Q1 1 LOT OF PIPING SYSTEM CONSIST OF:

No. Descriptions Specifications Insulations

1 Main H.P. Steam Piping c/w Insulation & cladding API Carbon Steel 50mm thk Rockwool
Sch 80 Pipes c/w about 0.4-0.5mm
thk plain Aluminium
2 Main L.P. Steam Piping c/w Insulation & cladding API Carbon Steel 50mm thk Rockwool
Sch 40 Pipes c/w about 0.4-0.5mm
thk plain Aluminium
3 Steam Condensate Piping API Carbon Steel NIL
Sch 40 Pipes
4 Crude Oil Piping, Sludge Piping (e.g. Start from Stainless Steel NIL
Sand Trap Tank, in Clarification Station, up to Sch 10 Pipes
Sludge Pit) (Unless Specified)
5 Pure Oil Piping (e.g. All Incoming & Outgoing API Carbon Steel NIL
Piping from Pure Oil Tank and to Vacuum Drier, Sch 40 Pipes
Float Tank, CPO Tank, CPO Despatch c/w
Recycling, etc.
6 Sterilizer Condensate Piping (e.g. From Vertical Stainless Steel NIL
Sterilizer Bottom Condensate Outlet to Sterilizer Sch 10 Pipes
Condensate Blowoff / Blowdown Chamber, Drain
to Condensate Pit, and Incoming & Outgoing
Piping for the Condensate Pit Pump, etc.)
7 Water Piping (Raw) (e.g. From River to Water OD225mm HDPE PN10 NIL
Reservoir [Max 200m run, and From Water Pipes – Max 600m run
Reservoir to Untreated Overhead Water Tank [Max (For underground], G.I
400m run) “B” Pipes (6” & below)
and G.I JIS Pipes (For 8”
& Above) (For Above
Ground)
8 Water Piping (Cold Water - Treated) (e.g. In Water G.I “B” Pipes (6” & NIL
Treatment Plant and to Mill) 2 individual piping to below) and G.I JIS Pipes
mill from Treated Overhead Water Tank which (For 8” & Above)
means 1 piping for Boiler Water Treatment & 1
piping for Mill Process Use)
9 Water Piping (Cold Water - Untreated) (e.g. From GI “B” Pipes and/or PVC NIL
Untreated Overhead Water Tank to Mill for Pipes
Washing)
10 Water Piping (Cold Water - Treated) (e.g. From HDPE PN10 Pipes (For NIL
Treated Overhead Domestic Water Tank to Mill underground)/ G.I “B” /
Office, Toilet Only) [Within Mill Compound – Supply PVC Pipes (For Above
main piping outside the office / toilet only] Ground] – Max 600m run
*Tap from outside main pipe to office / toilet by
others
11 Water Piping (Cold Water – Treated) (e.g. Excluded Excluded
Domestic Water Supply from Domestic Water
Pump to Estate / Housing Area)
12 Hot Water Piping GI “B” / API Sch 40 NIL
Pipes
13 Compressed Air Piping GI “B” / API Sch 40 NIL
Pipes / Ungalvanized
Black steel tubes /
Copper Tube / PVC
Flexible Air Hose / P.U
Air Hose
14 Diesel Piping GI “B” / API Sch 40 NIL
Pipes / Ungalvanized
Black steel tubes
15 Effluent Piping (e.g. From Sludge Pit to Cooling OD160mm HDPE PN16 NIL
Pond No.1) Pipes – Max 230m run
16 Effluent Pond Interconnecting Circulation / OD160mm & OD110mm NIL
Recycling Piping (e.g. Within Effluent treatment HDPE PN10 Pipes –
Plant) Max 1,000m run
17 Effluent Piping (Final Discharges to River) Excluded Excluded
18 Waste Water Piping (e.g. From Hydrocyclone & OD90mm HDPE PN10 NIL
Claybath Waste Water Pit to Effluent Pond) Pipes – Max 300m run
19 Piping to, within and outgoing from KCP Excluded Excluded
20 Pipe support(s) and/or gantry(es) within mill Mild Steel Channel / NIL
compound Angle / RHS / Pipe / To
suit

Valve, Fitting, Gauge Unit : Included

The following are excluded & should supply by others:


1) All excavation works & backfill for piping laying underground level.
2) All necessaries piling works & footing for piping support.
3) All necessaries steel pipes / precast concrete pipe culverts for piping pass-through under the
road / bridge.

Remarks:
1) Above are exclude piping system for recovery EFB liquor oil. The scope of supply and
specification, please refer to EFB oil recovery station.
2) Above are exclude fire fighting piping. The scope of supply ab specification, please refer to fire
fighting equipment & piping section.
Q2 FLOW METER

No Description Location Qty

1) Production Oil Flow Meter (Max 3”) After Vacuum Oil Dryer (For CPO) 1 unit

2) Production Oil Flow Meter (Max 3”) After Vacuum Oil Dryer (For KCPO) 1 unit

3) Oil Despatch Flow Meter (Max 4”) CPO Despatch 1 unit

4) Oil Despatch Flow Meter (Max 4”) KCPO Despatch 1 unit

5) Raw Water Flow Meter (Max 6”) Before Water Clarifier 1 unit

6) Water Flow Meter (Max 4”) For Boiler Water Treatment 1 unit

7) Diesel Flow Meter (Max 1”) After Diesel Storage Tank 1 unit

8) Raw Effluent Flow Meter (Max 4”) Toward Effluent Treatment Plant 1 unit

9) Effluent Final Discharge Flow Meter Final Discharge to River Excluded