You are on page 1of 11

G 13

1
-0
A1

37 -
A1
5
A1
-01
A1

50
-3

63
8
6
12
F2 22
0

6A

89
66
27
07
0
DOMESTIC
F1 WATER TANK - 2
68
94

5A
F
SUMP
PIT 1
DOMESTIC

85
3
34
99
WATER TANK - 1
7

37
A1
-0
A1 1
79 -3
5
7000

6 9

4A
DOMESTIC
E1 WATER PUMP
ROOM

SUMP FIRE WATER


E PIT 2 PUMP ROOM
76
71
4150

D1
D UP
NON-POTABLE
TANK

PR
OP
STAIR 3
43

ER
71

TY
LI
29749

NE
8750

C1
FIRE RESERVE
TANK
NE

C
LI
Y
ERT
OP
PR
3050

66
00
B

A1-01
A1-34

2
6800

17
12 47
2

PR 10
87

PROPERTY LINE
OP 2
E RT
Y
LI
NE
A
A1-01 A1-01 A1-01
PROPERTY LINE
1 A1-33 3 A1-35 A1-36 4

900 1850 5900 7400 7400 8050 3200 1800 5069 1375
1 BASEMENT FLOOR PLAN 41569

A1-01 A1-01 SCALE: 1:100M 11


10 9 8 7 6 5 4 3 2 1
SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION IMPORTANT NOTES:
1. STAKING OF COLUMNS, BEAMS, AND SLABS SHALL BE COORDINATED AND VERIFIED WITH ARCHITECTURAL PLANS AND
DETAILS. DIMENSIONS SHOWN ON STRUCTURAL PLANS ARE FOR DESIGN PURPOSES ONLY. CONSTRUCTION LAYOUT
SHOULD FOLLOW ARCHITECTURAL ALIGNMENTS. SHOULD CONFLICT OCCUR BETWEEN STRUCTURAL AND ARCHITECTURAL
PLANS, REFER THE MATTER TO THE ARCHITECT FOR FINAL DECISION AND APPROVAL.
2. COORDINATE WITH OTHER TRADES.
3. VERIFY ACTUAL CONDITION ON SITE.

PROJECT TITLE : OWNER : SHEET CONTENTS : PROJ. NO.: SHEET NO:


TH
year
R. VILLAROSA ARCHITECTS ROY A. VILLAROSA
REGISTERED ARCHITECT
DESIGN CONSULTANT:

BroadwayMalyan BM NOVOTEL SUITES MANILA AT ACQUA CENTURY LIMITLESS CORPORATION BASEMENT FLOOR PLAN 1410G A1-01
PARTNERS & ASSOCIATES Architectural Urbanism Design BRGY. HULO, MANDALUYONG CITY 21ST FLOOR PACIFIC STAR BLDG., SEN. GIL PUYAT AVE.
PRC No. 7799 Validity JAN. 15, 2021 COR. MAKATI AVE., MAKATI CITY 1200 PHILIPPINES
7th Floor, Strata 100 Bldg., Emerald Avenue, Ortigas Center, Pasig City, Philippines
since IAPOA No. 04096-228591072418 OR No. 256263 Date JUNE 14, 2019
DRAWN BY MUV/KAM DATE
Tel. (632) 631-2878; (632) 631-2888 Fax (632) 631-2806
1972 PTR No.
Place
3118533
PASIG CITY
Date
TIN
JAN. 08, 2019
107-321-379 CHECKED BY MUV ISSUED
G 13

2
-0
A1

7
-3
A1
5
C
A UP
R PE DN
P R A1
A LE -0
R

50
K V A1 2

63
EL -3
DR 8
AD RA
M I VE
6
M P
IN W
IS
TR ST DN DO
W
AY F2 12
22
0
AT A IR N
IO -8 R
N FL AM
O P
O D
R O
LO W
ST W NU
AI ER P GENSET - 01
R- S
7 LE 2N DR ER
DN
VE D IV VIC 6A
L EW E

90
RA AY

66
ST M
AI RA P- FD GENSET - 02 27
R- 1A T 07
M 3 0
9 P-
1B
DN 4 F1 FD
T
2

68
FD 95
T GENSET ROOM
1
GENSET - 03
EDP 5A
F EL.+1.70M 2000 KVA
TX-01
ST ST
AI

R
OR R-

O
DO
A 10
GE

UP
DN WET GARBAGE

-
LL
85
TRANSFORMER ROOM

5
34

99

RO
37
2000 KVA
3 MDP-02 TX-02 7 A1
-0
79 A1 2
7000

55
D PSG -3
9
R
2 IV STORAGE
C E
A
R
P
W
A MECO VAULT
4A
A
R
Y E1 MDP2 ROOM
K LVSB 2
RA
M
P G
DO AR
W BA
E N G
E
PLASTIC STORAGE FIRE COMMAND
RO CENTER ROOM
O MDP-01
M
75

PAPER STORAGE
71
4150

4150
R
O
1

O
WASHING AREA

FL
LVSB 1 LVSG ROOM
ND
CO
SE

TR D1 WASHING & PURCHASING


M

EN DN TO
O

PREPARATION

R
OFFICE
D
FR

PUMP

O
CH BOTTLE STORAGE

O
AREA
DN

ROOM

FL
DR

97270
CA
ND
P

AI
M

RP N CO
FPC-2
RA

JPC-1
A
SE

RK JPC-2
SE FPC-1
TO

EX MVSG ROOM
FI CU
UP

IT RE RI RAMP UP
PR
TY
P

CE CO R
M

MCC-LG OP
RA

SHE HE ER
NT MM OO
45

PL TY
71

ER AN M/ STAIR 3 LI
AN D NE
29750

T JAN 240
BO 448
5
X
8750

8750
EMPLOYEE
C1 ENTRANCE
RAMP UP
SERVICE CORRIDOR
ST
AI
R-
3 UP
STAIR - 2
CONCIERGE MAIL

22750
UP ROOM
SECURITY
SHOP RESIDENTIAL
OFFICE
STEP ENTRY FOYER
NE

HOTEL ENTRY
C UP
LI

FOYER
Y
ERT

LUGGAGE
OP

LINEN
PR
3050

3050
SORTING
DELIVERY AREA

B 64

13575
50

GRAND
RESIDENTIAL
LOBBY
UP A1-02
A1-34

2
RESIDENTIAL RESIDENTIAL
6800

6800
SERVICE LIFT HOTEL LIFT LIFT LOBBY
12 LOBBY SERVICE LIFT HOTEL LIFT
LOBBY
DROP-OFF AREA LIFT

PR

PROPERTY LINE
OP 10
E RT
87
0
Y
LI
NE
A 5
241
60
0

A1-02 PROPERTY LINE A1-02 A1-02

1 A1-33 3 A1-35 A1-36 4


900 1850 5900 7400 7400 8050 3200 1800 5070 550

1 GROUND FLOOR PLAN 41570

A1-02 A1-02 SCALE: 1:100M


11
10 9 8 7 6 5 4 3 2 1
SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION IMPORTANT NOTES:
1. STAKING OF COLUMNS, BEAMS, AND SLABS SHALL BE COORDINATED AND VERIFIED WITH ARCHITECTURAL PLANS AND
DETAILS. DIMENSIONS SHOWN ON STRUCTURAL PLANS ARE FOR DESIGN PURPOSES ONLY. CONSTRUCTION LAYOUT
SHOULD FOLLOW ARCHITECTURAL ALIGNMENTS. SHOULD CONFLICT OCCUR BETWEEN STRUCTURAL AND ARCHITECTURAL
PLANS, REFER THE MATTER TO THE ARCHITECT FOR FINAL DECISION AND APPROVAL.
2. COORDINATE WITH OTHER TRADES.
3. VERIFY ACTUAL CONDITION ON SITE.

PROJECT TITLE : OWNER : SHEET CONTENTS : PROJ. NO.: SHEET NO:


TH
year
R. VILLAROSA ARCHITECTS ROY A. VILLAROSA
REGISTERED ARCHITECT
DESIGN CONSULTANT:

BroadwayMalyan BM NOVOTEL SUITES MANILA AT ACQUA CENTURY LIMITLESS CORPORATION GROUND FLOOR PLAN 1410G A1-02
PARTNERS & ASSOCIATES
Architectural Urbanism Design
PRC No. 7799 Validity JAN. 15, 2021
7th Floor, Strata 100 Bldg., Emerald Avenue, Ortigas Center, Pasig City, Philippines 21ST FLOOR PACIFIC STAR BLDG., SEN. GIL PUYAT AVE.
since IAPOA No. 04096-228591072418 OR No. 256263 Date JUNE 14, 2019
DRAWN BY MUV/KAM DATE
Tel. (632) 631-2878; (632) 631-2888 Fax (632) 631-2806
1972 PTR No.
Place
3118533
PASIG CITY
Date
TIN
JAN. 08, 2019
107-321-379
COR. MAKATI AVE., MAKATI CITY 1200 PHILIPPINES
CHECKED BY MUV ISSUED
G 13

2
-0
A1

- 37
A1
5
A1
-0

50
A1 2

63
-3
8
6
F2 12
22
0

6A

90
66
27
07
0
OPEN TO BELOW
F1
68
95

5A
F

85
5
34

99
37
7 A1
-0
79 A1 2
7000

55
-3
9

4A
E1

OPEN TO BELOW
E
RAMP DN TO
GROUND FLOOR
75

HOT WATER
71
4150

4150
STORAGE TANK
RAMP UP FROM
R
TE

GROUND FLOOR
UT

D1
SH
RE

D
FI

TELCO TELCO TELCO


ROOM 1 ROOM 2 ROOM 3 PR
OP
ER
45

12 11 10 9 TY
71

LI
NE
29750

4725
8750

8750
C1
1

8
DN UP
STAIR - 2
PACU

22750
RM
2 DRIVEWAY

DR

7
NE

AI
C N
LI

CA
Y

NA
RT

L
3
E

IT. OFFICE
OP
PR
3050

3050
4 ELEC. ROOM 5 6 ELEC. ROOM

13575
DR SERVER ROOM
AIN
CA
NA
L
4425 A1-02
A1-34

2
6800

6800
HOTEL LIFT RESIDENTIAL RESIDENTIAL
12 SERVICE LIFT
LOBBY
SERVICE LIFT HOTEL LIFT
LOBBY OPEN TO BELOW LIFT LIFT LOBBY

PR

PROPERTY LINE
OP
E RT
Y
LI
NE
A 5
241
60
0

A1-02 PROPERTY LINE A1-02 A1-02

1 A1-33 3 A1-35 A1-36 4


900 1850 5900 7400 7400 8050 3200 1800 5070 550

41570

1 SECOND FLOOR PLAN 11


A1-03 A1-03 SCALE: 1:100M
10 9 8 7 6 5 4 3 2 1
SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION IMPORTANT NOTES:
1. STAKING OF COLUMNS, BEAMS, AND SLABS SHALL BE COORDINATED AND VERIFIED WITH ARCHITECTURAL PLANS AND
DETAILS. DIMENSIONS SHOWN ON STRUCTURAL PLANS ARE FOR DESIGN PURPOSES ONLY. CONSTRUCTION LAYOUT
SHOULD FOLLOW ARCHITECTURAL ALIGNMENTS. SHOULD CONFLICT OCCUR BETWEEN STRUCTURAL AND ARCHITECTURAL
PLANS, REFER THE MATTER TO THE ARCHITECT FOR FINAL DECISION AND APPROVAL.
2. COORDINATE WITH OTHER TRADES.
3. VERIFY ACTUAL CONDITION ON SITE.

PROJECT TITLE : OWNER : SHEET CONTENTS : PROJ. NO.: SHEET NO:


TH
year
R. VILLAROSA ARCHITECTS ROY A. VILLAROSA
REGISTERED ARCHITECT
DESIGN CONSULTANT:

BroadwayMalyan BM NOVOTEL SUITES MANILA AT ACQUA CENTURY LIMITLESS CORPORATION SECOND FLOOR PLAN 1410G A1-03
PARTNERS & ASSOCIATES 21ST FLOOR PACIFIC STAR BLDG., SEN. GIL PUYAT AVE.
Architectural Urbanism Design BRGY. HULO, MANDALUYONG CITY
COR. MAKATI AVE., MAKATI CITY 1200 PHILIPPINES
PRC No. 7799 Validity JAN. 15, 2021
7th Floor, Strata 100 Bldg., Emerald Avenue, Ortigas Center, Pasig City, Philippines
since IAPOA No. 04096-228591072418 OR No. 256263 Date JUNE 14, 2019
DRAWN BY MUV/KAM DATE
Tel. (632) 631-2878; (632) 631-2888 Fax (632) 631-2806
1972 PTR No.
Place
3118533
PASIG CITY
Date
TIN
JAN. 08, 2019
107-321-379 CHECKED BY MUV ISSUED
C
A
36 R
P
21 U A
G 13

2
P R

-0
P K

A1

37
E
R

-
A1
L 37
E

5
C 20 V
A E
R L
P D
A R
R IV 38 A1
K 19 E -02
W A1

50
A -3

63
Y 8
6
RA
M
P
DO F2 39 12
22
0
W
N
FL RA
O M
O P
R U
14 LO P
C
A W TO
R ER 4
T
P LE H
A
R VE 6A
15 K L

90
66
27
07
0
16
F1
68
17 95

5A
F
DN
L
O
W CHILLER ROOM
E
R

85
5
7

34
L

99
A1

37
4 E -0
V 2
E M & E ROOM A1
L 79 -3
D 9
7000

55
R
IV R
C 3 E FL AM
A W O P
R
P
A
Y
O U
R P 4A
UP FR
A
R PE OM E1
K R
LE 2ND
VE
L 18
E 2

25
75
71

1
4150

4150
C
PL
A
R
P
23 22 21 20 19
AN A
R
T
BO K
D1 24
R
TE

X
UT

D
SH

DN
RE
FI

M
O
T
BI OR
C
PA Y BIK PR
RK CL ES OP
IN E / ER
G
45

18 17 16 15 14 13 TY
71

LI
NE
29750

12 11 240
448
8750

8750
5

C1
DN 1 DN
UP TOILET
STAIR 2

22750
UP 2 PANTRY CONFERENCE
RM.
DRIVEWAY
NE

DR
C
LI

AI
Y

N
RT

CA
NA
3
E
OP

L MAINTENANCE
PR
3050

3050
& ENGINEERING
OFFICE
ELEC. ROOM ELEC. ROOM
4
B 64

13575
50

DR
AI
N MANAGER
CA
NA OFFICE A1-02
L
5 6 7 8 9 10 A1-34

2
HOTEL LIFT RESIDENTIAL RESIDENTIAL
6800

6800
SERVICE LIFT LIFT
12 LOBBY
SERVICE LIFT HOTEL LIFT LOBBY LIFT LOBBY
STORAGE &
WORKSHOP

PR

PROPERTY LINE
OP 10
E 87 DRAIN CANAL DRAIN CANAL DRAIN CANAL
RT 0
Y
LI
NE
A PLANT BOX PLANT BOX 241
5
60
0
A1-02 A1-02 A1-02
PROPERTY LINE
1 A1-33 3 A1-35 A1-36 4
900 1850 5900 7400 7400 8050 3200 1800 5070 550

41570

1 THIRD FLOOR PLAN 11


A1-04 A1-04 SCALE: 1:100M
10 9 8 7 6 5 4 3 2 1
SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION IMPORTANT NOTES:
1. STAKING OF COLUMNS, BEAMS, AND SLABS SHALL BE COORDINATED AND VERIFIED WITH ARCHITECTURAL PLANS AND
DETAILS. DIMENSIONS SHOWN ON STRUCTURAL PLANS ARE FOR DESIGN PURPOSES ONLY. CONSTRUCTION LAYOUT
SHOULD FOLLOW ARCHITECTURAL ALIGNMENTS. SHOULD CONFLICT OCCUR BETWEEN STRUCTURAL AND ARCHITECTURAL
PLANS, REFER THE MATTER TO THE ARCHITECT FOR FINAL DECISION AND APPROVAL.
2. COORDINATE WITH OTHER TRADES.
3. VERIFY ACTUAL CONDITION ON SITE.

PROJECT TITLE : OWNER : SHEET CONTENTS : PROJ. NO.: SHEET NO:


TH
year
R. VILLAROSA ARCHITECTS ROY A. VILLAROSA
REGISTERED ARCHITECT
DESIGN CONSULTANT:

BroadwayMalyan BM NOVOTEL SUITES MANILA AT ACQUA CENTURY LIMITLESS CORPORATION THIRD FLOOR PLAN 1410G A1-04
PARTNERS & ASSOCIATES 21ST FLOOR PACIFIC STAR BLDG., SEN. GIL PUYAT AVE.
Architectural Urbanism Design BRGY. HULO, MANDALUYONG CITY
COR. MAKATI AVE., MAKATI CITY 1200 PHILIPPINES
PRC No. 7799 Validity JAN. 15, 2021
7th Floor, Strata 100 Bldg., Emerald Avenue, Ortigas Center, Pasig City, Philippines
since IAPOA No. 04096-228591072418 OR No. 256263 Date JUNE 14, 2019
DRAWN BY MUV/KAM DATE
Tel. (632) 631-2878; (632) 631-2888 Fax (632) 631-2806
1972 PTR No.
Place
3118533
PASIG CITY
Date
TIN
JAN. 08, 2019
107-321-379 CHECKED BY MUV ISSUED
C
A
36 R
P
20 A
R G 13
K

2
-0
A1
U

7
-3
P 37

A1
SL 19 P
E
O R

5
PE L
= C E
17 A V
% R E 38
P 18 L
D A1
A R -0
R

50
IV A1 2

63
K
E -3
RA W 8
M A
Y
6
P
DO
W
N
F2 39 12
22
0

F L RA
RA O M
O P
M R
P L O UP
UP W TO
ER 5
T
24
C LE H
A
R
VE 6A
14 P L

90
A
25

66
R
K

R
TE
27

UT
07
0

SH
15
F1

RE
26

FI
68
16 DN
95

5A
F CALORIFIER PLANT ROOM
FOURTH UPPER
LEVEL
L
O
W
21
E

85
5
34
R

99
37
4 L
E
V 22 7 A1
-0
E 79 A1 2
L
7000

55
D 3 RAMP -39
R UP RD
C 3 IV PE FL DN
A
R
P
E
W
A
R OO
LE R
VE
23 4A
A
R
Y L E1
K

17
E 2

20 PUMP
75

ROOM
71

C 1
4150

4150
A
R
PL
AN
P
A 19
T
BO
R
K 14 13
D1
R
TE

X
UT

D
SH
RE
FI

M
O
T
BI OR
C
PA Y BIK PR
RK CL ES OP
IN E / ER
G
45

18 17 16 15 TY
71

240
LI
NE
29750

448
5

12 11
8750

8750
RAMP
C1 UP
DN
UP

DN
1 TOILET
ELEC. ROOM

22750
UP
DR
2 FOURTH LOWER LEVEL
PANTRY CONFERENCE
ROOM
AI
N
E

CA
N

C
LI

NA
Y

L
RT

3
E
OP

EL.+11.75M
SECURITY
PR
3050

3050
OFFICE
ELEC. ROOM ELEC. ROOM
4

13575
B 64
50 DR
AI
N
CA
NA
L

5 6 7 8 9 10 SECURITY A1-02
A1-34
CCTV
HEAD
ROOM
HOTEL LIFT
RESIDENTIAL 2
SERVICE LIFT RESIDENTIAL LIFT LOBBY
6800

6800
LOBBY
12 LOBBY SERVICE LIFT HOTEL LIFT LIFT

PR

PROPERTY LINE
OP DRAIN CANAL DRAIN CANAL DRAIN CANAL
10
E RT
87
0
Y
LI
NE
A PLANT BOX PLANT BOX
60
241
5

PROPERTY LINE A1-02


A1-02 A1-02
1 A1-33 3 A1-35 A1-36 4
900 1850 5900 7400 7400 8050 3200 1800 5070 550

41570

1 FOURTH FLOOR PLAN 11


A1-05 A1-05 SCALE: 1:100M
10 9 8 7 6 5 4 3 2 1
SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION IMPORTANT NOTES:
1. STAKING OF COLUMNS, BEAMS, AND SLABS SHALL BE COORDINATED AND VERIFIED WITH ARCHITECTURAL PLANS AND
DETAILS. DIMENSIONS SHOWN ON STRUCTURAL PLANS ARE FOR DESIGN PURPOSES ONLY. CONSTRUCTION LAYOUT
SHOULD FOLLOW ARCHITECTURAL ALIGNMENTS. SHOULD CONFLICT OCCUR BETWEEN STRUCTURAL AND ARCHITECTURAL
PLANS, REFER THE MATTER TO THE ARCHITECT FOR FINAL DECISION AND APPROVAL.
2. COORDINATE WITH OTHER TRADES.
3. VERIFY ACTUAL CONDITION ON SITE.

PROJECT TITLE : OWNER : SHEET CONTENTS : PROJ. NO.: SHEET NO:


TH
year
R. VILLAROSA ARCHITECTS ROY A. VILLAROSA
REGISTERED ARCHITECT
DESIGN CONSULTANT:

BroadwayMalyan BM NOVOTEL SUITES MANILA AT ACQUA CENTURY LIMITLESS CORPORATION 1410G A1-05
PARTNERS & ASSOCIATES 21ST FLOOR PACIFIC STAR BLDG., SEN. GIL PUYAT AVE.
FOURTH FLOOR PLAN
Architectural Urbanism Design BRGY. HULO, MANDALUYONG CITY
COR. MAKATI AVE., MAKATI CITY 1200 PHILIPPINES
PRC No. 7799 Validity JAN. 15, 2021
7th Floor, Strata 100 Bldg., Emerald Avenue, Ortigas Center, Pasig City, Philippines
since IAPOA No. 04096-228591072418 OR No. 256263 Date JUNE 14, 2019
DRAWN BY MUV/KAM DATE
Tel. (632) 631-2878; (632) 631-2888 Fax (632) 631-2806
1972 PTR No.
Place
3118533
PASIG CITY
Date
TIN
JAN. 08, 2019
107-321-379 CHECKED BY MUV ISSUED
K
R
A
P
G 13

02
R

-
A

A1

7
C

-3
A1
5
K
R
A
P
R
A AY R A1
C -0
W O
A1 2
VE FLO

50
I -3

63
DR TH 8
L
VE OF
4 6
N E
W P L T
O R
D AM ER PA
R P
UP ER F2 12
22
0
P
UP VEL
LE H
T
ER 4
14 W TO
K LO P PART OF PLANT
R R PU
A O BOX
6A
P O M
R
A FL RA
15 C

90
66
27
07
0
16
F1
68
95
17

PART OF PLANT 5A
F BOX PART OF
SWIMMING POOL
PART OF
ABOVE
SWIMMING POOL
ABOVE

85
5
7

34

99
A1

37
-0
A1 2
79 -3
9
7000

Y 55
A
3 W
K E
R
A IV
R SURGE TANK 4A
E1
P D
R
A L
E PART OF PLANT
C V
E BOX
L
R 18
E
E
W
O
2 L
PART OF
SWIMMING POOL
17 ABOVE
75

UPPER PART OF
71
4150

4150
K 1
R
A PUMP ROOM
X P OPEN TO BELOW
R
BO
R

A
16
TE

T C
AN D1
UT

L
SH

P
D
RE
FI

G
K IN E S /
R CL E
PA ICY BIK PR
B OR OP
T ER
45

15 14 13 12 TY
O
71

M
LI
NE
29750

240
STORAGE
11 448
8750

8750
5

C1

DN 1 DN
UP
TOILET STO.
STAIR 2
10

22750
UP 2 PANTRY
DRIVEWAY
NE

DR
C AI
LI

N
Y

CA
9
RT

NA
3
E

L
OP
PR

FINANCE
3050

3050
7800
AND ACCOUNTING
ELEC. ROOM ELEC. ROOM OFFICE
4
B 64

13575
50

DR
AI
N
CA
NA A1-02
L
5 6 7 8 FINANCE A1-34
MANAGER
2
RESERVATIONS RESIDENTIAL RESIDENTIAL
6800

6800
SERVICE LIFT CLINIC

5000
12 LOBBY SERVICE LIFT HOTEL LIFT HOTEL LIFT
LOBBY
OFFICE LIFT LIFT LOBBY

ACCOUNTING
MANAGER
10
87 DRAIN CANAL DRAIN CANAL DRAIN CANAL
0

A PLANT BOX PLANT BOX PLANT BOX 5


60 241
0
A1-02 A1-02 A1-02
PROPERTY LINE
1 A1-33 3 A1-35 A1-36 4
900 1850 5900 7400 7400 8050 3200 1800 5070 550

41570

1 FIFTH FLOOR PLAN 11


A1-06 A1-06 SCALE: 1:100M
10 9 8 7 6 5 4 3 2 1
SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION IMPORTANT NOTES:
1. STAKING OF COLUMNS, BEAMS, AND SLABS SHALL BE COORDINATED AND VERIFIED WITH ARCHITECTURAL PLANS AND
DETAILS. DIMENSIONS SHOWN ON STRUCTURAL PLANS ARE FOR DESIGN PURPOSES ONLY. CONSTRUCTION LAYOUT
SHOULD FOLLOW ARCHITECTURAL ALIGNMENTS. SHOULD CONFLICT OCCUR BETWEEN STRUCTURAL AND ARCHITECTURAL
PLANS, REFER THE MATTER TO THE ARCHITECT FOR FINAL DECISION AND APPROVAL.
2. COORDINATE WITH OTHER TRADES.
3. VERIFY ACTUAL CONDITION ON SITE.

PROJECT TITLE : OWNER : SHEET CONTENTS : PROJ. NO.: SHEET NO:


TH
year
R. VILLAROSA ARCHITECTS ROY A. VILLAROSA
REGISTERED ARCHITECT
DESIGN CONSULTANT:

BroadwayMalyan BM NOVOTEL SUITES MANILA AT ACQUA CENTURY LIMITLESS CORPORATION 1410G A1-06
PARTNERS & ASSOCIATES 21ST FLOOR PACIFIC STAR BLDG., SEN. GIL PUYAT AVE.
FIFTH FLOOR PLAN
Architectural Urbanism Design BRGY. HULO, MANDALUYONG CITY
COR. MAKATI AVE., MAKATI CITY 1200 PHILIPPINES
PRC No. 7799 Validity JAN. 15, 2021
7th Floor, Strata 100 Bldg., Emerald Avenue, Ortigas Center, Pasig City, Philippines
since IAPOA No. 04096-228591072418 OR No. 256263 Date JUNE 14, 2019
DRAWN BY MUV/KAM DATE
Tel. (632) 631-2878; (632) 631-2888 Fax (632) 631-2806
1972 PTR No.
Place
3118533
PASIG CITY
Date
TIN
JAN. 08, 2019
107-321-379 CHECKED BY MUV ISSUED
G 13

2
-0
A1

7
-3
A1
5
A1
-0

50
A1 2

63
-3
8
6
F2 12
22
0

DN

6A

90
66
27
07
0

F1
68
95

GARDEN
5A
F
KIDDIE POOL
SWIMMING
POOL

85
5
34

99
37
3675 7 A1
-0
79
4A
2
7000

55 281
0-3
9

4A
E1 PLANTERS
POOL DECK

E
PL
AN
TE
RS POOL DECK SWIMMING
75
71

POOL
4150

4150
STO / JAN

6415
DN DN
D1 PLANTERS PLANTERS PLANTERS
PLANTERS
D UP HE
STAIR - 1

COLD KITCHEN
CHASE
SHE PR
OP
RAMP DN ER
FIRE SUNKEN
45

TY
71

PRO LOUNGE LI
NE
29750

240
448
5
8750

8750
HOT KITCHEN
C1 HOT BUFFET
SERVICE BAR AREA
DN UP
STAIR - 2
DRY
BUFFET AREA

22750
STORAGE

DN
NE

C CHILLER
LI
Y
RT

SERVICE CORRIDOR
E
OP

DISHWASHING
PR

FREEZER
3050

3050
AREA

ELEC. ROOM ELEC. ROOM


PRIVATE DINING
B 64

13575
50
ROOM
HT

POTWASH GOURMET
BAR A1-02
JAN A1-34
HOTEL LOBBY
HOTEL LIFT RESIDENTIAL 2
SERVICE LIFT RESIDENTIAL
6800

6800
LOBBY LIFT LOBBY
12 LOBBY SERVICE LIFT HOTEL LIFT LIFT

SHE HE

PR

PROPERTY LINE
OP 10
E RT
87
0
Y
LI
NE
A
5
241
60
0

A1-02 PROPERTY LINE A1-02 A1-02

1 A1-33 3 A1-35 A1-36 4


900 1850 5900 7400 7400 8050 3200 1800 5070 550

41570

1 SIXTH FLOOR PLAN 11


A1-07 A1-07 SCALE: 1:100M
10 9 8 7 6 5 4 3 2 1
SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION IMPORTANT NOTES:
1. STAKING OF COLUMNS, BEAMS, AND SLABS SHALL BE COORDINATED AND VERIFIED WITH ARCHITECTURAL PLANS AND
DETAILS. DIMENSIONS SHOWN ON STRUCTURAL PLANS ARE FOR DESIGN PURPOSES ONLY. CONSTRUCTION LAYOUT
SHOULD FOLLOW ARCHITECTURAL ALIGNMENTS. SHOULD CONFLICT OCCUR BETWEEN STRUCTURAL AND ARCHITECTURAL
PLANS, REFER THE MATTER TO THE ARCHITECT FOR FINAL DECISION AND APPROVAL.
2. COORDINATE WITH OTHER TRADES.
3. VERIFY ACTUAL CONDITION ON SITE.

PROJECT TITLE : OWNER : SHEET CONTENTS : PROJ. NO.: SHEET NO:


TH
year
R. VILLAROSA ARCHITECTS ROY A. VILLAROSA
REGISTERED ARCHITECT
DESIGN CONSULTANT:

BroadwayMalyan BM NOVOTEL SUITES MANILA AT ACQUA CENTURY LIMITLESS CORPORATION 1410G A1-07
PARTNERS & ASSOCIATES Architectural Urbanism Design BRGY. HULO, MANDALUYONG CITY
21ST FLOOR PACIFIC STAR BLDG., SEN. GIL PUYAT AVE.
SIXTH FLOOR PLAN
COR. MAKATI AVE., MAKATI CITY 1200 PHILIPPINES
PRC No. 7799 Validity JAN. 15, 2021
7th Floor, Strata 100 Bldg., Emerald Avenue, Ortigas Center, Pasig City, Philippines
since IAPOA No. 04096-228591072418 OR No. 256263 Date JUNE 14, 2019
DRAWN BY MUV/KAM DATE
Tel. (632) 631-2878; (632) 631-2888 Fax (632) 631-2806
1972 PTR No.
Place
3118533
PASIG CITY
Date
TIN
JAN. 08, 2019
107-321-379 CHECKED BY MUV ISSUED
1190 40630

50
18
4215 25800 3200 7415

E1 2950 7400 7400 8050

50
95
75
71

00
4150

4150
98
5
90
17
D1
D UP DISHWASHING
00 STAIR 1
18

DN

CHASE

4800
55
45

SALES,
28

STO.
71

FIRE MARKETING
PRO DEPARTMENT
55

STAFF 1800W x 1200H x 1500W x 1000H x


62

1800W x 1200H x 4725


1400W x 900H x 3300L
8750

CANTEEN 3500L 3500L


3300L COFFEE SHOP AHU 6TH/7TH FLR AHU FAHU OFFICES
C1 PREPARATION
AHU ROOM
00
37

TOILET
DN
UP
STAIR 2

3950
CHASE HR
29750

DEPARTMENT OPERATIONS
MANAGER

DRY CHASE CHASE CHASE CHASE


C STORAGE CHASE

18600
F & B STORAGE
26
00
3050

3050
15 CHASE EXECUTIVE
00 ELEC. ROOM ELEC. ROOM ASSISTANT
28
00
EXECUTIVE
B OFFICE

13575
0

UNIFORM ROOM
5
10

22
50 CHASE
43
00
SOILED LINEN CHEMICAL STO.
ROOM ROOM VOID
MALE FEMALE
LOCKER RM
50

95 LOCKER RM GENERAL
24

0
CHEF
SERVICE LIFT RESIDENTIAL MANAGER
6800

57

6800
00 HOTEL LIFT OFFICE
12 LOBBY SERVICE LIFT HOTEL LIFT LOBBY LIFT

13
120 VOID
HOUSEKEEPING
OFFICE F&B
MANAGER STO.

A 51
70
5
241
60
0

11
900 1850 3150 2750 2600 600 5070 550

2750 5900 7400 7400 8050 3200 1800 5615

42115

10 9 8 7 6 5 4 3 2 1

1 SEVENTH FLOOR PLAN


A1-08 A1-08 SCALE: 1:100M

SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION IMPORTANT NOTES:
1. STAKING OF COLUMNS, BEAMS, AND SLABS SHALL BE COORDINATED AND VERIFIED WITH ARCHITECTURAL PLANS AND
DETAILS. DIMENSIONS SHOWN ON STRUCTURAL PLANS ARE FOR DESIGN PURPOSES ONLY. CONSTRUCTION LAYOUT
SHOULD FOLLOW ARCHITECTURAL ALIGNMENTS. SHOULD CONFLICT OCCUR BETWEEN STRUCTURAL AND ARCHITECTURAL
PLANS, REFER THE MATTER TO THE ARCHITECT FOR FINAL DECISION AND APPROVAL.
2. COORDINATE WITH OTHER TRADES.
3. VERIFY ACTUAL CONDITION ON SITE.

PROJECT TITLE : OWNER : SHEET CONTENTS : PROJ. NO.: SHEET NO:


TH
year
R. VILLAROSA ARCHITECTS ROY A. VILLAROSA
REGISTERED ARCHITECT
DESIGN CONSULTANT:

BroadwayMalyan BM NOVOTEL SUITES MANILA AT ACQUA CENTURY LIMITLESS CORPORATION 1410G A1-08
PARTNERS & ASSOCIATES 21ST FLOOR PACIFIC STAR BLDG., SEN. GIL PUYAT AVE.
SEVENTH FLOOR PLAN
Architectural Urbanism Design BRGY. HULO, MANDALUYONG CITY
COR. MAKATI AVE., MAKATI CITY 1200 PHILIPPINES
PRC No. 7799 Validity JAN. 15, 2021
7th Floor, Strata 100 Bldg., Emerald Avenue, Ortigas Center, Pasig City, Philippines
since IAPOA No. 04096-228591072418 OR No. 256263 Date JUNE 14, 2019
DRAWN BY MUV/KAM DATE
Tel. (632) 631-2878; (632) 631-2888 Fax (632) 631-2806
1972 PTR No.
Place
3118533
PASIG CITY
Date
TIN
JAN. 08, 2019
107-321-379 CHECKED BY MUV ISSUED
50
18
40705
E1 4215 29000 3200 2500 4990

2950 7400 7400 8050

75
71

00

4150
98
4150

5
STAIR

90
17
D1 UP 1
D
DN

CHASE

4800
45

55
71

FIRE
25

PRO
55
62
8750

M & E ROOM M & E ROOM M & E ROOM M & E ROOM M & E ROOM
C1
00

UP
37

DN
STAIR 2

3950
CHASE
29750

VOID
CHASE CHASE CHASE CHASE
C CHASE

18600
3050
3050

ELEC. ROOM CHASE CHASE CHASE ELEC.


28 ROOM
00 M & E ROOM
B OUTDOOR
LOUNGE
22
50 CHASE BELOW
SERVICE A1-10
LIFT A1-34
VOID VOID
LOBBY
2
RESIDENTIAL

6800
57
00 M & E ROOM M & E ROOM M & E ROOM
6800

12 LIFT UNASSIGNED
ROOM
13
12
0 VOID VOID

A 51
70

A1-10 A1-10 A1-10

1 A1-33 3 A1-35 A1-36 4

11
900 1850 3150 2750 2600 2400 700 4370

2750 5900 7400 7400 8050 3200 1800 5390

41890

10 9 8 7 6 5 4 3 2 1

1 21ST MEZZANINE FLOOR PLAN


A1-16 A1-16 SCALE: 1:100M

SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION IMPORTANT NOTES:
1. STAKING OF COLUMNS, BEAMS, AND SLABS SHALL BE COORDINATED AND VERIFIED WITH ARCHITECTURAL PLANS AND
DETAILS. DIMENSIONS SHOWN ON STRUCTURAL PLANS ARE FOR DESIGN PURPOSES ONLY. CONSTRUCTION LAYOUT
SHOULD FOLLOW ARCHITECTURAL ALIGNMENTS. SHOULD CONFLICT OCCUR BETWEEN STRUCTURAL AND ARCHITECTURAL
PLANS, REFER THE MATTER TO THE ARCHITECT FOR FINAL DECISION AND APPROVAL.
2. COORDINATE WITH OTHER TRADES.
3. VERIFY ACTUAL CONDITION ON SITE.

PROJECT TITLE : OWNER : SHEET CONTENTS : PROJ. NO.: SHEET NO:


TH
DESIGN CONSULTANT:

year
R. VILLAROSA ARCHITECTS ROY A. VILLAROSA
REGISTERED ARCHITECT BroadwayMalyan BM NOVOTEL SUITES MANILA AT ACQUA CENTURY LIMITLESS CORPORATION 21ST MEZZANINE 1410G A1-16
PARTNERS & ASSOCIATES Architectural Urbanism Design BRGY. HULO, MANDALUYONG CITY
21ST FLOOR PACIFIC STAR BLDG., SEN. GIL PUYAT AVE.
(MEPFS) FLOOR PLAN
PRC No. 7799 Validity JAN. 15, 2021 COR. MAKATI AVE., MAKATI CITY 1200 PHILIPPINES
7th Floor, Strata 100 Bldg., Emerald Avenue, Ortigas Center, Pasig City, Philippines
since IAPOA No. 04096-228591072418 OR No. 256263 Date JUNE 14, 2019
DRAWN BY MUV/KAM DATE
Tel. (632) 631-2878; (632) 631-2888 Fax (632) 631-2806
1972 PTR No.
Place
3118533
PASIG CITY
Date
TIN
JAN. 08, 2019
107-321-379 CHECKED BY MUV ISSUED
0
400
E1 50 250 50 50
50 50 50 50 50 50 50

0
10
50

0
10

50
50

ACCU

0
20
STAIR 1
D1

O
CL
D UP
AC AC AC AC AC AC AC
STAIR 1 DN

0
CHASE SUPERIOR
1

50
50
50

FIRE O STANDARD STANDARD STANDARD STANDARD STANDARD STANDARD STANDARD


CL 2 3 4 5 6 7 8
PRO
0
50

0
100

0
C1
50

DN AC
AC UP

CLO

CLO

CLO
CLO

CLO

CLO

CLO
STAIR 2

50
CHASE 0
29750

DELUXE R5
18

CHASE CHASE CHASE CHASE


C CHASE

200
CORRIDOR PREMIER
EL.+103.35M
9

50
50

CHASE CHASE CHASE


ELEC. ROOM ELEC. ROOM
50 CL CHASE
B O

150
0
AC
0 0

CLO
CLO A1-21
A1-34
SERVICE LIFT 2
LOBBY
57 RESIDENTIAL
00
50

50
MACHINE ROOM
12 SERVICE LIFT LIFT RESIDENTIAL
STANDARD STANDARD STANDARD STANDARD STANDARD STANDARD LIFT LOBBY
13 16 15 14 12 11 10
12
0

CLO

CLO

CLO
CLO

CLO
AC
51
A 70
AC AC AC AC AC AC
0
0 0
A1-21 A1-21 A1-21
0
1 A1-33 3 A1-35 A1-36 4

11
0 0 50 2750 3700 50 50 50 50 50 50 0 50 0

50 5900 7400 50 100 50 0 50


400

10 9 8 7 6 5 4 3 2 1

1 32ND FLOOR PLAN


A1-22 A1-22 SCALE: 1:100M

SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION IMPORTANT NOTES:
1. STAKING OF COLUMNS, BEAMS, AND SLABS SHALL BE COORDINATED AND VERIFIED WITH ARCHITECTURAL PLANS AND
DETAILS. DIMENSIONS SHOWN ON STRUCTURAL PLANS ARE FOR DESIGN PURPOSES ONLY. CONSTRUCTION LAYOUT
SHOULD FOLLOW ARCHITECTURAL ALIGNMENTS. SHOULD CONFLICT OCCUR BETWEEN STRUCTURAL AND ARCHITECTURAL
PLANS, REFER THE MATTER TO THE ARCHITECT FOR FINAL DECISION AND APPROVAL.
2. COORDINATE WITH OTHER TRADES.
3. VERIFY ACTUAL CONDITION ON SITE.

PROJECT TITLE : OWNER : SHEET CONTENTS : PROJ. NO.: SHEET NO:


TH
year
R. VILLAROSA ARCHITECTS ROY A. VILLAROSA
REGISTERED ARCHITECT
DESIGN CONSULTANT:

BroadwayMalyan BM NOVOTEL SUITES MANILA AT ACQUA CENTURY LIMITLESS CORPORATION 1410G A1-22
PARTNERS & ASSOCIATES Architectural Urbanism Design BRGY. HULO, MANDALUYONG CITY
21ST FLOOR PACIFIC STAR BLDG., SEN. GIL PUYAT AVE.
32ND FLOOR PLAN
COR. MAKATI AVE., MAKATI CITY 1200 PHILIPPINES
PRC No. 7799 Validity JAN. 15, 2021
7th Floor, Strata 100 Bldg., Emerald Avenue, Ortigas Center, Pasig City, Philippines
since IAPOA No. 04096-228591072418 OR No. 256263 Date JUNE 14, 2019
DRAWN BY MUV/KAM DATE
Tel. (632) 631-2878; (632) 631-2888 Fax (632) 631-2806
1972 PTR No.
Place
3118533
PASIG CITY
Date
TIN
JAN. 08, 2019
107-321-379 CHECKED BY MUV ISSUED
00
26
37144
E1 24980 11461
17480 2800 3400 1300 3200
LI
NE
E OF
AC
STAIR - 1 LI P
NE AT
O PA LINE OF ACP AT PARAPET
LI F RA
NE PA
O R P ET LINE OF PARAPET
4150

4150
00
F AP
W

98
AL ET
L
BE
LO
W
D1 DN.
D

PIPE CHASE STAIR - 2


LI
NE
OF
LI
NE AC
P
O
LINE O
F F AT
FIRE PRO WALL B PA PA
ELOW RA RA
VE

POTABLE WATER PE PE
O
AB

CT MAKE-UP TANK T T
ET

200m³
8750

8750
03

P
O
70

RA
RO

PA

C1 POTABLE WATER
F

W
AT
O

LO

PUMP ROOM
AL ET
NE

MAKE-UP LINE DN.


BE
AC

AP
LI

L
F

PROPOSED LOCATION
PA
O

W
NE

OF ELECTRICAL ROOM
O

F
LI

O
29750

NE

ROOF DECK
N
LI

LI

21394
C
CT MAKE
3050

3050
UP WATER ROOF DECK
TANK
20
47
COOLING TOWER A1-28
B 30
A1-34
03
2
SERVICE LIFT RESIDENTIAL LIFT
LI
NE MACHINE ROOM
OF MACHINE ROOM
LI
NE PA
OF RA
PE

6800
6800

AC UP UP
P T
12 AT
PA
13 RA
12 PE ROOF DECK
0 51 T
70

LINE OF WALL BELOW


LINE OF PARAPET
LINE OF PARAPET LINE OF ACP AT PARAPET
A LINE OF ACP AT PARAPET

1-28 A1-28 A1-28

1
1-33
3
A1-35
A1-36 4
11
6060 2750 4246 7004 8411

900 1850 5900 7400 7400 8050 3200 1800 5069 839
42408

10 9 8 7 6 5 4 3 2 1

1 ROOF DECK FLOOR PLAN


A1-27 A1-27 SCALE: 1:100M

SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION SYMBOL DATE DESCRIPTION IMPORTANT NOTES:
1. STAKING OF COLUMNS, BEAMS, AND SLABS SHALL BE COORDINATED AND VERIFIED WITH ARCHITECTURAL PLANS AND
DETAILS. DIMENSIONS SHOWN ON STRUCTURAL PLANS ARE FOR DESIGN PURPOSES ONLY. CONSTRUCTION LAYOUT
SHOULD FOLLOW ARCHITECTURAL ALIGNMENTS. SHOULD CONFLICT OCCUR BETWEEN STRUCTURAL AND ARCHITECTURAL
PLANS, REFER THE MATTER TO THE ARCHITECT FOR FINAL DECISION AND APPROVAL.
2. COORDINATE WITH OTHER TRADES.
3. VERIFY ACTUAL CONDITION ON SITE.

PROJECT TITLE : OWNER : SHEET CONTENTS : PROJ. NO.: SHEET NO:


TH
year
R. VILLAROSA ARCHITECTS ROY A. VILLAROSA
REGISTERED ARCHITECT
DESIGN CONSULTANT:

BroadwayMalyan BM NOVOTEL SUITES MANILA AT ACQUA CENTURY LIMITLESS CORPORATION ROOF DECK FLOOR PLAN 1410G A1-29-B
PARTNERS & ASSOCIATES Architectural Urbanism Design BRGY. HULO, MANDALUYONG CITY 21ST FLOOR PACIFIC STAR BLDG., SEN. GIL PUYAT AVE.
7th Floor, Strata 100 Bldg., Emerald Avenue, Ortigas Center, Pasig City, Philippines PRC No. 7799 Validity JAN. 15, 2018 COR. MAKATI AVE., MAKATI CITY 1200 PHILIPPINES
since IAPOA No. 04096-113064-020714 OR No. 113064 Date FEB. 07, 2014 DRAWN BY MUV/KAM DATE
Tel. (632) 631-2878; (632) 631-2888 Fax (632) 631-2806
1972 PTR No.
Place
9875832
PASIG CITY
Date
TIN
JAN. 12, 2015
107-321-379 CHECKED BY MUV ISSUED

You might also like