FATEHPUR LAXMANGARH WATER SUPPLY PROJECT PACKAGE - V MANASI

PIPE NOMI HYDRO


SN. FROM TO Section METERI NAL LENTH LAYING BALANCE TESTING OF CONTRACTOR WISE FIT-UP DETAILS
DATE :
NO. AL &
CLASS
DIA
mm
(MTR) TO BE LAID LAID LINE 02.08.2017

SECTION : (B)FROM MANASI PUMPING STATION TO CLUSTER 6A,11B,14A &14 B CONT. LENTH CONT LENTH CONT LENTH CONT LENTH CONT LENTH TOTAL LENTH REMARKS
1 MANASI PS JN-15 ( NODE -23 ) B DI -K9 400 5890 5994 -104 4960.5 RAKESH JI 5531.5 LBL 462.5 5994

2 JN-15 ( NODE -23 ) JN-NARODRA ESR B DI-K7 250 2619 2326 293 0 RAKESH JI 885.5 ROHITAS 1440.5 2326

3 JN-NARODRA ESR NARODRA ESR B DI-K7 100 350 0 350 0 0

4 JN-NARODRA ESR JN-09 (NADE-24) B DI-K7 250 6631 6817.5 -186.5 0 RAJENDR JI 6817.5 6817.5

5 JN-09 (NADE-24) ESR DUDWA B DI-K7 150 27 0 27 0 0

6 JN-09 (NADE-24) ESR PANLAVA B DI-K7 150 2075 2161.5 -86.5 2018.5 BALAJI 2123 ROHITAS 38.5 2161.5

7 JN-15 ( NODE -23 ) JN-03 B DI-K7 350 9347 7965 1382 7965 BRIJESH JI 7965 7965

8 JN-3 ESR JASRASAR B DI-K7 200 834 275 559 0 LBL 275 275

9 JN-3 JN-04 B DI-K7 250 11763 9788.5 1974.5 0 RAJENDR JI 9080.5 LBL 708 9788.5

10 JN-04 ESR PATODA B DI-K7 150 1300 957 343 0 LBL 957 957

11 JN-04 ESR BATHOTH EXISTING B DI-K7 150 4865 5010.5 -145.5 0 DILIP JI 2024 BRIJESH JI 990 LBL 11 MUKESH JI 1985.5 5010.5

TOTAL 45701 41295 4406 14944 0

SECTION : (C)FROM MANASI PUMPING STATION TO CLUSTER 11A,15A,15B 16 & PALARI VILLAGE CONT. LENTH CONT LENTH CONT LENTH CONT LENTH CONT LENTH TOTAL LENTH
1 MANASI PS JN-05 C DI-K9 450 9300 9368.5 -68.5 3380 RAKESH JI 5519.5 BRIJESH JI 3380 LBL 469 9368.5

2 JN-05 JN-06 C DI-K7 150 3926 3055 871 0 LBL 3055 3055

ESR KHURI BARI


3 JN-06
PROPOSED C DI-K7 100 262 0 262 0 0

ESR KHURI CHOTI


4 JN-06
EXISTING C DI-K7 100 443 0 443 0 0

5 JN-05 JN-07 C DI-K9 400 4000 3857.5 142.5 3500 BRIJESH JI 3650.5 RAJENDRA JI 207 3857.5

6 JN-07 ESR LALASI C DI-K7 150 50 0 50 0 0

7 JN-07 JN-17 C DI-K7 350 6700 6620.5 79.5 0 BRIJESH JI 3421.5 RAJENDRA JI 3199 6620.5

8 JN-17 ESR PALDI C DI-K7 100 440 0 440 0 0

9 JN-17 JN-08 C DI-K7 300 6650 6131 519 0 RAJENDRA JI 6131 6131

10 JN-08 ESR KHINWASR C DI-K7 150 120 0 120 0 0

11 JN-08 ESR BIRODI CHHOTI C DI-K7 150 4600 5852 -1252 0 RAJENDRA JI 5852 5852

TOTAL 36491 34884.5 1606.5 6880 0


SECTION :(D) FROM MANASI PUMPING STATION TO CLUSTER 12A, 12B, 13, & ALMAS CLUSTER CONT. LENTH CONT LENTH CONT LENTH CONT LENTH CONT LENTH TOTAL LENTH
1 MANASI PS JN-10 D DI-K9 400 8670 6681.5 1988.5 3525 DILIP JI 3525 SHARMA 1331 RAKESH JI 1325 KISHOR JI 115.5 BJH 385 6681.5

2 JN-10 ESR SINGODRA D DI-K7 100 20 951.5 -931.5 0 ROHITAS JI 951.5 951.5 SINGODRI TO JN-01

3 JN-10 JN-11 D DI-K9 350 2402 2360.5 41.5 0 DILIP JI 2360.5 2360.5

4 JN-11 ESR ANTROLI D DI-K7 150 467 0 467 0 0

5 JN-11 JN-12 D DI-K9 300 6253 3478.5 2774.5 3357.5 SH.BALAJI 3357.5 BJH 121 3478.5

ESR RAJPURA
6 JN-12 EXISTING D DI-K7 100 4970 3161.5 1808.5 3161.5 SH.BALAJI 3161.5 3161.5

7 JN-12 JN-13 D DI-K7 250 8 0 8 0 0

8 JN-13 JN-14 D DI-K7 200 4567 4242.5 324.5 0 TSK CONT. 836 BJH 1179 MANOJ 2227.5 4242.5

ESR CHORIMIYAN
9 JN-14 EXISTING D DI-K7 100 20 0 20 0 0

10 JN-14 JN-18 D DI-K7 150 2456 1837 619 0 manoj 1837 1837

11 JN-18 ESR ALMAS D DI-K7 100 172 0 172 0 0

12 JN-18 ESR BINCHARI D DI-K7 100 740 0 740 0 0

13 JN-13 JN -ESR BALARAN D DI-K7 200 256 0 256 0 0

ESR BALARAN
14 JN -ESR BALARAN EXISTING D DI-K7 100 88 0 88 0 0

15 JN -ESR BALARAN ESR KHRI RADAN D DI-K7 200 4779 4045.5 733.5 3181 DILIP JI 4045.5 4045.5

TOTAL 35868 26758.5 9109.5 13225 0

SECTION : (A)FROM MANASI PUMPING STATION TO CLUSTER 08A, 08B & 10 CONT. LENTH CONT LENTH CONT LENTH CONT LENTH CONT LENTH TOTAL LENTH
1 MANASI PS JN-15 A DI-K9 300 50 0 50 0 0

2 JN-15 ESR MANASI A DI-K7 100 10 0 10 0 0

PAWAN
3 JN-15 JN-01 A DI-K9 300 10895 11953.5 -1058.5 6554 RAKESH JI 1508 LBL 5656 BRIJESH JI 462 RAJKUMAR 2848
GOYAL
1468.5 11942.5

4 JN-01 ESR BADUSAR A DI-K7 150 676 1073.5 -397.5 0 LBL 1073.5 1073.5

PAWAN
5 JN-01 JN-02 A DI-K7 200 5515 4766.5 748.5 4533 LBL 1351
GOYAL
3415.5 4766.5

ESR BHUMA BADA


6 JN-02
EXISTING A DI-K7 100 445 11 434 0 LBL 11 11

PAWAN
7 JN-02 ESR DATUJALA A DI-K7 200 4245 4967 -722 0 LBL 418.5 GOYAL 3355 BJH 1204.5 4978

TOTAL 21836 22771.5 -935.5 11087 0

GRAND TOTAL 139896 125709.5 14186.5 46136 125709.5

AS PER SURVEY QTY 140731


AS PER L-SECTION QTY 139896
DIFFERENCE QTY 835
FATEHPUR LAXMANGARH WATER SUPPLY PROJECT PACKAGE - V MANASI
GAP DETAILS IN SECTION (A)

300 DI K-9 LENGTH 50 MTR / LAID = 0 MTR

1 MPS JN-15

100 DI K-7 LENGTH 10 MTR / LAID = 0 MTR

2 JN-15 ESR MANASI

300 DI K-9 LENGTH 10895 MTR / LAID = 10523.5 MTR

3 JN-15 JN-01
135 MTR GAP 30 MTR GAP 30 MTR GAP 995 MTR GAP IN VILLAGE 30 MTR GAP

1250
150 DI K-7 LENGTH 676 MTR / LAID = 873.5 MTR

4 JN-01 ESR BADUSAR


40 MTR GAP 210 MTR GAP

200 DI K-7 LENGTH 5515 MTR / LAID = 4678.5 MTR

5 JN-01 JN-2
40 MTR GAP 196 MTR GAP

100 DI K-7 LENGTH 445 MTR / LAID = 0 MTR

6 JN-02 ESR BHUMA BADA


EXISTING

200 DI K-7 LENGTH 4245 MTR / LAID = 4559.5 MTR

7 JN-02 ESR DATUJALA


45 MTR GAP 12 MTR GAP 120 MTR GAP 24 MTR 140 MTR GAP
FATEHPUR LAXMANGARH WATER SUPPLY PROJECT PACKAGE - V MANASI
GAP DETAILS IN SECTION (B)

400 DI K-9 LENGTH 5890 MTR / LAID = 5553.5 MTR

1 MPS JN-15
135 MTR GAP 30 MTR GAP 300 MTR GAP 200 MTR GAP 11 MTR GAP

250 DI K-7 LENGTH 2619 MTR / LAID = 885.5 MTR

2 JN-15 JN- NARODRA ESR


94 MTR GAP 48 MTR 1350 MTR NARODRA VIL. 30 MTR GAP

100 DI K-7 LENGTH 350 MTR / LAID = 0 MTR

3 JN- NARODRA NARODRA ESR


ESR

250 DI K-7 LENGTH 6631 MTR / LAID = 6817.5 MTR

4 JN- NARODRA JN-9


ESR
250 MTR GAP 60 MTR GAP

150 DI K-7 LENGTH 27 MTR / LAID = 0 MTR

5 JN-9 ESR DUDWA

150 DI K-7 LENGTH 2075 MTR / LAID = 2123 MTR

6 JN-9 ESR PANLAWA

350 DI K-7 LENGTH 9347 MTR / LAID = 7965 MTR

7 JN-15 JN-3
21.5 MTR GAP 328 MTR GAP 452.5 MTR GAP

200 DI K-7 LENGTH 834 MTR / LAID = 00 MTR

8 JN-3 ESR JASRASAR

250 DI K-7 LENGTH 11763 MTR / LAID = 7507.5 MTR

9 JN-3 JN-04
210 MTR GAP 440 MTR GAP 12 MTR GAP 1350 MTR AT HAPAS 565 MTR AT PATODA

150 DI K-7 LENGTH 1300 MTR / LAID = 00 MTR

10 JN-4 ESR PATODA

150 DI K-7 LENGTH 4865 MTR / LAID = 3014 MTR


ESR BATHOTH
11 JN-4 EXISTING
ESR BATHOTH
11 JN-4 EXISTING
900 MTR GAP 950 MTR GAP
FATEHPUR LAXMANGARH WATER SUPPLY PROJECT PACKAGE - V MANASI
GAP DETAILS IN SECTION (C)

450 DI K-9 LENGTH 9300 MTR / LAID = 8910.5 MTR

1 MPS JN-05
135 MTR GAP 30 MTR GAP 200 MTR GAP 200 MTR GAP 21 MTR GAP 5.5 MTR GAP

150 DI K-7 LENGTH 3926 MTR / LAID = 3055 MTR

2 JN-05 JN-06
40 MTR GAP 110 MTR GAP

100 DI K-7 LENGTH 262 MTR / LAID = 0 MTR

3 JN-06 ESR KHURI BARI


PROPOSED

100 DI K-7 LENGTH 443 MTR / LAID = 00 MTR


ESR KHURI CHOTI
4 JN-06 EXISTING

400 DI K-9 LENGTH 4000 MTR / LAID = 3857.5 MTR

5 JN-05 JN-07
60 MTR GAP 24 MTR GAP 25 MTR GAP

150 DI K-7 LENGTH 50 MTR / LAID = 0 MTR

6 JN-7 ESR LALASI

350 DI K-7 LENGTH 6700 MTR / LAID = 6620.5 MTR

7 JN-7 JN-17
25 MTR GAP 12 MTR GAP

100 DI K-7 LENGTH 440 MTR / LAID = 00 MTR

8 JN-17 ESR PALADI

300 DI K-7 LENGTH 6650 MTR / LAID = 2270 MTR

9 JN-17 JN-08
4156.5 MTR GAP

150 DI K-7 LENGTH 120 MTR / LAID = 0 MTR

10 JN-8 ESR KHINWASAR

150 DI K-7 LENGTH 4600 MTR / LAID = 0 MTR

11 JN-8 ESR BIRODI


CHHOTI
ESR BIRODI
11 JN-8 CHHOTI
FATEHPUR LAXMANGARH WATER SUPPLY PROJECT PACKAGE - V MANASI
GAP DETAILS IN SECTION (D)

400 DI K-9 LENGTH 8670 MTR / LAID = 6681.5 MTR

1 MPS JN-10
135 MTR GAP 54 MTR GAP 140 MTR GAP 107 MTR 3000 MTR GAP 225 MTR GAP 125 MTR GAP

100 DI K-7 LENGTH 20 MTR / LAID = 0 MTR

2 JN-10 ESR SINGODRA

350 DI K-9 LENGTH 2402 MTR / LAID = 2360.5 MTR

3 JN-10 JN-11
85 MTR GAP

150 DI K-7 LENGTH 467 MTR / LAID = 0 MTR

4 JN-11 ESR ANTROLI

300 DI K-9 LENGTH 6253 MTR / LAID = 3478.5 MTR

5 JN-11 JN-12
30 MTR GAP 30MTR GAP

100 DI K-7 LENGTH 4970 MTR / LAID = 3161.5 MTR


ESR RAJPURA
6 JN-12 EXISTING
30 MTR GAP 1808.5 MTR GAP IN VILLAGE

250 DI K-7 LENGTH 8 MTR / LAID = 8 MTR

7 JN-12 JN-13

200 DI K-7 LENGTH 4567 MTR / LAID = 2015 MTR

8 JN-13 JN-14
192 MTR GAP 18 MTR GAP 1050 MTR GAP FOREST GAP 1292 MTR GAP

100 DI K-7 LNGTH 20 MTR / LAID = 20 MTR


ESR CHORIMIYAN
9 JN-14 EXISTING

150 DI K-7 LENGTH 2456 MTR / LAID = 0 MTR

10 JN-14 JN-18

100 DI K-7 LENGTH 172 MTR / LAID = 0 MTR

11 JN-18 ESR ALMAS

100 DI K-7 LENGTH 740 MTR / LAID = 0 MTR

12 JN-18 ESR BINCHARI

200 DI K-7 LENGTH 256 MTR / LAID = 0 MTR

13 JN-13 JN -ESR BALARAN

100 DI K-7 LENGTH 88 MTR / LAID = 0 MTR

14 JN -ESR ESR BALARAN


BALARAN EXISTING

200 DI K-7 LENGTH 4779 MTR / LAID = 4045.5 MTR


JN -ESR
14
BALARAN ESR KHRI RADAN
200 MTR GAP 523.5 MTR GAP