Professional Documents
Culture Documents
Who/ what may What is the rate level What risk control action need to be taken
be haremed
Likely risk issue
(what need to be considered so that the risk are identified and effectively controlled)
(Specific Person) Rate risk as Low, Medium or High Time frame
General safety requiremnts Participiants work permit
operators severity of risk( s)-3 Competent operators
Spectators Likely hood of risk(L)-2 Ensure grinding disk and guard are not damged.
Staff Overall risk ( S*L) = 6 Ensure power code and motor are not damged
High Safety goggle , footwear and hearing protection to be
Worn while in a operation
No loose cloths. Every hire
Keep other people from workarea and erect barricade or screen
is necessarry
Make sure work piece is secure.
Grinder to be switched off before setting aside and immeadiately
when blade jams.
Make sure fingers, hands and power code are well clear on grinding
wheel.
Always use two hands while unit is operating.
Provide the handle(Maintain a firm grip with handle on the unit without excessive force.)
Likely hood of risk(L)-2 kick back is a sudden reaction to pinched, bound or misaligned wheel causing an uncontrolled
2.contact with oving parts. cut-Off tool to lift up and out of work piece toward the operator. Leads to human injury
3.High speed flying particles, from the grinding wheel
Overall risk ( S*L) = 6
itself
4. Due to kick back. High
5 .Usage of inappropriate and unsuitable parts.
Ergonomics operators
can anyone injures to due to: severity of risk( s)-2 Ensure the working platforms are in a good manner Every hire
1.poor work area and platforms. Likely hood of risk(L)-2 Take appropriate intervals between the activity.
2.Repetitive body movements. Overall risk ( S*L) = 4
3. constrained body posture. Medium
Vibrations
Take regular brake from continioues operation.
1.operator can injured or suffered ill-helath from operators severity of risk( s)-2 Wear apprpriate Ppes ( eg: gloves) Every hire
2.exposure from vibration Likely hood of risk(L)-2 Conduct the periodic inspection for smoother and less vibration
Overall risk ( S*L) = 4
Medium