You are on page 1of 3

Project: Banglore Metro -Cantonment ETAP Page: 1

Location: 20.0.2C Date: 11-25-2020

Contract: SN: SYSTRAMVA

Engineer: Study Case: GRD1 Filename:


banglore_metro_contanm
ent

Electrical Transient Analyzer Program

Ground Grid Systems

IEEE Std 80-2000/2013

Number of Ground Conductors: 23

Number of Ground Rods: 20

Total Length of Ground Conductors: 614.00 m

Total Length of Ground Rods: 60.00 m

Total Computational Time: 0.00 minutes

Frequency: 50.0

Unit System: Metric

Project Filename: banglore_metro_contanment

Output Filename: C:\ETAP 2000\banglore_metro_contanment\Grid3_Untitled.GR1S


Project: Banglore Metro -Cantonment ETAP Page: 2

Location: 20.0.2C Date: 11-25-2020

Contract: SN: SYSTRAMVA

Engineer: Study Case: GRD1 Filename:


banglore_metro_contanm
ent

Ground Grid Input Data

System Data

Short-Circuit Current Fault Duration (Seconds)

Total Sf Cp Tf Tc Ts
Ambient Fault Division Projection for for Sizing for
Freq. Weight Temp. Current Factor Factor Total Fault Ground Available
Hz kg °C kA X/R % % Duration Conductors Body Current
50.0 50 40.00 1.000 10.00 50.0 100.0 1.00 1.00 0.50

Soil Data

Surface Material Upper Layer Soil Lower Layer Soil

Resistivity Depth Resistivity Depth Resistivity


Material Type ohm.m m Material Type ohm.m m Material Type ohm.m

Gravel 10000.0 0.200 Moist soil 1000.0 1.00 Moist soil 2000.0

Material Constants
Resistivity of Thermal
r Factor Fusing Ground Conductor Capacity
Conductivity @ 20 °C K0 @ Temperature @ 20°C Per Unit Volume
Conductor/Rod Type % 1/°C 0 °C °C micro ohm.cm J/(cm³.°C)
Conductor & Rod Copper, commercial hard-drawn 97.0 0.00381 242.0 1084.0 1.78 3.42

Rod Data

Diameter Length No. of Cost


cm m Rods Arrangement $/Rod

1.400 3.00 20 Rods along Grid Perimeter 100.00

Grid Configuration

Number of Conductor Separation m


Conductor
Grid Length m
Size Depth in X in Y in X in Y Cost
mm² m Lx Ly Direction Direction Direction Direction $/m
95 0.50 30.91 23.46 10 13 2.6 2.6 10.00 Shape: Rectangular

Cost

Conductor Rod

Total Total Length Cost Total Total Length Cost Total Cost
No. m $ No. m $ $
23 614 6140.80 20 60 2000.00 8140.80
Project: Banglore Metro -Cantonment ETAP Page: 3

Location: 20.0.2C Date: 11-25-2020

Contract: SN: SYSTRAMVA

Engineer: Study Case: GRD1 Filename:


banglore_metro_contanm
ent

Ground Grid Summary Report

Rg GPR
Touch Potential Step Potential
Ground Ground
Resistance Potential Rise Tolerable Calculated Tolerable Calculated

ohm Volts Volts Volts % Volts Volts %

0.931 473.0 2218.0 803.9 36.2 8379.9 1254.8 15.0

Total Fault Current: 1.000 kA Reflection Factor (K): -0.818

Maximum Grid Current: 0.508 kA Surface Layer Derating Factor (Cs): 0.835

Decrement Factor (Df): 1.016