g e | 195
Kanakapura LPA Master Plan 2031 Zoning Regulations
96. “Plot or Site”: A parcel of land enclosed by definite boundaries and held in one
ownership.
97. “Porch or Portico” means a roof cover supported on pillars or cantilevered
projection for the purpose of pedestrian or vehicular approach to a building.
98. “Public and Semi-Public Building” means a building used or intended to be used
either ordinarily or occasionally by the public and owned by State or Central
Government or Quasi Government or Local Authorities such as offices, religious
institutions (a church, temple, chapel, mosque or any place of public worship),
educational institutions (college, school), health institutions, library, cultural and
recreational institutions/theatres of noncommercial nature, public concert room,
public hall, hospital run by public institutions, public exhibition hall, lecture room or
any other place of public assembly, Dharmashala.
99. “Pump Room” means a room provided below ground level adjacent to sump tank to
house various types of pumps with self-priming mechanism however the entrance
shaft of the pump room of a maximum of 2Mx2M may be permitted above the
ground level.
100. “Recreational Club” is a premises used for assembly of a group of persons
for social and recreational purposes with all related facilities.
101. “Repair Shop” is a premises similar to retail shop for carrying out repair of house
hold goods, electronic gadgets, automobiles, cycles etc.,
102. “Residential Building” means a building used or constructed or adopted to be
used wholly for human habitation and includes garden, ground, garages, stables,
and other out-houses if any, necessary for the normal use of the building as a
residence.
103. “Restaurant” is a premise used for serving food items on commercial basis
including cooking facilities, with covered or open space or both having seating
facilities.
104.”Retail Shop” is a premise for sale of commodities directly to the Consumer with
necessary storage.
105. “Right of way (ROW)” is the width of land acquired for the Road, along its
alignment. It should be adequate to accommodate all the cross sectional
elements of the highway and may reasonably provide for future development.
To prevent development along highways, control lines and building lines shall be
provided. Control line is a line which represents the nearest limits of future
uncontrolled building activity in relation to a road. Building line represents a line on
P a g e | 196
Kanakapura LPA Master Plan 2031 Zoning Regulations
either side of the road; between which and the road no building activity is permitted
at all.
106. ”Road Level” is the level of the road at the access to the property or in the event of
more than one entrance to the property the road level considered shall be at the
centre of the property frontage. The level of the road shall be taken at the centre of
the carriage way.
107. “Road Width” means the distance between the boundaries of a road including
footways and drains measured at right angles to the centre of the plot.
Note: In case of sites at T junction or at the intersection of multiple roads, the width of
the road parallel to the site shall be considered.
108. “Room Height” means the vertical distance measured between the finished floor
surface and the finished ceiling surface where a finished ceiling is not provided,
the underside of the joist or beams or tie beams shall determine the upper point of
measurement. The minimum height of the room shall be 2.75 m.
109. “Row Housing” means more than one residential buildings in a row attached to
each other with only front, rear and interior open spaces.
110. “Semi-detached Building” means a building detached on three sides with open
spaces as specified in these regulations.
111. “Service Apartment” means fully furnished room or suite or rooms with kitchen,
which is intended to be used on rental basis.
112. “Service Road” means a road / lane provided adjacent to a plots(s) for access or
service purposes as the case may be.
113. “Services” means activities incidental to the land use of the building such as
electrical sub-station, electrical panel room, generators, HVAC (Heating,
Ventilation & Air conditioning) facilities, plumbing and sanitary facilities, STP,
refrigeration and cold storage, firefighting facilities, building management systems,
car park management facilities and similar such activities.
114. Service Industry” means an industry where services are offered with or without
power. If power is used, aggregate installed capacity shall not exceed 5 HP. The
site area shall not exceed 240 sqm. Service industries shall be permitted in the
residential and commercial zone under special circumstances and in the light
industries zone of the Master Plan as given in Schedule I.
115. “Set back” means the open space prescribed under these Zonal Regulations
between the plot boundary and the plinth of the building.
116. “Stilt Floor” means a floor consisting of columns, used only for vehicle parking It
may also be open parking area provided at ground level and not be covered by
P a g e | 197
Kanakapura LPA Master Plan 2031 Zoning Regulations
enclosures and shutters. The height of the stilt floor shall be a minimum of 2.4m
and shall not exceed 3.0m. The height shall be considered for calculating the total
height of the building. In case of mechanical or multi-level parking the maximum
height shall be 3.6 m.
117. “Storey” means the space between the surface of one floor and the surface of the
other floor vertically above or below.
118. „„Staircase Room” means a room accommodating the stairs and for purpose of
providing protection from weather and not used for human habitation.
119. „„Town Municipality” means the Town Municipal Council of Kanakapura
established under the Karnataka Municipality Act.
120. “Villa” An independent house/dwelling on a given plot.
121. “Wholesale” An area where goods and commodities are sold or, delivered to
retailers, the premises include storage/ go down, loading and unloading facilities.
122. “Zonal Regulations” mean the Regulations governing land use made under the
Karnataka Town and Country Planning Act, 1961.
Note: -
1. The words and expressions not defined in these regulations shall have the same
meaning as in the Karnataka Town and Country Planning Act, 1961 and Rules, the
Building Bye Laws of Bangalore Mahanagara Palike and National Building Code of
India 2005.
2. Any other unforeseen situations that arise during implementation of this Zonal
Regulations for which provisions are not found in this, the Authority may take
decision in consultation with the BMRDA or Director of Town & Country Planning.
3. The Authority till the framing of its own Building Byelaws under Section 75 of the
KTCP Act 1961 shall adopt the relevant portions of the Building Byelaws of the
Bangalore Mahanagara Palike not covered under these Regulations in respect of
size of drawings, qualifications of persons drawing the plans, size of habitable rooms,
ventilation, facilities for physically handicapped persons, fire safety requirements,
staircase details, etc. in a building
4. Safety measures against earthquake in building construction:
Buildings shall be designed and constructed adopting the norms prescribed in the
National Building Code and in the “criteria for earthquake resistant design of
structures” bearing No. IS 1893-2002 published by the Bureau of Indian Standards,
making the buildings resistant to earthquake.
P a g e | 198
Kanakapura LPA Master Plan 2031 Zoning Regulations
For the purpose of these regulations, the planning area of the town is divided into
following use zones.
1. Residential
2. Commercial
3. Industrial
4. Public and Semi-Public
5. Public Utilities
6. Open Spaces, Parks, Playgrounds, Buffer along River and Burial Ground
7. Transport and Communication
8. Agricultural Use
9. Areas of special control
NOTE:
i. Uses permissible under special circumstances by the Authority in different
zones provided that:-
a) The proposal for all such changes are displayed in the notice board of the
Planning Authority, inviting objections from the public within a period of
not less than fifteen days from the date of display as may be specified by
the Planning Authority.
ii. Roads are permitted in all the zones.
iii. Prior to giving permission for religious use and school or college buildings in
different zones either under uses permissible or under special circumstances
by the Authority, instructions given in Government Circular No. Na A E 237
Be Ma Praa 2009 dated 19-09-2009 is to be followed.
iv. Uses permitted in all the above category of zones are subject to space
standards as given in Table-1.
v. Space standards for various buildings/ uses in different zones are strictly
adhered to while giving permission for change of land use / alienation as
prescribed in Table – 1.
P a g e | 199
Kanakapura LPA Master Plan 2031 Zoning Regulations
Uses of land that are permitted and those that may be permitted under special
circumstances by the Kanakapura Planning Authority in different zones of the local planning
area shall be as follows:
a. Uses permitted:
P a g e | 200
Kanakapura LPA Master Plan 2031 Zoning Regulations
Note:
a) Diesel generators equivalent to the quantity of power supplied by the Karnataka
Power Transmission Corporation Limited (KPTCL) may be permitted as substitute
to power cut and power failures in any zone after obtaining information on the
quantity of power supplied to a premises and the capacity of generator required
from KPTCL. However, in residential zone installation of diesel generators be
discouraged and shall be given in exceptional cases after spot verification and
obtaining No Objection Certificate from the KSPCB.
b) Where service apartments and other non-residential activities are permitted, fee
under section 18 of KTCP Act, 1961 for commercial use shall be levied.
a. Uses permitted:
All uses that are permitted in residential zone, traffic & transportation and
public/semipublic zones subjected to statutory NOC„S like FIRE, KSPCB etc., petty
shops/ retail shops & hardware shops, job typing / computer training institutes, cyber
cafe, and internet browsing, departmental stores, grocery/ HOPCOMS, vegetable
shops, newspaper, stationery and milk booth, commercial and corporate offices /
clinics belonging to “professional services” like advocates and doctors, architects and
self-owned, shopping/ commercial complexes and service establishments like hair
dressing saloons, massage centers, laundries, dry cleaning and tailoring shops,
restaurants and hotels, eateries such as darshinis, tea stalls, and take away, bakery
and sweet stalls , mutton and poultry stalls, cold storages, clubs, hostels, newspaper
or job printing, all types of offices, STD/FAX/internet center/ ATM centers/ banks,
insurance and consulting and business offices, places of amusement or assembly,
microwave towers and stations, advertising signs conforming to relevant building
byelaws, photo studio, church, temple and other places of worship and assembly,
educational, medical/engineering/ technical and research institutions,(on the sites
having minimum 2 ha with a minimum of 12m wide approach road), financial
P a g e | 201
Kanakapura LPA Master Plan 2031 Zoning Regulations
Note:
I Commercial complexes / office complexes/ neighborhood shops should have
sufficient provision for toilet for visitors in each floor and should be shown on
plan. It shall have waste disposal arrangements.
P a g e | 202
Kanakapura LPA Master Plan 2031 Zoning Regulations
multi-level), bus and truck terminals, loading and unloading facilities, warehouses,
public utilities like garbage and sewage disposal, municipal and Government offices,
dwellings for manager, watch and ward staff in an area not exceeding 1000 sqm or
10% of the total area, whichever is lower, canteen and recreation facilities, kalyana
mantapa, office, shops, clubs, job printing, banks, restaurants, dispensary and
automobile service stations.
All uses as per the categorization of light industries, medium industries and heavy
industries defined by Department of Industries and Commerce (schedule– I) except
Obnoxious and hazardous industries. There is no power limitation for industries to be
permitted in this zone.
Note:
i. To encourage work-home relationship, 40% of the available land area for
development of residential use for providing quarters to the employees of that
particular industry, subject to clearance from the KSPCB in an area of 10 hectares
and above.
ii. Wherever IT and BT industries are permitted in area of 5 hectares and above, 30% of
the area may be allowed for residential apartment for the convenience of the
employees subject to clearance from the KSPCB
iii. Residential regulations shall be followed for approval of residential development
within the premises of industrial/ I.T. and B.T. area.
iv. Uses permitted under this category are subject to environmental clearances.
P a g e | 203
Kanakapura LPA Master Plan 2031 Zoning Regulations
Schedule – I
1. Illustrative list of household and service industries permitted in Residential and
Commercial Zone:
Sl. No. Description
1. Bread and bakeries
2. Confectionary, candies and sweets
3. Biscuit Making
4. Ice, ice-Cream
5. Cold Storage (small scale)
6. Aerated water and fruit beverages
7. Huller and flour Mills
8. Automobile, scooter and cycle service and repair workshop
9. Furniture (Wooden and Steel)
10. Printing, book binding, embossing, etc.
11. Laundry, dry Cleaning and dyeing facilities
12. General jobbing and machine shops
13. Household utensil repairs, welding, soldering, patching and polishing.
14. Photography, printing (including sign board printing)
15. Vulcanizing
16. Tailoring
17. Hand looms
18. Velvet embroidery shops
19. Art weavers and silk sarees, printing and batik works
20. Jewellery, gold ornaments and silver wares
21. Mirror and photo frames
22. Umbrella assembly
23. Bamboo and cane products
24. Sport goods and repair shops
25. Musical instrument repair shops
26. Optical lens grinding, watch, pen repairs
27. Radio and T.V. repair shops
28. Electric lamp fittings
29. Shoe making and repairs
30. Audio / Video libraries
31. STD / ISD counters
P a g e | 204
Kanakapura LPA Master Plan 2031 Zoning Regulations
P a g e | 205
Kanakapura LPA Master Plan 2031 Zoning Regulations
P a g e | 206
Kanakapura LPA Master Plan 2031 Zoning Regulations
P a g e | 207
Kanakapura LPA Master Plan 2031 Zoning Regulations
P a g e | 208
Kanakapura LPA Master Plan 2031 Zoning Regulations
a) Uses permitted:
All Central, State and Quasi Government offices/ owned complexes, and centres
and institutional office, educational, college campus including hostel facilities for
students, integrated residential schools/colleges, higher educational Institutions,
colleges, cultural and religious institutions including libraries, reading rooms and
clubs, medical and health institutions, cultural institutions like community halls, opera
houses, clubs, auditoriums, cultural complexes predominantly non-commercial in
nature, exclusive places of worship/congregation, public toilets, nursery creches,
civic amenities and large infrastructure facilities of health, education, sports, cultural
and social institutions, utilities and services, offices/ sub offices of utilities, water
supply installations including disposal works, electric power plants, high tension and
low tension transmission lines, sub stations, gas installation and gas works,
firefighting stations, spastic rehabilitation centers, orphanages, Govt. dispensaries,
police stations, post offices, telecommunication/microwave tower, filling stations, fire
stations, broadcasting & transmission stations, banks, and quarters for essential staff
and all uses permitted under parks and playgrounds, traffic and transport related
facilities, Public Transport terminals and interchanges public distribution system
shops, bill collection centers, dobhi ghat, dharmashala and research institutions.
Note:
Retail shops, restaurants, filling stations, clubs, banks, canteens, dwellings required
for power maintenance and functioning of public and semi-public uses in the zone
may be permitted when they are run on non-commercial basis in their own premises
and ancillary to the respective institutions.
Parking lot, repair shops, parks, play grounds, maidens and stadiums (no area limit)
and recreational uses, stadium, cemeteries, crematorium, clubs, canteen, libraries,
aquarium, planetarium, museum, horticultural nursery and swimming pool,
orphanages and old age homes, airport related ancillary uses
P a g e | 209
Kanakapura LPA Master Plan 2031 Zoning Regulations
Note:-
i. In case any private property is included within the boundary of any
existing Public and Semi Public building and if the owner can establish
the ownership of such property vests with him/her, then the land use
adjoining the Public & Semi Public building may be assigned to such
private property by the Authority (to be decided by the authority on
case to case basis only).
ii. The regulations for the above will be decided by the Authority.
iii. In case of new developments, these shall remain as non-buildable areas and
remain as reservations and marked for the purpose intended.
P a g e | 210
Kanakapura LPA Master Plan 2031 Zoning Regulations
a) Uses permitted:
Parks, play grounds, stadia, NMT infrastructural facilities, sports complexes,
children„s play land inclusive of amusement parks such as Disney land type, toy
trains, parkways, boulevards, cemeteries and crematoria, burial grounds, public
toilets, parking, sewage treatment plants, water storage, sewage treatment plants,
public use ancillary to park and open space and open space, parking and
playground. The area of such ancillary use shall not exceed 5% of total area.
a) Uses permitted:
Railway lines, railway yards, railway stations, railway workshops, airport roads,
road transport depot, storage depots, bus stations, bus stands and bus shelter,
bus bays, auto stand, parking areas, multi-level car parking information, kiosk
Integrated, bus terminals, TTMC & metro stations, truck terminals, MRTS terminals,
workshop and garages for two wheelers/ LMV/ HMV and filling stations, service
stations, airports and helipad, post offices, telegraph offices, telephones and
telephone exchanges, television telecasting and radio broadcasting stations,
Transport offices, microwave stations and offices in their own premises and
residential quarters for watch and ward, filling stations, loading and unloading
platforms (with/without cold storage facility), weigh bridges, cargo terminals and
transfer of cargo between different types of transport (rail, road, air), Automobile
spares and services, transport depot, storage depots, bus stations, bus stands and
bus shelter, commercial, office use shall be permitted & encouraged in all transport
P a g e | 211
Kanakapura LPA Master Plan 2031 Zoning Regulations
hubs & interchanges like TTMC & IMTH etc., Provided that the built up area for
such use does not exceed 25% of developable area. Traffic and Transportation
Management Centres, Transit Interchange terminals/ Transit Terminals shall be a
minimum of 50 % of the permissible developable area.
Hotels, motels, clubs, go downs, special warehousing and indoor recreational uses,
shops, canteens, restaurants, banks, dwellings required for proper maintenance of
the transport and communication services in their own premises as an ancillary to the
respective institutions not exceeding 25% of the total developable area.
Note
1. Regulations for transit oriented development:
1. In case of development for any use abutting road with ROW/Road width of 60
m and above additional FAR of 0.5 over and above the FAR provided against
the said use shall be allowed within the 150 m radius of any transit hub/ major
interchanges (railway station, B.R.T. and metro) in Zonal Regulations of
Kanakapura Master plan, on payment of fee at twice the applicable
prescribed rates of Betterment levy subject to statutory clearances viz. fire,
Airport etc.
2. In case of development around Railway station/Metro Station/any other
Mass Rapid Transport System:
Station in the radius of 150 m from the boundary of the same an additional FAR
of 0.5 over and above FAR provided against the said use in Zonal Regulations of
Kanakapura Master Plan, on Payment of fee at twice the applicable prescribed
rates of betterment levy subject to statutory clearances e.g. Airport, Fire safety,
Pollution control etc.,
3. Minimum Foot path width shall be 2.0m to 3.0m based on the Road width as
indicated in road cross sections ( refer Annexure ).
4. As far as possible the traffic and transportation use should be located as per
the envisaged activity. It is desirable to have truck terminal/ freight complex/
logistics hub next to or alongside the industrial use. Similarly the public mass
transit is meant to take on maximum number of repeat trips hence major
terminals of passenger transit should be located at high density work place
and high density residential areas.
P a g e | 212
Kanakapura LPA Master Plan 2031 Zoning Regulations
a) Uses Permitted:
Agriculture and horticulture, children‟s play land inclusive of amusement parks, such
as Disney land type, eco-tourism activities, toy trains, dairy and poultry farming,
pisciculture, Piggeries farms, livestock rearing milk chilling centers, cold storage,
farm houses and their accessory building and uses not exceeding 200 sq. m. of plinth
area for the farmers own use within the limitation of minimum plot area of 1.20
hectares. Not exceeding 250 sq m of plinth area within the plot area limitation of 1.2
ha limited to G+ 1 floor. Uses specifically shown as stated in the land use plan like
urban village, brick kilns, concrete block, rice mills, sugar mills, jaggery mills,
gardens, orchards, nurseries and other stable crops, grazing pastures, forest lands,
marshy land, barren land and water sheet, highway amenities viz., filling stations,
weigh bridges and check posts.
Agro processing units (as defined by C & I Dept.), Urban amenities such as burial
grounds, sports grounds, clubs/ sports clubs, stadiums, playgrounds, parks and
garden land, water sports, golf centers, race course, race / driving testing tracks,
cultural buildings, places of worship, air terminal and helipads, educational and
health institutions, hospitals, libraries, exhibition centers, park and open spaces,
graveyards/burial grounds, rehabilitated schemes of government, institutions relating
to agriculture, research centres, LPG bottling plant (min. 500 m away from human
habitation), mini power projects, ware house, storage and sale of farm products
locally produced, provided the Ground Coverage does not exceed 15% and subject
to a maximum of Ground+ First floor only. Service and repairs of farm machinery and
agricultural supplies, old age and orphanage homes, Public utilities such as solid
waste landfills, water treatment plants, power plants, fuel stations and other highway
P a g e | 213
Kanakapura LPA Master Plan 2031 Zoning Regulations
amenities such as weigh bridges, check posts and toll gates having access to major
roads, truck terminals, quarrying and removal of clay and stone up to 3.0 m. depth
and crushing, wind mills, solar energy stations, residential developments within the
area reserved for natural expansion of villages and buildings in such areas should
not exceed two floors (Ground + one).
Within 150 m radius from the existing gramathana (as defined in the note below), for
those villages having a population up to 1000 as per 2011 census, and for every
additional 1000 population additional 50 m for uses permitted under residential and
agricultural zone may be permitted with the following conditions.
1) FAR: 1.0
2) Maximum no of floors: G+1
3) Setbacks and coverage for the respective uses: As per Table no 8
NOTE:
Gramathana: means old village settlement as earmarked in the revenue survey map
(village map). Any addition already made to the gramathana in any form shall not be
considered while measuring the distance between land in question and gramathana.
For efficient and scientific management and disposal of solid waste generated within Bruhat
Bangalore Mahanagara Palike limits, certain areas lying within Kanakapura Local Planning
Area have been identified. Following regulations are laid out in order to restrict development
around these areas as per Government Order No. Na A E 325 MNU 2007 dated 06-10-2007:
a. Area within a distance of 50 m from the premises of the SWM area/ site is
declared as “Buffer Zone” and No development or construction is permitted in
this zone. However set back and tree plantation may be allowed in this zone.
b. Area within a distance of 200 m from the premises of the SWM area/ site is
declared as “Sensitive Zone” and developments or construction may be
permitted without affecting solid waste management area / site.
P a g e | 214
Kanakapura LPA Master Plan 2031 Zoning Regulations
The historical monuments in any city reflect the past glory of the city. As they attract
tourists both from inside and outside the country. While permitting developments around
historical monuments, care has to be taken to see that their aesthetic environs are not
affected. In order to preserve aesthetic environs around these monuments it is necessary to
declare the areas surrounding these monuments as zones of special control and impose the
special regulations around these monuments.
The Archeological Survey of India has not yet declared any of the monuments in the
Kanakapura town and the State Archeological Department has also not identified any of the
monuments in the Kanakapura town.
If the Planning Authority observes any Heritage structures, precincts of historic and/or
aesthetic and/or Architectural and/or cultural or environmental significance and natural
features and sites of scenic beauty, then Authority may demarcate special Development
control areas for regulation of development around these areas, to preserve the importance
of the concerned heritage structure and also to control the surrounding developments so that
they do not mar the grandeur or beauty or view of the heritage structure for the purposes of
implementation.
A special Heritage committee may be constituted with the prior approval of the Government
to examine the proposals of development or any matter related to development, in the
various regulation areas, if received by the Authority, under the provisions of special
Regulations and to make recommendations to this Authority for consideration.
P a g e | 215
Kanakapura LPA Master Plan 2031 Zoning Regulations
Note:
i. No permission for any development around notified historical monument, shall be
accorded unless concurrence/ No Objection Certificate is received from the
competent authority i.e. Archaeological Survey of India, State Archaeology
Department.
ii. Any subsequent amendments to the Archaeology Act concerned regarding prohibited
area such amendments shall mutatis mutandis apply to these regulations.
Table- 1
Space Standards for various Buildings /Uses
P a g e | 216
Kanakapura LPA Master Plan 2031 Zoning Regulations
P a g e | 217
Kanakapura LPA Master Plan 2031 Zoning Regulations
Note:
a. For Plots of 4000 sqm and above, a minimum setback of 5.00m on all sides shall be
insisted
b. Multi Dwelling Units (Apartments) shall be allowed only on plot sizes of above 750sqm
and the road width shall be more than 9m
Note:
i. When car garage is proposed on the right side rear corner, the minimum front
setbacks shall be 3.0 m;
ii. For residential, commercial, public and semi-public, traffic and transportation,
public utility buildings, above 10 m in height, the setbacks shall be insisted as
per Table - 3;
iii. When minimum set back of 2.0 m is left on the right side, a scooter garage may
be permitted at the back side limiting the depth of the garage to 3.0 m
Table – 3
Exterior open spaces / setbacks for residential, commercial, public and
Semi-public, traffic and transportation, public utility buildings
exceeding 10.00 meters in height.
Minimum Exterior open spaces
setbacks
Sl. No. Height of building in meters
to be left on all sides
(in m)
1 Above 10.0 Up to 12.0 4.5
2 Above 12.0 Up to 15.0 5.0
3 Above 15.0 Up to 18.0 6.0
4 Above 18.0 Up to 21.0 7.0
5 Above 21.0 Up to 24.0 8.0
6 Above 24.0 Up to 27.0 9.0
7 Above 27.0 Up to 30.0 10.0
8 Above 30.0 Up to 35.0 11.0
9 Above 35.0 Up to 40.0 12.0
10 Above 40.0 Up to 45.0 13.0
11 Above 45.0 Up to 50.0 14.0
12 Above 50.0 16.0
P a g e | 218
Kanakapura LPA Master Plan 2031 Zoning Regulations
TABLE – 4
Maximum Floor Area Ratio & Road Widths for Different uses
Note:
Only effluent treatment plant, open to sky swimming pool, car parking are excluded from
FAR computations.
All projects honored by the Karnataka Housing Board. The following norms shall be adopted
while approving building plans for group housing;
a) The approach road to a group housing project must have a minimum width of 12
m;
b) A development plan showing the general arrangement of residential building
blocks, and dimensions of the plots earmarked for each building block, access
roads to abutting lands, parks, open spaces and civic amenity areas, shall be
obtained prior to according approval to the building plan;
c) Setbacks should be provided with reference to the depth and width of total plot
area;
d) The floor area ratio (FAR) shall be with reference to the width of the public road
abutting the property and the FAR shall be calculated for the net area of the plot
as prescribed in Table – 6 after deducting the area reserved for civic amenities.
e) The coverage shall be with reference to the total area of the development plan.
f) The distance between any two buildings shall not be less than half the height of
the taller building.
G) 15% of the total area to be reserved for civic amenity, parks and open spaces.
Out of which shall be 10% for parks and open spaces and 5% for Civic Amenity.
P a g e | 219
Kanakapura LPA Master Plan 2031 Zoning Regulations
TABLE – 6
Maximum plot coverage, FAR, minimum setbacks and minimum road width for
group housing
Note:
a) Approval of development plan showing the general arrangement of residential
building blocks, and dimensions of plot earmarked for each building blocks, means of
access roads and civic amenity areas, should precede the approval to building plan.
b) In case, the height of group housing building exceeds 10.0 m, then setback to be left
all-round the premises shall be as per Table – 2.
c) Parking requirement shall be as per Table – 9. In addition, 10% of the total parking
shall be reserved for visitors parking separately.
d) Internal roads and park area shall be developed by the owner / developer himself for
the specified purpose only.
e) 5% of total plot area may be utilized for commercial purpose also.
f) Park area reserved in the development plan shall be handed over free of cost to the
Authority by a relinquishment deed and the same may be allowed to be maintained
by the local residents’ association (Regd), if the authority so desires.
g) C.A. sites and park area reserved in the development plan shall be handed over free
of cost to the Authority by a relinquishment deed. Preference may be given to the
owner/developer of the respective project for lease of C.A. area reserved in the
Group Housing project.
h) The roads as shown in the Master Plan shall be incorporated and shall be handed
over to the Authority free of cost through a registered relinquishment deed.
P a g e | 220
Kanakapura LPA Master Plan 2031 Zoning Regulations
2. Building coverage
TABLE – 8
Row Housing (Maximum 12 units, minimum 3 units)
1 Minimum combined area of plot 210 sq m
3 Building coverage
P a g e | 221
Kanakapura LPA Master Plan 2031 Zoning Regulations
a. Front 8.00 m
4. Minimum setbacks b. Rear 4.50 m.
c. Sides 4.50 m.
TABLE – 10
Coverage, Floor Area Ratio and Open space for Industrial buildings
Other Minimum
Plot area in Max. plot Floor area Minimum
sides road width
sq m coverage Ratio Front setback in m
in m in m
Up to 230 80% 1.00 1.00 1.00 9
Note: whenever the plot of the minimum size prescribed is not facing the required width of
road, permission shall be granted to the maximum extent of built up area allowable to
that particular road width. The minimum frontage for plots up to 230 sqm shall be 9m
and for plots above 230 sqm shall be 12m.
P a g e | 222
Kanakapura LPA Master Plan 2031 Zoning Regulations
FAR and Ground Coverage in Industrial Zone for IT related activities to be followed as per
table 10 A below
Table -10 A
Sl Ground Permissible
Size of plot (sq m) Road width (m)
no coverage far
1 Upto 1000 55% 1.50 Above 9m upto 12m
2 Above 1000 upto 2000 50% 1.75 Above 12.0m upto 18.0
3 Above 2000 upto 4000 50% 2.00 Above 18.0 upto 24.0
4 Above 4000 upto 6000 45% 2.25 Above 24.0 upto 30.0
Note: whenever the plot of the minimum size prescribed is not facing the required width of
road, permission shall be granted to the maximum extent of built up area allowable to
that particular road width.
Parking regulations for IT and BT related buildings
Each off-street parking space provided for motor vehicles shall not be less than (2.5
m x 5.5 m) 13.75 sq m area and for scooter and cycle parking spaces provided shall
not be less than 3 sq m and 1.4 sq m respectively and it shall be 25% of the car
parking space.
For building of different uses, off-street parking spaces for vehicles shall be provided
as stipulated the Table - 11
P a g e | 223
Kanakapura LPA Master Plan 2031 Zoning Regulations
6 Assembly/Auditorium 25 seats
7 Government or Semipublic buildings 100 sq m floor area
8 Retail business 75 sq m floor area
P a g e | 224
Kanakapura LPA Master Plan 2031 Zoning Regulations
Additional parking or part thereof shall be provided when the part area exceeds 50%
of the prescribed limits/ standards
Note:
(a) Parking space shall be with reference to total floor area after deducting space covered
by lift room, stair case, open balcony and ducts open to sky in addition to the area
deducted for the purpose of calculating the F.A.R. Any place used for parking is not
included in the calculation of F.A.R. Incase, additional car parking is provided as part of
parking complex or parking lot in excess of required car parking, such area shall be
exempted from reckoning the F.A.R.
(b) Up to 50 sq m in the case of shops, parking spaces need not be insisted.
(c) Off-street parking space shall be provided with adequate vehicular access to a
Street and the area of drive aisles subject to a minimum of 3.50 m and such other
provision required for adequate maneuvering of vehicles shall be exclusive of the
parking spaces stipulated in these Zonal Regulations.
(a) First basement for plots up to 1000 sq m and second basement shall be
permissible for plots more than 1000 sq m.
(c) Car parking can be provided in the setback areas provided; a minimum of 3.0 m is
left free from the building.
i. Common and continuous cellar parking floors between adjoining blocks would be
allowed depending upon structural safety aspects.
ii. The parking spaces should be efficiently designed and clearly marked and
provided with adequate access, aisle, drives and ramps required for maneuvering
of vehicles. All sides of the stilt parking shall be open. When stilt parking is
provided, the height shall not exceed 2.40mtrs and height shall be considered for
calculating the total height of the building.
P a g e | 225
Kanakapura LPA Master Plan 2031 Zoning Regulations
iii. Stilt floor/Cellar parking floor shall be used only for parking and not for any
habitation purpose. Misuse of the area specified for parking of vehicles for any
other use shall be summarily demolished / removed by the Enforcement
Authority.
iv. For parking spaces in second basement and upper storey’s of parking floors, at
least two ramps of minimum 3.5 m width or one ramp of minimum 5.4 m width
and maximum slope of 1:8 shall be provided.
i. Basement / cellar shall be permitted to extend in the setback area except the
front setback after leaving a minimum of 2.0 m from the property line.
ii. A maximum of three basements in the case of 3-Star Hotels and above can be
permitted for parking and services
iii. Every basement storey shall be at least 2.4 m in height from the floor to the
bottom of the roof slab / beam / ceiling (whichever is less) and this height of
basement floor shall not exceed 2.75 m
iv. The basement storey shall not be projected more than 1.20 m above the average
ground level
a. Access ramps, elevators, escalators to the upper floors or terrace shall not be
provided in the setback area and the ramps to be within the plinth area of the
building and shall be exempt from F.A.R. calculation.
P a g e | 226
Kanakapura LPA Master Plan 2031 Zoning Regulations
subject to condition that they satisfy Fire and Airport Authority restrictions
wherever applicable.
1.3.8 Corridor
The minimum widths of corridor for different uses of building are as given in the Table
12.
TABLE – 12
Minimum Width of Corridors
Minimum width of the
Sl. No. Building use or type
corridor in m
a) No building/ development activity shall be allowed in the bed of water bodies like
nala, and in the Full Tank Level (FTL) of any lake, pond etc.
P a g e | 227
Kanakapura LPA Master Plan 2031 Zoning Regulations
No building shall be erected below an electrical line, as well as within the horizontal distance
from the electrical line indicated in the Table - 13. The vertical distance below the level of the
electrical line and the topmost surface of the building corresponding to the minimum
horizontal distance shall be as indicated in Table - 13. The minimum vertical clearance is not
applicable if the horizontal distance exceeds the minimum prescribed.
TABLE – 13
Distance of buildings from electrical lines
P a g e | 228
Kanakapura LPA Master Plan 2031 Zoning Regulations
(a) Single dwelling unit measuring 200 sq m of floor area or site area of more
than 400 sq m whichever is more.
(b) 500 lpcd for multi dwelling unit / apartments for every 5 units and multiples
thereof.
Solar photovoltaic lighting systems shall be installed in multi-unit residential
9 buildings (with more than five units) for lighting the setback areas, drive ways,
and internal corridors.
The following systems may be adopted for harvesting the rainwater drawn from
terrace and the paved surface.
1. Open well of a minimum of 1.00 m dia. and 6.00 m in depth into which rainwater may
be channeled and allowed after filtration for removing silt and floating material. The
well shall be provided with ventilating covers. The water from the open well may be
used for non-potable domestic purposes such as washing, flushing and for watering
the garden, etc.
P a g e | 229
Kanakapura LPA Master Plan 2031 Zoning Regulations
2. Rainwater harvesting for recharge of ground water may be done through a bore well
around which a pit of one meter width may be excavated up to a depth of at least 3.00
m and refilled with stone aggregate and sand. The filtered rainwater may be
channeled to the refilled pit for recharging the bore well.
4. The surplus rainwater after storage may be recharged into ground through percolation
pits, trenches, or combination of pits and trenches. Depending on the geomorphologic
and topographical condition, the pits may be of the size of 1.20 m width x 1.20 m
length x 2.00 m to 2.50 m depth. The trenches can be or 0.60 m width x 2.00 m to
6.00 m length x 1.50 m to 2.00 depth. Terrace water shall be channeled to pits or
trenches. Such pits or trenches shall be backfilled with filter media comprising the
following materials. –
P a g e | 230
Kanakapura LPA Master Plan 2031 Zoning Regulations
5. If the open space surrounding the building is not paved, the top layer up to a sufficient
depth shall be removed land refilled with course sand to allow percolation of rainwater
into ground.
The terrace shall be connected to the open well / bore well / storage tank /recharge pit
/trench by means of H.D.P.E. / P.V.C. pipes through filter media. A valve system shall be
provided to enable the first washings from roof or terrace catchments, as they would contain
undesirable dirt. The mouths of all pipes and opening shall be covered with mosquito (insect)
proof wire net. For the efficient discharge of rainwater, there shall be at least two rain water
pipes of 100 mm dia for a roof area of 100 sq m Rainwater harvesting structures shall be
sited as not to endanger the stability of building or earthwork. The structures shall be
designed such that o dampness is caused in any part of the walls or foundation of the
building or those of an adjacent building.
Public and semipublic buildings having covered area of 300 sq m and above shall be
designed and constructed to provide facilities to the physically handicapped persons as
prescribed in the Schedule-V of these Zoning Regulations.
SCHEDULE - V
Facilities for physically handicapped persons
These byelaws shall apply to the physically handicapped persons having the
following disabilities.-
i. Non-ambulatory disabilities: Impairments that regardless of cause or
manifestation, for all practical purposes, confine individuals to wheelchairs;
ii. Semi-ambulatory disabilities: Impairments that cause individuals to walk
difficulty or insecurity. Individuals using braces or crutches, amputees,
arthritics, spastics, and those with pulmonary land cardiac ills may be sent
ambulatory.
iii. Hearing disabilities: Deafness or hearing handicaps that make an individual
insecure in public areas because he is unable to communicate or hear
warning signals.
iv. Sight disabilities: Total blindness or impairments affecting sight to the extent
that the individual functioning in public areas is insecure or exposed to
danger.
P a g e | 231
Kanakapura LPA Master Plan 2031 Zoning Regulations
a. Access Path/ Walk Way: The width of access path / walkway from plot entry and
surface parking to the building entry shall not be less than 1.80 m. It shall not have a
gradient exceeding 5%.
b. Surface Parking: At least two car spaces shall be provided at surface level near
entrance with maximum travel distance of 30.00 m from the building entrance.
c. Space for Wheel Chair Users: Adequate space shall be kept for the free movement
of wheel chairs. The standard size of wheel chairs shall be taken as 1050 mm x 750
mm the doors shall have a minimum width of 900 mm to facilitate the free movement
of wheel chairs.
d. Approval to Plinth Level: At least one entrance shall have approach through a
ramp. The ramp shall have a minimum width of 1.80 m with maximum gradient of
1:10.
e. Entrance Landing: Entrance landing shall be provided adjacent to ramp with the
minimum dimension of 1.80 m x 2.00 m.
f. Corridors: The minimum width of corridors shall be 1.80 m.
g. Staircase: The minimum width of staircase shall be 1.50 m. The minimum number of
risers on a flight shall be limited to 12. Size of treads shall not be less than 30 cm and
the height of risers shall not be more than 15 cm.
h. Lifts:
h) Wherever lifts are required to be installed as per bye-laws, provision of at least
one lift shall be made for the wheel chair users with the following cage
dimensions recommended for passenger lifts of 13 persons capacity by Bureau
of Indian Standards.
Clear internal depth 1100 mm (1.10 m)
Clear internal width 2000 m (2.00 m)
Entrance door width 900 mm (0.90)
ii) The lift lobby shall have a minimum inside measurement of (1.80 x 1.80) m.
j. Toilets: One special water closet in a set of toilets shall be provided for the use of
handicapped persons with wash basin keeping in view the following provisions.-
i. The minimum size of toilet shall be 1.50 m x 1.75 m.
ii. The maximum height of the W.C. set shall be 0.50 m above the floor.
k. Hand Rails: Hand rails shall be provided for ramps, staircases, lifts and toilets. The
height of hand rails shall be normally 800 mm above the floor level. If the building is
meant for the predominant use of children, the height of hand rails may be suitably
altered.
P a g e | 232
Kanakapura LPA Master Plan 2031 Zoning Regulations
l. Guiding / Warning Floor Material: The floor material to guide or to warn the visually
impaired persons with a change of colour or material with conspicuously different
texture and easily distinguishable from the rest of the surrounding floor materials is
called guiding or warning floor material. The material with different texture shall give
audible signals with sensory warning when person moves on this surface with
walking stick. The guiding / warning floor material is meant to give the directional
effect or warn a person at critical places. This floor material shall be provided in the
following areas:
i. The access path to the building and to the parking area;
ii. The landing lobby towards the information board, reception, lifts, staircase and
toilets;
iii. At the beginning / end of walkway where there is vehicular traffic;
iv. At the location abruptly changing in level and at the beginning / end of ramp;
v. At the entrance / exit of the building.
m. Proper Signage: Appropriate identification of specific facilities within a building for
the handicapped persons should be done with proper signage. Visually impaired
persons make use of other senses such as hearing and touch to compensate for the
lack of vision; whereas visual signals shall benefit those with hearing disabilities.
Signs should be designed and located such that they are easily legible by using
suitable letter size (not less than 20 mm size). For visually impaired persons,
information board in Braille should be installed on the wall at a suitable height and it
should be possible to approach them closely. To ensure safe walking there should
not be any protruding sign, which creates obstruction in walking.
The symbols / illustrations should be in contrasting colour and properly illuminated so that
with limited vision one may be able to differentiate amongst primary colours.
P a g e | 233
Kanakapura LPA Master Plan 2031 Zoning Regulations
The following shall be considered while enforcing the zoning regulations for all types of
developments:
I. Conversions
a. Conversions prior to the Final approval of Master Plan 2031 are to be honored
irrespective of the land use proposed in the Master Plan except in cases of road
alignment, natural drains and water bodies.
b. The government is the competent authority to permit change of land use under the
act. It is further classified that the permission accorded by high power
committee/government/single window shall be deemed to be given. It should that
the planning authority has provided its opinion to government under the procedure
specified under section 14-A of the KTCP Act 1961.
d. Projects by the Karnataka Housing Board within the LPA shall be honored
irrespective of landuse given in the master plan
e. Projects by the KIADB/KHB or any other statutory bodies shall obtain prior
permission of the authority for development of the scheme.
a. The proposed land use indicated towards the roadside of a property shall be
the land use for the entire property (one property depth not exceeding 50 m)
without identifying it for different uses by measuring as per the scale of the
maps. This is applicable only to the built-up area as shown in the existing land
use map.
P a g e | 234
Kanakapura LPA Master Plan 2031 Zoning Regulations
c. The proposed alignments of STRR, IRR, RR, TRR, Expressway etc., are to
be incorporated. In case of any changes in the alignment by the competent
Authority, the same would prevail over MP proposal.
f. If the alignment of the existing road is shifted in the MP, the existing road as
on ground reality/ cadastral map may be considered for the proposed road
widening. The higher land use abutting the shifted road shall be considered
accordingly.
III. Setbacks
i. The front and rear setbacks shall be with reference to depth of the site.
ii. Left and right setbacks shall be with reference to width of the site.
iii. No side setbacks shall be insisted upon only in the case of reconstruction of
existing building where traditional row housing type of development exists and
in areas specifically provided under the Zonal Regulations.
P a g e | 235
Kanakapura LPA Master Plan 2031 Zoning Regulations
iv. The provision of setbacks should be read with tables prescribed for floor area
ratio, coverage etc., for different type of buildings.
v. When the building lines are fixed, the front set back shall not be less than the
building line fixed or the minimum front set back prescribed whichever is
higher.
vi. In the case of corner sites both the sides facing the road shall be treated as
front side and regulations applied accordingly to maintain the building line on
these two roads and to provide better visibility.
vii. In case where the building line is not parallel to the property line, the front and
rear setbacks shall not be less than the specified setbacks at any point.
viii. In case of building sanctioned prior to coming into force of these rules which
are abutting other properties on one, two or more sides, upper floors may be
permitted, to utilize the available FAR except in the front to enable road
widening, if any.
ix. In case of irregular plots setbacks are to be calculated according to the depth
or width at the points where the depth or width are varying. In such cases,
average setbacks should not be fixed at as they may effect minimum set back
at any point.
i. Higher FAR should be permitted only within 150m radius of any transit hub or
major interchanges (Railway station, metro or BRT station).
ii. Foot path and utility services are provided on either sides roads for 18m &
above roads for minimum of 1.5m to 3.5m width.
iii. Pedestrian only zones shall be identified and marked along with time bound
action plan for achieving the same.
P a g e | 236
Kanakapura LPA Master Plan 2031 Zoning Regulations
iv. Commercial, office use shall be permitted and even encouraged in all
transport hubs and interchanges like TTMC, IMTH etc.
v. Bus- bays shall be indicated on the layout approval drawings within the
layouts at the time of approval (Above 18M).
vi. The turning radii of roads at the junctions/ intersection designs shall be as per
the IRC code for intersection design for urban roads and shall include space
required for signals and utilities along with the signage.
vii. The parking requirements shall be 50% of the parking shown against the uses
in case of commercial/ service industry are proposed to be developed in the
transit stations/ terminals / interchanges i.e. TTMCs IMTC.
V. Basement
i. Means storey which is partly or wholly below the average ground level and
with a height not exceeding a projection of 1.2 m above the average ground
level and overall height of the basement under circumstances should not
exceed 2.75 m between the floor and the ceiling of the basement in case of
P a g e | 237
Kanakapura LPA Master Plan 2031 Zoning Regulations
P a g e | 238
Kanakapura LPA Master Plan 2031 Zoning Regulations
VI. Ramps
i. Provision for ramps shall have a minimum width of 3.5 m and a slope of not
less than 1 in 10. The ramp and the driveway in the basement shall be
provided after leaving a clear gap of minimum 2.0 m from the common
property line. The slope of the ramp shall commence from 1.5 m of the edge
of property line.
ii. Ramps for the physically challenged shall be provided in all Public buildings.
VII. NOC
i. For all the high-rise buildings NOC from the following departments shall be
obtained.
a. Fire force department.
b. K.U.W.S. & D.B.
c. K.P.T.C.L./BESCOM
d. Telecommunication department
e. Karnataka State Pollution Control Board
ii. For all Development Plans, Apartment Buildings and Residential Layouts which
come under the category stipulated by the Karnataka State Pollution Control
Board (K.S.P.C.B.), necessary NOC from K.S.P.C.B. shall be furnished.
iii. For Cinema theatres, the setbacks and other provisions shall be as per
Karnataka Cinematography Act and Rules.
VIII. Sanction or Refusal of Approval
(1) On receipt of the application for permission under Section 14, of KTCP Act the
Planning Authority shall furnish to the applicant a written acknowledgement of its
receipt and after such inquiry as may be necessary either grant or refuse a
commencement certificate Provided that such certificate may be granted subject to
such general or special conditions as the State Government may, by order made in
this behalf, direct.
(2) If the Planning Authority does not communicate its decision to the applicant
within three months from the date of such acknowledgement, such certificate shall
be deemed to have been granted to the applicant, Provided that the land use,
change in land use or the development for which permission was sought for is in
conformity with the Master Plan and the regulation finally approved under sub-
section (3) of Setion13 KTCP Act.
P a g e | 239
Kanakapura LPA Master Plan 2031 Zoning Regulations
If, during the execution / construction, any modifications are required in the approved
plan, the licensed developer / owner shall obtain revised approval by duly following
the above- mentioned procedure.
X. Road width
a) Road width means distance between the boundaries of a road including footways
and drains.
b) If the road width varies along the length of road, then the minimum width of the road
along 200 m stretch on either side, from the centre of the plot shall be considered.
c) In case of roads having service roads in addition to the main roads, the width of
road shall be aggregate width of service roads and main roads for determining FAR
and number of floors.
d) When a portion of land is at different/split levels, then the width of the road to be
considered for determining F.A.R. shall be the aggregate width of the roads which
are at different levels.
The means of exclusive access, which would be other than through public roads and streets,
shall not be of more than 30 m length from the existing public roads and streets The
minimum width of such access shall be 3.5 m. FAR and height of buildings coming up on
such plots shall be regulated according to the width of public street or road. If the means of
access exceeds 30.0 m in length, FAR shall be regulated with reference to the width of such
access road. Construction of buildings on plots with common access/lanes from the public
road/street shall be regulated according to width of such common access roads/lanes.
XII. Garages
a) For garages no side or rear setbacks are to be insisted. One upper floor not
exceeding 3.0 m. in height shall be permitted provided no openings are provided
towards neighboring buildings and at least one opening for light and ventilation is
provided towards the owners property.
b) Garages shall be permitted in the rear right hand corner of the plot. In cases of
buildings constructed or sanctioned prior to the enforcement of these regulations,
where space is not available on the right side, it may be permitted on the left side
provided minimum setback exists in the adjoining property of the left side.
P a g e | 240
Kanakapura LPA Master Plan 2031 Zoning Regulations
c) In case of corner plots, the garage shall be located at the rear corner diagonally
opposite to the road intersection.
d) The maximum width of the garage shall not exceed 4 m and the depth should not
be more than 6.0m or 1/3 the depth of the plot, whichever is lower.
e) The garages shall not be constructed or reconstructed within 4.5m from road edge.
This may be relaxed in cases where the garage forms part of the main building with
minimum setback for the plot.
In case of a plot facing the road proposed for widening, the required land as
indicated in the master plan for road widening shall be handed over to the local
Authority free of cost by a „„Relinquishment deed” by the owner of the land before
sanction is accorded to his plan;
a) The FAR shall be allowed as applicable to the total area of the site without
deducting the area to be taken over for road widening, provided at least 60% of the
site area is available for use as a building site after the proposed road widening;
and set back shall be determined for the remaining portion of the plot.
c) Lifts: Lifts shall be provided for buildings with ground plus three floors and above.
P a g e | 241
Kanakapura LPA Master Plan 2031 Zoning Regulations
d) Parking space: Adequate space for car parking shall be provided in the premises
as per standards in Table - 11.
XV. Water supply: Bore well shall be provided in all high rise buildings to provide
alternative source of water supply where the Karnataka Urban Water Supply and
Drainage Board so desires and the strata is capable of yielding water.
XVI. Height of building: In the reckoning of height of buildings, headroom, lift room,
water tanks on terrace, penthouse may be excluded.
XVII. Road alignment: In case of buildings that have been permitted lawfully by Town
Municipal Council or Planning Authority and if such structures are obstruction to the
alignment of the proposed roads in the Master Plan, 2031, such road alignment shall
be re-looked into by the Authority and decision may be taken suitably.
XVIII. Permissions: All permissions accorded by Govt. or by the Planning Authority shall
be treated as conforming uses irrespective of the classification made in the Master
Plan, 2031. This is to be allowed on a case by case basis only.
The purpose of these regulations is to guide the development of new areas in accordance
with the land use plan. As long as this is done on sound planning principles with adequate
space standards, the future of the Town is assured. This will not necessitate costly
corrective measures, which would become necessary, if sub-standard growth is allowed to
take place. These sub-division regulations are confined to standards of size of plots, street
widths and community facilities.
P a g e | 242
Kanakapura LPA Master Plan 2031 Zoning Regulations
In sanctioning the sub-division of a plot under section 17 of the Karnataka Town and Country
Planning Act, 1961, the Planning Authority shall among other things see that the following
planning standards are followed for sub-division of plot.
The Authority reserves the right to modify the layout submitted by the applicant / owner and
may impose any condition either from the planning point of view or in the interest of public.
A. Amalgamation:
i. In the case of amalgamation, the proposed sites shall have the same land
use.
ii. Ownership of the amalgamated plot could be in a single or multiple
names/family members/ company. But, amalgamation shall not be considered
if the plots are under lease agreement.
iii. Development controls for the amalgamated plot shall be with reference to
new dimensions.
B. Bifurcation:
i. In the case of all bifurcations, whether corner site or intermediate site, front
setback for the resulting site abutting the road shall be the same as that of the
original site and not that of the subdivided site.
ii. A Plot/ Site which is a part of the Sub division plan/layout/scheme duly
approved by the Authority may be further bifurcated with prior permission of
Authority and the sub divided plot shall not be less than the prescribed size of
the plot.
iii. Bifurcated plot shall not be less than 54 sq m. Bifurcated plot shall have a
minimum of 3.5 m access.
iv. The bifurcated plot shall have a minimum of 4.5 m frontage. This condition
shall not apply to family partition sites.
a) Size of plot
No building plot resulting from a sub-division after these regulations come into force is
smaller in size than 54 sq m in residential zone. In specific cases of sites for housing
P a g e | 243
Kanakapura LPA Master Plan 2031 Zoning Regulations
schemes for economically weaker sections, low income groups, slum clearance and Ashraya
The areas for open space and civic amenities and roads while sanctioning of layout for
residential purpose shall be subject to the following conditions:
i. The area earmarked for residential sites shall be a maximum of 55% of the total
extent.
ii. Balance area shall be earmarked for roads, parks, and playgrounds and civic
Amenities and the area under parks and playgrounds shall not be less than 10% of
the total extent and the civic amenity area shall not be less than 5% of the total
extent.
iii. Areas covered under Park Zones, Valleys, lake/nalla buffer etc may be shown as
park in the layout plan.
iv. If by incorporating major roads proposed in the Master Plan, the area under roads
exceeds 45%, in such case the reservation under parks and civic amenities may
be relaxed.
v. A maximum of 3% of the total area from out of the permissible residential area may
be earmarked for commercial uses.
vi. The area reserved for parks and open spaces, civic amenities and roads shall be
handed over to the Planning Authority free of cost through a registered
relinquishment deed before taking up development of the layout.
vii. Minimum width of road width shall not be less than 9.00 m. for plots upto 200 Sq M
and for bigger plots the road width shall not be less than 12.00 m.
viii. In case of EWS sites the minimum road width may be 7.5m
x. The land shall be access from public road and the use of land shall be in accordance
with the zonal regulations of master plan.
P a g e | 244
Kanakapura LPA Master Plan 2031 Zoning Regulations
xi. The necessary development charges shall be paid to the concerned UDA / Local
Authority. This fee is in addition to recovery of fee under Section 18 of K.T.C.P
Act and other fees/charges prescribed by the Government from time to time.
xii. Whenever the total area proposed for formation of layout exceeds 10acres, then
adequate extent of land may be earmarked for provision / installation of utilities
like transformer, sewage treatment plant, overhead water tank, bus bay / shelter,
etc. this area may be taken into calculation under either CA or Park as the case
may be. Decision of the Authority in this regard shall be final.
xiii. Landscaping on the streets/ sideways/ sidewalks for better green cover shall be
insisted for roads with road width of 15 m and above at the time of approval for
development (layouts/ Development Plan/ building plan).
xiv. While developing a land, if for any reason, the road has to be stopped without
continuation, and then cul-de-sac with turnaround area of 9 m radius of the end
shall be provided.
The developer / owner shall complete the development works of the approved
layout within a period of 2 years from the date of approval of the layout or such
extended period provided the total period does not exceed 5 years.
If the layout is not developed within the period as stipulated above, the planning
authority may seek the approval of the Metropolitan Commissioner, BMRDA
stating that the owner has already started the developments and the remaining
developmental works in the layout requires reasonable time to complete such
works.
Any extent of land can be approved as single plot subject to the following conditions:
i. The land in question is converted for residential purpose.
ii. The land shall have access from the public road and the use of land shall be in
accordance with the Zonal Regulations of the Master Plan.
P a g e | 245
Kanakapura LPA Master Plan 2031 Zoning Regulations
iii. The Authority shall collect the fee under Section 18 of the K.T.C.P. Act and
development charges and any other fees and charges prescribed by the Government
from time to time. In addition, fee for Rejuvenation of lake/tank as per section 18(A)
of the K T C P Act, 1961 at the rate of Rs. 1,00,000/- per acre shall be levied and
collected as per the Government circular No. Na A Ee 90 BMR 2010 dated 29-9-
2010.
iv. In case owner of any land who has obtained approval for single plot desires to sub-
divide his plot at a later stage, he shall obtain approval by the Authority treating it as
sub-division of land and the norms applies accordingly as prescribed in the Zoning
Regulations.
v. If any roads proposed in master plan shall be incorporated in the plan and shall be
handed over to the authority free of cost.
vi. The necessary development charges shall be paid to the concerned UDA / Local
Authority. This fee is in addition to recovery of fee under Section 18 of K.T.C.P Act
and other fees/charges prescribed by the Government from time to time.
A. If the non-residential layout for approval consists of only one single unit,
approval shall be given subject to the following conditions:
III. The land shall be access from public road and the use of land shall be in
accordance with the zonal regulations of master plan.
V. A minimum 5% of the total extent of land shall be reserved for vehicle parking
and this shall be in addition to the parking space prescribed in the Zoning
Regulations as per the total floor area of the building.
VI. A minimum 10% of the total extent shall be earmarked as park and open
space.
P a g e | 246
Kanakapura LPA Master Plan 2031 Zoning Regulations
VII. Areas covered under Parks Zones, Valleys, lake/nallah buffer etc. may be
shown as park in the development plan.
VIII. The area reserved for vehicle parking and open space shall be maintained by
the landowner and this land shall not be used for any other purpose by the
landowner.
IX. The Planning Authority shall collect the fee under section 18 of K.T.C.P. Act
and development charges applicable and any other fees and charges
prescribed by the Government from time to time.
X. In case owner of any land who obtained approval for single plot desires to
sub-divide his plot at later stage, he shall obtain approval of Authority for sub
division of plots as per prescribed norms.
XI. Any roads proposed in master plan shall be incorporated in the plan and shall
be handed over to the authority free of cost.
II. The land shall be access from public road and the use of land shall be in
accordance with the zonal regulations of master plan.
III. A minimum 5% of the total extent of land shall be reserved for vehicle parking
and this shall be in addition to the parking space prescribed in the Zoning
Regulations as per the total floor area of the building.
IV. A minimum 10% of the total extent of land shall be earmarked as park and
open space.
VI. The area earmarked for parking, park and open space and roads shall be
handed over to the local authority at free of cost for maintenance.
VII. The Planning Authority shall collect the fee under Section 18 of K.T.C.P. Act
and development charges and any other fees and charges prescribed by the
Government from time to time. In addition, fee for rejuvenation of lake/tank as
P a g e | 247
Kanakapura LPA Master Plan 2031 Zoning Regulations
per section 18 1A (v) of the KTCP Act 1961 at the rate of 1 00,000 per acre
shall be levied.
VIII. Any roads proposed in master plan shall be incorporated in the plan and shall
be handed over to the authority free of cost.
P a g e | 248
Kanakapura LPA Master Plan 2031 Zoning Regulations
P a g e | 249
Kanakapura LPA Master Plan 2031 Zoning Regulations
3 Industrial
a) Up to 2.0 Hectare 12.00 m
b) Above 2.0 Hectare 15.00 m
P a g e | 250
Kanakapura LPA Master Plan 2031 Zoning Regulations
c) Other facilities:
i) Post and Telegraph 10,000
ii) Police Station 10,000 As per the Standards of
iii) Religious Building 3,000 Respective Departments
iv) Filling Station 15,000
TABLE – 19
Standards for Parks, playground and open spaces
Sl. No. Category Population per unit Area in hectares (min.)
1. Tot-lot 500 0.05
2. Children park 2,000 0.20
3. Neighborhood play ground 1,000 0.20
4. Neighborhood park 5,000 0.80
TABLE –20
Proposed Building Line
P a g e | 251
Kanakapura LPA Master Plan 2031 Zoning Regulations
NOTE:
For National Highways, State highways, Major District roads, other district roads and village
roads standards specified (road width, building lines etc.,) by the Ministry of Surface
Transport, Government of India are to be followed vide Govt. Notification No: UDD 251 BMR
2005, dated 22-12-2005 and other circulars of Government of Karnataka)
For all existing roads of width more than 15m shall be provided minimum of 3m building line.
P a g e | 252
ANNEXURES
ANNEXURE 1: Notification for Kanakapura LPA
i
ii
iii
ANNEXURE 2: Govt. order for approval of IMP & MP provisional and notification
for public objections/suggestions on provisional master plan
iv
v
vi
vii
viii
ix
x
xi
xii
xiii
xiv
xv
xvi
xvii
xviii
ANNEXURE 3: Govt. order for constitution of committee to finalize the master
plan 2031
xix
xx
xxi
ANNEXURE 4: Sathanur Township Declaration order
xxii
xxiii
xxiv
xxv
xxvi
xxvii
xxviii
xxix
xxx
ANNEXURE 5: Groundwater Development
Recharge from other sources during 1474 3541 609 3369 2166
monsoon season, Ham
Recharge from rainfall during non- 1471 866 467 1177 1401
monsoon season, Ham
Recharge from other sources during non- 1083 683 969 531 1148
monsoon season, Ham
Total annual ground water recharge, Ham 7140 5655 4066 5076 6241
Net ground water availability, Ham 6783 5372 3862 4823 5929
xxxi
ANNEXURE 6: Stage of Ground Water Development of Watershed Zones in
Kanakapura Taluk and Bangalore South Taluk
OE – Over exploited
Only 34 MLD is available for entire taluk
xxxii
ANNEXURE 7: Status of Groundwater Utilization Lower Cauvery Catchment
(4b3)
xxxiii
ANNEXURE 8: Status of Groundwater Utilization Bangalore Rural District
xxxiv
ANNEXURE 9: Road Cross Sections (As per IRC-86-1983)
xxxv
Fig 4- Collector road cross section - 2 lane divided (RoW- 10-20m)
Figs 5- Local Street cross section with side walk (RoW: 10-12m)
xxxvi
Kanakapura Planning Authority
Email: member_plan2009@bsnl.in
Phone NO -27526208
Web: www.kanakapura-pa.in