ESPERANZA HEALTH CENTER

TERESA ST., BRGY. 592, ZONE 59,


STA. MESA, MANILA

PLUMBING NOTES LEGEND


1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE CDP CONCRETE DRAIN PIPE
EXECUTED IN ACCORDANCE WITH THE PROVISIONS OF THE
PHILIPPINE PLUMBING CODE, THE NATIONAL BUILDING CODE CO CLEAN OUT
AND THE RULES AND REGULATIONS OF THE LOCALITY.
CV CHECK VALVE

HB HOSE BIBB
2. COORDINATE THE DRAWINGS WITH OTHER RELATED
DRAWING SPECIFICATIONS THE ENGINEER AND OR ARCHITECT FD FLOOR DRAIN
SHALL BE NOTIFIED IMMEDIATELY OF ANY OTHER DISCREPANCIES
FOUND HEREIN. GICWL GALVANIZED IRON COLD WATER LINE (SCH. 40)

GICWR GALVANIZED IRON COLD WATER RISER (SCH. 40)

3. ALL PIPES SHALL BE INSTALLED AS INDICATED ANY GV GATE VALVE


RELOCATION REQUIRED FOR PROPER EXECUTION OF
PLUMBING WORKS SHALL BE WITH PROPER APPROVAL MH MANHOLE
FROM THE ENGINEER AND OR ARCHITECT.
PVCDS POLYVINYL CHLORIDE DOWNSPOUT

PVCDP POLYVINYL CHLORIDE DRAIN PIPE 1 VICINITY MAP


4. ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL P-1 SCALE NTS
MAINTAIN A ONE (1) PERCENT SLOPE MINIMUM UNLESS PVCSP POLYVINYL CHLORIDE SOIL PIPE
OTHERWISE SPECIFIED.
PVCVAC POLYVINYL CHLORIDE VENT. ACROSS CEILING

PVCVP POLYVINYL CHLORIDE VENT. PIPE


5. WATER SUPPLY PIPES TO FIXTURES SHALL BE SIZED IN
ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS. PVCVS POLYVINYL CHLORIDE VENT. STACK PROPOSED
RENOVATION OF
PVCVTR / W POLYVINYL CHLORIDE VENT THROUGH ROOF / WALL ESPERANZA HEALTH
6. ALL BRANCHES OF FIXTURES OR GROUP OF FIXTURES SHALL CENTER
BE PROVIDED WITH AIR CHAMBER MADE OF CAPPED VERTICAL PVCWP POLYVINYL CHLORIDE WASTE PIPE
EXTENSION PIPE NIPPLE.
PVCWS POLYVINYL CHLORIDE WASTE STACK

RD ROOF DRAIN
7. ALL WATER LINES SHALL BE HYDROSTATICALLY TESTED AT
120 PSI FOR A PERIOD OF 24 HOURS BEFORE BURIED OR UD URINAL DRAIN
COVERED. ALL GALVANIZED IRON PIPES DIRECTLY IN
CONTACT WITH THE SOIL SHALL BE PROVIDED WITH TWO (2) COATS WC WATER CLOSET
OF ASPHALT AND WRAPPED WITH JUTE CLOTH AND SOAKED IN
MELTED ASPHALT. LAV LAVATORY SEPTIC TANK
CS COUNTER SINK EXISTING CHAPEL / MPB
EFFLUENT AND COVERED COURT
8. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT CONNECT TO NEAREST
CV
THE SITE AND COORDINATE THE WORK WITH THE SEWER AND SWERAGE SYSTEM WM
STORM DRAINAGE LINE, EFFLUENT DISPOSAL POINT AND THE GV
WATER LINE SERVICE.
TAP TO MAIN
WATER LINE TAP TO EXISTING
DRAINAGE LINE
9. ALL PIPES AND OTHER DIMENSIONS ARE IN MILIMETERS (mm)
UNLESS OTHERWISE SPECIFIED.

VALENZUELA
TERESA STREET

2 SITE DEVELOPMENT PLAN


P-1 SCALE 1:100 METERS

PROJECT NAME / LOCATION SHEET CONTENTS PREPARED BY REVIEWED/SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: CONCURRED BY: SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REYNIEL JOHN S. MENDIOLA
SURVEYED:
ENGINEER I
NATIONAL CAPITAL REGION RENOVATION OF LYING-IN, DARWIN K. DIMAANO
- PLUMBING NOTES
NORTH MANILA ENGINEERING DISTRICT ESPERANZA HEALTH CENTER - LEGEND
DESIGNED:
ENGINEER II
P-1
OFFICE OF THE DISTRICT ENGINEER AND LYING-IN-CLINIC - VICINITY MAP MARK ANDREW M. MARTINO
- SITE DEVELOPMENT PLAN DRAWN:
ENGINEERING AIDE - A JULIET M. FAJARDO GERARDO T. DE GUZMAN MEDEL F. CHUA NILO C. MARAYAG ARIEL I. VALENCIA, MD, MPH, CESO III 15 31
Nagtahan, Sta. Mesa, Manila City of Manila
CHECKED:
EULOGIO C. DIMAFELIX Chief, Planning and Design Section Assistant District Engineer District Engineer Engineer IV Director IV, DOH - NCRO
ENGINEER II Head, Engineering & Civil Works Cluster, DOH - NCRO
F
WC
FDLAV
75mm Ø PVCWP WATER TANK
CO CO
FD
75mm Ø PVCSP LAV
WC
F
75mm Ø PVCVAC

100mm Ø PVCWP CO
CO
50mm Ø PVCVAC
LAV WC

FD F

100mm Ø PVCSP

50mm Ø PVCVAC
LAV

100mm Ø PVCWP
50mm Ø PVCVAC
UP 100mm Ø PVCSP CO F UP
75mm Ø PVCWP WC
FD
CO 50mm Ø PVCVAP LAV
LAV 100mm Ø PVCWP LAV 75mm Ø PVCVP (VERTICAL)
WC
75mm Ø PVCVP (VERTICAL) 75mm Ø PVCVP (VERTICAL) FD F 75mm Ø PVCVP (VERTICAL) 100mm Ø PVC PIPE (VERTICAL)
50mm Ø PVCVAC
100mm Ø PVCSP

50mm Ø PVCVAC
100mm Ø PVCSP
100mm Ø PVC PIPE (VERTICAL) 100mm Ø PVC PIPE (VERTICAL) CO
PVCDS PVCDS PVCDS
100mm Ø PVC PIPE (VERTICAL)
LAV FD WC

100mm Ø PVCWP
50mm Ø PVCVAC
150mm Ø PVC 150mm Ø PVC F
CB CB CB LAV
WC FD F
LAV

CO
75mm Ø PVCWP

150mm Ø PVC

100mm Ø PVCWP

50mm Ø PVCVAC
PVCDS CB OPEN AREA
RAMP UP
100mm Ø PVCSP

50mm Ø PVCVAC

WC
FD
LAV
CO F
150mm Ø PVC 150mm Ø PVC
100mmØ DS (TYP.) CB CB CB

PVCDS PVCDS PVCDS


50mm Ø PVCVAC

150mm Ø PVC
100mm Ø PVCWP

LAV
FD
WC
SD LAV WC
UP UP CO
F
CO CO CB
SHO STO.
MH
100mm Ø PVCSP
TO 3RD
FLR.
150mm Ø PVC

CO 50mm Ø PVCVAC
MH
CO
100mm Ø PVC PIPE (VERTICAL)
EFFLUENT
CONNECT TO NEAREST
SWERAGE SYSTEM CB
Ø PVC UP

ENTRANCE
150mm RAMP

CB

TAP TO EXISTING
DRAINAGE LINE

1 GROUND FLOOR SEWER LINE LAYOUT 2 SECOND FLOOR SEWER LINE LAYOUT
P-2 SCALE 1:100 METERS P-2 SCALE 1:100 METERS

PROJECT NAME / LOCATION SHEET CONTENTS PREPARED BY REVIEWED/SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: CONCURRED BY: SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REYNIEL JOHN S. MENDIOLA
SURVEYED:
ENGINEER I
NATIONAL CAPITAL REGION RENOVATION OF LYING-IN, DARWIN K. DIMAANO
- GROUND FLOOR SEWER LINE
NORTH MANILA ENGINEERING DISTRICT ESPERANZA HEALTH CENTER LAYOUT
DESIGNED:
ENGINEER II
P-2
OFFICE OF THE DISTRICT ENGINEER AND LYING-IN-CLINIC - SECOND FLOOR SEWER LINE MARK ANDREW M. MARTINO
LAYOUT DRAWN:
ENGINEERING AIDE - A JULIET M. FAJARDO GERARDO T. DE GUZMAN MEDEL F. CHUA NILO C. MARAYAG ARIEL I. VALENCIA, MD, MPH, CESO III 16 31
Nagtahan, Sta. Mesa, Manila City of Manila
CHECKED:
EULOGIO C. DIMAFELIX Chief, Planning and Design Section Assistant District Engineer District Engineer Engineer IV Director IV, DOH - NCRO
ENGINEER II Head, Engineering & Civil Works Cluster, DOH - NCRO
50mmØ GI PIPE
F
WC
FD LAV TANK
25mmØ GICWL PUMP WATER TANK

FD
LAV 50mmØ GI PIPE (VERTICAL)
WC
F

CO
WC

50mmØ GI PIPE

25mmØ GICWL
F FD

LAV

100mm Ø PVCWP
50mm Ø PVCVAC
UP UP

25mmØ GICWL

25mmØ GICWL
25mmØ GICWL (VERTICAL PIPE) LAV

25mmØ GICWL
WC
75mm Ø PVCVP (VERTICAL) 75mm Ø PVCVP (VERTICAL) FD F
25mmØ GICWL (VERTICAL PIPE)
100mm Ø PVC PIPE (VERTICAL)

100mm Ø PVC PIPE (VERTICAL)

LAV
WC FD F
LAV
100mm Ø PVCWP
50mm Ø PVCVAC

RAMP UP

50mmØ GI PIPE

25mmØ GICWL
F
FD
WC

UR

SS

CR LAV
SS
WC
SD LAV
CO UP UP
SHO STO.
TO ROOF 25mmØ GICWL
DECK

WC
LAV 75mm Ø PVCVP (VERTICAL)
FD
CO 100mm Ø PVC PIPE (VERTICAL)

RAMP UP
ENTRANCE

CV
WM
GV

TAP TO MAIN
WATER LINE

1 THIRD FLOOR SEWER LINE LAYOUT 2 GROUND FLOOR WATER LINE LAYOUT
P-3 SCALE 1:100 METERS P-3 SCALE 1:100 METERS

PROJECT NAME / LOCATION SHEET CONTENTS PREPARED BY REVIEWED/SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: CONCURRED BY: SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REYNIEL JOHN S. MENDIOLA
SURVEYED:
ENGINEER I
NATIONAL CAPITAL REGION RENOVATION OF LYING-IN, DARWIN K. DIMAANO
- THIRD FLOOR SEWER LINE
NORTH MANILA ENGINEERING DISTRICT ESPERANZA HEALTH CENTER LAYOUT
DESIGNED:
ENGINEER II
P-3
OFFICE OF THE DISTRICT ENGINEER AND LYING-IN-CLINIC - GROUND FLOOR WATER LINE MARK ANDREW M. MARTINO
LAYOUT DRAWN:
ENGINEERING AIDE - A JULIET M. FAJARDO GERARDO T. DE GUZMAN MEDEL F. CHUA NILO C. MARAYAG ARIEL I. VALENCIA, MD, MPH, CESO III 17 31
Nagtahan, Sta. Mesa, Manila City of Manila
CHECKED:
EULOGIO C. DIMAFELIX Chief, Planning and Design Section Assistant District Engineer District Engineer Engineer IV Director IV, DOH - NCRO
ENGINEER II Head, Engineering & Civil Works Cluster, DOH - NCRO
50mmØ GI PIPE (VERTICAL)
TANK

25mmØ GICWL
GV
25mmØ GICWL (VERTICAL PIPE) 25mmØ GICWL (VERTICAL PIPE)

25mmØ GICWL 25mmØ GICWL 25mmØ GICWL

LAV WC WC
FD F
F FD
LAV
LAV

25mmØ GICWL
CO F UP UP
WC
25mmØ GICWL

FD
LAV

25mmØ GICWL
LAV 25mmØ GICWL (VERTICAL PIPE) 25mmØ GICWL (VERTICAL PIPE)

25mmØ GICWL (VERTICAL PIPE)


25mmØ GICWL

LAV FD
WC
F
25mmØ GICWL

OPEN AREA
WC
FD
LAV F
FD
F WC

UR

25mmØ GICWL
SS

LAV
FD CR LAV
SS
WC
UP 25mmØ GICWL UP
F

TO 3RD 25mmØ GICWL TO ROOF


FLR. DECK

25mmØ GICWL (VERTICAL PIPE)

WC
LAV
25mmØ GICWL (VERTICAL PIPE) FD

25mmØ GICWL

1 SECOND FLOOR WATER LINE LAYOUT 1 THIRD FLOOR WATER LINE LAYOUT
P-4 SCALE 1:100 METERS P-4 SCALE 1:100 METERS

PROJECT NAME / LOCATION SHEET CONTENTS PREPARED BY REVIEWED/SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: CONCURRED BY: SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REYNIEL JOHN S. MENDIOLA
SURVEYED:
ENGINEER I
NATIONAL CAPITAL REGION RENOVATION OF LYING-IN, DARWIN K. DIMAANO
- SECOND FLOOR WATER LINE
NORTH MANILA ENGINEERING DISTRICT ESPERANZA HEALTH CENTER LAYOUT
DESIGNED:
ENGINEER II
P-4
OFFICE OF THE DISTRICT ENGINEER AND LYING-IN-CLINIC - THIRD FLOOR WATER LINE MARK ANDREW M. MARTINO
LAYOUT DRAWN:
ENGINEERING AIDE - A JULIET M. FAJARDO GERARDO T. DE GUZMAN MEDEL F. CHUA NILO C. MARAYAG ARIEL I. VALENCIA, MD, MPH, CESO III 18 31
Nagtahan, Sta. Mesa, Manila City of Manila
CHECKED:
EULOGIO C. DIMAFELIX Chief, Planning and Design Section Assistant District Engineer District Engineer Engineer IV Director IV, DOH - NCRO
ENGINEER II Head, Engineering & Civil Works Cluster, DOH - NCRO
P
CS
Ø PV CWP
V
mm Ø P
100 5mm
7V O
LA C C
VA
P VC
WC F
K LA
V mØ CO
C
N FD 50m VC
VA
TA
P
R AC L AV F mØ
TE C CV P
FD P WC FD 50m
VA PV PVCS W
WA UP ØP
VC m Ø Ø
FD F ØP
VC
PV
CWP
LAV UP
50m 00mm m
50m
m 1 WC 75m mm
Ø P
L) 100 CW
ICA CO LAV
PV
E RT Ø
(V ) m
AL
m
VP TIC
100
P VC R L) )
mØ (VE P CO ICA L
C
IPE
VA
75m P S PU E RT TICA VC
C CD AM V
P ( (VER
P
PV PV R V V mØ
mØ C
PV PIPE LA 50m C
m CB Ø F A VA
100 m PV
C C RE P VC
75m m Ø FD W
F
LA
V CO m
CO NA mØ
WC FD 10 0 E 50m
V D S P VC OP
VC mØ
C
FD LA VC
VA
CS
P P 0 m VC WP
VC
PV 5 P
WC F Ø P
Ø 1 mØ ØP
O m
WP C CB mm
m m
50m m 150 P
VC 100 100 CW LAV
P P S C CB PV
mØ PV
CS C CD ØP
V
DS Ø
75m Ø VA PV m C m m CO
m PVC CB150m PV 100 FD
75 m
mØ PV
C
V WC
75m P mØ C LA V F
CS m PV LA AC
L)
PV 150 mØ F CV A
CB TIC
V
Ø
C O C ØP
.) CB 50m WD R
m
S (VE
00m S YP CD CB F
1 m
CD (T PV FD 50m IPE
1
AL
)
PV DS VC L)
TIC ) mØ
P ICA L) CP
(VE
R
TIC
AL m mØ O. (VE
R T
IC A D
3RR. ØP
V
VP E R 100 CB150m ST C
VP (VE
RT
O mm
100
V PV L
VC E( AC
S VC E T F
UP UP
Ø
ØP PIP
CV
CD P IP P
mm
m C PV
PV 150 CB mØ CP CW
75m PV 75m PV PV
Ø UP
mØ Ø
m Ø
m 50m MP mm mm
10 0 RA C 100 100
LAV
PV

50 m
1 CB WC
P FD F
CS
PV G CO
Ø E TIN E
C XISE LIN
m
V AN
LA
m
100 E
O G
TR P T INA
CO P EN TA DRA
CS
Ø PV CVAC
WC V
mm Ø P
100 mm
SD 50
O
SH

CO
MH
CO
ST
MH CO RE
E NT NEA TEM
S
FLU TO SY
EF ECT AGE
N
N E R
CO SW

1 GROUND FLOOR ISOMETRIC SEWER LINE LAYOUT 2 SECOND FLOOR ISOMETRIC SEWER LINE LAYOUT
P-5 SCALE 1:100 METERS P-5 SCALE 1:100 METERS

PROJECT NAME / LOCATION SHEET CONTENTS PREPARED BY REVIEWED/SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: CONCURRED BY: SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REYNIEL JOHN S. MENDIOLA
SURVEYED:
ENGINEER I
NATIONAL CAPITAL REGION RENOVATION OF LYING-IN, DARWIN K. DIMAANO
- GROUND FLOOR ISOMETRIC
NORTH MANILA ENGINEERING DISTRICT ESPERANZA HEALTH CENTER SEWER LINE LAYOUT
DESIGNED:
ENGINEER II
P-5
OFFICE OF THE DISTRICT ENGINEER AND LYING-IN-CLINIC - SECOND FLOOR ISOMETRIC MARK ANDREW M. MARTINO
SEWER LINE LAYOUT DRAWN:
ENGINEERING AIDE - A JULIET M. FAJARDO GERARDO T. DE GUZMAN MEDEL F. CHUA NILO C. MARAYAG ARIEL I. VALENCIA, MD, MPH, CESO III 19 31
Nagtahan, Sta. Mesa, Manila City of Manila
CHECKED:
EULOGIO C. DIMAFELIX Chief, Planning and Design Section Assistant District Engineer District Engineer Engineer IV Director IV, DOH - NCRO
ENGINEER II Head, Engineering & Civil Works Cluster, DOH - NCRO
) LAV
AL L
TIC ICW F
R ØG
L
)
(VE ICAL mm
ICW
C VP RT 25 WC
ØG
VC
A
(VE
CV P mm V
V
Ø K L
FD 25 LA
IPE N
ØP W
LAV m GIC
CO WC 50m
m
75m GI
P TA PIP
E) mØ LA
V
mØ R L
FD 50m TE ICA
25m
F UP MP WA UP WL (V
ERT
FD
F
WP PU WC
VC P GIC
mØ m mØ
25
m
100
L) IPE
ICA IP
UP
RT ØG
(VE mm MP
PIP
E 50 RA
LAV
PVC A L) F
m Ø
R TIC V
00m LA
1 P (VE
CV D
WC F ICWL
Ø PV G
75mm mØ FD
25m WC F

WL
GIC Ø
IPE mm
IP G 25
V L) mØ
LA T ICA 50m
(VER
AL
) WC IPE E)
TIC FD P PIP
ER OF ØP
VC
ICA
L O.
VP
(V
ROCK CO m m E RT ST
PVC TO DE 100 L (V
m Ø UP GICW UP
75m mØ UP
25m
P MP
) CW C
AL PV RA
RTIC Ø C VA
(VE 0 m m
Ø PV
IPE
10 mm
VCP 50
WL
ØP F
FD LA
V IC
mm WC
ØG
10 0 IPE m
SS IP G 25m CE
V
UR FD mØ LA R AN
50m NT
CR E

SS WC L
W
SD GIC
CO O mØ
SH 5m2

CV M
W V
G

IN
MA NE
P TOER LI
TAWAT

1 THIRD FLOOR ISOMETRIC SEWER LINE LAYOUT 2 GROUND FLOOR ISOMETRIC WATER LINE LAYOUT
P-6 SCALE 1:100 METERS P-6 SCALE 1:100 METERS

PROJECT NAME / LOCATION SHEET CONTENTS PREPARED BY REVIEWED/SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: CONCURRED BY: SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REYNIEL JOHN S. MENDIOLA
SURVEYED:
ENGINEER I
NATIONAL CAPITAL REGION RENOVATION OF LYING-IN, DARWIN K. DIMAANO
- THIRD FLOOR ISOMETRIC
NORTH MANILA ENGINEERING DISTRICT ESPERANZA HEALTH CENTER SEWER LINE LAYOUT
DESIGNED:
ENGINEER II
P-6
OFFICE OF THE DISTRICT ENGINEER AND LYING-IN-CLINIC - GROUND FLOOR ISOMETRIC MARK ANDREW M. MARTINO
WATER LINE LAYOUT DRAWN:
ENGINEERING AIDE - A JULIET M. FAJARDO GERARDO T. DE GUZMAN MEDEL F. CHUA NILO C. MARAYAG ARIEL I. VALENCIA, MD, MPH, CESO III 20 31
Nagtahan, Sta. Mesa, Manila City of Manila
CHECKED:
EULOGIO C. DIMAFELIX Chief, Planning and Design Section Assistant District Engineer District Engineer Engineer IV Director IV, DOH - NCRO
ENGINEER II Head, Engineering & Civil Works Cluster, DOH - NCRO
)
PIPE
AL
R TIC
(VE NK
WL TA
GIC

25m

F LAV

WC LAV )
) IPE
WC FD IPE WL
WL LP
L
AL
P ICW GV GIC FD A
GIC TIC mØ IC
UP UP
L G
mØ ICW L) mØ F RT
25m
G
(V ER A 25m 25m (VE
TIC L
Ø
WL ICW
m
R
LAV
25m
GIC (VE G
m Ø IPE mØ
25m GI
P 25m

50m
V L
LA ICW F
m ØG WL
25m F A GIC

FD W
C RE 25m
E NA
OP E)
PIP
AL
TIC
ER
LAV L (V
G ICW

FD 25m
F WC WL
V F GIC
LA mØ
25m V
WCD LAV
LA
CO )
F
WC IPE
LP
L
ICW FD A
OF TIC
L
IPE
G
) D W
3RR. ER

LP
25m O
GIC
mØ ROCK L (V
TIC
A T F L E) TO DE ICW
ER UP
25m PIP UP G
L (V AL Ø
TIC 25m
m
ICW ER
Ø G
W L (V
25 mm GIC
L V
ICW LA mØ
25m
G
F
mØ WC
25m FD F FD V
LA WL
WC GIC
SS mØ
UR 25m
GIC
WL
CR WL
Ø SS Ø GIC
mm 25
25 mm

1 SECOND FLOOR ISOMETRIC WATER LINE LAYOUT 2 THIRD FLOOR ISOMETRIC WATER LINE LAYOUT
P-7 SCALE 1:100 METERS P-7 SCALE 1:100 METERS

PROJECT NAME / LOCATION SHEET CONTENTS PREPARED BY REVIEWED/SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: CONCURRED BY: SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REYNIEL JOHN S. MENDIOLA
SURVEYED:
ENGINEER I
NATIONAL CAPITAL REGION RENOVATION OF LYING-IN, DARWIN K. DIMAANO
- SECOND FLOOR ISOMETRIC
NORTH MANILA ENGINEERING DISTRICT ESPERANZA HEALTH CENTER WATER LINE LAYOUT
DESIGNED:
ENGINEER II
P-7
OFFICE OF THE DISTRICT ENGINEER AND LYING-IN-CLINIC - THIRD FLOOR ISOMETRIC MARK ANDREW M. MARTINO
WATER LINE LAYOUT DRAWN:
ENGINEERING AIDE - A JULIET M. FAJARDO GERARDO T. DE GUZMAN MEDEL F. CHUA NILO C. MARAYAG ARIEL I. VALENCIA, MD, MPH, CESO III 21 31
Nagtahan, Sta. Mesa, Manila City of Manila
CHECKED:
EULOGIO C. DIMAFELIX Chief, Planning and Design Section Assistant District Engineer District Engineer Engineer IV Director IV, DOH - NCRO
ENGINEER II Head, Engineering & Civil Works Cluster, DOH - NCRO
2 - 10 mm Ø EXTRA BARS S-1a - 100mm THK. + FIN. SLAB w/
700
TOP / BOTTOM ON 10 mm Ø REBARS @ 300 mm O.C.
BENT UP 2 OUT OF 3 @ L/4 150 400 150
TWO PARALLEL SIDES LEGEND:
FROM FACE SUPPORT BOTHWAYS

4650 CB CATCH BASIN PVCSP POLYVINYL CHLORIDE SOIL PIPE

150
DRAINAGE PIPE CDP CONCRETE DRAIN PIPE PVCVAC POLYVINYL CHLORIDE VENT. ACROSS CEILING
1000 3200
CO CLEAN OUT PVCVP POLYVINYL CHLORIDE VENT. PIPE

400
700
150 150 INLET OUTLET
200 600 200 1100 150 700 150 1100 150 CV CHECK VALVE PVCVS POLYVINYL CHLORIDE VENT. STACK

150
HB HOSE BIBB PVCVTR / W POLYVINYL CHLORIDE VENT THROUGH ROOF / WALL
150

FD FLOOR DRAIN PVCWP POLYVINYL CHLORIDE WASTE PIPE


PLAN
900

GICWL GALVANIZED IRON COLD WATER LINE (SCH. 40) PVCWS POLYVINYL CHLORIDE WASTE STACK

GICWR GALVANIZED IRON COLD WATER RISER (SCH. 40) RD ROOF DRAIN
700
50 600 50

150 400 150 100 mm Ø PVCDS GV GATE VALVE UD URINAL DRAIN


2800

2500

MH MH 75
MH MANHOLE WC WATER CLOSET
150mm THK. CHB w / 100 mm

100
Ø REBARS HOR. EVERY 2 - PVCDS POLYVINYL CHLORIDE DOWNSPOUT LAV LAVATORY
LAYERS
6
900

(VARIABLE)
VERT. @ 600 mm O.C. PVCDP POLYVINYL CHLORIDE DRAIN PIPE CS COUNTER SINK
A-4 INLET 50

600 min.
2% SLOPE
PVC
PVC
150

2% SLOPE 50 OUTLET

100
100
S2 - 100mm THK. + FIN. SLAB w/ 10mmØ
A-4
6

REBARS @ 300 mm O.C. BENT UP 2/3 OUT


@ L/4 FACE SUPPORT AND SHORT SPAN
10 mm Ø TEMP. BARS @ 300 mm EW SECTION

1 DETAIL PLAN OF SEPTIC TANK


SCALE 1:40 METERS
5 CATCHBASIN DETAIL SECTION
SCALE 1:20 METERS
P-8 P-8

600
250 100 250

10mmØ BAR HANDLE

100
3-10mmØ (E.W.)
50 50 700
100mm THK. + FIN. SLAB w/ 10 mm Ø REBARS
@ 200 mm O.C. BENT UP 2 OUT OF 3 @ L/4 50 500 50 225 250 175
FROM FACE SUPPORT BOTHWAYS

150 x 300 mm RC BEAM w/ 2 - 16 mm Ø


COVER DETAIL

225
TOP & BOT. REBARS & 10 mm Ø STIRRUPS 4 STEEL GRATING
1 @ 50, 3 @ 100, REST @ 300 mm O.C. SCALE 1:20 METERS
4650 P-8

250
700
600 150 700 150 4 - 10mm Ø BOTHWAYS

225
CO 100mm THK. + FIN. SLAB w/10 mm Ø
350100 VAR. 100

350100 VAR. 100

100
NGL NGL BENT UP 2 OUT OF 3 @L/4
MH MH MH
AIR SPACE FROM FACE SUPPORT BW

INLET PLAN

WATER
PLASTERED w/ WATERPROOFING INLET

100
LEVEL
COMPOUND OR APPLY ONE FACE PLASTERED w/WATERPROOFING
BITUMEN TAR WATER LEVEL COMPOUND OR APPLY ONE FACE 700
BITUMEN TAR
2125

2125

LEACHING WALLS REINFORCEMENT


DIGESTIVE CHAMBER
1550

1550

CHAMBER 10 mm Ø VERT. & HOR. BARS 225 250 225


@ 200 mm Ø O.C. BOTHWAYS AIR SPACE
STEEL GRATING
100 mm thk. SLAB w/ 10 mm Ø REINFORCED

50

100
VERTICAL & HORIZONTAL

50
10 mm Ø REBARS @
2 % SLOPE 300 mm BOTHWAYS @ 200 mm O.C. BOTHWAYS 10
125

125

150 1000 150 3200 150 150 2500 150


100 mm thk. + FINISH SLAB w/ 10 mm Ø
2800 REBARS @ 300 mm O.C. BOTHWAYS SECTION
GRAVEL BEDDING

2 LONGITUDINAL SECTION DETAIL 3 CROSS SECTION DETAIL 6 STEEL GRATING COVER


SCALE 1:20 METERS
P-8 SCALE 1:40 METERS
P-8 SCALE 1:40 METERS P-8

PROJECT NAME / LOCATION SHEET CONTENTS PREPARED BY REVIEWED/SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: CONCURRED BY: SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REYNIEL JOHN S. MENDIOLA
SURVEYED:
ENGINEER I
NATIONAL CAPITAL REGION RENOVATION OF LYING-IN, - DETAIL OF SEPTIC TANK DARWIN K. DIMAANO
NORTH MANILA ENGINEERING DISTRICT ESPERANZA HEALTH CENTER - DETAIL OF CATCHBASIN DESIGNED:
ENGINEER II
P-8
- SPOT DETAIL SECTION
OFFICE OF THE DISTRICT ENGINEER AND LYING-IN-CLINIC MARK ANDREW M. MARTINO
- COVER DETAIL DRAWN:
ENGINEERING AIDE - A JULIET M. FAJARDO GERARDO T. DE GUZMAN MEDEL F. CHUA NILO C. MARAYAG ARIEL I. VALENCIA, MD, MPH, CESO III 22 31
Nagtahan, Sta. Mesa, Manila City of Manila - STEEL GRATING COVER
CHECKED:
EULOGIO C. DIMAFELIX Chief, Planning and Design Section Assistant District Engineer District Engineer Engineer IV Director IV, DOH - NCRO
ENGINEER II Head, Engineering & Civil Works Cluster, DOH - NCRO