TERRAZA
q L30= 0,88 t
a) LOSAS L30 e= 10cm
V18
V20
V19 3,50

RL30 L30
V18 = RV19 RL30
V20

RL30 L30 L30


V18 = RV19 = RV20 = q x l = 0,88t/m x 3,50m = 1,54 t
2 2
L20 L10 q= 0,88 t
L10 - L20
V14 V13 V11
l 3,50 3,50 m
Map 1,3475 tm/m
QM 0,385 0,385 t/m
Qq 1,54 1,54 t/m
Qt 1,155 1,925 1,925 1,155 t/m

3,85 t/m

b) VIGAS V13 (15/65)

q = 4,09 t/m
q V13 = 3,85 t/m + 1,2 x 0,20 t/m = 4,09 t/m
C4 C5
6,50

V13 V13
RC4 RC5
V13 V13
RC4 = RC5 = q x l = 4,09 t/m x 6,50m = 13,29 t
2 2

V18 - V19 (15/35)

q V18 -V19 = 1,54 t/m + 1,2 x 0,09 t/m = 1,65 t/m


V18 V19 q= 1,65 t/m

C7 C5 C2
l 3,50 3,50 m
Map 2,53 tm
QM 0,72 0,72 t
Qq 2,89 2,89 t
Qt 2,17 3,61 3,61 2,17 t

7,22 t
c) COLUMNA C5 (nota: desprecio peso propio)

V13 V18-19
RC5 = RC5 + RC5 = 13,29 t + 7,22 t = 20,51 t
F.A.P.y D.

1- ESTRUCTURA S/ PLANTA BAJA

OFICINA
q L3= 0,80 t

a) LOSAS L3 e= 10cm V10


V8
3,50

RL3
V8 RL3
V10

RL3 L3
V8 = RV10 = q x l = 0,80t/m
2 2
L2 L1 q= 0,8 t
L1 - L2
V4 V1
V3
l 3,50 3,50 m
Map 1,225 tm/m
QM 0,35 0,35 t/m
Qq 1,40 1,40 t/m
Qt 1,05 1,75 1,75 1,05 t/m

b) VIGAS V3 (15/65) 3,5 t/m

q V3 = 3,5 t/m + 1,2 x 0,20 t/m = 3,74 t/m q = 3,74 t/m

C4 V8
V3
RC4 = RV3
V8 = q x l = 3,74 t/m x 6,50m = 12,16 t
6,50

2 2 V3
RC4 RV3
V8

V8 (20/70)

q V8 = 1,4 t/m + 1,2 x 0,29 t/m = 1,75 t/m


P = RV3
V8 + RC5 = 12,16 t + 20,51 t = 32,67 t

V8 V8
RC7 = RC2 = q x l + P = 1,75 t/m x 7,0 m + 32,67 t = 22,46 t
2 2 2 2
P= 32,67 t
q = 1,75 t/m

C7 C2
3,50 3,50

V8 V8
RC7 = 22,46 t RC2 = 22,46 t
22,46
16,335
Q [t]
16,335 22,46

M [tm]

f = 2,68
M= 67,89 tm