SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2014) Rev 8 30-Jun-14

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Metal Duct Hangers and Support Installation SAIC-K-4012 31-Dec-14 HVAC
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Rectangular duct supports. Supports for rectangular ducts as set forth


in Table 6.7 when suspended fromabove shall be installed on two SAES-K-100
A1
opposite sides of each duct and shall be riveted, bolted or metal Section 604.2
screwed to each side of the duct at not more than the intervals specified.

Horizontal round duct supports. Horizontal round ducts 40 inches


(1016 mm) or less in diameter when suspended from above shall be
supported at intervals not more than as set forth in Table 6.7 with one
SAES-K-100
hanger installed to comply with the requirements listed below:
Section 604.2.1
1. Ducts shall be equipped with tightfitting circular bands extending
around the entire perimeter of the duct at each specified support
interval.

A2

2. Circular bands shall not be less than 1 inch (25mm) wide nor SAES-K-100
less than equivalent to the gage of the duct material it supports. Section 604.2.2

3. Each circular band shall be provided with a suitable means of SAES-K-100


connecting to the suspending support. Section 604.2.3

4. Ducts shall be braced and guyed to prevent lateral or horizontal SAES-K-100


swing. Section 604.2.4

Horizontal Duct shall have a support within two feet of each elbow and SAES-K-001
A3
within 4 feet of each branch intersection (SMACNA Para 5.1.1) Para 4.8.12.6

Concrete Inserts shall be installed before the concrete is poured SAES-K-001


A4
(SMACNA Para. 5.2.1) Para 4.8.12.6

Concrete fasteners shall be installed after the concrete has been poured SAES-K-001
A5
and the forms have been removed. (SMACNA Para. 5.2.2) Para 4.8.12.6

The support spacing interval and method of contact with the duct
SAES-K-100
A6 assembly shall be selected to avoid structural failure or closure failure in
Section 1
the duct. (UMC Para. 6.204 A)

The Support system shall not cause corrosion by galvanic action at


points of contact with the duct
SAES-K-100
A7 (UMC Para. 6.204 F)
Section 1
Note: Corrosion by galvanic action occurs when dissimilar metals are in
contact with each other

The support system shall not penetrate enclosures containing fluids or


SAES-K-100
A8 electrical wiring in such a manner to create a hazard
Section 1
(UMC Para. 6.204 G)

The support system shall not penetrate a bearing member in such a


SAES-K-100
A9 manner as to cause excessive loading on the member
Section 1
(UMC Para. 6.204 G)

When Ducts are supported from wall they shall be located against the
SAES-K-001
A10 wall or maximum of 2" away from wall. Weld, bolt or No. 8 (Min) screw
Para 4.8.12.6
may be used as fasteners. (SMACNA FIG 5-9 Note No. 2)

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2014) Rev 8 30-Jun-14
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Metal Duct Hangers and Support Installation SAIC-K-4012 31-Dec-14 HVAC
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Fastener (for supporting ducts from wall) shall be located within 1" of the
duct edge (wall side) and within 2" of the duct outer edge. Minimum of 3 SAES-K-001
A11
on 24" width and up is required in addition along sides nearest anchors. Para 4.8.12.6
(SMACNA FIG 5-9)

Rectangular duct risers from floor shall be supported by angles


or channels secured to the sides of duct with welds, bolts, sheet metal
screws, or blind rivets. (SMACNA Para 5.2.10)
Note: 1-If the spacing of the fasteners are not specified / shown, then SAES-K-001
A12
spacing shall be as instructed by Saudi Aramco. Para 4.8.12.6
2- Angle sizes and their spacing shall be as shown on the Construction
Drawings, if they are not shown / specified, then sizes and spacing shall
be as instructed bySaudi Aramco.

Round Ducts riser from floor shall be supported by split band support by
supplemental angle or channel spanning the slab opening or as
recommended by the manufacturer. Minimum of two fasteners in each
half of band is required. (SMACNA FIG. 5-10) SAES-K-001
A13
Note: No. of fasteners and spacing shall be as shown in Construction Para 4.8.12.6
drawings. If Construction drawings do not address the number of the
fasteners and/or spacing of them then the number of the fasteners and
spacing shall be as instructed by Saudi Aramco (SMACNA FIG 5-10)

Riser support intervals should be at one or two storey intervals as


SAES-K-001
A14 suitable for loading. Load can be transferred to the riser support by
Para 4.8.12.6
angles or by rods. (SMACNA Para 5.2.10))
REMARKS:

REFERENCE DOCUMENTS:
1-SAES-K-001 -- Design and Installation of Heating, Ventilating and Air Conditioning Systems, 05 December 2012
2-SAES-K-100 Saudi Aramco Mechanical (HVAC) Code, 20 October 2012
3-SMACNA -- HVAC Duct Construction Standards, Metal & Flexible, Fourth Edition
4-Uniform Mechanical Code (UMC), 2009

ATTACHMENTS:
1-Table 6-7-Duct Supports

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - June 2014) Rev 8 30-Jun-14
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Metal Duct Hangers and Support Installation SAIC-K-4012 31-Dec-14 HVAC
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
2009 UNIFORM MECHANICAL CODE

The support system shall not penetrate a bearing member in such a manner as to cause excessive loading on
the member
(UMC Para. 6.204 G)