You are on page 1of 1

TEST PAPER

Name __________ Date ________


Designation __________ Time 03 hours
Total Marks 100

1. GT Fuel Oil System drawing with set points

2. What is the purpose of the turning gear and Turning Gear Operation procedure from zero

speed?

3. What are the protections of GT & ST?

4. On what BMS Load we get permissive for Economizer 2A & 2B put into service. What steps

you will take to get Economizers into service manually

5. Write the purpose of Chemicals used in Demin plant, CT & HRSG

6. Write Logic & Isolation of HP Feed water pump.

7. Write Permissive & Protection of BMS System

8. Why we need of Vacuum in condenser? What are the causes of vacuum loss

9. Write the purpose of ST Membrane valve, OPC system & ST HP Oil pump.

10. Write purpose and Logic of HP bypass and HP Steam Vent valve

11. Draw the single line diagram of GIS System, 11kv and 415 v BB including their incoming

supply sources

12. Write the purpose & Logic of Fire Fighting Pumps.

13. What is function of Cooling Tower & which type of Cooling Tower in EPQL

14. What is FF Deluge valve & where we are using deluge system in our plant

15. What is the purpose of EDG, BSDG & RDG

16. Write the function of the followings:

a. DCS
b. NMS
c. PA System
d. Fire Alarm System
e. HRSG’s CBD, IBD & EBD
f. Oily Waste water System

You might also like