You are on page 1of 5

PTS 12.30.

02: PIPING GENERAL REQUIREMENTS

Scope of Assessment:
The scope covers design and installation for both upstream and downstream piping including selection and requirements for piping for various fluids and system
except for the piping systems specified in Section 1.1.4. This PTS also specifies additional requirements for specific services and precaution during construction
and pre-commissioning for compliance by Contractor.

Prepared by: Arif Zaki bin Ariffin Verified by: Nor Azah bt Muslim Endorsed by: Amir bin Ahmad
Position: Piping Engineer Position: Staff (Piping) Position: Custodian (Piping)
Date: 26th January 2018 Date: 29th January 2018 Date: 29th January 2018

Reference Requirements
Modification
No. Page and (based on MCF 2014 and PTS August Remark/ Justification of Change
(based on PTS December 2017 revision)
Section 2015 revision)
1 Page 12, If a system operating above 0 °C is Deleted The temperature transition profile study will provide
Section connected to a system operating at 0 °C the exact length of pipe to be provided to withstand
3.2.4 or below, the first 50 D (with a maximum the actual temperature. This give better indications of
of 10m) shall (PSR) be designed to the the suitable materials to be used.
specifications of the lower temperature
system. (D)
2 Page 13, Safety relief valve discharge piping shall Deleted PTS 12.35.01 - Pipe Stress Analysis for Piping
(PSR)
Section be designed to withstand the dead Design has been established, which has address the
3.3.11 loads and the blow-off loads. Blow-off requirement of relief valve discharge line. The pipe
design loads shall (PSR) take into account stress analysis shall ensure the piping flexibility
the most severe case, such as possible requirement are incorporated.
flashing conditions and liquid entrainment
in vapour flows. (D)
3 Page 16, Piping shall (PSR) be designed so that the Deleted This does not relate to Process Safety Requirement.
Section complete system can be flushed and It is for operation and maintenance purposes hence
3.4.1 (ix) cleaned. (e.g. “dead ends” should be shall is sufficient.
avoided). For vents and drains, see
(3.13). (D)

Legend: (N) = New (D) = Deleted (R) = Revised

MCF Checklist Change Justification Form Revision 1 (Dec 2017) Page 1 of 5


PTS 12.30.02: PIPING GENERAL REQUIREMENTS

Scope of Assessment:
The scope covers design and installation for both upstream and downstream piping including selection and requirements for piping for various fluids and system
except for the piping systems specified in Section 1.1.4. This PTS also specifies additional requirements for specific services and precaution during construction
and pre-commissioning for compliance by Contractor.

Prepared by: Arif Zaki bin Ariffin Verified by: Nor Azah bt Muslim Endorsed by: Amir bin Ahmad
Position: Piping Engineer Position: Staff (Piping) Position: Custodian (Piping)
Date: 26th January 2018 Date: 29th January 2018 Date: 29th January 2018

Reference Requirements
Modification
No. Page and (based on MCF 2014 and PTS August Remark/ Justification of Change
(based on PTS December 2017 revision)
Section 2015 revision)
4 Page 17 / For all design cases, the upper and Deleted PTS 12.35.01 - Pipe Stress Analysis for Piping
Section lower design temperatures and Design has been established. The pipe stress
3.5.3 differences in temperature between analysis shall ensure the piping flexibility requirement
piping and equipment shall (PSR) be taken are incorporated.
into consideration. (D)
5 Page 17 / Expansion joints shall (PSR) not be used in Deleted PTS 12.35.01 - Pipe Stress Analysis for Piping
Section very toxic services or in systems where Design has been established. The pipe stress
3.5.5 they would be subjected to torsional analysis shall ensure the piping flexibility requirement
loads. (D) are incorporated.
6 Page 18, Branches shall (PSR) be avoided Deleted PTS 12.35.01 - Pipe Stress Analysis for Piping
Section downstream of high capacity gas Design has been established, which has address the
3.9.1 (v) pressure reducing systems such as requirement for small bore branches. The pipe stress
compressor recycle systems, steam analysis shall ensure the piping flexibility requirement
desuperheaters, high-rate depressuring are incorporated. Bracing for the small bore piping
valves and safety relief valves. If this is has been specified in the standard drawings.
not possible, branches shall (PSR) be
located well away from these sources of
vibration based on vibration study report.
Special attention shall be paid to the
bracing of these branches to the run-pipe
(see Standard Drawings D12.92.355,

Legend: (N) = New (D) = Deleted (R) = Revised

MCF Checklist Change Justification Form Revision 1 (Dec 2017) Page 2 of 5


PTS 12.30.02: PIPING GENERAL REQUIREMENTS

Scope of Assessment:
The scope covers design and installation for both upstream and downstream piping including selection and requirements for piping for various fluids and system
except for the piping systems specified in Section 1.1.4. This PTS also specifies additional requirements for specific services and precaution during construction
and pre-commissioning for compliance by Contractor.

Prepared by: Arif Zaki bin Ariffin Verified by: Nor Azah bt Muslim Endorsed by: Amir bin Ahmad
Position: Piping Engineer Position: Staff (Piping) Position: Custodian (Piping)
Date: 26th January 2018 Date: 29th January 2018 Date: 29th January 2018

Reference Requirements
Modification
No. Page and (based on MCF 2014 and PTS August Remark/ Justification of Change
(based on PTS December 2017 revision)
Section 2015 revision)
D12.92.356, D12.92.357). Welding of the
bracing to the run pipe/ flange shall be of
full penetration type. (D)

7 Page 36/ (N) A bypass shall (PSR) be installed in the To avoid temperature shock at downstream piping
Section following cases: (N) system for high temperature service
4.2.2.ii.b)
To ensure the line can be operated when the check
valve is blocked with the frozen fluid for low
temperature service
8 Page 65/ (N) iv. Double bleed valves shall (PSR) be To ensure the toxic or flashing fluid are contained
Section provided for flashing fluids, or very within the piping system safely.
8.7.4 toxic fluids. This includes isolation
for all instrument (e.g. control valves,
relief valves, level gauges) mounted
on pressurized fluid containing
equipment or piping. The
downstream side of the bleed valves
shall (PSR) be: (N)

Legend: (N) = New (D) = Deleted (R) = Revised

MCF Checklist Change Justification Form Revision 1 (Dec 2017) Page 3 of 5


PTS 12.30.02: PIPING GENERAL REQUIREMENTS

Scope of Assessment:
The scope covers design and installation for both upstream and downstream piping including selection and requirements for piping for various fluids and system
except for the piping systems specified in Section 1.1.4. This PTS also specifies additional requirements for specific services and precaution during construction
and pre-commissioning for compliance by Contractor.

Prepared by: Arif Zaki bin Ariffin Verified by: Nor Azah bt Muslim Endorsed by: Amir bin Ahmad
Position: Piping Engineer Position: Staff (Piping) Position: Custodian (Piping)
Date: 26th January 2018 Date: 29th January 2018 Date: 29th January 2018

Reference Requirements
Modification
No. Page and (based on MCF 2014 and PTS August Remark/ Justification of Change
(based on PTS December 2017 revision)
Section 2015 revision)
9 Page 66 (N) Where double valve isolation is required, it To ensure the fluid is contained within the piping
Section shall (PSR) be applied to: (N) system safely and avoid any leakage to the
8.7.4 downstream of the piping system if one of the valve
passing.
10 Page 68 / (N) The need for positive isolation is dictated by To avoid possibility of fluid passing to the
Section special safety and/or process requirements. downstream of the piping system or equipment.
8.8.1 Positive isolation shall (PSR) be provided
when: (N)

11 Page 161 / (N) Process environment in normal operating To ensure the material are suitable for the various
Section condition and short-term upsets e.g start-up, type of process conditions to avoid any damage
18.3.1 shutdown, process upsets, shall (PSR) be mechanism which lead to pipe failure.
considered if the damage mechanism is
anticipated. For normal operating condition,
Table 18.2 provides the Wet H2S severity
category based on pH, cyanide content and
suplhide content of water. (N)

Legend: (N) = New (D) = Deleted (R) = Revised

MCF Checklist Change Justification Form Revision 1 (Dec 2017) Page 4 of 5


PTS 12.30.02: PIPING GENERAL REQUIREMENTS

Scope of Assessment:
The scope covers design and installation for both upstream and downstream piping including selection and requirements for piping for various fluids and system
except for the piping systems specified in Section 1.1.4. This PTS also specifies additional requirements for specific services and precaution during construction
and pre-commissioning for compliance by Contractor.

Prepared by: Arif Zaki bin Ariffin Verified by: Nor Azah bt Muslim Endorsed by: Amir bin Ahmad
Position: Piping Engineer Position: Staff (Piping) Position: Custodian (Piping)
Date: 26th January 2018 Date: 29th January 2018 Date: 29th January 2018

Reference Requirements
Modification
No. Page and (based on MCF 2014 and PTS August Remark/ Justification of Change
(based on PTS December 2017 revision)
Section 2015 revision)
12 Page 162 / (N) All materials exposed to wet H2S service To ensure the quality of the supplied material is
Section including pressure retaining base materials complying to the applicable code and standard.
18.4.1 shall (PSR) be supplied with an inspection
certificate in accordance with EN 10204
Type 3.2. (N)

Legend: (N) = New (D) = Deleted (R) = Revised

MCF Checklist Change Justification Form Revision 1 (Dec 2017) Page 5 of 5