You are on page 1of 1

8.T12.15-150.

B1

35.T10.09-150.B2
27.T10.10-150.T2

13.T10.08-300.T2
8.T12.14-150.T1 HOSTEL HOSTEL HOSTEL HOSTEL HOSTEL HOSTEL HOSTEL

A B C D E F G

STG.
15

150
0
8.T12.13-150.B1
HOSTEL
350dp x 200 BEAM 'b1a' (400dp x 200)
1

150

(3)
650

650
300 (9) (9) (9) (9)
T2 36.T12.12-1/R.T1
-3 00. 2 ABR.

225

225
5
8.T12.12-150.T1 0-0 0.B
). T1 05-30 (5) (3) 8.T10.07-300.T1
3 .
8.T12.11-150.T1 (3+ .T10
12 SFL: +6.00

(27)
A A
BRC A142 FFL: +3.00
BRC A142 26.T10.06-150.B1
ANTI-CRACK ANTI-CRACK

BEAM 'b1d' (400dp x 200)

BEAM 'b1d' (400dp x 200)

BEAM 'b1d' (400dp x 200)

BEAM 'b1d' (400dp x 200)


BEAM 'b1c' (350dp x 200)
BRC A142 MESH MESH

lab
ANTI-CRACK SFL: +6.00 SFL: +6.00

ds
750 650
MAIN STAIR: SECTION A-A THRU MESH FFL: +3.00 FFL: +3.00

oli
150

ks
FLIGHTS 3 AND 5 (1:25)

hic
8.T12.10-150.B1 1400
40.T12.13-150.B1

0t

(5)
8.T12.09-150.T1

15
ABR.

B
225

225
1400

1400
8.T10.14-300.T1
16.T10.04/05-150.T1

750

750

750
150
ALT.
8.T12.08-150.B1
150

HOSTEL
BEAM 'b1b' (400dp x 200)
150
2

(4)
300

(8)

(5)
(3+ 11.T10.03-150.T1

150
3
12. ).T10
150
SFL: +5.95 STG
T1 - 8.T12.07-150.T1
0.0 05-30 FFL: +2.95
5-3 0
00. .T2 HOSTEL
B2 8.T12.06-150.T1 3 BEAM 'b1b' (400dp x 200)

750

750
8.T10.15-300.B2 (14) (14) (14) (14) 56.T10.03-300.T1

lab
STG.

1400

1400
225

225
ds
4.T10.16-300.T2 (2) (2)

B
soli
k
thic
150

BEAM 'b1e' (400dp x 200)


BEAM 'b1d' (400dp x 200)

BEAM 'b1d' (400dp x 200)


MAIN STAIR: SECTION A-A THRU

150
FLIGHTS 2, 4 AND 6 (1:25) (9) (9) (9) (9) 36.T12.02-1/R.B1
450 ABR.
8.T12.04-150.B1
8.T12.03-150.T1 SFL: +6.00 SFL: +6.00 4.T12.01-1/R.B1
BRC A142
BRC A142 FFL: +3.00 FFL: +3.00 ANTI-CRACK
450 ANTI-CRACK
MESH
MESH
15

150

C
0

8.T12.02-150.B1

225

225
(4)
900

650

650
150

300
T2
00. 2
HOSTEL

5 - 3 4
8.T12.01-150.T1 0-0 0.B
T1 05-30 350dp x 200 BEAM 'b1a' (400dp x 200)

C
3 ). .
(2+ .T10
1 1 TYPICAL SUSPENDED FLOOR SLAB PLAN (1:50)
100

7.T12.15-150.B1
05 05 7.T12.14-150.T1 HOSTEL HOSTEL HOSTEL

3 2 3
250

05 05 1400
A142 BRC MESH

150
300 MAIN STAIR: SECTION A-A THRU A142 BRC MESH

150
7.T12.13-150.B1

50

50
HOSTEL FLIGHT 1 (1:25) HOSTEL
100 100
2 1

150
4250
300
T2
00. 2
HOSTEL

A 5 - 3 02 02 02 02 T10 T10 T10 T10


7.T12.12-150.T1 0-0 0.B
T1 05-30

150

150
3 ) . .
7.T12.11-150.T1 (3+ .T10
450

1 2
300 300 225 200 300 300 300 200 225 300 300
150 150
1100

SECTION A-A THRU SUSPENDED SLAB SECTION B-B THRU SUSPENDED SLAB
(1:25) (1:25)
8.T12.01-150
150

General Notes:
ABR. Reinforcement: TRANSMISSION STATUS APPROVAL RETURN STATUS
100

FIRE ESCAPE: SECTION A-A THRU STAIR Do not scale from this drawing.
2500

FLIGHTS 3 AND 5 (1:25). Marked 'T' to be rolled high tensile steel bars of grade
This drawing is copyright and is sent to you in confidence; it 460.
7.T12.10-150.B1 must not be copied, used or disclosed, in whole or in part, to Marked 'R' to be round mild steel bars of grade 250.
7.T12.09-150.T1 HOSTEL
third parties without written permission. It remains the property
of Eng. Justin O. Angiro and must be returned on request. Ground Slabs:
4 A NICO JOA JOA 05.09.2014 SUBMISSION ISSUE 3
A A A142 BRC MESH This drawing is to be read in conjunction with all relevant 100 mm thick load bearing ground floor slab with A142 REV ESTABLISHED CHECKED APPROVED DATE NO.

contract documents.
1100

Mesh fabric(cover 25 top)

50
structural engineer
7.T12.08-150.B1
150

All concrete in contact with the ground to be suitable for use in Allow for polythene DPM under ground floor slab;
the following conditions:
150

In accordance to the Architects drawings, allow for fixing Eng. Justin O. Angiro
450

300 DS-1 (Design Sulfate Class) details on hand rails and parapets HILTI Studs Anchors
T10 T10 ACEC Class AC-1 (Aggressive Chemical HAS M12; Consulting Structural/Civil Engineer
(3+ Environment for Concrete)
3 and Project Manager

150
12. ).T10
150

HOSTEL
Minimum Concrete Cover for:
T1 - 7.T12.07-150.T1 P.O.Box 33109, Kampala.
B 0.0 05-30 Reinforced Concrete (with 20mm aggregates) grades to be:
5-3 0 300 300 225 200 Concrete in contact with the ground to be 40mm. Tel: +256-772-592259
2700 1200 00. .T2 Foundations and ground floor slabs C25 Other Concrete Elements to be 20mm.
B2 7.T12.06-150.T1
Suspended slabs and Stairs C25
PLAN OF MAIN STAIR (1:25) Columns, walls and beams C25 All 200mm thick walls to be constructed before casting of
SECTION C-C THRU SUSPENDED SLAB R.C columns and beams.
HOSTEL HOSTEL (1:25) Mass Concrete to be Grade C15 with 40mm aggregates
3 4
4250
150
HOSTEL

G FIRE ESCAPE: SECTION A-A THRU STAIR Sign.............................................................


FLIGHTS 2, 4 AND 6 (1:25).
architect
450

Arch. Samuel KWESEGAMU.


7.T12.04-150.B1
B. Arch. MSc.Arch.
1000

7.T12.03-150.T1
DESIGN AND ADVISORY CONSULT
8.T12.01-150 P.O. Box 5065, Kampala.
ABR.
150
100

150

7.T12.02-150.B1
2300

project Proposed Girls' Hostel.


150

address
Plot. 9, Oragani Road, Ngora Town Council.
A A 300 T2
-3 00. 2 Eng. Justin OMODING ANGIRO and
5
7.T12.01-150.T1 0-0 0.B
1000

2.T16
T1 05-30
client
) . Mrs. Christine MARGARET ANGIRO.
3 .
(2+ .T10 R08-175

300
1 1 P.O. Box 33109, Kampala.
100
450

drawing title
2.T16
Suspended Floor Plan, Main Stair, Fire
HOSTEL 05 05 RING BEAM Escape Stair and Plan of Ring Beams.
gl SECTION (1:25)
250

project no. discipline drawing no. revision


05 05
2700 1200 1414 STRUC 1.02 A
300 FIRE ESCAPE: SECTION A-A THRU STAIR issue type scale paper size
PLAN OF FIRE ESCAPE STAIR (1:25) FLIGHT 1 (1:25). PLAN OF RING BEAMS (1:100) SUBMISSION SHOWN A1

You might also like