TERMS OF PAYMENT: 30% Down Payment, remaining thru progress billing DELIVERY/INSTALLATION DURATION: 80 regular working days VALIDITY OFFER : 10 days upon receipt of proposal PROJECT DURATION: 80 regular working days PRODUCT WARRANTY: 4 months warranty on workmanship CONTACT PERSON, POSITION: Engr. Arthur Due (Operations Manager) & Mr. Romar Castillo (Asst. Engineer) CONTACT NUMBER: 727-7739 ; 705-1710 MATERIAL UNIT DESCRIPTION TOTAL QTY UNIT LABOR UNIT COST TOTAL UNIT COST AMOUNT COST GENERAL REQUIREMENTS Mobilization 1.0 lot Safety Provision 1.0 lot Tools and Equipment 1.0 lot Hauling of Debris 1.0 lot BADMINTON BLEACHERS 40mm x 40mm X 5mmTHK Square Hollow 24.0 l.m. Tubular Steel (Vertical) 40mm x 40mm x 5mmTHK Square Hollow 72.0 l.m. Tubular Steel (Horizontal) 25mm x 25mm x 3mmTHK Square Hollow 44.0 l.m. Tubular Steel 25mm x 1425mm x 25mmTHK S4S WPC 292.0 l.m. (Wood Plastic Composite)
50mm x 2mmTHK Aluminum Bleacher Seat
8.0 l.m. Edging in Powder Coated
50mm x 40mm x 2mmTHK Steel L- Bracket 120.0 set/s
Caster Wheel 24.0 set/s
Rubber Footing 12.0 set/s Bolts (sizes as per supplier's 4.0 set/s recommendation) PAINTING WORKS 40mm x 40mm x 5mmTHK Hollow Tubular 96.0 l.m. Steel, in Powder Coated Finish 25mm x 25mm x 3mmTHK Square Hollow 44.0 l.m. Tubular Steel, in Powder Coated