REVISED INDUCTION
CC
COVID 19 PANDEMIC
Name: *Samuel Andrei Dunareanu
Employer *Tclarke Date of Birth 24/10/1997
Trade: *Plumber Mobile No. 0040760758396
Mode of transport* Underground Tube Miles travelled* 1 mile
Walk
Cycle NI Number:ST 58 83 32 A
Vehicle
Bus Postcode:IG11 7FU
Underground Tube
Overhead Train
NEXT OF KIN - Name: Emanuela Dunareanu
Project No & Address. 50 Broadway CW255 Contact No: 0040755524438
*The above information is required INDUCTION
to calculate the carbon footprint of NUMBER
the organization
All workers and management to
attend site (where possible) using
private transport (car/cycle) and
travel separately. Hand cleaning
provision (hand sanitizer) will be
provided at entry and egress points.
If public transport absolutely has
to be used for whatever reason,
then appropriate action must be
taken to comply with social
distancing whilst on the network
or use the appropriate PPE.
NOTE IF YOU ARE UNDER THE AGE OF 18 YOU WILL BE REQUIRED TO HAVE A SEPERATE RISK
ASSEMENT COMPLETED
TRAINING CERTIFICATES: Have you provided your training ID No. Expiry Date
details?
C.S.C.S + Unique Learner Number:
Plant Operator 06053603 052022
First Aid
Other:
Please listen to the Site Induction and tick YES if you understand NO if you do not and any comments
YES NO COMMENTS
THE SITE
YES NO COMMENTS
3. GENERAL SITE RULES
Security arrangements for site arrival and departure
Use of welfare facilities & social distancing during breaks
Keeping the site clean, C&W cleaning ROTA & good hygiene practice
Drugs and alcohol policy
Behaviour (shouting, abusive language, courtesy to the public)
Changing clothes & good hygiene practice before leaving site
Use of radios
Safe use of mobile phones
Hours of work
The Considerate Constructors Scheme
4. SITE SAFETY
Mandatory PPE and dress code
PPE Risk Assessment
General site risks & current COVID- 19 RAMS awareness
(slips, trips and falls, Manual Handling, Working at Height)
Specific site risks (Method Statements and Risk Assessments)
updated 20-04-202.
Tools, plant and equipment provided (condition, competence to use, etc)
Your own tools, plant and equipment (condition, PAT testing, etc)
Scaffold (Do not interfere/alter remove or adapt any access equipment
unless authorized and trained to do so)
SITE OPERATIVE/SUB- CONTRACTOR
REVISED INDUCTION
CC
COVID 19 PANDEMIC
Permits to Work (hot works, excavating, lone working, Ladder ect)
Skills cards
Accident and near miss reporting
5. Environmental Issues:
Protection (trees, wildlife, etc)
Waste recycling (skips and segregation)
Energy management (turn it off)
Spills and leaks
Reduction of noise, light and all other pollution
Asbestos on site Asbestos tool box talk must be undertaken prior to works
starting. Formal training is to be undertaken within the month.
Reasonable fitness and understanding of spoken English are essentials for working on site.
I have been instructed and understand my duties and responsibilities on the above items
Operative’s Signature: Date:
YOU MUST NOW ATTEND A BRIEFING ON ALL RISK ASSESSMENTS AND METHOD STATEMENTS BEFORE
STARTING WORK
Please tick to
show you have
read these
Contractors COMPANY’S ENHANCED RAMS - COVID 19
Corley & Wooley: Operations of Site Activities during the COVID-19 pandemic (RAMS)
Corley & Wooley: Castle Square Induction for Operations during Covid-19 pandemic