Professional Documents
Culture Documents
• From constant failure rate to failure level with time thinking in terms of PPM failure rates
• From reliability prediction to robustness validation
AS-IS TO-BE
Digital Twin
MBUS
Data-driven Digital Twins
• Site-centric • User-centric
• Fragmented • Closed-loop
• Reactive Smart and Closed-loop • Proactive, Predictive
Robust
• Skill-dependent Adaptive, I-V Curve • AI/Automation
Ai-powered Proactive
Programmability Maintenance
Intelligent
Fault Tolerance Design Fault Isolation Fault Detection Methods Warnings Predictions Self Healing
HUAWEI TECHNOLOGIES CO., LTD. Page 1
Reducing Costs by Improving Reliability Upfront
Reduce Unscheduled Maintenance Events and Corresponding Costs - upfront