aredita wsdta |[arteft side trom centerline towards increasing
a3M/siKM
Se ears 33M/181 to 151.400KM.
as pipeline Across and Parallel to NH
chainage / Km direction a
(8) Right side from centerline towards Increasing
[chainage / Km direction saeabara
Proposal to acquire Land No.
1.9. [{a) Left side from center ine No Nil
[o) Right side from center ing Nil
|Whether proposals in the same side where land is
1.10 |not to be acquired Se
ifnot then where to fay the cable Within ROW,
ai [Petals of already laid services, any,along the al
proposed route
12 |Number of lanes (2/4/6/8 lanes) existing ‘Lane with paved shoulder
‘Lag [Proposed Number of lanes (2 lane with paved
3 Ni
shoulders / 4 /6/8 lanes)
yes then which side
Not existing |
114 [fa Left side from centor Ine
[Right side rom centerline
Proposed Service Road
1.0 [alte side from center ine Not Applicable No service Road
[0) Right side fom conter ine
Rae Baral Amoth, Pratapolirh GA,
‘renee sreretrs oh1s.
[whether proparalto ly Gas Pipeline safer the
service road or between the service road and mai] ‘Not Applicable
|ariagews
Io service Road
Feu
ihe permission for laying of Petvolem Products
lbioetine sal be considered fr approval rejecton|
Ipased on the Ministry Circulars mentioned as
|svove
ves
Whether carving of sewaue/#as pipeline has Be
proposed on te parapet / part ofthe bridges. If
|yes then mention the methodology proposed for
tne same
No
IFerossing ofthe road nvoWed yest shal either
[encased in pipes or trough structure or conduits | Yes, Method used i HOD For erossing|
|pecialy uit or that purpose at the expenses of and parallel,
Ihe agency owning the hie
(a) Whether enstng drainage strocutures ae
alowed to cary sewage/e3s pipeline te
[b)iston a tine normal 19 NH Paral & Crossing
) what the distance of crossing the
sewage/e3s pipeline from the existing structures?
{crossings shall not be too near the existing Not Applicable
|tructures onthe National Highway, the minimum
distance being 15 meter.
[a The casing pipe [or conduit pipe he case of
[electri eable) carving te uit ine shal be of
toe east iron, or reinforced cement concrete and
hve adequate strenght and be large enough to
Jpeit ready withdeawal ofthe carrie pipe/cabe
IMention type of casing.
No
[eens ofthe csina/eondut pipe shall be sealed
from the outside, so thatit doesnot act asa No
\rsinage path
if The casing/condul pipe should, 5 minim
extend trom drain to cuts and toe of slope inthe No
ils.
gh The op ofthe casng/condult pipe shoud be at
least 1.65 meter below the surface of the road
|ubjec to being at least 03 below the dain
ners. Mention the proposed details
iy Mention the methodology proposed Tor
|-rossing of road forthe proposed Sewage/sas pipe
line, crossing shal be by boing method (HOO)
Itrenchless Technolog special, where the
lessting read pavement iof cement concrete or
[dense bituminous concrete type.
[0 The caing/eondut pipe sal be installed with
Jan even bearing thoughout its length andin such
!amannerasto prevent the formation ofa
[waterway along
No
[Document / Drawings enclosed withthe proposal
aa
[cross section showing the sie of tench for open
Irenching method (st normal size of 1.65 meter
deep x 0.3 meter wide) () Should not be less than
[50.cm wider than the outer diameter ofthe pipe
i) Located as close tothe extreme edge ofthe
ight of way as posse but not less than 30 meter
Irom the centre-tines ofthe nearest carriageway
|i) Shall sot be permitted to run along the Endlosed
ational Highways when the road formation is
situated in double cutting, Nor Shall these be laid
lover the existing culverts and bridges (v) These
Jnould tw sc ad that their top iat least 0.6 meter
below the yround level 30 s ott obstruct
drainage of the road lon.
Meet Ges Resources Limiied
rapt
hater Aran Teeieres feaPTe
eau Baral Amethi. Pratangar-G.A.
ey Sti were TN
spa aas007622
[cross section showing the sizeof pitand location of
[cable for HOD method
Enclosed
23
strip plan / Route plan showing Gas pipeline,
\chainage, Width of ROW, distance of proposed
Pipeline from the edge of ROW, Important mile
stone, intersections, cross drainage works etc.
Enclosed
24
Methodology for laying of showing Gas pipeline
Enclosed
24a
[Open trenching method. (May be alowed in utility
corridor only where pavement is neither cement
concrete nor dense bituminous concrete type.) If
ves, what isthe Methodology of refining trench.
Yes
[a) The trench width should be atleast 30 cm, but
not more than 60.em wider than the outer diameter
lof the pipe,
ves
(0) For filing ofthe trench, Bedding shall be to =
\depth of not less than 30 cm. t shall consist of
|eranular material ree of lumps, clods and cobbles
{and graded to yield a firm surface without sudden
[change in the bearing value. Unsuitable soll and
ves
(The backfil shall be completed in two stages ()
side fl tothe level ofthe top of the pipe and (i)
loverfilto the bottom of the road crust.
ves
(@) The side-il shall consist of granular material aid
in 15 em layers each consolidated by mechanical
tampering and controlled addition of moisture to
[95% ofthe Proctor Density. Overfill shall be
|compacted tothe same density as the material that
had been removed. Consolidation by saturation or
pending wil not be Permitted.
Yes
[e) The road crust shall be built to the same strength]
las the existing crust on either side ofthe trench.
[care shall be taken to avoid the formation of a dip
lat the trench.
Yes
y
ue)
(UmsTeE e)y a®
Rae Barat Amen Pritargane A
rertett, wemns oe
Src
Mob 9a
33306876[f) The excavation shal be protected by flagman,
signs and barricades, and red lights during night
hours.
ves
Ig) required, a diversion shall be constructed at
ithe expense of agency owning the utility line.
ves
242
Horizontal Directional Driling (HOD) Method
Enclosed
243
[Methodology for Laying of Gas pipeline through CO
|works and method of laying. In cases where the
carrying of Gas pipeline on the bridge becomes
inescapable.
NA
[Draft License Agreement signed by two witnesses
Yes Enclosed
Performance Bank Guarantee in favour of NH
Division has to be obtained as per MorTh guidelines
ior a period of one year intially (extendable if
required till satisfactory completion of work) as a
security for ensuring/making good the excavated
lrench for laying the Gas pipe line/ducts by proper
ting and compaction, clearing debris/loose earth
produced due to execution of trenching atleast SO
rm away from the edge of the right of way. No
ipayment shall be payable by the NHAI tothe
licensee for clearing debris/loose earth.
Performance 8G as per above isto be obtained,
‘As per new guidelines of MoRTH
circular dt. 22.11.2016
4a
|confirmation of BG has been obtained or not as per
INHAL gudelines.
We agree to pay Bank Guarantee
|Amount, Which will be agreed by NHA
[Affidavit / Undertaking from the Applicant forthe
following ie to be furnised
Yes
5a
Not to Damage to other utility, if damaged then
to pay the losses either to NH or to the
|concerned agency.
Yes
32
For Renewal of Bank Guarantee
Not Applicable
53
For Confieming all standard condition of Ministry
circulars and NH guideline
Enclosed
54
For Shifting of Gas pipeline as and when required by
INHAI at theic own cost.
Enclosed
55
[For shifting Gas pipeline due to 4/6 lanning /
lwidening of NH
Enclosed
For indemnity against al damages and claims clause
xxv)
Enclosed
37
[For traffic movement during laying of Gas pipeline
to be managed by the Applicant.
Enclosed
58
if any claim is raised by the Concessionaire then
Ithe same has to be paid by the applicant,
Enclosed
59
Prior approval ofthe NHAI shall be obtained before
lundertaking any work of installation, shifting or
Iepairs, or alterations to the Gas pipe line/any other
tility located in the National highway right-of-ways.
Enclosed
5.10
Expenditure, eny, incurred by NAAI for repairing
any damage caused tothe National Highway by the
laying, maintenance or shifting ofthe Gas pipe line
willbe borne bythe applicant agency owning the
line.
Enclosed
saa
If the NHAI considers it necessary in future to move
the utility line for any work of improvement of
repairs to the road, it willbe carried out as desired
lay the Hil ar the cast of ve anency owning the
utility line within a reasonable time (not exceeding
60 days) ofthe intimation given.
Noted
Rajeev
Chief Mon
Se, eT
Mb 9443330076[Cerificate from the applicant inthe folowing
format i) Laying of Gas pipeline wil not have any
|deeletrious effects on any of the bridge components
land Roadway safty for traffic
i) "We do not undertake that | will relocate service
road / approach road / utilities at my own cost
notwithstanding the permission granted withing
such time as wl be stipulated by NH" for future 4/6
lanning or any other development.
saa
Yes; Enclosed
|Who will sign the agreement on behalf of Gas,
pipeline agency
Rajeev Sachdeva
(Chief Manager-CGD (8GRL)
[Power of Attorney to sign the agreement is avalabe|
lor not
Yes
[The Project Director/Excutive Engineers, will submit
the following Certificates
Yes
[certificate for proposal for confirming ofall
standard condition issued vide Ministry of Road
[Transport and Highway Circular No.-NH-II/P/66/76
dated 18/19.11.1976, RW/NHA«I//66/76 dated
7.1 |11.5.1982, (i) RW/NH-12037/1/86/001 dated
_A, |28.7.1993. il) RW/NH-11037/1/86/001 dated
29.1.1995 (iv) RW/NH-34066/2/95/ SBR dated
25.10.1999 and (v) RW/NH-34066/7/2003 S&R (8)
ldated 17.9.2003,
Yes, Enclosed
Certiicate from XEN in the following format () "itis
certified that any other location of the Gas pipeline
\would be extremely dificult and unreasonable
[costly and the installation of Gas pip line within
|ROW will not adversely affect the design, stability &
traffic safety of the highway nor the likely future
improvement such as widening ofthe carriageway,
leasing of curve etc”.
72]
Yes, Enclosed
ty tor 6 tanning
(a) Where feasibility is available "/ do certify that
here will be no hindrance to proposed six laning
lbased on the feasibility report considering
loroposed structures at the said location”.
> |(p) incase feasibility report isnot available"! do
certify thot cuffcient ROW is ovallable at site for
laccommadating proposed six laning”.
Agreed
Rajeev Spchdeva / water
Chet Mas GD. 0 pada oh
‘shorat apr
Wricer rer Teetrenervtetteors
Rae Barell Ameth. Pratapgam. GA
Grae, rN wereere ah
Mob oa 13550076
Page Sof6if ni section proposed to be taken up by NHAIon
1BOT basis -a cause is to be inserted in the
|Agreement. "The permitted highway on which
licensee has been granted the right of lay Gas
pipeline/cable/duct has also been granted as aright
lof way tothe concessionaire under the concession
lagreement for up-gradation of (Jaunpur- Lucknow)
INH No, 733 crossing & Parallel details as per
|Annexure "A" attached on Build, Operate and
Hransfer Basis and therefore, the licensee shall
honor the same."
crossing & parallel details attached as
per annexure'A’
|Who will supervise the work of laying of Gas
pipeline
(BGRY india
(@) On behalf of the Applicant
Rajeev Sochdeva
Chief Manager-CGD (BGRL)
[b) On behalf of NH Division
Person deputed by NHAI
10
[Who will ensure thatthe defects In road portion
[after laying of water / Gas supply pipeline are
corrected and ifnot corrected then what action will
lbe taken.
(a) On behalf ofthe Applicant
Rajeev Sachdeva
Chief Manager- CGD (BGRL)
(6) On behalf of NH DWvision
Person deputed by NHAI
u
‘Who will pay the claims for damages done /
\disruption in working of concessionaire if asked
by the concessionaire
(On behalf ofthe Applicant
(@GRL) India
2
[A certificate trom Project Director/Executive
[Engineer that he wil enter the proposed permission
inthe register of records ofthe permissions in the
prescribed Performa (Copy enclosed).
Enclosed
B
I any previous approvals accorded for laying of
lunderground water / Petroleum / Gas supply
pipeline then Photocopy of register of records of
lpermissions accorded as maintained by Project
Dicector/Executive Engineer then copy be enclosed.
Not Enclosed
No previous
approval
Bharat Gas Resources Limied,
Rajeev Sachdeva,
CChiof Manager-CGD (BGRL)
Bharat Gas Resources Limitos
creer tren feenetey fearrree
Rae Bareli Amethi, Pratapoarh.G A,
‘Srereen sri, rere che
Mob 9413550076
Page GofDestination 7| Pipeline Road Pipeline | Crossing
Sr. Village Name at
Description of | Description | Chainage | Chainage | Width in
No. Crossing
Location inkm. | inkm, | Meter.
National Highway [120.3MM Dia t |
731 (On Lucknow- | Steel with | viiage-
Jaunpur.) Across at | 40MM OFC and Kamrauli, Tehsil - |
1 1s1.400 | o.ooxm =| 26m
upsioc 180MM — dia Musafirkhana,
JagdishpurRoad —_| MOPE Pipeline. Dist - Amethi
No.t
National Highway- [203MM Dia | |
731 (On Jaunpur- | Stee! along with
Lucknow) Parallel | 40MM OFC Village
Line-a
Right Side only from 151.00KM- Kamrauli, Tehsil -
2 . (0.00Km -| aoom
UPSIDC Road No. 7 151.400KM Musafirkhana,
0.400KM) |
(BHEL) to SAIL Gate. Dist-Amethi. |
Total length |
1990m. |
Total Length | 426M
ae
Bharat Gas Resources timid
Saree fren fener
Mob. oa igaaicDetails of Laying Underground Pi
ANNXEURE-2
1@ Across and parallel to NHAI-731
T | (i) [Name of company asking for Permission [Bharat Gas Resources Ltd
(ii) [Contact Person : Name & Designation Rajeev Sachdeva
Chief Manager-CGD
BGRL (india)
{iil |Full Address Bharat Gas Resources Limited
Bharat Bhawan, 4 & 6 Currimbhoy Road,
Ballard Estate, Mumbai, Maharashtra, India
}-400001
(iv) [Telephone No. and Fax [9413330676
(v) [Details & purpose for laying the pipe HTransportation of Natural Gas for Domestic
line crossing through NHAI Land and industrial use in,Amethi District.
(Wi) [Any other details regarding laying
(2) Distance of proposed site from the Within ROW of NHAI- 731 (launpurto
icenter of the road llagdishpur- Lucknow) section.
(b) Whether itis possible to lay the Yes
proposed lines or not (reasons)
[(c) Whether itis possible to cross the Yes
proposed lines through existing _ lines
lor not ( reasons)
2 Detalls regarding road alignment whether INot Applicable as crossing NH at
U/G Cable / pipe is to be laid along the road| : |parpendicular
( |Name of Road INHAI-731,
(li) [Category of road (to be ascertained National Highways. Detals as per annexure"
{from km. stone on road side)
(i) [wicth of the road
(@) Formation width measured from Meters
learthen bank
(b) Black Topped carriageway width Meter each carriage width
(c) Road Boundary (extent of highway IMeters
land) (All these details are to be shown on
the drawing also)
(d ) Location of pipeline laying Along [As per annexure
Details to be supplied on layout drawings ee ea ee
(6 sets)
enclosed.
Rojoow Qignseys Her, gay
Chet Menoge CB on r
Se ear cenrone on
na Se Reesea [GEOGRAPHICS OF THE PIPELINE Not Applicable as HDD Method.
ROUTE
(a) Dimension of the Pipeline trench
((B) Dimension of Protection pipe. las per cross section drawing Enclosed.
(c) Diameter of the Pipeline / Cable. 1120.3 mm Dia Steel with OFC Pipeline &
180mm MDPE Pipeline.
[Te Right of user [Not Applicable as HDD Method,
5 |(i) | This is to certify that no Govt. Land shall be Agreed
loccupied by applicant except for the
purpose of laying of UG Cables / Pipeline.
(i. | This isto certify that the work shall bein | [Agreed
accordance with the Govt. Rules and
regulations in force from time to time and
binding to Applicant.
ii) | This isto Certify that all required cost and | [Agreed
fees as per rules and regulation of the Govt.
will be deposited timely.
Rajeev Sachdeva
Chief Manager- CGD (BGRL)
BGRL (Indj
feva
&Go
asin
ge ae
SAS, Brera — oh