Bullehshah Packages Power House Internship Report
Contents
2
Bullehshah Packages Power House Internship Report
3
Bullehshah Packages Power House Internship Report
Demineralize Demineralize
Raw Water Demine water Feed water Deaerator
water plant water tanks
water
Water
Bypass
Feed Water
Economizer Feed Water HP Heaters Feed Water Pumps
Feed water
5 bar
PM6 PM7
4
Bullehshah Packages Power House Internship Report
Server
Operation Operation
Controller
Station 1 Station 2
Input/output
Cards
DCS is the online system for controlling the machines of Bullehshah Packaging. The system is
controlled by the controller attached to the server. DCS is based on four important subsystems
that are as follows
o Analogue Input
Analogue input is used to control all the temperatures, pressures, flow and levels
of the tanks in all the instruments that are used in machines. This input will be
received to the instruments of the machines from the controller of DCS.
o Analogue Output
Analogue output is the output of machines like actuators, motors, valves and
pumps etc. we will give output to program controller and the machines will
receive the input according to that output.
o Digital input
Digital input is the input in the form of digital binary values i.e. 0 and 1. This
input is for switches in the machines. It is used to tell us the status (on and off) of
instruments attached to machines.
5
Bullehshah Packages Power House Internship Report
o Digital Output
Digital output is the output and commands of valves, SOV’s etc. We will give
digital output to program controllers and in the field they will receive input
according to that output.
Distribution of Power
Block Diagram of distribution
Below is the symbolic diagram of distribution of power to the mill.
,,,,
6
Bullehshah Packages Power House Internship Report
Then afterwards this supplies power to all the departments of Bullehshah Packaging. This was the
main symbolic diagram of power Distribution.
7
Bullehshah Packages Power House Internship Report
The conduit pipe should not be broken or damaged because it can be harmful for
the operators and workers.
Number of conduit pipes is incomplete and also there are some pipes which are
not in use or they are empty. There is no wire inside the pipe. Figure is shown
below
The solution of this problem is that we should use conduit pipes according to our
requirements. Excess pipes should not be used. The conduit pipes should be
properly fitted from one conduit to other conduit.
8
Bullehshah Packages Power House Internship Report
The solution to this problem is that the above pipe is of 37mm and the conduit if
of 40mm. So the conduit pipe should also be of size 40mm. By this we shall not
require an insulation tape for connecting the pipes.
A conduit pipe of 27mm is not fitted to T shape connector properly. The conduit
pipe is damaged from all the three sides of connector as shown in figure
The conduit pipe should be properly fitted inside the T shape connector. The T
shape connector is of diameter 1.25 inches and a conduit pipe which is of 20 mm
size is connected there. The pipe is small as compared to the T. all the three pipes
should be of 27mm to be connected properly in all the three sides of T shape
connecter.
Two different conduit pipes are connected to each other. One is of 28mm and the
second pone is of 20mm and they are connected by insulation tape. There are two
solutions of this problem
One is that we should connect two sided connector
Second one is that the size of pipe should be same.
o Panel Gland
A conduit pipe of the size of 27mm is improperly connected to the panel gland
and also the heat resistive insulation is not properly on the conduit pipe. The pipe
9
Bullehshah Packages Power House Internship Report
is also damaged. So as there is high voltage on the panel so it can be harmful for
workers. Figure is shown below
The size of the gland and the size of the panel should be same so that it can be
fitted easily and heat resistive insulation should be of greater length so that it can
be fitted on both the gland and the pipe.
o Solenoid Valves
There are solenoid valves or indicators on the balers and they are severe damaged
as shown in figure
These valves should be changed for the proper working of the Baler.
10
Bullehshah Packages Power House Internship Report
Panel Wiring
o X2 Terminal Block (Motor Signals)
S.no Wire Number Point coming Point going to Component
from
1 5 02-6 17-2 Starter Key
21-10 S
2 4 02-5 17-3 Starter Key
21-11 R
3 1 02-2 17-6 Starter Key
21-11 B
4 3 02-5 17-6 Power View
21-12 Terminal A(1)
5 16 02-16 17-9 No wire
21-13
6 14 02-14 17-9 Power View
21-11 Terminal A(2)
7 15 02-15 17-10 Power View
21-14 Terminal A(3)
8 2 02-3 17-10 Power View
21-15 Terminal A(5,6)
9 7 02-8 17-13 Switch KA070
21-16 (Diesel Motor
Stop Relay)
10 11 02-11 17-14 Switch Terminal
21-16 11
11 6 02-7 17-15 Switch KAS73
21-17 (Motor
Emergency Stop
Relay)
12 3 02-4 17-16 Switch Terminal
21-18 3
13 8 02-9 17-17 Switch KA071
21-18 (Max Min RPM
Commutation
Relay)
14 10 02-11 17-18 Switch Terminal
21-19 10
15 -24 02-12 21-12 35-12 SB62
(Bedplate
Emergency Stop
Push Button-1)
11
Bullehshah Packages Power House Internship Report
12