Professional Documents
Culture Documents
We guarantee you can pass any IT certification exam at your first attempt with just 10-12
hours study of our guides.
Our study guides contain actual exam questions; accurate answers with detailed explanation
verified by experts and all graphics and drag-n-drop exhibits shown just as on the real test.
To test the quality of our guides, you can download the one-fourth portion of any guide from
http://www.certificationking.com absolutely free. You can also download the guides for retired
exams that you might have taken in the past.
For other payment options and any further query, feel free to mail us at
info@certificationking.com
APICS CPIM-ECO : Practice Test
Question No : 1
A company produces a part with a nominal diameter of 2.0 inches and a tolerance of ±
0.006 with a standard deviation of 0.001 inches. A sample has the average diameter of
1.996 inches with a standard deviation of 0.001 inches. What is the CPK and process
capability?
A. 0.667, capable
B. 0.667, not capable
C. 0.333, capable
D. 0.333, not capable
Answer: B
Question No : 2
Answer: B
Question No : 3
Group technology identifies the common characteristics of parts on the basis of which of
the following factors?
A. Yields
B. Processes
C. Source
D. Costs
Answer: B
Question No : 4
www.CertificationKing.com 2
APICS CPIM-ECO : Practice Test
What management approach is based on the participation of all members of an
organization in improving processes, and culture in which they work?
Answer: C
Question No : 5
When addressing the storage and movement of inventory in a push system, it would be
important to consider:
A. orders that are issued without regard for needs of other warehouses.
B. projected requirements for all warehouses and direct sales.
C. the need to increase warehouse levels of safety stock.
D. elimination of central control of inventory allocation.
Answer: B
Question No : 6
To decrease time to market for discrete products, it is most effective to improve which of
the following phases?
A. Product definition
B. Product design
C. Production
D. Distribution
Answer: B
Question No : 7
www.CertificationKing.com 3
APICS CPIM-ECO : Practice Test
A. Production throughput
B. Return on investment (ROI)
C. Manufacturability
D. Quality
Answer: B
Question No : 8
A. inventory staging.
B. a point-of-sale system.
C. point-of-use storage.
D. cycle counting.
Answer: C
Question No : 9
The next job to be performed was selected because it had the least amount of operation
time prior to the due date. Which of the following priority sequencing rules was being used?
Answer: B
Question No : 10
www.CertificationKing.com 4
APICS CPIM-ECO : Practice Test
C. Determine the percentage of output within specification limits
D. Verify ongoing process capability
Answer: B
Question No : 11
A. coaching.
B. a statistical approach.
C. a kaizen event.
D. voice-of-the-customer data.
Answer: A
Question No : 12
Based on the data provided, assume that time available per day is 840 minutes. What is
the takt time per unit of demand?
A. 84.0 minutes
B. 22.1 minutes
www.CertificationKing.com 5
APICS CPIM-ECO : Practice Test
C. 2.21 minutes
D. 8.4 minutes
Answer: B
Question No : 13
Which of the following topics is the most important training for lean team members?
A. Kanban
B. Problem solving
C. Single minute exchange of dies
D. Standard work
Answer: B
Question No : 14
Answer: A
Question No : 15
Obtaining processing inspection and testing data is an example of which of the following
quality-related costs?
A. Appraisal
B. Prevention
C. Internal failure
D. External failure
www.CertificationKing.com 6
APICS CPIM-ECO : Practice Test
Answer: A
Question No : 16
The question below is based on the following chart of values relative to upper and lower
control limits:
A. Special
B. Periodic
C. Common
D. Assignable
Answer: C
Question No : 17
The primary reason for using an empty conveyance container as a triggering signal is to:
Answer: A
www.CertificationKing.com 7
APICS CPIM-ECO : Practice Test
Question No : 18
Which of the following actions helps product design and development pursue a strategy of
first-to-market?
Answer: A
Question No : 19
Operations management should measure the workload resulting from manufacturing orders
for which of the following reasons?
Answer: B
Question No : 20
A company is gathering data as to why the machine is consistently shutting down. What
methodology should a company pursue first?
A. 5S
B. Plan-do-check-act
C. Kaizen event
D. Statistical process control
Answer: B
Question No : 21
www.CertificationKing.com 8
APICS CPIM-ECO : Practice Test
Select the process performed in the Analyze section of the DMAIC process.
Answer: C
Question No : 22
Which of the following persons has direct responsibility for the accuracy of production
activity reporting?
A. Controller
B. Shop supervisor
C. Materials manager
D. Director of manufacturing
Answer: B
Question No : 23
A. Cell output
B. Material and resource priority
C. Overall equipment effectiveness
D. Process variability
Answer: D
Question No : 24
www.CertificationKing.com 9
APICS CPIM-ECO : Practice Test
A. customers use contract carriers.
B. suppliers have their products ready at specified times.
C. suppliers be located close to their customers' sites.
D. electronic data interchange be used.
Answer: B
Question No : 25
Based on the theory of constraints (TOC) scheduling approach, smaller lots created as a
result of splitting order quantities are considered to be:
Answer: C
Question No : 26
In an attempt to reduce costs associated with information system transactions, which of the
following approaches should be considered?
Answer: B
Question No : 27
Which of the following statements about the MRP due date for a shop order is true?
www.CertificationKing.com 10
APICS CPIM-ECO : Practice Test
C. It is established at order release time and frozen until order completion.
D. It is equal to the due date plus 5 "M" days.
Answer: B
Question No : 28
Answer: B
Question No : 29
After some investigation, a packaging company determined that all of its defective
containers were being delivered by one of their third-party trucking companies. What
quality tool would have been used to find this information?
A. Check sheet
B. Pareto diagram
C. Plan-do-check-action
D. Process flow diagram
Answer: A
Question No : 30
The best way to determine feasibility of the capacity plan for a work center is to use:
A. input/output control.
B. priority sequencing rules.
C. order management processing.
D. rough-cut capacity planning.
www.CertificationKing.com 11
APICS CPIM-ECO : Practice Test
Answer: A
Question No : 31
A. Improved efficiency
B. Less headcount required
C. Lower finished goods inventory
D. Increased forecast accuracy
Answer: C
Question No : 32
Manufactured parts are being assembled on a production line at a constant rate when a
faulty component is identified. An assembly worker pushes the line stop button and work
ceases while the defect is reviewed. This action is an example of:
A. heijinka.
B. andon.
C. jidoka.
D. kaizen.
Answer: C
Question No : 33
A kanban shop floor control system has which of the following characteristics?
Answer: B
www.CertificationKing.com 12
APICS CPIM-ECO : Practice Test
Question No : 34
When an order is split into two orders, the immediate effect on a job shop work center is to
increase which of the following elements?
A. Setup time
B. Work-in-process quantity
C. Run time
D. Lot size
Answer: A
Question No : 35
A. a bottleneck resource.
B. theoretical capacity.
C. available capacity.
D. standard hours available.
Answer: A
Question No : 36
Answer: D
Question No : 37
www.CertificationKing.com 13