SAUDI ARAMCO INSPECTION CHECKLIST
Metal Duct, Hangers and Supports and Insulation
SAIC-K-4008 30-Apr-13 HVAC
Receiving
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A General
Schedule “Q”
A1 Delivered equipment and material shall be free of damage. Attachment IV
Para 3.3
B Metal Duct Hangers and Supports

Duct Hangers and Support material shall be in accordance with table SAES-K-100
B1
6-E.See attachment 5 Section 603

Duct Hangers and Support size and thickness shall be in accordance SAES-K-100
B2
with table 6-E. See attachment 5 Section 603

C Metal Ducts

Material. Supply air, return air and outside air for heating, cooling or
evaporative cooling systems shall be conducted through duct
SAES-K-100
C1 systems constructed of metal as set forth in Tables 6-A, 6-B and 6-
Section 601.1
C;metal ducts complying withUMC Standard 6-1 with prior approval;
or factory-made air ducts complying with UL181.

Galvanized steel shall be of lock-forming quality with aminimum


SAES-K-100
C2 coating of 1.25 ounces per square foot (0.38 kg/m2) of zinc
Section 602
conforming to the requirements of UMC Standard 2-2.
Duct wall thickness of the supplied sheet metals for positive pressure
SAES-K-001
C3 ducting systems shall be as per the attached table. See attachment
clause 4.8.12.5
3 & 4 (UMC tables 6-A and 6-B)

Duct wall thickness of the supplied sheet metal thickness for negative
SAES-K-001
C4 pressure ducting system shall be as per the attached table. See
clause 4.8.12.5
attached tables See attachment 1 & 2 (UMC tables 5-B & 5C)

Turning vanes, as per SMACNA HVAC Duct Construction Standards, SAES-K-001


C5
shall be provided in all rectangular elbows of low velocity systems. clause 4.8.12.9

Grease ducts and plenums serving a Type I kitchen hood shall be


constructed of at least 0.055-inch-thick (1.40 mm) (No. 16 SAES-K-100
C6
manufacturers standard gauge) steel or stainless at least 0.044 inch Section 507.3
(1.10 mm) in thickness.

Duct material for Supply, Return and Exhaust ducts and other
terminal devices, i.e., Volume Dampers, Air Diffusers, Grilles,
etc.,installed within a corrosive environment, such as Battery room or SAES-K-100
C7
any rooms emitting corrosive gas or vapor, shall either be coated with Section 603.0
anti-corrosive coating prior to insulation or the ducts shall be made of
316L stainless steel material or better.

D Metal Duct Insulation

Page 1 of 8
Supply- and return-air ducts and plenums of a heating or cooling
systemshall be insulated with not less than the amount of insulation SAES-K-100
D1
set forth in Table 6-Dexcept for ducts and plenums used exclusively Section 604.1
for evaporative cooling systems.

"Insulation of ducts shall also comply with the requirements of SAES- SAES-K-100
D2
K-001" Section 605
Liner Materials shall have a mold-, humidity- and erosion-resistant SAES-K-100
D3
surface that meets the requirements of UL 181. Section 604.2

External Insulation. Insulation applied to the exterior surface of ducts


located in buildings shall have a flame spread index of not more than
SAES-K-100
D3 25 and a smoke-density index not exceeding 50 when tested as a
Section 603.0
composite installation, including insulation, facing materials, tapes
and adhesives as normally applied.

Identification. Factory-made air ducts and faced insulations intended


for installation on the exterior of metal ducts shall be legibly printed
with:
SAES-K-100
D4 a) Name of the manufacturer
Section 604.4
b) Thermal resistance (R) value at installed thickness
c) Flame-spread index
d) Smoke-developed index of the composite material

Page 2 of 8
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - Mar. 2013) Rev 7 31-Mar-13
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Metal Duct, Hangers and Supports and Insulation
SAIC-K-4008 30-Apr-13 HVAC
Receiving
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

REMARKS:

REFERENCE DOCUMENTS:
1-SAES-K-001 -- Design and Installation of Heating, Ventilating, and Air Conditioning, 05 December 2012

2-Schedule "Q" -- Quality Requirements

3-SAES K-100 -- Saudi Aramco Mechanical Code (HVAC), 20 October 2012

4-Uniform Mechanical Code (UMC), 1997

ATTACHMENTS:
1.Table 5B-Minimum Sheet Metal Thickness for Round Ducts
2.Table 5C-Minimum Sheet Metal Thickness for Rectangulare Ducts
3-Table 6B-Construction Details for Round and Flat-Oval Ducts
4-Table 6A-Construction of Details for Rectangular Sheet Metal Ducts
5-Table 6E- Duct Supports

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 3 of 8
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - Mar. 2013) Rev 7 31-Mar-13
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Metal Duct, Hangers and Supports and Insulation
SAIC-K-4008 30-Apr-13 HVAC
Receiving
Attachment 1 --

Attachment 2 --

Page 4 of 8
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - Mar. 2013) Rev 7 31-Mar-13
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Metal Duct, Hangers and Supports and Insulation
SAIC-K-4008 30-Apr-13 HVAC
Receiving

Page 5 of 8
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - Mar 2013) Rev 7 31-Mar-13
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Metal Duct, Hangers and Supports and Insulation
SAIC-K-4008 30-Apr-13 HVAC
Receiving
Attachment 3 --
1997 UNIFORM MECHANICAL CODE

Page 6 of 8
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - Mar 2013) Rev 7 31-Mar-13
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Metal Duct, Hangers and Supports and Insulation
SAIC-K-4008 30-Apr-13 HVAC
Receiving

Attachment 4 --

Page 7 of 8
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - Mar 2013) Rev 7 31-Mar-13
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Metal Duct, Hangers and Supports and Insulation
SAIC-K-4008 30-Apr-13 HVAC
Receiving

Attachment 5 --
1997 UNIFORM MECHANICAL CODE

Page 8 of 8

You might also like