PRO-FORMA PROPONENT COMPLIANCE MONITORING REPORT (CMR)
The project
consists of 6-basement
parking, 4-storey
shopping mall and on
top of it are four (4)
towers for BPO offices
Project (Tower 1& 2-15 storey, Complied
coverage/limits/
Tower 3- 20 storey and
Tower 4 (Alliance Global
Plaza)-25-storey) with a
gross floor area of
315,954.43 square
meters.
Components Complied
It is provided with
161 commercial units,
75 office units and 2,342
parking slots. It has a
2
ANNEX 3-1
PRO-FORMA PROPONENT COMPLIANCE MONITORING REPORT (CMR)
Submit a revised/
enhanced
Environmental
Monitoring Plan
including the corrected
EQPL entries within
thirty (30 days of receipt
of ECC.
Implement a Social
3
ANNEX 3-1
PRO-FORMA PROPONENT COMPLIANCE MONITORING REPORT (CMR)
Development Program
including employment
priority for qualified local
residents within the
impact areas.
Undertake a continuing
Information, Education and
Communication (IEC) Program
to explain to all stakeholders,
the final approved EMMoP and
the conditions of this ECC as
well as an update of project
status including any significant
changes on the EMMoP, results
of MMT activities and over-all
performance against this ECC
Submit an
Abandonment Plan to
the EMB-NCR at least
30 days prior to the
project’s abandonment.
The plan shall include
rehabilitation
measures/clean-up,
remediation of areas
affected by the project
and proposed
alternative projects in
the area.
That a billboard
containing this message
“Notice to the Public,
this project, High Place
and Office Towers of
ASIAWORLD
CORPORATION has
been issued an
Environmental
Compliance Certificate
4
ANNEX 3-1
PRO-FORMA PROPONENT COMPLIANCE MONITORING REPORT (CMR)
1. A Memorandum of
Agreement (MOA) on
the formation of a Multi-
partite Monitoring Team
and establishment of an
5
ANNEX 3-1
PRO-FORMA PROPONENT COMPLIANCE MONITORING REPORT (CMR)
Environmental
Guarantee Fund and
Environmental
Monitoring Fund shall
be initiated by the
proponent in
coordination with EMB-
NCR and shall be
submitted to the EMB-
NCR for approval within
sixty (60) days from the
receipt of this ECC. The
establishment of
EMF/MMT is for the
duration of construction
phase only.
1. An Environmental
Unit (EU)/ Pollution
Control Officer (PCO)
must be
established/appointed to
handle the environment-
related aspects of the
project in addition to the
monitoring requirements
as specified in the
Environmental
Management Plan
(EMP)/Environmental
Monitoring Plan (EMoP).
Monitor actual project
impacts vis-à-vis the
predicted impacts and
management measures
in the EMP.
6
ANNEX 3-1
PRO-FORMA PROPONENT COMPLIANCE MONITORING REPORT (CMR)
management measures
in the EPRMP.
- Submit semi-annually
an ECC Compliance
Report on or before
August and February of
each year. Each report
must show the summary
of cumulative
performance of
Proponent against
previous year’s
requirements and
commitments
In case of transfer of
ownership of this
project, these same
conditions and
restrictions shall apply,
and the transferee shall
be required to notify the
EMB-NCR within fifteen
(15) days as regards to
the transfer of
7
ANNEX 3-1
PRO-FORMA PROPONENT COMPLIANCE MONITORING REPORT (CMR)
ownership
No other activities
should be undertaken
other than what was
stipulated in the EIS.
Should there be any
planned expansion of
the project beyond the
project description in the
submitted documents;
or any planned change
in the activity request for
an ECC amendments
must be made prior to
implementation of any
project expansion /
modification.
8
ANNEX 3-1
PRO-FORMA PROPONENT COMPLIANCE MONITORING REPORT (CMR)
and
recommendatio
ns in the
Engineering
Geological and
Geohazard
Assessment
Report for the
proposed High
Land
Development
Project.
Ensure compatibility
Condition No.3 of the project
location vis-à-vis
zoning classification
9
ANNEX 3-1
PRO-FORMA PROPONENT COMPLIANCE MONITORING REPORT (CMR)
B. Impact Monitoring
10
ANNEX 3-1
PRO-FORMA PROPONENT COMPLIANCE MONITORING REPORT (CMR)
E. Noise Monitoring
11
ANNEX 3-1
PRO-FORMA PROPONENT COMPLIANCE MONITORING REPORT (CMR)
3) Environmental
Guarantee Fund
TOTALS
A. Compliance Status
B. Environmental Quality Status (applicable only if EQPLs have been set by the
Proponent as its commitment or if opted to be mutually agreed upon by Proponent
with the EMB and other members of the MMT)
V. ATTACHMENTS
_________________________ _________________________
Name/Position Name/Position
_________________________ _________________________
Proponent/Company Name Proponent/Company Name
12
ANNEX 3-1
PRO-FORMA PROPONENT COMPLIANCE MONITORING REPORT (CMR)
_________________________ _________________________
Date Date
13