You are on page 1of 7

Job Number Sheet

Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

Retaining Wall Design : Ver W4.0.04 - 12 Feb 2021


Title : Cantilever wall example
C14
Input Data
Wall Dimensions Unfactored Live Loads General Parameters Design Parameters
H1 (m) 5.6 C (m) 0.4 W (kN/m2) 15 Soil friction  (°) 30 SF Overturning 1.5
H2 (m) 1.4 F (m) 0 P (kN) 0 Fill slope  (°) 0 SF Slip 1.5
H3 (m) 0.2 xf (m) 0 xp (m) 0 Wall friction  (°) 15 ULS DL factor 1.4
Hw (m) -2 At (m) 0.35 L (kN/m) 0  Concrete kN/m3 25 ULS LL factor 1.6
Hr (m) 0.36 Ab (m) 0.35 xl (m) 0  Soil kN/m3 18 Pmax (kPa) 130
B (m) 2.15 Cover wall mm 50 Lh (kN/m) fc' (MPa) 25 Soil Poisson  0.5
D (m) 0 Cover base mm 50 x (m) 0 fy (MPa) 500 DLFac Slide/Ovt 0.9
Seepage allowed
Active pressure NOT applied on back of shear key for sliding

Theory : Coulomb
Wall type : Cantilever

SEISMIC ANALYSIS SETTINGS:

Seismic Analysis ON/OFF:OFF

Horizontal Acceleration (g) 0.02


Vertical Acceleration (g) 0.01
Include Live loads Y

VALUES OF PRESSURE COEFFICIENTS:

Active Pressure coefficient Ka :0.301


Passive Pressure coefficient Kp :4.977
Base frictional constant µ :0.577

FORCES ACTING ON THE WALL AT SLS:


All forces/moments are per m width

FORCES (kN ) and their LEVER ARMS (m )


Description F Horizontal Lever arm F Vertical Lever arm
left (+) down (+)
Destabilizing forces:
Total Active pressure Pa 76.408 1.800 20.474 2.500
As a result of surcharge w 23.583 2.700 6.319 2.500

Stabilizing forces:
Passive pressure on base Pp -87.785 0.467
Weight of the wall + base 70.500 1.944
Weight of soil on the base 38.700 1.075
UDL of15.0 kPa 0.000 2.500

EQUILIBRIUM CALCULATIONS AT SLS


All forces/moments are per m width

1.Moment Equilibrium

Point of rotation: bottom front corner of base.

For Overturning moment Mo calculate as follows:


Mo = Sum(hor. forces x l.a.) - Sum(vert. forces x l.a.)
For Stabilizing moment Mr calculate as follows:
Mr = -Sum(hor. forces x l.a.) + Sum(vert. forces x l.a.)
where l.a. = lever arm of each force.

Stabilizing moment Mr : 219.61 kNm


Destabilizing moment Mo : 134.23 kNm
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

Safety factor against overturning = Mr/Mo = 1.636

2.Force Equilibrium at SLS

Sum of Vertical forces Pv : 135.99 kN


Frictional resistance Pfric : 78.52 kN
Passive Pressure on shear key : 0.00 kN
Passive pressure on base : 87.79 kN
=> Total Horiz. resistance Fr : 166.30 kN

Horizontal sliding force on wall Fhw : 99.99 kN


Horizontal sliding force on shear key Fht : 0.00 kN
=> Total Horizontal sliding force Fh : 99.99 kN

Safety factor against overall sliding = Fr/Fh = 1.663

FORCES ACTING ON THE WALL AT ULS:


All forces/moments are per m width

FORCES (kN ) and their LEVER ARMS (m )


Description F Horizontal Lever arm F Vertical Lever arm
left (+) down (+)
Destabilizing forces:
Total Active pressure Pa 106.972 1.800 28.663 2.500
As a result of surcharge w 37.733 2.700 10.110 2.500

Stabilizing forces:
Passive pressure on base Pp -79.007 0.467
Weight of the wall + base 63.450 1.944
Weight of soil on the base 34.830 1.075
UDL of13.5 kPa 0.000 2.500

EQUILIBRIUM CALCULATIONS AT ULS


All forces/moments are per m width

1.Moment Equilibrium

Point of rotation: bottom front corner of base.

For Overturning moment Mo calculate as follows:


Mo = Sum(hor. forces x l.a.) - Sum(vert. forces x l.a.)
For Stabilizing moment Mr calculate as follows:
Mr = -Sum(hor. forces x l.a.) + Sum(vert. forces x l.a.)
where l.a. = lever arm of each force.

Stabilizing moment Mr : 197.65 kNm


Destabilizing moment Mo : 197.49 kNm

Safety factor against overturning = Mr/Mo = 1.001

2.Force Equilibrium at ULS

Sum of Vertical forces Pv : 122.39 kN


Frictional resistance Pfric : 70.66 kN
Passive Pressure on shear key : 0.00 kN
Passive pressure on base : 79.01 kN
=> Total Horiz. resistance Fr : 149.67 kN

Horizontal sliding force on wall Fhw : 144.70 kN


Horizontal sliding force on shear key Fht : 0.00 kN
=> Total Horizontal sliding force Fh : 144.70 kN

Safety factor against overall sliding = Fr/Fh = 1.034

SOIL PRESSURES UNDER BASE AT SLS

Maximum pressure :144.41 kPa


Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

Minimum pressure : 0 kPa @ 0.62 m from right hand side of base.


Maximum pressure occurs at left hand side of base

*** MAXIMUM PRESSURE EXCEEDS SPECIFIED ALLOWABLE PRESSURE BY 14.4 kPa ***

WALL MOMENTS (ULS) AND REINFORCEMENT TO ACI 318 - 2014

Position from Moment Front Reinforcing Back Reinforcing Minimum


base top (m ) (kNm ) (mm^2/m ) (mm^2/m ) (mm^2/m )

0.00 213.80 0.00 1764.60 812.00


0.10 207.03 0.00 1704.28 812.00
0.21 199.50 0.00 1637.55 812.00
0.31 191.35 0.00 1565.71 812.00
0.42 182.69 0.00 1490.02 812.00
0.52 173.68 0.00 1411.71 812.00
0.62 164.43 0.00 1331.97 812.00
0.73 155.08 0.00 1251.98 812.00
0.83 145.78 0.00 1172.86 812.00
0.94 136.63 0.00 1095.71 812.00
1.04 127.79 0.00 1021.60 812.00
1.14 119.33 0.00 951.09 812.00
1.25 111.23 0.00 884.08 812.00
1.35 103.50 0.00 820.45 812.00
1.46 96.13 0.00 760.08 812.00
1.56 89.11 0.00 702.85 812.00
1.66 82.42 0.00 648.65 812.00
1.77 76.07 0.00 597.38 812.00
1.87 70.04 0.00 548.93 812.00
1.98 64.33 0.00 503.21 812.00
2.08 58.92 0.00 460.11 812.00
2.18 53.82 0.00 419.54 812.00
2.29 49.01 0.00 381.42 812.00
2.39 44.48 0.00 345.67 812.00
2.50 40.22 0.00 312.18 812.00
2.60 36.24 0.00 280.89 812.00
2.70 32.51 0.00 251.71 812.00
2.81 29.04 0.00 224.57 812.00
2.91 25.81 0.00 199.38 812.00
3.02 22.81 0.00 176.08 812.00
3.12 20.05 0.00 154.59 812.00
3.22 17.50 0.00 134.84 812.00
3.33 15.16 0.00 116.75 812.00
3.43 13.03 0.00 100.27 812.00
3.54 11.10 0.00 85.31 812.00
3.64 9.35 0.00 71.82 812.00
3.74 7.78 0.00 59.73 812.00
3.85 6.38 0.00 48.96 812.00
3.95 5.14 0.00 39.46 812.00
4.06 4.06 0.00 31.16 812.00
4.16 3.13 0.00 23.99 812.00
4.26 2.33 0.00 17.90 812.00
4.37 1.67 0.00 12.82 812.00
4.47 1.13 0.00 8.68 812.00
4.58 0.71 0.00 5.43 812.00
4.68 0.39 0.00 2.99 812.00
4.78 0.17 0.00 1.32 812.00
4.89 0.04 0.00 0.34 812.00
4.99 0.00 0.00 0.00 812.00
5.10 0.00 0.00 0.00 812.00
5.20 0.00 0.00 0.00 812.00

BASE MOMENTS (ULS) AND REINFORCEMENT TO ACI 318 - 2014

Position from Moment Top Reinforcing Bot Reinforcing Minimum


left (m ) (kNm ) (mm^2/m ) (mm^2/m ) (mm^2/m )

0.00 0.00 0.00 0.00 952.00


0.05 -0.10 0.00 0.67 952.00
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

0.10 -0.41 0.00 2.67 952.00


0.14 -0.92 0.00 6.02 952.00
0.19 -1.64 0.00 10.70 952.00
0.24 -2.56 0.00 16.72 952.00
0.29 -3.68 0.00 24.08 952.00
0.34 -5.01 0.00 32.79 952.00
0.38 -6.55 0.00 42.84 952.00
0.43 -8.28 0.00 54.25 952.00
0.48 -10.23 0.00 67.00 952.00
0.53 -12.38 0.00 81.11 952.00
0.58 -14.73 0.00 96.58 952.00
0.62 -17.28 0.00 113.41 952.00
0.67 -20.05 0.00 131.62 952.00
0.72 -23.01 0.00 151.19 952.00
0.77 -26.18 0.00 172.15 952.00
0.82 -29.56 0.00 194.49 952.00
0.87 -33.14 0.00 218.23 952.00
0.91 -36.92 0.00 243.36 952.00
0.96 -40.91 0.00 269.90 952.00
1.01 -45.10 0.00 297.86 952.00
1.06 -49.50 0.00 327.24 952.00
1.11 -54.10 0.00 358.05 952.00
1.15 -58.91 0.00 390.30 952.00
1.20 -63.92 0.00 424.00 952.00
1.25 -69.14 0.00 459.17 952.00
1.30 -74.56 0.00 495.81 952.00
1.35 -80.18 0.00 533.93 952.00
1.39 -86.01 0.00 573.55 952.00
1.44 -92.05 0.00 614.68 952.00
1.49 -98.28 0.00 657.33 952.00
1.54 -104.73 0.00 701.52 952.00
1.59 -111.38 0.00 747.27 952.00
1.63 -118.23 0.00 794.58 952.00
1.68 -125.28 0.00 843.47 952.00
1.73 -132.55 0.00 893.97 952.00
1.78 -140.01 0.00 946.08 952.00
1.83 -147.68 0.00 999.83 952.00
1.88 -155.56 0.00 1055.25 952.00
1.92 -163.64 0.00 1112.34 952.00
1.97 -171.92 0.00 1171.13 952.00
2.02 -180.41 0.00 1231.64 952.00
2.07 -189.10 0.00 1293.90 952.00
2.12 -198.00 0.00 1357.93 952.00
2.16 -207.10 0.00 1423.76 952.00
2.21 -216.41 0.00 0.00 952.00
2.26 -225.92 0.00 0.00 952.00
2.31 -230.07 0.00 0.00 952.00
2.36 0.21 0.00 0.00 952.00
2.40 0.07 0.00 0.00 952.00
2.45 0.02 0.11 0.00 952.00
2.50 0.00 0.00 0.00 952.00

SHEAR CHECK AT WALL-BASE JUNCTION TO ACI 318 - 2014

Shear force at bottom of wall V = 125.4 kN


Shear stress at bottom of wall v = 0.43 MPa OK
Allowable shear stress vc = 0.61 MPa (based on Wall tensile reinf.)
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

Sketch of Wall

Design code: ACI 318 - 2014

0.35

0.20
15.00
0.00°

15.00°
30.00°
5.60
1.40

2.15 0.35
0.40

Ka=0.30
Kp=4.98
µ=0.58
V=125.4kN
v= 0.43MPa
144.4kPa vc= 0.61MPa
Wall type: Cantilever SFslip = 1.66
Theory: Coulomb SFslip (ULS) = 1.03
SFovt = 1.64
SFovt (ULS) = 1.00

Wall Bending Moments

Wall Moments

Moment max = 213.8kNm @ -.400m


5.00

4.50

4.00

3.50

3.00
Height (m)

2.50

2.00

1.50

1.00

.500
20.0

40.0

60.0

80.0

100

120

140

160

180

200

220

Bending moment (kNm)


Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

Base Bending Moments

Base Moments Moment max = -230.1kNm @ 2.32m


.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40
-20.0
-40.0
-60.0
Bending moment (kNm)

-80.0
-100
-120
-140
-160
-180
-200
-220
-240
Position (m)

Wall Reinforcement

Wall Reinforcement
5.00 Reinf. max = 1765 mm^2/m @ 0.00m

4.50
Nominal
4.00

3.50

3.00
Height (m)

Back
2.50

2.00

1.50

Front
1.00

.500
1000

1200

1400

1600

1800
200

400

600

800

Reinforcement (mm^2/m)
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date

Base Reinforcement

Base Reinforcement Reinf. max = 1424 mm^2/m @ 2.21m

1400
1300
1200
1100
Reinforcement (mm^2/m)

1000
Nominal
900
800
700
600
500
400
300
200
100
.200

.400

.600

.800

1.00

1.20

1.40

1.60

1.80

2.00

2.20

2.40
Top
Position (m)

Schematic Reinforcement

Y16@200 (Hor)

Y16@200 (Hor)
Y25@250 (NF)

Y16@200 (FF)

1-R10/m2 clips

1-R10/m2 clips

Y16@200 starters
FRONT
Y25@150 starters

Y20@250 (T1)

Y20@200 (B1)

Y20@250 (T2)

Y20@250 (B2)

SECTION

You might also like