583+000 583+500

583+500 584+000

+818
19FK0010: Asset Preservation Program
Reconstruction of 3.232 lane kilometer concrete pavement
K0583+818 - K0585+333, K0586+729 - K0587+043
STATUS: Completed as of June 26, 2020 (Under Warranty)

584+000 584+500

584+500 585+000
at 847.3 m

Alin Bridge
LIMIT: K0585+431
LENGTH: 16.20 l.m

585+000 585+500

+333