Professional Documents
Culture Documents
B1
35.T10.09-150.B2
27.T10.10-150.T2
13.T10.08-300.T2
8.T12.14-150.T1 HOSTEL HOSTEL HOSTEL HOSTEL HOSTEL HOSTEL HOSTEL
A B C D E F G
STG.
15
150
0
8.T12.13-150.B1
HOSTEL
350dp x 200 BEAM 'b1a' (400dp x 200)
1
150
(3)
650
650
300 (9) (9) (9) (9)
T2 36.T12.12-1/R.T1
-3 00. 2 ABR.
225
225
5
8.T12.12-150.T1 0-0 0.B
). T1 05-30 (5) (3) 8.T10.07-300.T1
3 .
8.T12.11-150.T1 (3+ .T10
12 SFL: +6.00
(27)
A A
BRC A142 FFL: +3.00
BRC A142 26.T10.06-150.B1
ANTI-CRACK ANTI-CRACK
lab
ANTI-CRACK SFL: +6.00 SFL: +6.00
ds
750 650
MAIN STAIR: SECTION A-A THRU MESH FFL: +3.00 FFL: +3.00
oli
150
ks
FLIGHTS 3 AND 5 (1:25)
hic
8.T12.10-150.B1 1400
40.T12.13-150.B1
0t
(5)
8.T12.09-150.T1
15
ABR.
B
225
225
1400
1400
8.T10.14-300.T1
16.T10.04/05-150.T1
750
750
750
150
ALT.
8.T12.08-150.B1
150
HOSTEL
BEAM 'b1b' (400dp x 200)
150
2
(4)
300
(8)
(5)
(3+ 11.T10.03-150.T1
150
3
12. ).T10
150
SFL: +5.95 STG
T1 - 8.T12.07-150.T1
0.0 05-30 FFL: +2.95
5-3 0
00. .T2 HOSTEL
B2 8.T12.06-150.T1 3 BEAM 'b1b' (400dp x 200)
750
750
8.T10.15-300.B2 (14) (14) (14) (14) 56.T10.03-300.T1
lab
STG.
1400
1400
225
225
ds
4.T10.16-300.T2 (2) (2)
B
soli
k
thic
150
150
FLIGHTS 2, 4 AND 6 (1:25) (9) (9) (9) (9) 36.T12.02-1/R.B1
450 ABR.
8.T12.04-150.B1
8.T12.03-150.T1 SFL: +6.00 SFL: +6.00 4.T12.01-1/R.B1
BRC A142
BRC A142 FFL: +3.00 FFL: +3.00 ANTI-CRACK
450 ANTI-CRACK
MESH
MESH
15
150
C
0
8.T12.02-150.B1
225
225
(4)
900
650
650
150
300
T2
00. 2
HOSTEL
5 - 3 4
8.T12.01-150.T1 0-0 0.B
T1 05-30 350dp x 200 BEAM 'b1a' (400dp x 200)
C
3 ). .
(2+ .T10
1 1 TYPICAL SUSPENDED FLOOR SLAB PLAN (1:50)
100
7.T12.15-150.B1
05 05 7.T12.14-150.T1 HOSTEL HOSTEL HOSTEL
3 2 3
250
05 05 1400
A142 BRC MESH
150
300 MAIN STAIR: SECTION A-A THRU A142 BRC MESH
150
7.T12.13-150.B1
50
50
HOSTEL FLIGHT 1 (1:25) HOSTEL
100 100
2 1
150
4250
300
T2
00. 2
HOSTEL
150
150
3 ) . .
7.T12.11-150.T1 (3+ .T10
450
1 2
300 300 225 200 300 300 300 200 225 300 300
150 150
1100
SECTION A-A THRU SUSPENDED SLAB SECTION B-B THRU SUSPENDED SLAB
(1:25) (1:25)
8.T12.01-150
150
General Notes:
ABR. Reinforcement: TRANSMISSION STATUS APPROVAL RETURN STATUS
100
FIRE ESCAPE: SECTION A-A THRU STAIR Do not scale from this drawing.
2500
FLIGHTS 3 AND 5 (1:25). Marked 'T' to be rolled high tensile steel bars of grade
This drawing is copyright and is sent to you in confidence; it 460.
7.T12.10-150.B1 must not be copied, used or disclosed, in whole or in part, to Marked 'R' to be round mild steel bars of grade 250.
7.T12.09-150.T1 HOSTEL
third parties without written permission. It remains the property
of Eng. Justin O. Angiro and must be returned on request. Ground Slabs:
4 A NICO JOA JOA 05.09.2014 SUBMISSION ISSUE 3
A A A142 BRC MESH This drawing is to be read in conjunction with all relevant 100 mm thick load bearing ground floor slab with A142 REV ESTABLISHED CHECKED APPROVED DATE NO.
contract documents.
1100
50
structural engineer
7.T12.08-150.B1
150
All concrete in contact with the ground to be suitable for use in Allow for polythene DPM under ground floor slab;
the following conditions:
150
In accordance to the Architects drawings, allow for fixing Eng. Justin O. Angiro
450
300 DS-1 (Design Sulfate Class) details on hand rails and parapets HILTI Studs Anchors
T10 T10 ACEC Class AC-1 (Aggressive Chemical HAS M12; Consulting Structural/Civil Engineer
(3+ Environment for Concrete)
3 and Project Manager
150
12. ).T10
150
HOSTEL
Minimum Concrete Cover for:
T1 - 7.T12.07-150.T1 P.O.Box 33109, Kampala.
B 0.0 05-30 Reinforced Concrete (with 20mm aggregates) grades to be:
5-3 0 300 300 225 200 Concrete in contact with the ground to be 40mm. Tel: +256-772-592259
2700 1200 00. .T2 Foundations and ground floor slabs C25 Other Concrete Elements to be 20mm.
B2 7.T12.06-150.T1
Suspended slabs and Stairs C25
PLAN OF MAIN STAIR (1:25) Columns, walls and beams C25 All 200mm thick walls to be constructed before casting of
SECTION C-C THRU SUSPENDED SLAB R.C columns and beams.
HOSTEL HOSTEL (1:25) Mass Concrete to be Grade C15 with 40mm aggregates
3 4
4250
150
HOSTEL
7.T12.03-150.T1
DESIGN AND ADVISORY CONSULT
8.T12.01-150 P.O. Box 5065, Kampala.
ABR.
150
100
150
7.T12.02-150.B1
2300
address
Plot. 9, Oragani Road, Ngora Town Council.
A A 300 T2
-3 00. 2 Eng. Justin OMODING ANGIRO and
5
7.T12.01-150.T1 0-0 0.B
1000
2.T16
T1 05-30
client
) . Mrs. Christine MARGARET ANGIRO.
3 .
(2+ .T10 R08-175
300
1 1 P.O. Box 33109, Kampala.
100
450
drawing title
2.T16
Suspended Floor Plan, Main Stair, Fire
HOSTEL 05 05 RING BEAM Escape Stair and Plan of Ring Beams.
gl SECTION (1:25)
250