NITROGEN PURGING P16-C Project No. Project Title Facilities INFORMATION Test Packages No Purging Medium System Purging Duration Sub System Location INSPECTION / TEST OK N/A P/L No Verify the Reinstatement Leak Test for the system/sub system /test 1 package above have been completed and accepted THE SYSTEM SHOWN ON THE ATTACHED P&ID (TEST PACKAGE) HAS BEEN PURGED ANCHIVED 7% O2 CONTENT. Signature:
Name: 2 Title:- Site Representative
Company:
Date:
COMMENT(S) AND ADDITIONAL INFORMATION
COMPLETED BY VERIFIED BY CONFIRMED BY
Designation Contractor Representative PCSB Inspector Operation Company PETRONAS Carigali PETRONAS Carigali Name Signature Date