You are on page 1of 2

GEA TDS GmbH Maintenance plan Project: Nestlé Pakistan

Am Industriepark 2-10 Kabirwala plant - Milk recovery system


D-21514 Büchen Project-No.: 36002930

Maintenance plan one or more times


per day. Control

per 2 months

per 6 months
per 2 weeks

per 4 weeks
per week

per year
components remark
the maintenance instructions from the respective supplier has to be obeyed as well
and does overrule this plan in case of any discrepancy

Filter:
angular filter x cleaning
filter for:
air x - controlling
x xx xx - replace filter element
dirt trap x
steam trap x

Valves:
Varivent/Eco-valve x
butterfly valve
ball valve
x
manual shut off valve
x
control valve x
non return valve x
safety valve x functional test
pressure reducing valve xx - drain condensate and
x xx cleaning filter elememt

Instruments:
pressure gauge x
pressure transmitter PT x
inductive flowmeter FT x
temperature transmitter TT
PT 100
x
thermometer x
level indicator HL LL x
level transmitter LT x

Maintenance plan.xls page 1 of 2 31.03.2009


GEA TDS GmbH Maintenance plan Project: Nestlé Pakistan
Am Industriepark 2-10 Kabirwala plant - Milk recovery system
D-21514 Büchen Project-No.: 36002930

Maintenance plan one or more times


per day. Control

per 2 months

per 6 months
per 2 weeks

per 4 weeks
per week

per year
components remark
the maintenance instructions from the respective supplier has to be obeyed as well
and does overrule this plan in case of any discrepancy

heat exchanger:
plate heat exchanger x - controlling
x xx xx - man. cleaning and replace
gasket

pumps:
x - controlling
x xx xx - maintenance see
centrifugal pump documentation

inspection of tank x - controlling


inspection of sprayball x x - controlling and cleaning

Maintenance plan.xls page 2 of 2 31.03.2009