EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Use properly insulated test lead clips and terminals to avoid contact with
unexpected hazardous voltages.
- Test clips should be attached one at a time each time a connection is
SAEP-332
A1 made.
Sec. 4 e
- A single hand should be used to make the connection, in a well
balanced body position, while the other hand should be free from resting
on any surface.
Use caution when long test leads (100 meters or longer) are extended
near overhead high voltage AC power lines, since hazardous voltages
SAEP-332
A2 can be induced into the test leads. Use rubber mats, rubber gloves, or
Sec. 4 f
both, when making measurements if induced AC potentials over 15 volts
are measured on pipelines near high voltage AC power lines.
SAEP-332
B2 Calibrate all meters annually.
Sec. 7.1.4
Page 1 of 10
Use a clamp-on-ammeter for the direct measurements of DC currents.
Meters having current measuring capacity up to 200 amps and a variety
of clamp sizes are preferred. When changing clamp sizes for the same SAEP-332
B4
meter, refer to the manufacturer's instructions for adjusting the readings. Sec. 7.1.6
Currently, the clamp-on ammeters made by William H. Swain company
are widely used in Saudi Aramco facilities.
Page 2 of 10
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
SATR-X-3203
Plant Potential Survey Testing 30-Apr-13 CP-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
In the clean-up,
-Remove the oxide layer on the copper rod by using fine sand paper
-Renew the copper sulfate electrolyte.
-Fill the electrode half full, as a minimum, with a saturated water solution SAEP-332
B6
of copper sulfate. Sec. 7.1.7
-Use only distilled water and chemically pure copper sulfate.
-add an excess of copper sulfate crystals, equal to approximately 10%
(by weight) of the saturated solution in the cell.
Measure the potential between the Structure to the electrolyte before the SAEP-332
C1
CP system is energized or as found potential. Sec. 11
Measure the potential between the Structure to the electrolyte when the SAEP-332
C2
CP system is turned On.. Sec. 11
Measure the potential between the Structure to the electrolyte when the SAEP-332
C3
CP system is turned Off. Sec. 11
SAEP-332
C4 An evaluation of current distribution in the negative circuits, if applicable
Sec. 1
Commentary Note:
The Saudi Aramco Project Management Team (SAPMT) shall be notified SAEP-332
C5
of the deficiencies detected during the commissioning to ensure Sec. 5
corrective action is taken.
Page 3 of 10
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
SATR-X-3203
Plant Potential Survey Testing 30-Apr-13 CP-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
For structures surrounded by soil, measure the structure potential with a SAEP-332
C7
portable copper-copper sulfate reference electrode. Sec. 9.1.1
If there are anodes in the area of the potential measurement, locate the
SAEP-332
C12 reference electrode midway between the anodes. Measure potentials at
Sec. 8.1.3
well-defined locations to allow for future monitoring.
Report Forms: Record all data relative to the commissioning and / or re-
commissioning of cathodic protection systems on the Commissioning SAEP-332
C14
Report forms attached in Appendix A through K of this Engineering Sec. 5
Procedure.
Evaluation of the Surveys: Forward the detailed data including raw data
and as-built data obtained during the commissioning surveys, to the
SAEP-332
C15 appropriate department for review. Determine the anomalies,
Sec. 5
discrepancies, and recommendations for upgrading or improving the
cathodic protection system (if any), and notify the appropriate agencies.
Page 4 of 10
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
SATR-X-3203
Plant Potential Survey Testing 30-Apr-13 CP-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
F. CONCLUSIONS
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
SAEP-332
Result were in accordance with the Appendix A Commissioning
F1 Sec 14
Report.Result.
Appendix A
SAEP-332
Test results are acceptable and in accordance with Saudi Aramco
F2 Sec 1
Engineering Standards and contractural requirements.
Appendix A
Test results are acceptable and in accordance with Saudi Aramco SCH. Q Attch. IV
F3
Engineering Standards and contractual requirements. Sec 3
REMARKS:
REFERENCE DOCUMENTS:
1. Schedule Q -- Quality Requirements (Pro Forma Contract), February 2008
2. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), March 2006
3. SAEP-332 Cathodic Protection Commissioning 31 May, 2005
4. SAEP-332 A Appendix A through K, 31 May, 2005
NOTES:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products
or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose
listing states that the equipment, material, or services either meets appropriate designated standards or has been tested and found
suitable for a specified purpose.
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified
organization concerned with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by
manufacturer
whose labeling the manufacturer indicates compliance with appropriate standards or performance in a specified manner.
Page 5 of 10
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
SATR-X-3203
Plant Potential Survey Testing 30-Apr-13 CP-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED
Page 6 of 10
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
SATR-X-3203
Plant Potential Survey Testing 30-Apr-13 CP-
Page 7 of 10
Bond Drain Data:
Bond Name of Structure Potential (-mV) of Bond As Found/Off
Cable No Current Flowing Structure Current Current Potential (-mV)
or Flowing (Amp)
Structure
From To From To From To
Page 8 of 10
Structure
From To From To From To
Isolation Flanges
Insulation Flange No Location Isolation Test
Pass Fail
1
2
3
4
CALIBRATION CERTIFICATE
Certification Agency:
Equipment Type, Model and Serial Number:
Page 9 of 10
Page 10 of 10