You are on page 1of 1

DOC.NO.

:
SHIFT WISE PRODUCTION REPORT SEPL/QMS/QSP/19/F08
Machine No. : 90 R. Date : 22-11-2017
Part No. : FOOOBL1-40c\027 ( MM ) Shift :
Part Name : STATOR Time :
Operation No. : NIL Date :
COIL TC NO :
COIL HEAT NO:
Production Details
coining
Coil welding
Accepted Rejected rejection Rework Total
Coil no . Weight in Target(Nos)
Out Put
:
Quantity Rejected Quantity Production
KG (Nos) : Quantity Quantity (Nos) : (Nos) :
(Nos) :
(Nos) :

Time Lost (Min)


Time
Code no .
01. Machine Breakdown 02. Plan maintenance 03. No power/air 04. No operator
05. No raw material 06. Setting 07.Restart 08. No tool
CODE NOS . : REASON 09. Quality check 10. Idling 11. Admin 12. Tool change
FOR BREAKDOWN
13. Tool setting 14. Machine cleaning 15. CMM check 16. Missfeed
17. Involved in curling 18. Welding setting 19. Strip welding
Remark :-

Operator Name :- Supervisor Name :-


Sign :- Sign:-

DOC.NO.:
SHIFT WISE PRODUCTION REPORT SEPL/QMS/QSP/19/F08
Machine No. : 90 R. Date : 22-11-2017
Part No. : FOOOBL1-40c\027 ( MM ) Shift :
Part Name : STATOR Time :
Operation No. : NIL Date :
COIL TC NO :
COIL HEAT NO:
Production Details
coining
Coil welding rejection Rework
Accepted Rejected Total
Coil no . Weight in Target(Nos)
Out Put
: Quantity Quantity Rejected Quantity Production
KG (Nos) : Quantity (Nos) : (Nos) :
(Nos) : (Nos) :

Time Lost (Min)


Time
Code no .
01. Machine Breakdown 02. Plan maintenance 03. No power/air 04. No operator
05. No raw material 06. Setting 07.Restart 08. No tool
CODE NOS . : REASON 09. Quality check 10. Idling 11. Admin 12. Tool change
FOR BREAKDOWN
13. Tool setting 14. Machine cleaning 15. CMM check 16. Missfeed
17. Involved in curling 18. Welding setting 19. Strip welding
Remark :-

Operator Name :- Supervisor Name :-


Sign :- Sign:-

You might also like