A.1.4 Photographs
The Contractor shall provide record photographs taken as, when and
where directed by the Engineer at intervals of not more than one month. The
photographs shall be sufficient in number and location to record the exact
progress of the Works. The Contractor shall provide one proof print of each
photograph taken, and the negative and ten copies, not less than 254 mm x 203
mm and printed on glossy paper, of any of the photographs by the Engineer. The
photographs retained by the Engineer will become the property of the
Government and the Contractor shall supply approved albums to accommodate
them. Two copies are to be signed by the Contractor, one of which will be signed
by the Engineer and returned to the Contractor.
A.2 MEASUREMENT AND PAYMENT
A.2.1 Measurement
1. Lump-sum items shall be provided for the provision of:
- Office building for the Engineer including pieces of furnitures, appliances and
equipment.
- Laboratory building for the Engineer including furnitures, appliances and equipment.
- Survey equipment for the Engineer.
2. The quantities for the maintenance of the office and the laboratory for the Engineer
shall be for the time the Engineer occupies the office and the laboratory respectively.
The unit of the measure is “month”.
4. The quantities for the provision of vehicles for the Engineer shall be the number of
each type of vehicle supplied. The unit of measure is “each”.
5. The quantities for the operation of vehicle for the Engineer shall be for the time the
Engineer is supplied with each vehicle prior to their finally becoming the property of the
Government. The unit of measure is “month”.
6. The quantities for progress photographs shall be the number of photographs selected
and provided as progress photographs. The unit of measure is ‘each”.
A.2..2 Payment