STRATEGIC PROJECT
PLAN
WEBSITE DEVELOPMENT
Table of Contents
STATEMENT OF WORK................................................................................................................................2
INTRODUCTION...........................................................................................................................................2
PROJECT SCOPE...........................................................................................................................................5
WORK REQUIREMENTS................................................................................................................................7
MILESTONES................................................................................................................................................8
PRICING.....................................................................................................................................................10
ACCEPTANCE CRITERIA..............................................................................................................................11
Acceptance................................................................................................................................................13
1
STATEMENT OF WORK
Date:
Prepared By:
INTRODUCTION
construction industry. The company is in order to improve its marketing strategy by adapting to
the new set of standard of the advertisement campaign. By redesigning its website company is
trying to provide a user friendly interface to its customers by allowing all the different strategies
to be included in the website. Pashendale hoildings wants to include every feature of the
The main motivation that has occurred in maintaining the new website is because company is
trying to enter in to the advertising market with all set of standards which are necessary for the
company (Rose et al, 2014). Company wants the site to be modified where PHL will work in
2
more ease as the customer will directly contact with them. The chief marketing officer is the in
charge of the supervision team and the acceptance and denial of the project lies in his hand
PHL is not equipped with the inner IT division and hence the outsourcing of the project has to
be done and for this purpose the contractors are hired and the bidding is done to select the
best contractor as company wants a better looking website with all the details included in it.
milestones and the acceptance of the proposal will be handled on the basis of the project
deliverables.
This Website Design Project Plan is an understanding amongst Pashendale and the third party
put forward in the related Service Order because Pashendale does not holds any IT firm
registered under its name and thus pashendale has incorporated the website developers to
make the website attractive and worth eye capturing. Theory here applies to the party
comprehend, recognize and concur this is an online assertion which is being gone into in
Creating online platforms and sites from the World Wide Web isn't not at all like building a
home or business building. Frameworks must be set up to help frameworks. The establishment
and shell must be very much intended to help the exercises of the clients. Plans must be made
that permit the different development groups to guide and facilitate their exercises to show the
coveted wrapped up item in a convenient manner. The possible clients must be persistently
considered to guarantee that their needs and prerequisites are met. The records, which take
after this presentation, are planned to be models that can be altered for the particular
3
necessities of a task (Rose et al, 2014). In this project plan we will be pursuing the work
4
PROJECT SCOPE
Staying away from an awful circumstance is significantly simpler in the event that you do the
legwork in advance to ensure you are using sound judgment with the ventures you go up
against. Recognizing the extension and objectives of the undertaking will empower you to make
a great choice and check whether a task is a 'fit' for you as well as your group (Sheen and Gallo,
2015). One of the most critical elements to consider with another undertaking is the individual
you will work with to supply you heading, data, content and endorsements. This can be an
inward or outer customer. It is best to have one contact who is in charge of conclusive close
down and endorsement. This will help take out disarray and correspondence breakdown.
The scope of the project is limited to design and implement the sites according to all the
services provided by the pashendale holdings regarding construction industry. The scope is
limited and the maintenance of the site after the commissioning gets over holds on to the legal
Given data from the Initial Proposal and by applying the advancement, group can deliver the
Plan Overview which needs to be checked by PHL’s Chief Marketing Officer (CMO), Sennveasna
Naveen. This record permits the advancement and program territory group’s methods for
affirming that they share a typical comprehension of the objectives, goals, and extent of the
task. The two parties should approve the Plan Overview previously continuing this model report
will give a point by point depiction of the specialized plan particulars, content blueprint,
improvement course of events and asset anticipating the general venture. This documentation
5
permits the improvement and program region groups methods for affirming that they share a
basic comprehension of the point by point work degree and asset responsibility important to
finish the venture. The two gatherings should approve the Plan Particulars before continuing.
This model outline gives intends to list and recognize particular venture errands and
expectations, and furthermore, to whom the undertaking is appointed and who should survey
and endorse the work. The sets of assignments recorded here might be exhibited in a more
point by point and particular way than in the Project Plan Specifications record. The project
scope and limitations will be needed. The scope of the project is set and is prescribed by the
holdings to create a well-established online site where everything of the construction company
will be covered.
6
WORK REQUIREMENTS
The basic work requirements which are needed to implement the designing of the website of
Contractor will be required with the project plan metrics so that designing and implementation
of the work can be done in the desired time. The project plan proposal is required to be
approved so that further implementation of the work can be achieved and the basic milestones
which are set can be achieved in mean time. After the approval the coding will be done and the
contractor will provide testing plan to pashendale holdings for achieving the desired targets and
These records are in the first place, and principal, specialized instruments, that permit program,
plan and advancement colleagues to share basic understandings of the extension, broadness
and subtle elements of the venture will be required by the contractor to get the project done in
a limited time. The archives additionally give intends to "design the work and work the
thoughts exhibited here were adjusted from the Education Alliance Item Development Process
and include the utilization of distinct advances. In spite of the fact that the process is
consecutive, it isn't really direct. One may see the improvement process as a winding or even a
twofold helix, where venture groups and people are constantly hovering back to direct audits of
the work by associating with each other to guarantee that the task stays on track and is
7
8
MILESTONES
The release of the statement of work is the basic milestone that has to be implemented for the
project to be started, after the release of the statement of work is done, the contractor
selection for the designing purpose will be selected. The selection of contractors will be on the
tender basis and all the contractors will be selected on the basis of their experiences (Gregory
and Travers, 2010). The most experienced and reliable contractor will be selected for the
purpose. As the contractor is selected and all the basic requirements for the completion of the
project is been provided the contractor will start working on the coding of the sites and the
review of the design will be completed by october 13, 2018. The review is done and if it gets
passed by the officials then implementation will be done and it will be reviewed The web
architecture audit is to be finished three weeks after undertaking beginning and the site usage
audit is to be concluded a month and a half after venture beginning. Usage should then be
finished by 5 December 2018 with preparing of PHL faculty to be finished seven days after the
9
fact. The venture culmination audit must be played out seven days before Christmas Day and
10
PRICING
The total cost of the project is $295, 000 and it includes several stages of planning which are
planning, designing, implementation and conversion. Each stage is of its high importance as
each is the preliminary stage of the program. The designing and implementation of the work
will be accepted by the PHL’s Chief Marketing Officer (CMO), Sennveasna Naveen, and he will
release the funds regarding the project and all the necessary funding for the project involved
11
ACCEPTANCE CRITERIA
different assertions consulted as for time accommodated government audit, expectations will
be examined and the contractors will have to arise with the requirememts inside five days of
working of ordinarily planned survey. In the event that the expectations are not satisfactory,
the COR will inform the Customer Account Specialist (CAS) quickly.
PHL’s Chief Marketing Officer (CMO), Sennveasna Naveen, will be responsible for the
acceptance of all deliverables from the website design contractor. Non-adjusting items or
administrations will be rejected. Lacks will be revised, by the temporary worker, inside 10 work
long periods of the dismissal take note. In the event that the inadequacies can't be adjusted
inside ten (10) work days, the contractual worker will instantly tell the COR of the purpose
behind the postponement and give a proposed remedial activity design inside 10 work days. In
the event that the contractual worker does not give items or administrations that comply with
the necessities of this undertaking request, the Government will record the issues related with
Both parties will agree on the terms and will prepare an audit plan as how the work will be
delivered in time. The two parties will agree on the terms if the deliverables which were
assured are delivered in time and must be of high quality. The acceptance of the firm and the
negotiations from the contractor will not allow any acceptance. If the review team fails any
process then the acceptance will not be done and the contractor will have to perform the task
12
again till the inspection team passes the deliverables. The costing factor as discussed by two
parties must meet all the things and if the contractor demands extra price between the project
completion periods then he will be liable to the legal proceedings. The delivery of the project
should be in the specified milestones and if there are any late comings in the project
13
Acceptance
The contractor named below verifies that the terms of this Statement of Work are acceptable.
The parties
hereto are each acting with proper authority by their respective companies.
(CMO),
Signature
Date 20/9/2018 20/9/2018
14
REFERENCES
Gregory, D. W., & Travers, E. B. (2010). Ethical challenges of bid shopping. Constr. Law., 30, 29.
Rose, G., Degen, M., & Melhuish, C. (2014). Networks, interfaces, and computer-generated
Sheen, R., & Gallo, A. (2015). HBR Guide to Building Your Business Case. Harvard Business Press.
15