You are on page 1of 3

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 30-Apr-13

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Exhaust Fan Receiving, Handling and Preservation SAIC K-4001 30-Apr-13 HVAC
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Receiving

Fans shall be air-foiled, backward-inclined, backward curved, or forward-


curved. Fans shall be air-foil, backward-inclined, backward curved, or
forward-curved and shall conform to AMCA 99 and AMCA 210 SAES-K-001
A1
requirements. In variable air volume (VAV) Para 4.8.9.1
systems a variable speed fan shall be provided. Propeller
fans may be used for exhaust services.

Fans shall meet the requirements of AMCA 210 "Laboratory of testing


fans for aerodynamic performance rating". SAES-K-001
A2
Note: Certification by the manufacturer is required upon Saudi Aramco Para 4.8.9.1
request.

Fans shall conform to AMCA 99 "Standards Handbook"


SAES-K-001
A3 Note: Certification by the manufacturer is required upon Saudi Aramco
Para 4.8.9.1
request

Variable speed fan shall be provided in variable air volume (VAV) SAES-K-001
A4
systems. Para 4.8.9.1

Parts of fans in contact with explosive or flammable vapors, fumes or


SAES-K-100
A5 dusts shall be of nonferrous or nonsparking materials or their casing shall
Section 1
be lined or constructed of such material. (UMC Para 503.2)*

Equipment (Fans) used to exhaust explosive or flammable vapors, fume


SAES-K-100
A6 or dusts shall bear identification plate stating the ventilation rate for which
Section 1
the system was designed for. (UMC 503.2.1)

Fans located in systems conveying Corrosive shall be of material that are


SAES-K-100
A7 resistant to the Corrosive or shall be coated with corrosion resistant
Section 1
material. (UMC 503.2.2)

An identification tag or name plate made of 316 stainless steel or better,


SAES-K-001 Para
A8 shall be attached to each equipment unit, securely with stainless steel or
4.8.1.2.1
Monel fasteners.

The tag or name plate shall be marked by raised letters or die-stamping


with at least the following information:
a) Purchase Order Number b) Manufacturer c) Part/Model No. d) Serial SAES-K-001 Para
A9
No. e) Date of Manufacture f) Mark/Tag No. The tag or name plate shall 4.8.1.2.2
be located such that the information is visible and can be read after
equipment installation.

B Handling, Storage, and Preservation

Page 1 of 3
Verify that Approved procedures for handling, storage and preservation of
Fans, lists all the required inspection schedules for maintaining the quality
of the material and /or equipment. CONTRACTOR shall include
procedures for handling, storage, and preservation of material as
specified in all applicable specifications, manufacturer recommendations
and COMPANY’s standards. The procedure shall list all inspection
Schedule “Q”
schedules for maintaining the quality of the material or equipment as well
B1 Section 5 6., Att.
as provide for documentation that the required activities have been
IV
performed. Individuals responsible for special handling, storage and
preservation shall be fully qualified to do so, and supplied with
predetermined WORK and inspection instructions. Data concerning
handling, storage and preservation shall be included on the Monthly
Materials Procurement Status Report as specified in Schedule “G” and
shall be available at site at time of material/equipment receiving.

* Verification is required by checking the equipment submittal if verification is not possible by visual inspection

Page 2 of 3
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 30-Apr-13
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Exhaust Fan Receiving, Handling and Preservation SAIC K-4001 30-Apr-13 HVAC
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

REMARKS:

REFERENCE DOCUMENTS:
1-SAES-K-001 -- Heating, Ventilating and Air Conditioning (HVAC), 5 July 2009 Design and Installation of Heating,
Ventilating and Air Conditioning Systems 05 December 2012
2-SAES-K-100 -- Saudi Aramco Mechanical (HVAC) Code, 31 May, 2004 20 October 2012
3-Schedule "Q" -- Saudi Aramco Quality Requirements
4-Uniform Mechanical Code (UMC), 1997 2009

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 3 of 3

You might also like